Engineering Department Fiscal Year 2018 Budget Copyright 2014
City of Dubuque Public Hearings # 4.
ITEM TITLE: Engineering Department Fiscal Year 2018 Budget
Presentation
SUMMARY:
SUGGESTED DISPOSITION:
ATTACHMENTS:
Description Type
Recommended FY18 Engineering CIP Supporting Documentation
Recommended FY18 Engineering OP Supporting Documentation
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type Sanitary Sewer Rehabilitation and Lining DEPARTMENT: 55 TOTAL
Program PROJECT
FD/CIP NO: 710-1637 COST
$ 1,383,742
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 11,733 $ 533,009 Construction $ 350,000 $ 355,000 $ 24,000 $ 110,000 $ 150,000
$ 11,733 $ 533,009 TOTAL $ 350,000 $ 355,000 $ — $ 24,000 $ 110,000 $ 150,000
B. PROJECT FINANCING
$ 11,733 $ 533,009 Sanitary Sewer Construction Fund $ 350,000 $ 355,000 $ 24,000 $ 110,000 $ 150,000
$ 11,733 $ 533,009 TOTAL $ 350,000 $ 355,000 $ — $ 24,000 $ 110,000 $ 150,000
PROJECT DESCRIPTION
This project provides for systematic lining and associated grouting of sanitary sewers throughout the City. FY18 scheduled lining is proposed for Consent Decree
Sewershed 12 including but not limited to the areas of Montrose and Pickett and Alta Vista, in addition to City-wide sanitary sewer rehabilitation needs. FY19
scheduled lining is proposed for Consent Decree Sewershed 7 including but not limited to the areas of Broadway, Central, and Clarke Drive, in addition to City-
wide sanitary sewer rehabilitation needs. Fiscal year budget requests beyond FY19 are subject to change and are dependent on on-going system analysis and
inspection.
JUSTIFICATION
The trenchless lining process, upgrades the City's aging infrastructure to prevent collapses and reduces infiltration problems without the disruption of open cut
sanitary sewer replacement methods. The lining process extends the useful life of existing sanitary sewers.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, functional and self-supporting sanitary
sewer and water pollution control systems, objective 2.1) Support maintaining the integrity of the sanitary system and 2.5) Support minimizing infiltration and inflow
into the collection system and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction of stormwater,
wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best management
practices in the collection and disposal of stormwater and wastewater.
This project is coordinated with work in CIP 7101335 (Sanitary Sewer manhole replacement project) and 7202332 (Storm I&I Brick manhole project).
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
211
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type Sanitary Sewer Manhole Replacement/ DEPARTMENT: 55 TOTAL
Rehabilitation Project PROJECT
FD/CIP NO: 710-1335 COST
$ 487,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 54,573 $ 25,000 Design & Engineering $ 16,000 $ 10,000 $ 10,000 $ 6,000 $ 30,000
$ 229,268 $ 140,774 Construction $ 200,000 $ 90,000 $ 90,000 $ 65,000 $ 400,000
$ 283,841 $ 165,774 TOTAL $ 216,000 $ - $ 100,000 $ 100,000 $ 71,000 $ 430,000
B. PROJECT FINANCING
State Revolving Fund Loan $ 216,000
$ 283,841 $ 165,774 GO Borrowing
Sanitary Sewer Construction Fund $ 100,000 $ 100,000 $ 71,000 $ 430,000
$ 283,841 r$___16_5_,7714 TOTAL r$-2-16,000 $ - $ 100,000 $ 100,000 $ 71,000 $ 430,000
PROJECT DESCRIPTION
This project provides for the replace ment/rehabiIitation of aging and deteriorated sanitary sewer manholes. The design and engineering line item shall provide for
professional engineering services to complete bid and award documents, as necessary. FY18 project funds are scheduled for approximately twenty-five manhole
rehabilitation or replacements throughout the City including manholes in Sewersheds 1 and 14 where sanitary sewer overflows have been documented since 2011.
FY20, FY21, and Beyond FY22 project funds are requested to repair, rehabilitative or replace sanitary sewer manholes per the approved Consent Decree Status
Update Report dated May 2016.
JUSTIFICATION
Under the City's current program of sanitary sewer inspection and maintenance, manholes that are in need of repair or replacement are noted. This project
provides the funding for such repair/replacement as these manholes are located. Manholes that are in need of repair or replacement are a source of Inflow &
Infiltration (I&I) into the sanitary sewer. The replacement/rehabilitation cost of each manhole is approximately $10,000.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, functional and self-supporting sanitary
sewer and water pollution control systems, objective 2.1) Support maintaining the integrity of the sanitary sewer system and Environmental Quality Goal Five: To
assure appropriate control, collection, disposal, and per capita reduction of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4)
Promote a sanitary environment through the implementation of best management practices in the collection and disposal of stormwater and wastewater. This
project is coordinated with Sanitary Sewer CIP 7202332.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
212
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type I & I Reduction Program DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 710-1294 COST
$ 340,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 318,792 $ 244,236 Design & Engineering $ 10,000 $ 1,000 $ 10,000 $ 10,000 $ 10,000
$ 12,804 $ 130,229 Construction $ 100,000 $ 9,000 $ 100,000 $ 100,000 $ 65,000
$ 49,713 $ 8,868 Other
$ 381,309 $ 383,333 TOTAL $ 110,000 $ 10,000 $ - $ 110,000 $ 110,000 $ 75,000
B. PROJECT FINANCING
$ 381,309 $ 383,333 Sanitary Sewer Construction Fund $ 110,000 $ 10,000 $ 110,000 $ 110,000 $ 75,000
$ 381,309 $ 383,333 TOTAL E-110,000 $ 10,000 $ - $ 110,000 $ 110,000 $ 75,000
PROJECT DESCRIPTION
This project provides for an infiltration and inflow identification and elimination program that is consistent with United States Environmental Protection Agency
(EPA) and Iowa Department of Natural Resources (DNR) expectations as outlined in the Consent Decree. It includes the installation and operation of flow meters
and rain gages for a Supervisory Control and Data Acquisition (SCADA) flow monitoring system, physical inspection, smoke testing, dye and flood testing, flow
isolation readings, sewer cleaning and televising, Fats, Oils and Grease inspection, along with reporting and remediation. This also includes some portion of the
cost to repair or modify problems of the collection system that contribute to I&I. This program is consistent with the City's discussion with the United States
Environmental Protection Agency (USEPA) and Iowa DNR. The FY18 Project provides for design and engineering funds for continued expansion of the SCADA
project to all sewersheds. The SCADA permanent metering manhole completion year is scheduled for 2026, based on 30 permanent flow metering sites.The
proposed engineering work would be conducted under a professional engineering services contract tied to installation of the SCADA project. The FY18
construction fund is provided to cover costs of the I&I program, such as new flow metering sites and flow units, software upgrades, smoke and dye testing supplies
and equipment, etc. The proposed construction fund beyond FY18 will be subject to adjustment as the program extends beyond 2017 to remain in compliance with
the Consent Decree.
JUSTIFICATION
Reduction of infiltration and inflow of storm water into the sanitary sewer system reduces the potential for sewer backups during rains and reduces pumping costs
throughout the collection system and enables the treatment plant to operate more efficiently. Project also required to ensure compliance with the Consent Decree.
RELATIONSHIP TO OTHER PROJECTS
This project is one of three designed to identify and eliminate the infiltration and inflow of stormwater and groundwater into the sanitary sewer system. The other
two are 7202332 and 7202333.
This project implements the Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, water pollution control systems,
objective 2.1) Support maintaining the integrity of the sanitary sewer system and Goal Three: To provide, maintain, and improve a safe and functional storm sewer
system, objectives 3.3) Strive to meet all local, state and federal stormwater management standards and regulations, including National Pollution Discharge
213
Elimination System (NPDES) stormwater permit and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction
of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best
management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
214
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type Sanitary Sewer Internal Main - New DEPARTMENT: 55 TOTAL
Developments - Revolving Loan Fund PROJECT
FD/CIP NO: 710-1293 COST
$ 256,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Construction $ 65,000 $ 191,000
$ — $ — TOTAL $ 65,000 $ 191,000 $ — $ — $ — $
B. PROJECT FINANCING
Loan Repayments $ 65,000 $ 191,000
$ — $ — TOTAL $ 65,000 $ 191,000 $ — $ — $ — $ —
PROJECT DESCRIPTION
This program utilizes existing City funds for the City Council's new policy of loaning the cost of internal sewer mains and laterals in new subdivisions for the owner-
occupied residential component. This is a Revolving Loan Fund which is limited by the amount available, and priority will be given to low-to moderate-income
housing developments and Green Subdivisions. Loan repayments will be returned to the program to fund other developments. A subdivision is in the process of
using funds from the program, $140,037.21, and the City has committed to fund sanitary sewer internal main for two other subdivisions through development
agreements: $150,000 and $76,000.
JUSTIFICATION
The program lessens the upfront financial burden of developing a subdivision by loaning the funds required to build the sanitary sewer. The developer is then able
to pay the money back as each lot is sold, with the balance of the loan due after five years.
RELATIONSHIP TO OTHER PROJECTS
This project is part of the City's overall intent to extend services in new growth areas and recently annexed sections of the City and implements the
Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, functional and self-supporting sanitary sewer and water pollution
control systems, objective 2.1) Support maintaining the integrity of the sanitary sewer system and Goal Eleven: To plan for, build, or improve infrastructure systems
to meet anticipated growth and development needs, objectives 11.1) Encourage development and redevelopment in areas where existing infrastructure is
underutilized and 11.7) Work with the Iowa Department of Transportation (IDOT) and the Dubuque Metropolitan Area Transportation Study (DMATS) on the timely
development of new highway and arterial street systems to provide growth potential for the future.
This project also implements the Comprehensive Plan's Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita
reduction of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of
best management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water and Community Design.
215
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type Cedar and Terminal Street Force Mains DEPARTMENT: 55 TOTAL
and Llft Station Assessment and PROJECT
Improvements FD/CIP NO: 710-2606 COST
$ 1,211,400
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 5,229 $ 172,935 Design & Engineering $ 70,000 $ 198,000
$ 11,429 $ 236,807 Construction $ 715,000 $ 1,987,000
$ 16,658 $ 409,742 TOTAL $ 785,000 $ — $ — $ — $ — $ 2,185,000
B. PROJECT FINANCING
$ 152,679 Sanitary Sewer Construction Fund $ 785,000 $ 2,185,000
$ 16,658 $ 257,063 GO Borrowing
$ 16,658 $ 409,742 TOTAL $ 785,000 $ — $
PROJECT DESCRIPTION
This project provides for immediate improvements to Terminal Street Lift Station, Cedar Street Lift Station, and the Cedar and Terminal Force Mains to the Water&
Resource Recovery Center. The original project was developed in FY2015 to examine the force mains first and lift stations second, however due to recent emergency
events at Terminal Street lift station the priority order has shifted to examine Terminal Street Lift Station first. FY 2018 funding is to provide for new dry weather pumps and
a new wet well to handle average daily flows to reduce stress and strain on the larger pumps currently in the lift station which are designed to operate with low flows, the
fund also provides for ancillary improvements including a new gravity sewer connecting the new wet well to the existing lift station influent manhole, a new magnetic flow
meter, a mechanical screen, and hot-tap to the 42" PCCP to allow the system to route without passing through Terminal Street lift station or the valve house. The project
identified beyond FY2022 is for the replacement of the wet weather pumps and motors, replace piping in the drywell, inspection of both the Cedar Street force main to the
valve house and from the valve house at Terminal Street to the WRRC, including all engineering analysis and reports, replace piping inside Terminal Street lift station that
has rusted, and replacement of three sluice gates, complete new hardware and coatings of the lift station along with replacement pluming and electrical improvements.
This project currently does not include funding for any work associated with the repairs or replacement of the force mains or insertion points for future flow rerouting in the
event of force main failure.
JUSTIFICATION
The City has identified necessary improvements along the force main between Cedar Street to Terminal Street Lift Stations and Terminal to the W&RRC, specifically, during
a visual inspection performed by City staff in 2014, the 42 inch diameter force main between Terminal Street Lift Station and the W&RRC was clearly exposed to the river
and possible barge traffic, it is imperative the exposed sections be secured. In addition, work is also required at the lift stations, including replacement of the sluice gates at
Terminal Street Lift Station. This work was budgeted in FY2014, however, the sluice gates cannot be replaced until flow can be re-routed around Terminal Lift Station, this
CIP provides for the design to re-route flow, temporarily suspending operations. During 2016, pump failure at Terminal Street Lift Station resulted in emergency work being
performed and resulted in an immediate need to address issues at the lift station.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, water pollution control systems, objective 2.1)
Support maintaining the integrity of the sanitary sewer system and Goal Three: To provide, maintain, and improve a safe and functional storm sewer system, objectives 3.3)
Strive to meet all local, state and federal stormwater management standards and regulations, including National Pollution Discharge Elimination System (NPDES)
stormwater permit and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction of stormwater, wastewater, solid
216
wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best management practices in the collection and
disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
217
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type 30th and Jackson Sanitary Sewer DEPARTMENT: 55 TOTAL
Reconstruction PROJECT
FD/CIP NO: 710-2720 COST
$ 170,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 20,000
Construction $ 150,000
$ — $ — TOTAL $ 170,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
State Revolving Fund Loan $ 170,000
$ — $ — TOTAL $ 170,000
PROJECT DESCRIPTION:
This project provides for the replacement of an estimated 850 feet of 8-inch diameter clay pipe running through the former H &W site at 30th and Jackson street.
This project is located in Consent Decree Sewershed 10. Design and engineering provides for facility plan development, as necessary, and work associated with
special conditions that may arise from working within a private property, i.e. environmental hazards. Per the Consent Decree USEPA approved Corrective Action
Plan for Sewershed 10, the completion date must occur no later than December 2018.
JUSTIFICATION
This project clay piping has deteriorated to the point that reconstruction is necessary at the site of 30th and Jackson street.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, functional and self-supporting sanitary
sewer and water pollution control systems, objective 2.1) Support maintaining the integrity of the sanitary sewer system and Goal Eleven: To plan for, build, or
improve infrastructure systems to meet anticipated growth and development needs, objective 11.7) Work with the Iowa Department of Transportation (IDOT) and
the Dubuque Metropolitan Area Transportation Study (DMATS) on the timely development of new highway and arterial street systems to provide growth potential
for the future, and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction of stormwater, wastewater, solid
wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best management practices in the
collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES:
This project implements the Sustainable Principles of Clean Water and Native Plants and Animals.
218
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type Marquette Place Sanitary Sewer DEPARTMENT: 55 TOTAL
Improvements PROJECT
FD/CIP NO: 710-2721 COST
$ 225,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 25,000
Construction $ 200,000
$ — $ — TOTAL $ 225,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
Sanitary Sewer Construction Fund $ 225,000
Is — $ — TOTAL $ 225,000 $ — $ — $ — $ — $ —
PROJECT DESCRIPTION:
This project provides for the replacement and possible relocation, if feasible, of 800 feet of 8-inch diameter clay pipe running behind the properties of Marquette
Place. This project is located in Consent Decree Sewershed 10. The design and engineering line item shall provide for professional engineering services to
complete bid and award documents.Per the Consent Decree USEPA approved Corrective Action Plan for Sewershed 10, the completion date must occur no later
than December 2018.
JUSTIFICATION
The 8-inch diameter vitrified clay pipe was installed in 1978 and is located in an area that is challenging to maintain and has deteriorated to the point that
reconstruction is necessary. In addition, several private property structures have encroached onto the sewer easement, and currently the corner of a private deck
sits on top of a manhole adding to maintenance issues.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, functional and self-supporting sanitary
sewer and water pollution control systems, objective 2.1) Support maintaining the integrity of the sanitary sewer system and Goal Eleven: To plan for, build, or
improve infrastructure systems to meet anticipated growth and development needs, objective 11.7) Work with the Iowa Department of Transportation (IDOT) and
the Dubuque Metropolitan Area Transportation Study (DMATS) on the timely development of new highway and arterial street systems to provide growth potential
for the future, and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction of stormwater, wastewater, solid
wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best management practices in the
collection and disposal of stormwater and wastewater.
This project will require coordination with Water Distribution improvements.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES:
This project implements the Sustainable Principles of Clean Water and Native Plants and Animals.
219
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type Sewer Connections-Assistance to Low/ DEPARTMENT: 55 TOTAL
Moderate-Income Residents for PROJECT
Connection to City Sewer FD/CIP NO: 710-1067 COST
$ 75,580
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 8,124 $ 27,456 Other $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
$ 8,124 $ 27,456 TOTAL $ — $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
B. PROJECT FINANCING
$ 8,124 $ 27,456 DRA Distribution $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
$ 8,124 $ 27,456 TOTAL $ — $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
PROJECT DESCRIPTION
This project provides additional assistance to low- and moderate-income residents who are required to hook-up to City sewer because their properties are within
200 feet of public mains.
JUSTIFICATION
Although Community Development Block Grant funds provide approximately $10,000 per year for this type of assistance, at times the need is greater than
available resources and sanitary sewer funding is recommended to augment the block grant program.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, functional and self-supporting sanitary
sewer and water pollution control systems, objective 2.1) Support maintaining the integrity of the sanitary sewer system and Goal Eleven: To plan for, build, or
improve infrastructure systems to meet anticipated growth and development needs, objective 11.7) Work with the Iowa Department of Transportation (IDOT) and
the Dubuque Metropolitan Area Transportation Study (DMATS) on the timely development of new highway and arterial street systems to provide growth potential
for the future.
This project also implements the comprehensive Plan's Infrastructure Goal Four: To promote fair housing opportunity for residents in all city neighborhoods,
objectives 4.1) Provide for effective implementation of existing fair housing programs and 4.3) Monitor, evaluate, and work to minimize federal, state and local
codes and regulations that are possible barriers to development of housing, particularly for persons with disabilities or low income and Goal Five: To assist local
service agencies in providing shelter and semi-independent living for persons in need of supportive services, objective 5.1) Monitor and evaluate homeless and
other special needs populations in order to document needs and design assistance programs.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
220
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type Harlan & Euclid Street Sanitary DEPARTMENT: 55 TOTAL
Reconstruction PROJECT
FD/CIP NO: 710- COST
$ 75,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Construction $ 75,000
$ — $ — TOTAL $ — $ 75,000 $ — $ — $ — $
B. PROJECT FINANCING
Sanitary Sewer Construction Fund $ 75,000
$ — $ — TOTAL $ — $ 75,000 $ — $ — $ — $ —
PROJECT DESCRIPTION:
This project provides for the replacement of 335 feet of 70-year old, 6-inch diameter clay pipe that runs in the alley between Harlan and Euclid Streets with an 8-
inch diameter sewer. Approximately 175 feet of sewer was replaced in 2012 with 8-inch diameter PVC.This project is located in Consent Decree Sewershed 10.
Per the Consent Decree USEPA approved Corrective Action Plan for Sewershed 10, the completion date must occur no later than December 2019.
JUSTIFICATION
The 70 plus year old sewer is at the end of its useful life. With its sub-standard size, the 6-inch diameter pipe has made it difficult to provide reliable sewer service
to homes along the north side of Harlan Street and the south side of Euclid Street.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, functional and self-supporting sanitary
sewer and water pollution control systems, objective 2.1) Support maintaining the integrity of the sanitary sewer system and Goal Eleven: To plan for, build, or
improve infrastructure systems to meet anticipated growth and development needs, objective 11.7) Work with the Iowa Department of Transportation (IDOT) and
the Dubuque Metropolitan Area Transportation Study (DMATS) on the timely development of new highway and arterial street systems to provide growth potential
for the future, and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction of stormwater, wastewater, solid
wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best management practices in the
collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES:
This project implements the Sustainable Principles of Clean Water and Native Plants and Animals.
221
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Sanitary Sewer Business Type Sanitary Sewer External Extensions - DEPARTMENT: 55 TOTAL
Annexation PROJECT
FD/CIP NO: 710-1350 COST
$ 1,480,295
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 17,452 $ 129,000 Design & Engineering
$ 127,897 $ 972,446 Construction $ 233,500 $ 8,310,000
$ 145,349 $ 1,101,446 TOTAL $ — $ — $ — $ 233,500 $ — $ 8,310,000
B. PROJECT FINANCING
$ 145,349 $ 234,446 GO Borrowing
$ 867,000 Sanitary Sewer Construction Fund $ 233,500 L $ 8,310,000
$ 145,349 $ 1,101,446 TOTAL $ — $ — $ — $ 233,500 $ — $ 8,310,000
PROJECT DESCRIPTION
This project provides for City participation in the extension of sanitary sewers into new development areas or recently-annexed areas as part of pre-annexation
agreements. The funds are requested in the fiscal year where the developer has indicated strong interest of development, the requested year is subject to change.
Requested funds shown for Beyond FY22 provides funding for construction, design, and engineering services for sanitary sewer extensions for Middle Road
(Merkes/Pothoff agreements) and Tanglewood subdivision.
JUSTIFICATION
It has been the City's practice in the past to share a percentage of the cost of extending sanitary sewer interceptor or collector lines into new developing sections
of the City or recently-annexed areas of the City. Funds are appropriated on an annual basis in anticipation that developments will need sanitary sewer service..
RELATIONSHIP TO OTHER PROJECTS
This project is part of the City's overall intent to extend services in new growth areas and recently-annexed sections of the City, and implements the
Comprehensive Plan's Infrastructure Goals Two: To provide, maintain and improve cost-effective, functional and self-supporting sanitary sewer and water pollution
control systems, objective 2.1) Support maintaining the integrity of the sanitary sewer system and Goal Eleven: To plan for, build, or improve infrastructure systems
to meet anticipated growth and development needs, objectives 11.1) Encourage development and redevelopment in areas where existing infrastructure is
underutilized and 11.7) Work with the Iowa Department of Transportation (IDOT) and the Dubuque Metropolitan Area Transportation Study (DMATS) on the timely
development of new highway and arterial street systems to provide growth potential for the future.
This project also implements the Comprehensive Plan's Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita
reduction of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of
best management practices in the collection and disposal of stormwater and wastewater.
222
This project is coordinated with work in CIP 7101012 (Annexation Study Implementation) and CIP 7401012
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water and Community Design.
223
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Stormwater Infiltration & Inflow Elimination DEPARTMENT: 55 TOTAL
Program PROJECT
FD/CIP NO: 720-2332 COST
$ 380,083
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 2,342 $ 10,000 Design & Engineering $ 5,000 $ 15,000 $ 15,000
$ 104,768 $ 127,973 Construction $ 20,000 $ 95,000 $ 91,121
$ 107,110 $ 137,973 TOTAL $ — $ — $ — $ 25,000 $ 110,000 $ 106,121
B. PROJECT FINANCING
$ 107,110 $ 137,973 Stormwater Construction Fund $ 25,000 $ 110,000 $ 106,121
$ 107,110 $ 137,973 TOTAL $ — $ — $ — $ 25,000 $ 110,000 $ 106,121
PROJECT DESCRIPTION
This project provides for the elimination of the City's brick sanitary sewer manholes and replacement/rehabilitation of sanitary sewers as needed to eliminate
wastewaters from entering into the stormwater management system.
JUSTIFICATION
Brick manholes are highly susceptible to taking stormwater. And when stormwater gets into the sanitary sewer collection system it can overwhelm the system and
cause the stormwater/wastewater mixture to overflow into local creeks, streams and rivers. The City's NPDES stormwater permit requires the City to eliminate this
discharge in order to protect the biological integrity of the receiving waters. Replacing porous brick manholes with water-tight manholes reduces the flow of
stormwater into the sanitary sewer system and supports the city's efforts to comply with the requirements identified in the USEPA/IDNR/City of Dubuque Consent
Decree.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Two: To provide, maintain and improve cost-effective, functional and self-supporting sanitary
sewer and water pollution control systems, objective 2.1) Support maintaining the integrity of the sanitary and sewer system and Environmental Quality Goal Five:
To assure appropriate control, collection, disposal, and per capita reduction of stormwater, wastewater, solid wastes, and household hazardous wastes, objective
5.4) Promote a sanitary environment through the implementation of best management practices in the collection and disposal of stormwater and wastewater. This
project is also related to CIP#7101294, I&I Reduction Program and CIP#7101350, Sanitary Sewer Manhole Replace ment/RehabiIitation Project.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
224
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Catch Basin Reconstruction DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720-1081 COST
$ 137,020
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 759 $ 9,241 Design & Engineering $ 2,500 $ 10,000 $ 10,000
$ 60,000 Construction $ 12,500 $ 42,020 $ 43,060
$ 759 $ 69,241 TOTAL $ — $ — $ — $ 15,000 $ 52,020 $ 53,060
B. PROJECT FINANCING
$ 759 $ 69,241 Stormwater Construction Fund $ 15,000 $ 52,020 $ 53,060
$ 759 $ 69,241 TOTAL $ — $ — $ — $ 15,000 $ 52,020 $ 53,060
PROJECT DESCRIPTION
This project provides funding for the reconstruction of catch basins. There are approximately 900 curb opening style catch basins throughout the city which were
the standard prior to 1990. This project provides for the replacement of these and other old-style catch basins that are in disrepair within a fifteen year period.
JUSTIFICATION
The current standard catch basin is much more efficient at collecting stormwater than the old -style catch basins. Old catch basins do not collect the desired
amount of street drainage causing unnecessary street flooding. Under some circumstances, the old style catch basins have larger openings that can pose a safety
risk to pedestrians.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objectives 3.1) Support maintaining the integrity of the storm sewer system, 3.2) Support maximizing and maintaining the effectiveness of the City's detention
basins and 3.4) Identify existing and potential flood prone problem areas, and alleviate with appropriate mitigation strategies, where possible, and Environmental
Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction of stormwater, wastewater, solid wastes, and household hazardous
wastes, objective 5.4) Promote a sanitary environment through the implementation of best management practices in the collection and disposal of stormwater and
wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water and Reasonable Mobility.
225
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Storm Sewer Improvements/Extensions DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720-1008 COST
$ 259,316
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 25,117 $ 10,000 Design & Engineering $ 5,000 $ 10,000 $ 10,000
$ 3,216 $ 128,583 Construction $ 25,000 $ 52,400 $ 53,672
$ 28,333 $ 138,583 TOTAL $ — $ — $ — $ 30,000 $ 62,400 $ 63,672
B. PROJECT FINANCING
$ 28,333 $ 138,583 Stormwater Construction Fund $ 30,000 $ 62,400 $ 63,672
$ 28,333 $ 138,583 TOTAL $ — $ — $ — $ 30,000 $ 62,400 $ 63,672
PROJECT DESCRIPTION
This project provides for various storm sewer improvements such as adding storm sewer and catch basins. It also provides for City participation in the extension
of public drainage facilities on private property. The extent of City participation will be limited to the City supplying construction materials on a case-by-case basis
linked to private participation. These monies will only become available on a case-by-case basis, based on benefit to the City.
JUSTIFICATION
This project is an appropriation for City participation in storm sewer construction in new subdivision developments and in existing areas to relieve drainage
problems. Priorities are based upon citizen requests and severity of the problem.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objectives 3.1) Support maintaining the integrity of the storm sewer system and 3.4) Identify existing and potential flood prone problem areas, and alleviate with
appropriate mitigation strategies, where possible and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction
of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best
management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
226
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Storm Sewer General Repairs DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720-1066 COST
$ 473,793
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 69,837 $ 62,000 Design & Engineering $ 15,000 $ 20,000 $ 64,000
$ 66,956 $ 100,000 Construction $ 60,000 $ 80,000 $ 132,323
$ 136,793 $ 162,000 TOTAL $ — $ — $ — $ 75,000 $ 100,000 $ 196,323
B. PROJECT FINANCING
$ 136,793 $ 162,000 Stormwater Construction Fund $ 75,000 $ 100,000 $ 196,323
$ 136,793 $ 162,000 TOTAL $ — $ — $ — $ 75,000 $ 100,000 $ 196,323
PROJECT DESCRIPTION
This project provides for annual unanticipated or emergency repairs to the City's storm sewer system. Design engineering is scheduled to cover a part of the costs
associated with staff members working on storm sewer general repairs.
JUSTIFICATION
This is an annual maintenance and repair project necessary to assure proper operation of the storm sewer system.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objectives 3.1) Support maintaining the integrity of the storm sewer system and Environmental Quality Goal Five: To assure appropriate control, collection,
disposal, and per capita reduction of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment
through the implementation of best management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
227
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Draintile Program DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720-1354 COST
$ 41,210
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 217 $ 3,783 Design & Engineering $ 2,000 $ 3,000 $ 3,000
$ 62,583 Construction $ 18,400 $ 17,810 $ 18,224
$ 217 $ 66,366 TOTAL $ — $ — $ — $ 20,400 $ 20,810 $ 21,224
B. PROJECT FINANCING
$ 217 $ 66,366 Stormwater Construction Fund $ 20,400 $ 20,810 $ 21,224
$ 217 $ 66,366 TOTAL $ — $ — $ — $ 20,400 $ 20,810 $ 21,224
PROJECT DESCRIPTION
This project provides for the installation of draintile to collect sump pump discharge and direct it to a storm sewer where a storm sewer is not available.
JUSTIFICATION
A significant number of homes in Dubuque utilize sump pumps to prevent groundwater damage in their basements. In many instances, sump pump discharge is
directed through the curb into the street. The relatively constant flow of water on streets has resulted in damage to some streets and, in some instances, resulted
in hazardous, slick street surfaces. In 2007 and 2008 over 50 problem areas were identified by citizens.
RELATIONSHIP TO OTHER PROJECTS
This project is related to the I&I Reduction Program in that it provides a place for sump pump discharge other than an illegal sanitary sewer connection. This
project implements the Comprehensive Plan's Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction of
stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.3) Promote a safe and sanitary environment along the city's streets, alleys,
and other properties, Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system, objective 3.4) Identify existing and
potential flood prone problem areas, and alleviate with appropriate mitigation strategies, where possible, and Transportation Goal One: To provide, maintain and
improve safe and efficient movement on the City's street system, objective 1.3) Support maintaining the street system's continuity and safety.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
228
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Wilbricht Lane Detention Basin DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 7202722 COST
$ 50,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 15,000
Construction $ 35,000
$ — $ — TOTAL $ 50,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
Stormwater Construction Fund $ 50,000
Is — $ — TOTAL $ 50,000
PROJECT DESCRIPTION
This project provides for the creation of a new detention basin just south of Wilbricht Lane at Flora Park Drive.
JUSTIFICATION
The storm sewer that conveys stormwater through the area frequently surcharges, impacting multiple homes along Glendale Court. Creation of the detention basin
will mitigate the flooding and prevent the storm sewer from overflowing.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objectives 3.1) Support maintaining the integrity of the storm sewer system and 3.4) Identify existing and potential flood prone problem areas, and alleviate with
appropriate mitigation strategies, where possible and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction
of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best
management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
229
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Van Buren Storm Sewer Outlet DEPARTMENT: 55 TOTAL
Improvements PROJECT
FD/CIP NO: 720-2723 COST
$ 65,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 7,000
Land and R.O.W. $ 3,000
Construction $ 55,000
$ — $ — TOTAL $ 65,000 $B. PROJECT FINANCING
Stormwater Construction Fund $ 65,000
TOTAL $ 65,000
PROJECT DESCRIPTION
Project involves improvements to the outlet of the 72-inch diameter storm sewer that outlets south of Van Buren Street near Hickson Avenue.
JUSTIFICATION
The existing storm sewer outlets into a natural drainage ditch which has become unstable. Without the improvements, the ditch will continue to deteriorate and
undermine both the storm sewer and adjacent private property.
RELATIONSHIP TO OTHER PROJECTS:
This project implements the Comprehensive Plan's Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objectives 3.1) Support maintaining the integrity of the storm sewer system and 3.4) Identify existing and potential flood prone problem areas, and alleviate with
appropriate mitigation strategies, where possible and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction
of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best
management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Clean Water and Native Plants and Animals.
230
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Pennsylvania - Middle Road Culvert DEPARTMENT: 55 TOTAL
Replacement PROJECT
FD/CIP NO: 720-1365 COST
$ 150,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 50,000
Construction $ 100,000
$ — $ — TOTAL $ 150,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
Stormwater Construction Fund $ 150,000
Is — $ — TOTAL $ 150,000
PROJECT DESCRIPTION
The project involves the replacement of the existing large diameter corrugated metal pipe (CMP) culvert that passes stormwater under Pennsylvania/ Middle Road
just west of Radford Road. With the corporate City limits for both Dubuque and Asbury running down the approximate centerline of the road, the existing CMP
culvert is located within each municipal jurisdiction. Both City and Asbury staff have reviewed the condition of the CMP culvert and have agreed that it would be
mutually beneficial to replace the deteriorated culvert. This estimated funding would cover the City's approximate 50% cost share to replace the culvert and the
City of Asbury would cover the other 50% cost.
JUSTIFICATION
The existing corrugated metal pipe culvert is starting to deteriorate and nearing the end of its life-cycle.
RELATIONSHIP TO OTHER PROJECTS
The work would be most cost effective if done in conjunction with street improvements. However, due to the deteriorated nature of the culvert, it may need to be
replaced prior to any planned street work. This project implements the Comprehensive Plan's Infrastructure Element: Goals 3.1 and 3.4.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
231
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type US52 Storm Sewer: 11th Street from Elm DEPARTMENT: 55 TOTAL
to White and White Street from 9th to 11th PROJECT
Street (Street Project) FD/CIP NO: 720-2274 COST
$ 200,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 10,000
Construction $ 190,000
$ — $ — TOTAL $ 200,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
$ —
Stormwater Construction Fund $ 200,000
Is — TOTAL $ 200,000
PROJECT DESCRIPTION
This project allows for the construction of a new storm sewer system to collect stormwater on White Street, and west of White Street, and directing it north to the
11th Street storm sewer that runs east to the 16th Street Detention Basin (Bee Branch Ponding Area).
JUSTIFICATION
Currently, the storm sewer system passes through the 10th and Jackson Street area. The size of the localized storm sewers are not designed to handle the
stormwater that originates from outside the area. As a result, street flooding on 10th Street has occurred during short duration, high-intensity rains.
RELATIONSHIP TO OTHER PROJECTS
This project is to be done with the US52 Phase III resurfacing project.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water, Community Health and Safety, and Reasonable Mobility.
232
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type US52 Storm Sewer: Central Ave from 9th DEPARTMENT: 55 TOTAL
to 21 st Street (Street Project) PROJECT
FD/CIP NO: 720- COST
$ 100,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 10,000
Construction $ 90,000
$ — $ — TOTAL $ — $ 100,000 $ — $ — $ — $
B. PROJECT FINANCING
$ —
Stormwater Construction Fund $ 100,000
Is — TOTAL $ — $ 100,000
PROJECT DESCRIPTION
This project provides for the reconstruction of storm sewer and associated catch basins in conjunction with the resurfacing of Central Avenue from 9th to 21st
Street.
JUSTIFICATION
Upgrading and replacing aging storm sewers and catch basins is most cost effective when done in conjunction with street work.
RELATIONSHIP TO OTHER PROJECTS
This project is to be done with the US52 Phase IV resurfacing project along Central Avenue from 9th to 21 st Street.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water, Community Health and Safety, and Reasonable Mobility.
233
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type University Ave Storm Sewer DEPARTMENT: 55 TOTAL
Reconstruction (Street Project- EW PROJECT
Corridor Study) FD/CIP NO: 720- COST
$ 175,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Construction $ 175,000
$ — $ — TOTAL $ — $ — $ — $ — $ 175,000 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 175,000
$ — $ — TOTAL $ is — $ — $ 175,000 $ —
PROJECT DESCRIPTION
This project provides for the relocation, reconstruction, and extension of storm sewer as necessary due to the construction of the three roundabouts on University
Avenue outlined in the East/West Corridor Study.
JUSTIFICATION
The construction of roundabouts requires the relocation and possible improvements to the existing storm sewer system along University Avenue between Loras
Boulevard and Pennsylvania Avenue.
RELATIONSHIP TO OTHER PROJECTS
This project is related to the East/West Corridor Study Street Project CIP.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water, Community Health and Safety, and Reasonable Mobility.
234
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Century Drive Storm Sewer DEPARTMENT: 55 TOTAL
Reconstruction (Street Project) PROJECT
FD/CIP NO: 720- COST
$ 127,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 12,000
Construction $ 115,000
$ — $ — TOTAL $ — $ — $ — $ 127,000 $ — $
B. PROJECT FINANCING
Stormwater Construction Fund $ 127,000
$ — $ — TOTAL $ — $ — $ — $ 127,000
PROJECT DESCRIPTION
This project provides for the reconstruction and upgrading the storm sewer system along Century Drive from US20 1,200 feet to the north to the western Kennedy
Mall entrance.
JUSTIFICATION
Upgrading and replacing the existing, aging storm sewer system and catch basins serving Century Drive is warranted and done most cost effectively when done in
conjunction with planned street work.
RELATIONSHIP TO OTHER PROJECTS
This project is related to the Century Drive Street Reconstruction CIP.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water, Community Health and Safety, and Reasonable Mobility.
235
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Saint Anne Drive Storm Sewer Extension DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720- COST
$ 62,500
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 7,500
Construction $ 55,000
$ — $ — TOTAL $ — $ — $ — $ — $ 62,500 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 62,500
Is — $ — TOTAL $ — $ — $ — $ — $ 62,500 $ —
PROJECT DESCRIPTION
Project involves the extension of 260 feet of 15-inch diameter storm sewer on Saint Anne Drive at Avalon Road and to the east. The work includes the construction
of additional storm sewer intakes at the intersection of Saint Anne and Avalon.
JUSTIFICATION
Extension of the storm sewer will improve the drainage on Saint Anne Drive, Bristol Drive, and Pennsylvania Avenue (at Bristol). It will also allow for the installation
of drain tile to eliminate icing at the Saint Anne and Avalon intersection.
RELATIONSHIP TO OTHER PROJECTS
This project is related to the Drain Tile Extension Program (CIP#7201354).
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Clean Water and Native Plants and Animals.
236
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Northwest Arterial Detention Basin DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720- COST
$ 48,500
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 11,000
Construction $ 37,500
$ — $ — TOTAL $ — $ — $ — $ — $ 48,500 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 48,500
Is — $ — TOTAL $ — $ — $ — $ — $ 48,500 $ —
PROJECT DESCRIPTION
This project provides for the installation of an energy dissipation, let-down structure where stormwater flows into the NW Arterial Detention Basin from the west.
JUSTIFICATION
Currently, stormwater from the west flows down into the detention basin over a rip-rap (rock) flume. On multiple occasions over the past few years, the stormwater
flows have washed away the rip-rap and caused erosion and damage to the detention basin and the repair costs have become increasingly excessive.
Construction of the energy dissipation, let-down structure will eliminate the recurring erosion and maintenance issues.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objectives 3.1) Support maintaining the integrity of the storm sewer system and 3.4) Identify existing and potential flood prone problem areas, and alleviate with
appropriate mitigation strategies, where possible and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction
of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best
management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
237
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Key Way Drive Outfall and Storm Sewer DEPARTMENT: 55 TOTAL
Replacement Project PROJECT
FD/CIP NO: 720- COST
$ 30,100
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 5,000
Construction $ 25,100
$ — $ — TOTAL $ — $ — $ — $ — $ 30,100 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 30,100
Is — $ — TOTAL $ — $ — $ — $ — $ 30,100 $ —
PROJECT DESCRIPTION
This project provides funds for the repair of approximately 64 linear feet of 48 inch diameter storm sewer located at the outfall adjacent to Key Way Drive. The
project is subject to access issues, so costs include site access and site restoration as necessary. The area is residential.
JUSTIFICATION
In response to a Public Works request and site investigation the storm sewer sections scheduled for replacement were seen to be significantly eroded and beyond
repair.
RELATIONSHIP TO OTHER PROJECTS
The project implements the Comprehensive Plan' s Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objective 3.1) Support maintaining the integrity of the storm sewer system and Environmental Quality Goal Five: To assure appropriate control, collection, disposal,
and per capita reduction of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the
implementation of best management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
238
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Hillcrest-Rosemont Detention Basin DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720- COST
$ 98,800
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 15,000
Land and R.O.W. $ 15,000
Construction $ 68,800
$ — $ — TOTAL $ — $ — $ — $ — $ 98,800 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 98,800
$ — $ — TOTAL $ — $ — $ — $ — $ 98,800 $ —
PROJECT DESCRIPTION
This project provides for the creation of a new detention basin just north of Hillcrest Road at Rosemont Street.
JUSTIFICATION
As outlined in the Drainage Basin Master Plan, the intersection of Hillcrest Road and Rosemont Street experiences flooding as a result of heavy, intense rains. The
Drainage Basin Master Plan outlined that the most cost effective way to address the flooding was to create a detention basin upstream of the Hillcrest& Rosemont
intersection.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objectives 3.1) Support maintaining the integrity of the storm sewer system and 3.4) Identify existing and potential flood prone problem areas, and alleviate with
appropriate mitigation strategies, where possible and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction
of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best
management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
239
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Copper Field Storm Sewer Extension DEPARTMENT: 55 TOTAL
Project PROJECT
FD/CIP NO: 720- COST
$ 34,700
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 6,000
Construction $ 28,700
$ — $ — TOTAL $ — $ — $ — $ — $ 34,700 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 34,700
Is — $ — TOTAL $ — $ — $ — $ — $ 34,700 $ —
PROJECT DESCRIPTION
This project involves the extension of approximately 150 feet of storm sewer along Copper Field to Mill Run.
JUSTIFICATION
Several homes on Mill Run utilize sump pumps and drain tile to prevent groundwater damage to their homes. The sump pump discharge is directed through the
curb into the street. While curb and gutter is designed to convey storm water, the relatively constant flow of drain tile and sump pump discharge has resulted in
hazardous, slick street surfaces. Extension of the storm sewer will facilitate the extension of drain tile and the interception of the sometimes hazardous discharge.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objectives 3.1) Support maintaining the integrity of the storm sewer system and 3.4) Identify existing and potential flood prone problem areas, and alleviate with
appropriate mitigation strategies, where possible and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction
of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best
management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
240
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Roosevelt Culvert Reconstruction DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720- COST
$ 21,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 5,000
Construction $ 16,000
$ — $ — TOTAL $ — $ — $ — $ — $ 21,000 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 21,000
Is — $ — TOTAL $ — $ — $ — $ — $ 21,000 $ —
PROJECT DESCRIPTION
This project involves the reconstruction of the culvert under Roosevelt Street just east of Peru Road.
JUSTIFICATION
The existing corrugated metal pipe has deteriorated to the point where replacement is appropriate.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Three: To provide, maintain, and improve a safe and functional storm sewer system,
objectives 3.1) Support maintaining the integrity of the storm sewer system and 3.4) Identify existing and potential flood prone problem areas, and alleviate with
appropriate mitigation strategies, where possible and Environmental Quality Goal Five: To assure appropriate control, collection, disposal, and per capita reduction
of stormwater, wastewater, solid wastes, and household hazardous wastes, objective 5.4) Promote a sanitary environment through the implementation of best
management practices in the collection and disposal of stormwater and wastewater.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
241
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Cedar Cross Road Storm Replacement DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720- COST
$ 69,700
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 11,000
Construction $ 58,700
$ — $ — TOTAL $ — $ — $ — $ — $ 69,700 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 69,700
Is — $ — TOTAL $ — $ — $ — $ — $ 69,700 $ —
PROJECT DESCRIPTION
This project involves the replacement of the existing storm sewer on Cedar Cross Road at Crescent Ridge.
JUSTIFICATION
The existing storm sewer is corrugated metal pipe and it has deteriorated to the point where small sink holes form over the pipe.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Element: Goals 3.1 and 3.4.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
242
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Seippel Road Culvert Replacement (Street DEPARTMENT: 55 TOTAL
Project) PROJECT
FD/CIP NO: 720- COST
$ 54,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 8,000
Construction $ 46,000
$ — $ — TOTAL $ — $ — $ — $ — $ 54,000 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 54,000
Is — $ — TOTAL $ — $ — $ — $ — $ 54,000 $ —
PROJECT DESCRIPTION
The project involves the replacement of the existing large diameter culvert that passes stormwater under Seippel Road just south of Commerce Park.
JUSTIFICATION
The existing corrugated metal culvert is starting to deteriorate and nearing the end of its life-cycle.
RELATIONSHIP TO OTHER PROJECTS
The work would be most cost effective if done in conjunction with street improvements. However, due to the deteriorated nature of the culvert, it may need to be
replaced prior to any planned street work. This project implements the Comprehensive Plan's Infrastructure Element: Goals 3.1 and 3.4.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
243
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Keokuk Storm Sewer Extension DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 720- COST
$ 44,600
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 8,600
Construction $ 36,000
$ — $ — TOTAL $ — $ — $ — $ — $ 44,600 $
B. PROJECT FINANCING
Stormwater Construction Fund $ 44,600
Is — $ — TOTAL $ — $ — $ — $ — $ 44,600 $ —
PROJECT DESCRIPTION
This project involves the construction of 15-inch diameter storm sewer from Keokuk Street to the north along the unimproved but platted National Street.
JUSTIFICATION
The existing sewer from Keokuk discharges onto National Street and flows over ground for a few hundred feet before it enters into another section of the City's
storm sewer system network. The current system is susceptible to erosion and maintenance issues and costs.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Element: Goals 3.1 and 3.4.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water.
244
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type 22nd Street/Kaufmann Ave Storm Sewer DEPARTMENT: 55 TOTAL
Improvements (Phase 8 of Bee Branch PROJECT
Watershed Flood Mitigation Project) FD/CIP NO: 264-2690 COST
340-2690 $15,150,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 400,000 $ 450,000 $ 300,000
Construction $ 4,910,000 $ 6,204,000 $ 2,886,000
$ — $ — TOTAL $ 5,310,000 $ 6,654,000 $ 3,186,000 $ — $ — $
B. PROJECT FINANCING
Federal Grant $ 5,310,000 $ 6,190,000
State Flood Mitigation $ 464,000 $ 3,186,000
TOTAL $-5,31—0,000 $ 6,654,000 $ 3,186,000 $
PROJECT DESCRIPTION
This project provides for the installation of a large diameter storm sewer and total reconstruction of the street and utilities along 22nd Street from Elm Street to the
west across Central Avenue up Kaufmann Ave to Kane Street. Due to the size of the storm sewer to be installed, the project requires the complete reconstruction
of the street, traffic control, and public utilities along the entire stretch.
JUSTIFICATION
Stormwater can form what resembles a river running down 22nd Street from Central Avenue to Elm Street. A hydraulic capacity analysis of the Kaufmann Avenue
(22nd Street) storm sewer revealed that the existing storm sewer is insufficient to convey more than a 2-year rain event. Construction of the Bee Branch Creek
Restoration Project just downstream will alleviate this condition somewhat. But in order to alleviate the flooding conditions, it is necessary to increase the size of
the storm sewer.
RELATIONSHIP TO OTHER PROJECTS
This project is Phase 8 of the Bee Branch Watershed Flood Mitigation Project. The Bee Branch Watershed Flood Mitigation Project phases are as follows: Phase 1
- Carter Road Detention Basin, Phase 2 -W.32nd Street Detention Basin, Phase 3 - Historic Millwork District, Phase 4- Lower Bee Branch Creek Restoration,
Phase 5 - Bee Branch Flood Mitigation Gate Replacement Project, Phase 6 - Impervious Surface Reduction (Pervious Pavement Systems), Phase 7 - Upper Bee
Branch Creek Restoration, Phase 8 - 22nd St/Kaufmann Ave Storm Sewer Improvements, Phase 9 - Flood Maintenance Facility, Phase 10 - North End Storm
Sewer Improvements, Phase 11 -Water Plant Flood Protection System, Phase 12 - 17th St/W. Locust Street Storm Sewer Improvements.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water, Community Health, &Safety, and Reasonable Mobility.
245
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Bee Branch Creek Railroad Culverts DEPARTMENT: 55 TOTAL
(Component of Phase 4& Phase 7 of the PROJECT
Bee Branch Watershed Flood Mitigation FD/CIP NO: 264-2690 COST
Project) 720-2690 $19,187,750
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 500,000 $ 500,000
Professional Services $ 50,000
Property Acquisition $ 300,000
Construction $ 8,500,000 $ 9,337,750
$ — $ — TOTAL $ 9,350,000 $ 9,837,750 $B. PROJECT FINANCING
Federal Grant $ 7,750,000 $ 1,250,000
State Revolving Fund Loan $ 1,600,000 $ 8,587,750
is — $ — TOTAL r$ 91
350,000 $ 9,837,750 $ r$----
PROJECT
—PROJECT DESCRIPTION
This project provides for the installation of culverts under the railroad tracks at the Canadian Pacific railroad yard at 506 Garfield Avenue. It includes the installation
of six 8-foot diameter culverts to be tunneled under the railroad tracks. It also includes the construction of 3 12-foot wide by 10-foot high box culverts from Garfield
Avenue to the south to a proposed transition structure where stormwater from the box culverts will join flow from the existing Bee Branch sewer and be directed
into the proposed tunneled culverts and the existing box culverts under the railroad tracks through a proposed outfall structure into the Lower Bee Branch Creek. It
also includes the construction of a 36-inch diameter sanitary sewer from the Lower Bee Branch to the Upper Bee Branch through the railroad property.
JUSTIFICATION
Installation of the new culverts is a critical to mitigating the damage caused by repeated flash flooding in the Bee Branch Watershed. The Drainage Basin Master
Plan predicted that there are over 1,155 homes and businesses in the Bee Branch Watershed at risk of flood damage during heavy rains, flooding and witnessed
firsthand in Dubuque six times since 1999. A subsequent study in 2009 by the Federal Emergency Management Agency (FEMA) identified a flood prone area in
the Bee Branch Watershed impacting 1,373 properties. Of the seven (7) Presidential Disaster Declarations issued between 1999 and 2011 due to the damage
sustained as a result of intense rainfall and flash flooding, six (6) have hit the Bee Branch Watershed particularly hard with estimated damages totaling $69.8
million, or about $5.8 million annually. Once the improvements are implemented, flash flooding experienced within the Bee Branch Watershed will be mitigated and
the annual cost of flood damage will be negligible. The Bee Branch Creek Restoration is the key component of the Watershed Flood Mitigation Project that will
prevent an estimated $582 million in damages over the 100?]year design life of the project, save countless lives, and stop the disinvestment occurring in the
watershed.
RELATIONSHIP TO OTHER PROJECTS
This project is a component of Phase 4 and Phase 7 of the Bee Branch Watershed Flood Mitigation Project. The Bee Branch Watershed Flood Mitigation Project
phases are as follows: Phase 1 - Carter Road Detention Basin, Phase 2 -W.32nd Street Detention Basin, Phase 3 - Historic Millwork District, Phase 4- Lower Bee
Branch Creek Restoration, Phase 5 - Bee Branch Flood Mitigation Gate Replacement Project, Phase 6 - Impervious Surface Reduction (Pervious Pavement
246
Systems), Phase 7 - Upper Bee Branch Creek Restoration, Phase 8 - 22nd St/Kaufmann Ave Storm Sewer Improvements, Phase 9 - Flood Maintenance Facility;
Phase 10 - North End Storm Sewer Improvements, Phase 11 -Water Plant Flood Protection System, Phase 12 - 17th St/W. Locust Street Storm Sewer
Improvements.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water, Community Health, &Safety, and Reasonable Mobility.
247
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type 17th Street Storm Sewer Improvements DEPARTMENT: 55 TOTAL
(Phase 12 of Bee Branch Watershed Flood PROJECT
Mitigation Project) FD/CIP NO: 264-2690 COST
340-2690,
710-2690 $11,181,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 200,000 $ 250,000 $ 150,000 $ —
Construction $ 2,050,000 $ 5,000,000 $ 3,531,000 $ —
$ TOTAL $ — $ 2,250,000 $ 5,250,000 $ 3,681,000 $ — $B. PROJECT FINANCING
Federal Grant $ 2,250,000 $ 350,000 $ — $ —
Stormwater Construction Fund $ 853,525 $ 669,218
State Flood Mitigation $ 4,046,475 $ 3,011,782
is — $ — TOTAL r$--- $ 2,250,000 r$ 5–,250,000 $ 3,681,000
PROJECT DESCRIPTION
This project provides for the construction of a large diameter storm sewer along 17th Street from the Lower Bee Branch Creek to W. Locust Street. Due to the size
of the storm sewer to be installed, the project requires the complete reconstruction of the street, traffic control, and public utilities along the entire stretch.
JUSTIFICATION
The Drainage Basin Master Plan identified multiple locations between W. Locust Street and the Bee Branch Creek Restoration where the existing storm sewer
capacity is not adequate to carry even the 10?-year rainstorm. A problem area was identified at the base of Locust Street and 17th Street where the grade flattens
along the street causing flooding in the area. In addition, stormwater will flow rapidly down 17th Street much like a running river. The expansion of the capacity of
storm sewer inlets and pipes would significantly reduce flooding of streets and adjacent properties within the Locust Street Drainage Subarea.
RELATIONSHIP TO OTHER PROJECTS
This project is Phase 12 of the Bee Branch Watershed Flood Mitigation Project. The Bee Branch Watershed Flood Mitigation Project phases are as follows: Phase
1 - Carter Road Detention Basin, Phase 2 -W.32nd Street Detention Basin, Phase 3 - Historic Millwork District, Phase 4- Lower Bee Branch Creek Restoration,
Phase 5 - Bee Branch Flood Mitigation Gate Replacement Project, Phase 6 - Impervious Surface Reduction (Pervious Pavement Systems), Phase 7 - Upper Bee
Branch Creek Restoration, Phase 8 - 22nd St/Kaufmann Ave Storm Sewer Improvements, Phase 9 - Flood Maintenance Facility, Phase 10 - North End Storm
Sewer Improvements, Phase 11 -Water Plant Flood Protection System, Phase 12 - 17th St/W. Locust Street Storm Sewer Improvements.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water, Community Health, &Safety, and Reasonable Mobility.
248
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 8C
Engineering/Stormwater Business Type Flood Control Maintenance Facility (Phase DEPARTMENT: 55 TOTAL
9 of Bee Branch Watershed Flood PROJECT
Mitigation Project) FD/CIP NO: 720-2609 COST
340-2609 $ 5,921,001
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 260,755 Design & Engineering $ — $ — $ 200,000
Construction $ 3,900,000 $ 260,000
$ 308,100 $ 1,252,146 Land and R.O.W.
$ 308,100 $ 1,512,901 TOTAL $ — $ — $ — $ — $ 4,100,000 $ 260,000
B. PROJECT FINANCING
$ 500,622 Stormwater Construction Fund $ —
$ 308,100 $ 1,012,279 State Flood Mitigation $ — $ — $ 4,100,000 $ 260,000
$ 308,100 $ 1,512,901 TOTAL $ — $ — $ — $ — $ 4,100,000 $ 260,000
PROJECT DESCRIPTION
This project involves the construction of a maintenance facility near 16th and Elm Streets in the vicinity of the Lower Bee Branch Creek Restoration. In addition to
providing work space for City employees assigned to maintaining the Bee Branch Creek Restoration, the facility will provide storage of a boat that will allow access
to every foot of the newly created shoreline. It will also provide public restrooms which will double as a storm shelter for people within the greenway in the event
that severe weather approaches while they are in the mile long corridor. Parking will also be provided as part of the project.
JUSTIFICATION
The Flood Mitigation Maintenance Facility will provide the work space and equipment storage areas necessary to provide adequate maintenance of the Bee
Branch Creek Restoration and the 16th Street Detention Basin and ensure that the facilities are able to function at an optimum level when a flash flood occurs.
RELATIONSHIP TO OTHER PROJECTS
This project is Phase 9 of the Bee Branch Watershed Flood Mitigation Project. The Bee Branch Watershed Flood Mitigation Project phases are as follows: Phase 1
- Carter Road Detention Basin, Phase 2 -W.32nd Street Detention Basin, Phase 3 - Historic Millwork District, Phase 4- Lower Bee Branch Creek Restoration,
Phase 5 - Bee Branch Flood Mitigation Gate Replacement Project, Phase 6 - Impervious Surface Reduction (Pervious Pavement Systems), Phase 7 - Upper Bee
Branch Creek Restoration, Phase 8 - 22nd St/Kaufmann Ave Storm Sewer Improvements, Phase 9 - Flood Maintenance Facility, Phase 10 - North End Storm
Sewer Improvements, Phase 11 -Water Plant Flood Protection System, Phase 12 - 17th St/W. Locust Street Storm Sewer Improvements.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Clean Water and Community Health, & Safety.
249
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Street Construction General Repairs DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-2142 COST
$ 500,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 183,906 $ 141,296 Construction $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
$ 183,906 $ 141,296 TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
B. PROJECT FINANCING
$ 183,906 $ 141,296 Sales Tax Fund (30%) $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
$ 183,906 $ 141,296 TOTAL $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000
PROJECT DESCRIPTION
This project provides funding for an annual program to perform design and construction for general street construction related improvements.
JUSTIFICATION
In prior years, the City had an annual capital improvement budget that would collectively fund all construction related improvements and the 5-Year Annual Street
Construction Program. This policy has been changed and now the Annual Street Construction Program is budgeted as individual CIP's. As a result, an annual
program is needed to provide a funding mechanism to allow for the construction for general street construction repairs and related improvements as miscellaneous
projects develop. The Engineering Department routinely work on miscellaneous repair projects that occur, require a quick response and that are both unexpected
and not budgeted. This annual program will provide a funding source to cover the construction costs for those unanticipated small repair projects.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.1) Support the ongoing street reconstruction, rehabilitation, and maintenance overlay programs, ensuring the timely
maintenance, repair and reconstruction of the city's streets and bridges and Transportation Goal One: To provide, maintain and improve safe and efficient
movement on the City's street system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and
reconstruction of the City street system and 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting,
street layout, speed limits, street signage, street pavement striping, and traffic signals.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
250
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Guardrail Replacement DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1027 COST
$ 55,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 12,592 $ 12,408 Construction $ 15,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
$ 12,592 $ 12,408 TOTAL $ 15,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
B. PROJECT FINANCING
$ 12,592 $ 12,408 Sales Tax Fund (30%) $ 15,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
$ 12,592 $ 12,408 TOTAL $ 15,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
PROJECT DESCRIPTION
This project provides for the installation, replacement, maintenance and/or removal of guardrail. Currently, Guardrail sections under review include Lawther,
Thomas Place, Cedar Cross Rd. and on Burden. Other areas are reviewed based on citizen feedback.
JUSTIFICATION
A majority of the guardrail and guard cable along City streets and walls is substandard in both performance and appearance. This project provides for upgrading
of non-functional, rusted, or misaligned guardrail and guard cable throughout the City.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
251
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Pavement Marking Project DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-2245 COST
$ 870,001
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 81 Design & Engineering
$ 66,982 $ 177,938 Construction $ 135,000 $ 135,000 $ 135,000 $ 85,000 $ 135,000 $ 135,000
$ 67,063 $ 177,938 TOTAL $ 135,000 $ 135,000 $ 135,000 $ 85,000 $ 135,000 $ 135,000
B. PROJECT FINANCING
$ 67,063 $ 162,938 Sales Tax Fund (30%) $ 120,000 $ 120,000 $ 120,000 $ 70,000 $ 120,000 $ 120,000
$ 15,000 IDOT Funding $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000
$ 67,063 $ 177,938 TOTAL $ 135,000 $ 135,000 $ 135,000 $ 85,000 $ 135,000 1$ 135,000
PROJECT DESCRIPTION
This annual reoccurring budget provides for pavement markings on City streets. Markings typically include: centerlines, lane lines, edge lines, curb medians,
diagonal gore markings, crosswalks, stop bars, arrows, word messages, railroad crossings, and disability symbols. In 2016 the City entered into an agreement with
the Iowa DOT to include pavement markings on DOT designated roadway segments within the City and the Iowa DOT would reimburse the City for actual costs
incurred.
JUSTIFICATION
At one time the Public Works owned equipment that allowed City personnel to apply all pavement markings. In the early 1980's the City decided to outsource this
activity because of the high cost of new painting equipment. The Engineering Department took over the responsibility of developing plans and specifications for
this activity along with administering the pavement marking contract.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system and 1.3) Support maintaining the street system's continuity and safety and Goal Three: To facilitate improved four-lane access for surface transportation
from Dubuque to major cities in the region, objective 3.3) Support a street and highway system which meets current and future traffic needs; Infrastructure Goal
Four: To provide, maintain, and improve a cost-effective, safe and functional surface transportation system, objectives 4.2) Identify new technologies, new
materials and new concepts for street maintenance, restoration, and reconstruction and 4.4) Support maintaining and improving city alleys, guardrails, street lights,
traffic control lights, street pavement markings, traffic signs, street name signs, walls and other related facilities; and Public Safety Goal Two: To maintain
appropriate readiness response capabilities in all areas of public safety, objective 2.5) Consider expanding the use of ITS (Intelligent Transportation System)
equipment, including regional partnerships.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
252
253
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works East-West Corridor Capacity DEPARTMENT: 55 TOTAL
Improvements PROJECT
FD/CIP NO: 360-1039 COST
250-1039 300-1039 $10,771,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 50,000 Design & Engineering $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
$ 1,000,000 Consultant Services $ 200,000 $ 240,000 $ 250,000 $ 250,000 $ 250,000
Property Acquisition $ 1,400,000 $ 1,600,000 $ 1,000,000
Construction $ — $ — $ 1,229,000 $ 1,556,000 $ 1,496,000
$ — $ 1,050,000 TOTAL $ 1,650,000 $ 1,890,000 $ 2,529,000 $ 1,856,000 $ 1,796,000 $
B. PROJECT FINANCING
$ 250,000 Sales Tax Fund (30%)
$ 800,000 DMATS STP Funds $ 1,280,000 $ 1,472,000 $ 2,029,000 $ 1,356,000 $ 1,296,000
State Grant $ — $ — $ 450,000 $ 450,000 $ 450,000
Greater Downtown TIF $ 50,396 $ 50,000 $ 50,000 $ 50,000
Road Use Tax $ 370,000 $ 367,604
$ — $ 1,050,000 TOTAL $ 1,650,000 $ 1,890,000 $ 2,529,000 $ 1,856,000 $ 1,796,000 $ —
PROJECT DESCRIPTION
In February 2012, the City Council formally adopted the East -West Corridor Connectivity Study- Final Report and directed City staff to begin implementation
plans for the recommendations contained in the East-West Corridor Connectivity Report. The adopted East -West Corridor Connectivity Study report will act as
the City's Master Plan for both short-term and long-term capacity improvements or corridor modifications to support growing east-west traffic flow in the City. The
study included recommended improvements supporting complete streets concepts, multi-modal transportation, vehicle, pedestrian, bicycle, and recreational
improvements.
The section of University Avenue, from Pennsylvania Avenue to Loras Boulevard, referred to as the "Overlap Section"was recommended for converting the three
intersections along University Avenue to roundabouts. With funds programmed in FY2016 - 2018, the next steps in the design development process are to begin
the preliminary engineering and environmental (NEPA) study phase for the Overlap Section. Once the preliminary engineering and environmental (NEPA) study
are completed, corridor impacts will be identified and property acquisition could begin in approximately FY2018 and would take approximately 3 years to complete.
Once property acquisition is completed within the "Overlap Section", construction to convert the three intersections along University Avenue to roundabouts could
begin in FY2020 and would take approximately 3 years to complete.
JUSTIFICATION
The City Council listed the completion of the East -West Corridor Connectivity Study as a "High-Priority" in its Goals and Priorities for Policy Agenda. The US
Highway 20 corridor is the primary east-west route in the City of Dubuque and future traffic volume projections indicate US Highway 20 alone will not provide
sufficient capacity for east-west travel in the city. Capacity along alternate east-west corridors will need to be improved to provide connectivity between the western
growth areas and the downtown urban core.
254
RELATIONSHIP TO OTHER PROJECTS
This project a transportation priority of the City of Dubuque. This project implements the Comprehensive Plan's Transportation Goal Two: To plan long-range for
both local and regional street and highway systems to ensure safe, efficient access into and through the city and to support urban growth in an appropriate
development pattern, objectives 2.1) Coordinate with regional transportation agencies to maintain and update a long-range transportation plan, 2.2) Coordinate
with regional transportation agencies involved with highway planning and construction, 2.3) Support improving the existing street network to reduce traffic capacity
restraints and improve safety, 2.4) Encourage the involvement of the public in the transportation planning process and 2.5) Plan for aesthetically appealing streets
and highways, with particular focus on gateway opportunities and street tree plantings, Goal Three: To facilitate improved four-lane access for surface
transportation from Dubuque to major cities in the region, objectives 3.1) Encourage public/private partnerships to plan and promote future transportation facilities
with local, regional, state, and federal agencies, 3.2) Cooperate with regional transportation agencies in the development of an improved highway system to serve
the city and 3.3) Support a street and highway system which meets current and future traffic needs.
This Project also implements the Comprehensive Plan's Infrastructure Goal Eleven: To plan for, build, or improve infrastructure systems to meet anticipated growth
and development needs, objective 11.7) Work with the Iowa Department of Transportation (IDOT) and the Dubuque Metropolitan Area Transportation Study
(DMATS) on the timely development of new highway and arterial street systems to provide growth potential for the future, and Economic Development Goal
Three:To concentrate on retaining and expanding existing local businesses, objective 3.5) Encourage maintaining and strengthening Dubuque's position as a
retail center in the trade area, Goal Seven: To maintain and strengthen Dubuque's position as a tourist destination, objectives 7.1) Promote existing attractions,
7.2) Promote a variety of additional year-round tourist attractions and 7.3) Consider recommendations in the Riverfront Plan to add amenities for both citizens and
tourists along the Mississippi River, Goal Eight: To promote and encourage preservation of our historic assets, objective 8.2) Explore ways to remove barriers to
preservation, and Goal Nine: To strengthen the local tax base, objective 9.4) Consider annexing additional land, as necessary and as possible according to smart
growth principles to accommodate future expansion.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Regional Economy and Community Design.
255
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Sidewalk Program - City-Owned DEPARTMENT: 55 TOTAL
Property PROJECT
FD/CIP NO: 300-1425 COST
$ 510,000
2017
2016 ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 48,524 $ 76,476 Construction $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 85,000 $ 85,000
$ 48,524 $ 76,476 TOTAL $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 85,000 $ 85,000
B. PROJECT FINANCING
$ 48,524 $ 76,476 Sales Tax Fund (30%) $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 85,000 $ 85,000
$ 48,524 $ 76,476 TOTAL $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 85,000 $ 85,000
PROJECT DESCRIPTION
This project provides for a multi-year program for the installation and reconstruction of public sidewalks adjacent to City-owned property and City owned
infrastructures, i.e., catch basins, hydrants, signals, financial assistance. This appropriation also provides for tree and tree stump removal when trees are needed
to be removed as part of the reconstruction of the sidewalks. This project may also include the installation and reconstruction of curb ramps which is required by
the Americans with Disabilities Act (ADA).
JUSTIFICATION
The reconstruction of public sidewalks is necessary for the safety of pedestrians and to keep the City's liability to a minimum. ADA requires installation of curb
ramps whenever a sidewalk is repaired at an intersection and if a ramp is not currently constructed.
RELATIONSHIP TO OTHER PROJECTS
This project is tied to the City's annual sidewalk inspection program and provides funding for the repair of sidewalks adjacent to City-owned properties. This
project implements the Comprehensive Plan's Infrastructure Goal Five: To provide for, maintain and improve safe, accessible public sidewalks and steps
throughout the community, where possible, objective 5.1) Support maintaining and improving the condition of public sidewalks, steps, walks, and handrails and
Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and properties, objective 10.2) Support accessibility to City-owned
buildings, structures, facilities and properties. This project also implements the Comprehensive Plan's Land Use and Urban Design Goal Eight: To provide physical
accessibility throughout the city, objective 8.5) Promote assurance with the provision of access to persons with disabilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
256
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Sidewalk Program Related Curb and DEPARTMENT: 55 TOTAL
Catch Basin Replacements PROJECT
FD/CIP NO: 300-1041 COST
$ 360,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 66,680 $ 85,858 Construction $ 70,000 $ 70,000 $ 70,000 $ 70,000 $ 80,000 $ 85,000
$ 66,680 $ 85,858 TOTAL $ 70,000 $ 70,000 $ 70,000 $ 70,000 $ 80,000 $ 85,000
B. PROJECT FINANCING
$ 66,680 $ 85,858 Sales Tax Fund (30%) $ 70,000 $ 70,000 $ 70,000 $ 70,000 $ 80,000 $ 85,000
$ 66,680 $ 85,858 TOTAL $ 70,000 $ 70,000 $ 70,000 $ 70,000 $ 80,000 $ 85,000
PROJECT DESCRIPTION
This project provides for replacement of curbs and catch basins related to the sidewalk inspection and replacement program.
JUSTIFICATION
Replacement of sidewalks, particularly those abutting the curb line or an intersection, frequently requires replacement of curbs and catch basins. It is anticipated
in future years this program will increase with the installation of curb ramps with detectable warnings required by the Americans with Disabilities Act (ADA).
Without funding for replacement of the curbs and catch basins, the program is restricted or delayed until funding can be secured. With funding earmarked for curb
and catch basin replacement, the program can move forward on an established schedule. With an increase in curb and catch basin inspections at time of sidewalk
inspections, additional curb and catch basins are identified for replacement, especially if the street is to be overlaid in the near future. The anticipated cost for curb
and catch basin repairs has been increasing over the past few years and is anticipated to continue when the ramps needing walls, foundations, railings, and
special designs are addressed.
RELATIONSHIP TO OTHER PROJECTS
This project is tied to the City's annual sidewalk inspection program. Curb replacements are also funded in the operating and capital budgets of the Operations
and Maintenance Department. This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective,
safe and functional surface transportation system, objective 4.1) Support the ongoing street reconstruction, rehabilitation, and maintenance overlay programs,
ensuring the timely maintenance, repair and reconstruction of the city's streets and bridges and Goal Five: To provide for, maintain and improve safe, accessible
public sidewalks and steps throughout the community, where possible, objective 5.1) Support maintaining and improving the condition of public sidewalks, steps,
walks, and handrails.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Clean Water.
257
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Sidewalk Inspection Program -Assessable DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 100-1108 COST
$ 183,158
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 3,158 $ 30,000 Construction $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000
$ 3,158 $ 30,000 TOTAL $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000
B. PROJECT FINANCING
$ 3,158 $ 30,000 Special Assessments $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000
$ 3,158 $ 30,000 TOTAL $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000
PROJECT DESCRIPTION
This project provides for the replacement of defective sidewalks by private contractors. City Ordinances#41-102 through#41-105 provide that a property owner
be given a thirty day notice to replace a hazardous or defective sidewalk and, if they fail to do so, the City will have the repair made and the cost assessed to the
property owner.
JUSTIFICATION
In Fiscal Year 1989, the City began an inspection and reconstruction program for City sidewalks. Reconstruction is required on these walks when defective
conditions are found. These funds enable the City to have the reconstruction done by contractors if the property owner does not make the corrections after proper
notice and reasonable time. These costs are then placed as liens against the properties and property tax receipts are collected in the next fiscal year in the
amount of the original expenditure. Past history reflects a higher construction and engineering cost and is reflected in Fiscal Years 2010-2014. Construction cost,
time for completion of contracts, timing of contracts contribute to higher expenses.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Five: To provide for, maintain and improve safe, accessible public sidewalks and steps
throughout the community, where possible, objectives 5.1) Support maintaining and improving the condition of public sidewalks, steps, walks, and handrails and
5.2) Encourage reasonable removal of snow and ice accumulations from public sidewalks, steps, and walks and Public Safety Goal Eight: To provide review and
inspection services that regulate the safe and sanitary construction and maintenance of buildings and structures, objective 8.6) Support continued coordinated
review and inspection services of zoning, housing, building, fire, engineering, health and water codes and regulations for buildings, structures, and sites.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
258
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works ADA Curb Ramp Construction Project DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 260-1236 COST
$ 96,416
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 105 $ 33,311 Construction $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 13,000
$ 105 $ 33,311 TOTAL $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 13,000
B. PROJECT FINANCING
$ 105 $ 33,311 CDBG Grant $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 13,000
$ 105 $ 33,311 TOTAL $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 13,000
PROJECT DESCRIPTION
This project provides funding for the annual program to install accessible curb ramps at existing intersections throughout the City. this project funds the accessible
curb ramps in low to moderate income area only.
JUSTIFICATION
The Americans with Disabilities Act requires the installation of curb ramps with detectable warnings at all intersections throughout the City. This would be a multi-
year program until all installations are completed in compliance with ADA requirements. The regulations require that cities begin a program for compliance with the
installation of curb ramps at all intersections by January 26, 2005, and for those areas where existing pedestrian walkways cross curbs serving state and local
government offices and facilities.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Five: To provide for, maintain and improve safe, accessible public sidewalks and steps
throughout the community, where possible, objective 5.1) Support maintaining and improving the condition of public sidewalks, steps, walks, and handrails and
Land Use and Urban Design Goals Eight: To provide physical accessibility throughout the city, objectives 8.3) Facilitate, where possible, enhanced accessibility
within existing development and 8.5) Promote assurance with the provision of access to persons with disabilities.
A project in the Public Works Department also provides funds in the amount of$30,000 for curb ramp construction.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
259
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Stone Retaining Walls DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1029 COST
350-1029 $ 919,043
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 41,735 Design & Engineering $ 20,000 $ 5,000 $ 10,000 $ 10,000 $ 5,000 $ 10,000
$ 98,560 $ 178,748 Construction $ 255,000 $ 20,000 $ 140,000 $ 90,000 $ 45,000 $ 90,000
$ 140,295 $ 178,748 TOTAL $ 275,000 $ 25,000 $ 150,000 $ 100,000 $ 50,000 $ 100,000
B. PROJECT FINANCING
$ 140,295 $ 178,748 Sales Tax Fund (30%) $ 275,000 $ 25,000 $ 150,000 $ 100,000 $ 50,000 $ 100,000
$ 140,295 $ 178,748 TOTAL $ 275,000 $ 25,000 $ 150,000 $ 100,000 $ 50,000 $ 100,000
PROJECT DESCRIPTION
This annual funding provides for maintenance and repair of existing retaining walls that are owned by or are the responsibility of the City of Dubuque in various
locations throughout the City. This annual program will allow for maintenance, repair and reconstruction of city owned retaining walls as needed. Based on the
recommendation of the City's Legal Department, there are a significant number of private property owner retaining walls which are adjacent to City right-of-way in
which a mutual benefit could be established through litigation, as a result, the annual funding for retaining wall maintenance, repair and reconstruction has been
increased to address this potential liable cost to the City.
JUSTIFICATION
This annual program would provide for proactive maintenance, reconstruction and emergency repairs to city owned retaining walls.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities and Transportation Goal One: To provide, maintain and improve safe and efficient movement on the
City's street system, objective 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the
City street system.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Community Design and Clean Water.
260
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Bridge Repairs/Maintenance DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1258 COST
$ 800,765
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 17,526 $ 15,000 Design & Engineering $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000
$ 308,239 Construction $ 65,000 $ 70,000 $ 80,000 $ 85,000 $ 85,000
$ 17,526 $ 323,239 TOTAL $ 80,000 $ 85,000 $ 95,000 $ 100,000 $ 100,000 $
B. PROJECT FINANCING
$ 17,526 $ 323,239 Sales Tax Fund (30%) $ 80,000 $ 85,000 $ 95,000 $ 100,000 $ 100,000
$ 17,526 $ 323,239 TOTAL $ 80,000 $ 85,000 $ 95,000 $ 100,000 $ 100,000 $ -
PROJECT DESCRIPTION
The City currently has 18 bridge structures under it's jurisdiction. This annual program provides for the biannual bridge inspection (a new Federal requirement),
bridge program management and periodic preventative maintenance and repairs to the various bridges throughout the City. The Bridge Repair and Maintenance
program includes painting, repair of spalled areas in the concrete deck, piers, wingwalls and barrier rail. Program funding is also used for the sealing of hairline
cracks to prevent deterioration of reinforcing steel, maintain and repair expansion joints, and the repairs to armoring stone at abutments, inlet and outlet structures
to prevent scour and undermining.
JUSTIFICATION
The City's bridges are inspected every two years. The last inspection, dated August 2013, indicated that several of the City's bridges require minor repairs. As a
result of the new federal bridge inspection standards, the annual Bridge Repair and Maintenance program funding has been increased to allow for the preventative
maintenance and repairs to the various bridge structures throughout the City, as needed.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objectives 4.1) Support the ongoing street reconstruction, rehabilitation, and maintenance overlay programs, ensuring the timely
maintenance, repair and reconstruction of the city's streets and bridges and 4.5) Support extending the life and improve the quality of the city street system
through preventative maintenance programs and Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objective 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
261
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Decorative Concrete Maintenance DEPARTMENT: 55 TOTAL
Program PROJECT
FD/CIP NO: 300-1630 COST
$ 100,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 3,713 $ 71,287 Construction $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000
$ 3,713 $ 71,287 TOTAL $ 25,000 $ — $ 25,000 $ 25,000 $ 25,000 $ 25,000
B. PROJECT FINANCING
$ 3,713 $ 71,287 Sales Tax Fund (30%) $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000
$ 3,713 $ 71,287 TOTAL $ 25,000 $ — $ 25,000 $ 25,000 $ 25,000 $ 25,000
PROJECT DESCRIPTION
This annual program provides funding to the Decorative Concrete Maintenance Program to perform preventative maintenance, cleaning, sealing and the repair of
decorative concrete pavement at the Mississippi Riverwalk, Alliant Amphitheater, River's Edge Plaza, Ice Harbor West Road, Grand River Center, Main Street,
Peosta Channel Trail, Flat Iron Park, City Hall, Chamber Building Plaza Area, and the Locust and 5th Street Gateway Locations.
JUSTIFICATION
To maintain the quality appearance and integrity of the decorative concrete surface. An annual maintenance program is needed to remove dirt, oils, stains and
apply a new protective sealer on the surface.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Five: To provide for, maintain and improve safe, accessible public sidewalks and steps
throughout the community, where possible, objective 5.1) Support maintaining and improving the condition of public sidewalks, steps, walks, and handrails; Goal
Seven: To provide, maintain and improve the floodwall, harbors, fishing piers, and boat docks and ramps for industrial, commercial, and recreational use of the
riverfront, objective 7.2) Support providing, preserving, and maintaining aesthetically attractive waterfront areas; and Goal Ten: To provide, maintain, and improve
City-owned buildings, structures, facilities, and properties, objective 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-
owned buildings, structures, facilities, and properties. This project also implements the Comprehensive Plans Environmental Goal Seven: To promote the
protection, preservation, and enhancement of the biodiversity of the city's bluffs and prairies, wetlands, waterways, and all natural areas, and encourage
partnerships, objective 7.4) Provide an aesthetically attractive city riverfront for use by industrial, recreational, residential, and commercial interests.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Regional Economy and Community Design.
262
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Street and Alley Assessment Assistance DEPARTMENT: 55 TOTAL
Program PROJECT
FD/CIP NO: 300-1256 COST
$ 20,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 90,000 Pay to Other Agency $ — $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ — $ 90,000 TOTAL $ — $ 5,000 $ 5,000 $ 5,000 $ 5,000 $
B. PROJECT FINANCING
$ 90,000 Sales Tax Fund (30%) $ — $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ — $ 90,000 TOTAL $ — $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ —
PROJECT DESCRIPTION
This project provides for payment of a portion or all of special assessments for street improvements for eligible low and moderate income residents.
JUSTIFICATION
Maintenance of public facilities which deter neighborhood decay and improve safety is of benefit to the entire community. The utilization of Sales Tax Funds to
offset the cost of special assessments for street improvements not only aids in the continued revitalization of the City's neighborhoods, but reduces the cost to the
low and moderate income residents to whom such assessment may be financially prohibitive. In FY 2017, the SRF Green Alley Program will reconstruct a few
alleys remaining from the planned 73 alleys. It is anticipated assessment assistance will be required.
RELATIONSHIP TO OTHER PROJECTS
This project provides special assessment relief to eligible property owners included in the City's annual street reconstruction program and SRF Green Alley
Program. This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional
surface transportation system, objectives 4.1) Support the ongoing street reconstruction, rehabilitation, and maintenance overlay programs, ensuring the timely
maintenance, repair and reconstruction of the city's streets and bridges and 4.3 Seek alternative funding sources for construction and maintenance, Land Use and
Urban Design Goal One: To protect and enhance the viability, livability and affordability of the city's residential neighborhoods while integrating multifamily
development throughout the community, objective 1.1) Promote inclusive and economically integrated neighborhoods that allow a diverse mix of residents and
housing types, and City Fiscal Goal Five: To emphasize the use of fees and user charges to maintain existing City services and reduce reliance on local property
taxes while remaining sensitive to program access, affordability, and availability for those with low or moderate incomes or disabilities, objective 5.3) Promote
access to and affordability and availability of essential City services to low and moderate income persons and persons with disabilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Community Design.
263
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Southwest Arterial Project DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1287 COST
$23,600,291
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 566,675 $ 4,357,031 Design & Engineering $ 55,000 $ 57,000 $ 59,000
$ 72,887 $ 320,484 Consultant Services
$ 1,818,008 $ 658,408 Property Acquisition
$ 1,372,507 $ 13,763,291 Construction $ 500,000
$ 3,830,077 $ 19,099,214 TOTAL $ 555,000 $ 57,000 $ 59,000 $B. PROJECT FINANCING
$ 38,634 Sales Tax Fund (30%) $ 55,000 $ 57,000 $ 59,000
$ 2,853,677 Dubuque County
$ 2,925,336 $ 4,174,700 State Grant $ 500,000
$ 866,107 $ 12070, ,837 DMATS STP Funds
$ 3,830,077 $ 19,099,214 TOTAL r$-5-5 5,0-0 0 $ 57,000 r$--5-9,000 $ — r$----
PROJECT
—PROJECT DESCRIPTION
The proposed Southwest Arterial project will be a 6.1-mile four-lane divided freeway with priority 1-access control between Highway 61/151 and Highway 20. The
Southwest Arterial project will provide an alternate, direct and efficient route for traffic through southwestern Dubuque, which will connect two growing sections of
the community together and will support future anticipated expansion growth to the southwest of the City toward the Dubuque Regional Airport. The Southwest
Arterial project will provide a significant national and regional economic benefit in providing a direct connection between the Technology Park and the Industrial
Center West.
CURRENT STATUS
The preliminary engineering design phase is completed and the Southwest Arterial project is now proceeding with the final engineering design phase, right-of-way
property acquisition and archaeological and cultural resource phase III mitigation work.
Property Acquisition
The City is currently proceeding with right-of-way property acquisition for the 52 impacted properties. As of January 2015, the City has purchased 29 properties
and has expended approximately $7.1 million for right-of-way property acquisition. Currently there are 4 properties that are in active good faith negotiations to
purchase. The remaining 19 properties are anticipated to be completed by the end of fiscal year 2016.
Construction Update
The first phase of construction, the North Cascade Road reconstruction project was substantially completed in December 2012. Final finish grading, seeding and
fencing was completed by November of 2013. The project provided for the reconstruction (grading, paving & bridge) and realignment of North Cascade Road
which will allow the Southwest Arterial to travel under the new North Cascade Road Bridge.
264
The second construction phase, the English Mill Road reconstruction project, is scheduled for bid letting in the summer of 2015 and will involve side road
improvements that will allow the highway to travel under the new English Mill Road Bridge.
The third construction phase, the Military Road reconstruction project, is scheduled for bid letting in the spring of 2016 and will involve side road improvements that
will allow the highway to travel under the new Military Road Bridge.
TRANSFER OF JURISDICTION
The greatest recent accomplishment for the Southwest Arterial project was the execution of the Memorandum of Understanding, which was formalized with a
signing ceremony on August 9, 2013. This historic achievement would not have occurred without the collaborative partnership between the Iowa DOT staff and the
City of Dubuque and its partners.
The following is a brief summary of the overall intent and principle objectives set forth when developing the MOU: The Iowa DOT and City, in joint cooperation, will
Transfer the Jurisdiction of the Southwest Arterial from the City to the State in exchange for the Transfer of Jurisdiction of the Northwest Arterial (or Iowa 32), and
portions of existing U.S. 52 / Iowa 3 through downtown Dubuque, from the State to the City. The Transfer of Jurisdiction will occur after the Southwest Arterial is
completed and open to traffic.
FUNDING
As a result of hard work from Dubuque's congressional delegation and the strong support and partnership of U.S. Senator Harkin, U.S. Senator Grassley and
Congressman Braley, the City has secured approximately$32.8 million in federal funding for the Southwest Arterial project. The Iowa Department of
Transportation Commission approved in the current Iowa 5-Year Highway Transportation Improvement Program $97.4 million in funding programmed for the
Southwest Arterial project.
The following table summarizes the maximum City and County local match funding, including both federal earmark and Iowa DOT funding for continuing the
advancement and completion of the Southwest Arterial:
Funding Summary Amount
Total Federal Funding $ 32,860,720 **
Total Local Funding $ 7,152,913 **
Total State Funding $ 97,400,000
TOTAL FEDERAL/STATE/ LOCAL FUNDING: $ 137,413,633
** Following the completion of the North Cascade, English Mill and Military Road construction projects, along with the completion of final engineering design, right-
of-way property acquisition, and mitigation work, it is projected that all current federal appropriated funding and local match for the Southwest Arterial will be
expended.
Subject to future continued funding availability in the Iowa DOT's 5-Year Transportation Program, the Iowa DOT projects that the Southwest Arterial (2-lanes) could
be open to traffic by the end of 2019.
JUSTIFICATION
265
Economic Development
Dubuque is the regional economic center for the Iowa, Illinois and Wisconsin tri-state area. With local international companies, it is critical to construct the
Southwest Arterial as an alternate, direct route for commercial traffic through southwestern Dubuque. The Southwest Arterial project will significantly improve the
efficiency and safety of the regional highway transportation network that is vital for the statewide, national and global distribution of local commerce and the
continued growth and sustainability of the strong regional economy.
Mobility Benefits
The Southwest Arterial project will connect two growing sections of the community together and will support future anticipated expansion growth to the southwest
of the City toward the Dubuque Regional Airport. The Southwest Arterial will also provide an efficient bypass around the City thereby reducing travel times and
minimizing delay by reducing traffic volumes and congestion on the local street system.
Environmental Benefits
The Southwest Arterial project will provide an alternate, direct and efficient route for traffic through southwestern Dubuque, which will provide significant travel time
savings by avoiding the numerous signalized intersections on Highway 61/151, Highway 20 and Central Avenue (Hwy 52/3) through Dubuque, thereby providing
fuel energy savings, reducing vehicle emissions and improving air quality. The Southwest Arterial project will be designed and constructed with forward thinking
sustainability initiative incorporated, which will include an environmentally and resource sensitive highway corridor, an integrated bike/ pedestrian trail with
amenities, and Intelligent Transportation System (ITS) technology.
RELATIONSHIP TO OTHER PROJECTS
This project is the#1 transportation priority of the City of Dubuque. This project implements the Comprehensive Plan's Transportation Goal Two: To plan long-
range for both local and regional street and highway systems to ensure safe, efficient access into and through the city and to support urban growth in an
appropriate development pattern, objectives 2.1) Coordinate with regional transportation agencies to maintain and update a long-range transportation plan, 2.2)
Coordinate with regional transportation agencies involved with highway planning and construction, 2.3) Support improving the existing street network to reduce
traffic capacity restraints and improve safety, 2.4) Encourage the involvement of the public in the transportation planning process and 2.5) Plan for aesthetically
appealing streets and highways, with particular focus on gateway opportunities and street tree plantings, Goal Three: To facilitate improved four-lane access for
surface transportation from Dubuque to major cities in the region, objectives 3.1) Encourage public/private partnerships to plan and promote future transportation
facilities with local, regional, state, and federal agencies, 3.2) Cooperate with regional transportation agencies in the development of an improved highway system
to serve the city and 3.3) Support a street and highway system which meets current and future traffic needs.
This Project also implements the Comprehensive Plan's Infrastructure Goal Eleven: To plan for, build, or improve infrastructure systems to meet anticipated growth
and development needs, objective 11.7) Work with the Iowa Department of Transportation (IDOT) and the Dubuque Metropolitan Area Transportation Study
(DMATS) on the timely development of new highway and arterial street systems to provide growth potential for the future, and Economic Development Goal
Three:To concentrate on retaining and expanding existing local businesses, objective 3.5) Encourage maintaining and strengthening Dubuque's position as a
retail center in the trade area, Goal Seven: To maintain and strengthen Dubuque's position as a tourist destination, objectives 7.1) Promote existing attractions,
7.2) Promote a variety of additional year-round tourist attractions and 7.3) Consider recommendations in the Riverfront Plan to add amenities for both citizens and
tourists along the Mississippi River, Goal Eight: To promote and encourage preservation of our historic assets, objective 8.2) Explore ways to remove barriers to
preservation, and Goal Nine: To strengthen the local tax base, objective 9.4) Consider annexing additional land, as necessary and as possible according to smart
growth principles to accommodate future expansion.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Regional Economy and Community Design.
266
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works North Cascade Road Reconstruction DEPARTMENT: 55 TOTAL
Phase 1 - Catfish Creek to Edval Lane PROJECT
Phase 2 - Edval Lane to SW Arterial FD/CIP NO: 360-2021 COST
350-2021 300-2021 $ 4,981,001
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 100,000 Property Acquisition $ 200,000 $ 100,000
$ 5,583 $ 223,000 Other $ 206,000
$ 2,749,218 Construction $ 1,397,200
$ 5,583 $ 3,072,218 TOTAL $ 406,000 $ 1,497,200 $B. PROJECT FINANCING
North Cascade Housing TIF $ 406,000 $ 625,000
$ 2,559,800 DMATS STP Funds $ 872,200
$ 5,583 $ 512,418 Road Use Tax Funds
$ 5,583 $ 3,072,218 TOTAL $ 406,000 $ 1,497,200 $ — $
PROJECT DESCRIPTION
This project provides for the reconstruction of North Cascade Road between the bridge over Catfish Creek to the future intersection of North Cascade Road and
the Southwest Arterial. The project will be developed into 2 phases, Phase 1 (2017-2018) -from Catfish Creek bridge to Edval Lane, and Phase 2 (2019) -from
Edval Lane to Southwest Arterial. The current 24-foot roadway will be widened to accommodate a 35-foot urban "complete street' section with 5-foot paved
shoulders/ bike lanes on each side. The existing curves on North Cascade Road are substandard and will be realigned to improve safety and allow for better sight
distance. The project will require the purchase of right-of-way property to accommodate the new roadway width and larger curves. Watermain will be extended
along the North Cascade Road corridor to serve the Timber Hyrst subdivision and future development along the Southwest Arterial Corridor.
The City is proposing to use both DMATS STP funding and North Cascade Road TIF Urban Renewal revenues generated to support funding the eligible public
infrastructure, traffic capacity/safety related improvement along North Cascade Road.
JUSTIFICATION
The Timber Hyrst residential subdivision is under development and will connect Creekwood Drive to North Cascade Road between Edval Lane and the Catfish
Creek bridge. The development agreement for this subdivision between the City of Dubuque and North Cascade Road Developers, LLC. stipulates that the City of
Dubuque will have safety related improvement completed by the end of the 2012 construction season. However, due to funding restraints and previous housing
market conditions, the developer has agreed to allow the project to be delayed. The existing sight distance along this stretch of North Cascade Road is less than
desirable and the realignment of the existing curves in this area will improve safety for the motoring public.
With the upcoming completion of the Southwest Arterial and the location of the Interchange at North Cascade/English Mill Road, traffic volumes are expected to
increase on North Cascade Road. The existing roadway is narrow, substandard in design and is inadequate to accommodate future traffic and development
growth. This roadway is classified as a collector under the FHWA Street Classification. The existing 24-foot rural roadway has granular shoulders and typical rural
267
ditch grading and drainage. This project will provide for a 35-foot wide concrete roadway with curb and gutter, with 5-foot bike lanes and grading for future
sidewalks on each side of the road.
RELATIONSHIP TO OTHER PROJECTS
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
268
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works N. Grandview Avenue and University DEPARTMENT: 55 TOTAL
Avenue Roundabout PROJECT
FD/CIP NO: 300-2724 COST
$ 1,150,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Consultant Services $ 50,000
Design & Engineering $ 190,000 $ 50,000 $ — $ —
Construction $ 850,000
Land and R.O.W. $ 10,000
TOTAL $ 250,000 $ 900,000 $ — $B. PROJECT FINANCING
IDOT Funding $ 850,000 $ — $ —
Sales Tax Fund (30%) $ 250,000 $ 50,000
is — $ — TOTAL $ 250,000 $ 900,000 $
PROJECT DESCRIPTION
This project provides for the construction of a modern roundabout at the intersection of N. Grandview Avenue and University Avenue. The intersection would be
reconstructed into a single lane roundabout. The existing Jule bus transfer location on the south side of University Avenue along N. Grandview Avenue (near Hartig
Drugs) would be relocated to the north side of University Avenue along N. Grandview Avenue (near Allison-Henderson park). The project would include installation
of the roundabout with 9" PCC pavement, a red colored truck apron, splitter islands, appropriate signage, street lighting, pavement markings and landscaping in
the center of the roundabout. There would be additional pavement placed adjacent to Allison-Henderson Park on the east side of N. Grandview Avenue to
accommodate the bus pull off area for the bus transfer station.
JUSTIFICATION
This project will reconstruct an intersection that is currently 4-way stop sign controlled. The intersection experiences significant delays at times of the day. This
intersection once reconstructed as a roundabout will improve the north-south flow through the new Grandview-Delhi-Grace roundabout and reduce east-west
delays on University Avenue. The University Avenue corridor is part of the East-West Corridor Study Area where intersection improvements have been
recommended. The East-West Corridor Study Implementation is a Top Priority of the City Council.
RELATIONSHIP TO OTHER PROJECTS
This project will have impacts on the City of Dubuque Water Main, Sanitary Sewer, and Fiber Optic Conduits. This project implements the Comprehensive Plan's
Transportation Goal Two: To plan long-range for both local and regional street and highway systems to ensure safe, efficient access into and through the city and
to support urban growth in an appropriate development pattern, objectives 2.1) Coordinate with regional transportation agencies to maintain and update a long-
range transportation plan, 2.2) Coordinate with regional transportation agencies involved with highway planning and construction, 2.3) Support improving the
existing street network to reduce traffic capacity restraints and improve safety, 2.4) Encourage the involvement of the public in the transportation planning process
and 2.5) Plan for aesthetically appealing streets and highways, with particular focus on gateway opportunities and street tree plantings, Goal Three: To facilitate
improved four-lane access for surface transportation from Dubuque to major cities in the region, objectives 3.1) Encourage public/private partnerships to plan and
269
promote future transportation facilities with local, regional, state, and federal agencies, 3.2) Cooperate with regional transportation agencies in the development of
an improved highway system to serve the city and 3.3) Support a street and highway system which meets current and future traffic needs.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Regional Economy, Reasonable Mobility, Healthy Air and Community Design.
270
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Chavenelle Road Rehabilitation (NW DEPARTMENT: 55 TOTAL
Arterial - Radford) PROJECT
FD/CIP NO: 360-2551 COST
$ 1,500,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 200,000
Construction $ 1,300,000
$ — $ — TOTAL $ 1,500,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
DICW TIF $ 1,500,000
Is — $ — TOTAL $ 1,500,000
PROJECT DESCRIPTION
This project provides for the pavement rehabilitation of Chavenelle Road between the Northwest Arterial and Radford Road.
JUSTIFICATION
The section of Chavenelle Road between the Northwest Arterial to Radford Road was constructed in 1981 with the original development of the Industrial Center
properties. The pavement condition on Chavenelle Road is deteriorating due to concrete panel displacement at a majority of the transverse joints causing a non-
uniform pavement with a rough riding surface. This section of Chavenelle is an 8-inch concrete pavement with minimal reinforcing steel which was constructed
over soils that were used from developing the Industrial Center building sites. This section of Chavenelle Road is subject to wet subsurface conditions which cause
the pavement supporting base material to become saturated thus reducing the load transfer capability of the subgrade base material. The wet subsurface
conditions have also made the pavement highly susceptible to freeze -thaw conditions during the winter seasons. The City consulted with the Iowa Concrete
Paving Association and the Iowa State University Concrete Pavement Technology Center in evaluating several alternatives for Chavenelle Road, including
pavement rehabilitation to a complete roadway reconstruction.
Based on cost considerations, the pavement rehabilitation alternative is recommended to give the roadway additional years of service instead of planning for full
reconstruction. The pavement rehabilitation project will include the installation of longitudinal subdrain along each side of the road, full and partial depth pavement
patching, and dowel bar joint reinforcement repairs along with diamond grinding the concrete surface to provide a more acceptable ride.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system, 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits, street
signage, street pavement striping, and traffic signals and 1.3) Support maintaining the street system's continuity and Goal Two: To plan long-range for both local
and regional street and highway systems to ensure safe, efficient access into and through the city and to support urban growth in an appropriate development
pattern, 2.3) Support improving the existing street network to reduce traffic capacity restraints and improve safety, 2.4) Encourage the involvement of the public in
271
the transportation planning process, 2.5) Plan for aesthetically appealing streets and highways, with particular focus on gateway opportunities and street tree
plantings.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility, Community Design and Regional Economy.
272
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Third Street Overpass Decorative Railing DEPARTMENT: 55 TOTAL
Painting Project PROJECT
FD/CIP NO: 250-1702 COST
$ 100,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 5,000
Construction $ 95,000
$ — $ — TOTAL $ 100,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
Private Participant $ 30,000
Road Use Tax Fund $ 70,000
TOTAL Is 100,000
PROJECT DESCRIPTION
The proposed project will provide for the temporary removal, sandblasting, re-painting , and reinstalling approximately 1,430 lineal feet of decorative railing on the
Third Street Overpass bridge into the Port of Dubuque.
JUSTIFICATION
The decorative railing on the south side of the pedestrian walkway of the Third Street Overpass was installed in 2006. Over the past several years the powder coat
paint finish along the entire length has partially or completely failed. This has resulted in the paint peeling off, exposing the steel railing to the weather elements
which has caused a majority of the fence panels to rust. The rusted and now unsightly decorative railing is a component of the pedestrian walkway and is a highly
visual element on the Third Street Overpass bridge into the Port of Dubuque. Re-painting the decorative railing is recommended to maintain and protect the
integrity of the railing while restoring the aesthetic appearance of the railing.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Five: To provide for, maintain and improve safe, accessible public sidewalks and steps
throughout the community, where possible, objective 5.1) Support maintaining and improving the condition of public sidewalks, steps, walks, and handrails.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Smart Resource Management, Community Health and Safety, and Reasonable Mobility.
273
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works HWY 52 Phase III - 11th Street (Elm to DEPARTMENT: 55 TOTAL
White) and White Street (9th to 11th) PROJECT
Pavement Rehabilitation Project FD/CIP NO: 250-2274 COST
$ 751,800
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 97,650
Construction $ 654,150
$ — $ — TOTAL $ 751,800 $ — $ — $ — $ — $
B. PROJECT FINANCING
IDOT Funding $ 261,660
Road Use Tax $ 490,140
TOTAL $ 751,800 $
PROJECT DESCRIPTION
This project provides for the rehabilitation of the pavement on 11th Street (IA 3/52)from Elm Street to White Street and on White Street from 9th Street to 11th
Street. This project also includes the reconstruction of all curb access ramps along the corridor to bring them to ADA compliance. Due to the One-way to Two-way
downtown street conversion and the signing of the transfer of jurisdiction of roadways, The project will be completed in partnership with the Iowa DOT.
JUSTIFICATION
The existing asphalt pavement is showing signs of distress from the volume of truck traffic and needs to be resurfaced. The Iowa DOT will be responsible for the
construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each direction from roadway centerline) on White Street, and the west
bound 12 feet center travel lane on 11th Street. The Iowa DOT will be responsible for 50% of the costs associated with the pedestrian access curb ramps. The City
will be responsible for the costs associated with pavement rehabilitation of the parking lanes, the east bound 12 feet center travel lane on 11th Street, 50% of the
costs associated with the pedestrian access curb ramps and all other associated costs, such as engineering design, contract administration, construction
engineering and inspection will be funded solely with City funding.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system and 1.3) Support maintaining the street system's continuity and safety and Goal Three: To facilitate improved four-lane access for surface transportation
from Dubuque to major cities in the region, objective 3.3) Support a street and highway system which meets current and future traffic needs.
This project also implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objectives 4.2) Identify new technologies, new materials and new concepts for street maintenance, restoration, and reconstruction, 4.4)
Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and
other related facilities, 4.5) Support extending the life and improve the quality of the city street system through preventative maintenance programs and 4.6)
Coordinate with state, county, and other cities for surface transportation system improvements and maintenance and Goal Five: To provide for, maintain and
improve safe, accessible public sidewalks and steps throughout the community, where possible, objectives 5.1) Support maintaining and improving the condition of
274
public sidewalks, steps, walks, and handrails and 5.4) Support building alternate pedestrian routes and integrate these with walking/biking trails as a unique city
attraction.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
275
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Crosswalk Warning Devices DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-2246 COST
$ 93,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 2,000 $ 2,000 $ 2,000
$ 31,000 Construction $ 29,000 $ 29,000 $ 29,000
$ — $ 31,000 TOTAL $ 31,000 $ — $ — $ 31,000 $ — $ 31,000
B. PROJECT FINANCING
$ 31,000 Sales Tax Fund (30%) $ 31,000 $ 31,000 $ 31,000
$ — $ 31,000 TOTAL $ 31,000 $ — $ — $ 31,000 $ — $ 31,000
PROJECT DESCRIPTION
This project would provide for the installation of crosswalk warning devices at one location per year.
JUSTIFICATION
The City receives several requests each year for pedestrian crossings. These devices would alert motorists to pedestrians entering the roadway. These devices
would be solar-powered LED lights which use less power than traditional bulbs. The device utilizes super-bright LED technology and a "stutter flash"that would
flash at motorists 190 times in 30 seconds when activated Results have shown that more than 90% of motorists stop when the LED stutter lights are activated by
the pedestrian. When the activation button is pushed, a friendly voice explains to pedestrians how to use the crosswalk. At night the button placards are
illuminated so pedestrians can see them. Upon activation, the entire area is illuminated, including where the pedestrian is standing, the pedestrian street signs,
and the center of the roadway in divided highways so the motorist can clearly see the entire crossing. The system would be radio controlled and solar powered
for maximum efficiency.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system and 1.3) Support maintaining the street system's continuity and safety; and Goal Eight: To establish improved hike and bike routes in the city to encourage
alternative modes of transportation, objectives 8.2) Promote a more bicycle- and pedestrian-friendly transportation network and 8.7 Promote bicycles as a viable
alternative mode of transportation, using signs, striped lanes, and safe crossings, Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe
and functional surface transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street
pavement markings, traffic signs, street name signs, walls and other related facilities and Goal Five: To provide for, maintain and improve safe, accessible public
sidewalks and steps throughout the community, where possible, objectives 5.1) Support maintaining and improving the condition of public sidewalks, steps, walks,
and handrails and 5.4) Support building alternate pedestrian routes and integrate these with walking/biking trails as a unique city attraction. This project also
implements the Comprehensive Plan's Public Safety Goal Two: To maintain appropriate readiness response capabilities in all areas of public safety, objective 2.5)
Consider expanding the use of ITS (Intelligent Transportation System) equipment, including regional partnerships.
276
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility, Smart Energy Use and Community Design.
277
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works HWY 52 Phase IV- Central Avenue DEPARTMENT: 55 TOTAL
Pavement Rehabilitation from 9th Street to PROJECT
21 st Street FD/CIP NO: 300- COST
360- 250- $ 1,923,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 250,000
Construction $ 1,673,000
$ — $ — TOTAL $ — $ 1,923,000 $ — $ — $ — $
B. PROJECT FINANCING
IDOT Funding $ 836,500
Greater Downtown TIF $ 176,977
Sales Tax Fund (30%) $ 612,029
Road Use Tax $ 297,494
is — $ — TOTAL
PROJECT DESCRIPTION
This project provides for the rehabilitation of the pavement on Central Avenue (IA3/52) from 9th Street to 21st Street. This project also includes the reconstruction
of all curb access ramps along the corridor to bring them to ADA compliance. Underground utility work will be coordinated and completed prior to the rehabilitation
work.
JUSTIFICATION
The existing asphalt pavement is showing signs of distress from the volume of truck traffic and needs to be resurfaced. The project will be completed in partnership
with the Iowa DOT. The Iowa DOT will be responsible for the construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each
direction from roadway centerline) and 50% of the costs associated with the pedestrian access curb ramps. The City will be responsible for the costs associated
with pavement rehabilitation of the parking lanes, 50% of the costs associated with the pedestrian access curb ramps and all other associated costs, such as
engineering design, contract administration, construction engineering and inspection will be funded solely with City funding.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system and 1.3) Support maintaining the street system's continuity and safety and Goal Three: To facilitate improved four-lane access for surface transportation
from Dubuque to major cities in the region, objective 3.3) Support a street and highway system which meets current and future traffic needs. This project also
implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface transportation
system, objectives 4.2) Identify new technologies, new materials and new concepts for street maintenance, restoration, and reconstruction, 4.4) Support
maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and other
related facilities, 4.5) Support extending the life and improve the quality of the city street system through preventative maintenance programs and 4.6) Coordinate
with state, county, and other cities for surface transportation system improvements and maintenance and Goal Five: To provide for, maintain and improve safe,
278
accessible public sidewalks and steps throughout the community, where possible, objectives 5.1) Support maintaining and improving the condition of public
sidewalks, steps, walks, and handrails and 5.4) Support building alternate pedestrian routes and integrate these with walking/biking trails as a unique city
attraction.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
279
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Street Public Works Bluff Street Parking Expansion DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 360- COST
$ 175,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 21,500
Construction $ 153,500
$ — $ — TOTAL $ — $ — $ 175,000 $ — $ — $
B. PROJECT FINANCING
$ —
Greater Downtown TIF $ 175,000
Is — TOTAL $ — $ — $ 175,000
PROJECT DESCRIPTION
This project would add parking and provide improved pedestrian access and ADA accommodations near the Bluff Street Row houses at 15th Street and Bluff
Street. Bluff Street would be reconfigured by addressing traffic calming measures. Most traffic would follow a re-configured Locust Street that would allow 2 way
traffic to Loras Blvd. Parking bays would be added in the current island between Locust Street and Bluff Street.
JUSTIFICATION
This project would provide for some additional parking in the Bluff Street neighborhood near 15th Street and Bluff Street. Bluff street would be reconfigured to
reduce traffic that flows through this neighborhood, sidewalk would be added and ADA parking stalls would be installed. This project supports the city goal of
Improved Connectivity.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Eleven: To plan for, build, or improve infrastructure systems to meet anticipated growth and
development needs. This project also implements the Comprehensive Plan's Land Use and Urban Design Goal One: To protect and enhance the viability, livability
and affordability of the city's residential neighborhoods while integrating multifamily development throughout the community and Goal Eight:
To provide physical accessibility throughout the city. In addition, this project supports the Comprehensive Plan's Transportation Goal One: To provide, maintain and
improve safe and efficient movement on the City's street system.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Community Design, Reasonable Mobility, and Community Health and Safety.
280
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C
Engineering/ Miscellaneous General Government Federal Building Renovation DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 350-1841 COST
360-1841 $ 1,270,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 5,523 $ 25,478 Design & Engineering $ 22,000 $ 250,000 $ 751,000
Property Acquisition $ 70,000
$ 239,758 Construction $ 39,000 $ 220,000 $ 325,000 $ 120,000 $ 6,258,000
$ 5,523 $ 265,236 TOTAL $ 39,000 $ 70,000 $ 242,000 $ 575,000 $ 120,000 $ 7,009,000
B. PROJECT FINANCING
Greater Downtown TIF $ 39,000 $ 70,000 $ 242,000 $ 575,000 $ 120,000 $ 7,009,000
$ 5,523 $ 265236 GO Borrowing
$ 5,523 t_72#,236 TOTAL $ 39,000 $ 70,000 7_742,0-00 $ 575,000 $ 120,000 $ 7,009,000
PROJECT DESCRIPTION
In 2008 significant updates to the Historic Federal Building were completed to improve its overall condition and to ensure it remains as a historic structure
anchoring downtown. Improvements to the building included: conversion of the former courtroom and two jury rooms on the second floor to the new City Council
Chambers, small meeting room and remote broadcast studio for City Channel 8, the City Housing and Community Development Department moved into the
completely renovated west half of the third floor, partial steel window renovation, exterior window painting, and exterior building signage.
In FY 2018 the following items are budgeted for: $4,000 for sidewalk repair to the only ADA accessible entrance into the building, $35,000 to complete the
separation of the roof drain system from the sanitary sewer system. In FY19 $120,000 is allocated to purchase the vacant parking lot adjacent to the building from
the US Post Office. In FY 2020 the following items are budgeted for: $22,000 to conduct an American Society of Heating, Refrigeration and Air-Conditioning
Engineers (ASHRAE) Level 1 Energy Audit, $6,000 for the replacement of the public information kiosk in the lobby, $100,000 for making improvements to the
vacant parking lot adjacent to the building, $25,000 for making ADA accessibility upgrades to the 3rd floor public restrooms, $49,500 for tuckpointing and
waterproofing of the building window wells, and $13,000 to tuck point the front steps and replace rusting hand rails. Also $15,000 is budgeted to paint the interior
post office space per the terms of the lease agreement, and $4,500 is budgeted for improvements to the public wayfinding signs for the building. In FY 2021
$250,000 is budgeted for an ASHRAE Level 2 & 3 Energy Assessment which will build off of the results from the Level 1 energy audit. The Level 2 Assessment
provides detailed survey of building systems and operations, breakdown of energy source and end use, identification of Energy Efficiency Measures (EEMs) for
each energy system, range of savings &costs for the EEMs, spotlight on operational discrepancies and outline of priorities for needed upgrades. The ASHRAE
Level 3 Energy Assessment allows for complex HVAC system upgrade alternative analysis, return on investment and construction cost estimating. Also $220,000
is budgeted for structural repairs to the loading dock and leaking building foundation and $105,000 for replacement of the first floor lobby lights with replica period
fixtures, main stairwell painting and lighting, and refinishing of the historic woodwork in the main lobby.
Additional construction funding beyond FY22 is being budgeted to address known long term building operations and maintenance requirements. Work includes:
$2,535,000 to complete the replacement of the building's cooling, heating and ventilation systems with a new, energy efficient, high performance systems, $22,000
281
for office space renovations to vacant rooms in building to improve their ability to be rented, $1,800,000 for restoration of the existing steel windows, $375,000 for
remaining needed updates to the fire alarm system throughout the building and a generator for emergency operations, $230,000 is budgeted to install a new
building wide security system that will include electronic locks, $30,000 to paint and replace blinds in the second floor offices, and $450,000 to renovate the
basement spaces so they can be leased to commercial entities. The beyond FY22 budget includes associated design and construction contingency costs for all of
the previously mentioned work.
JUSTIFICATION
After the City took possession of the building in July of 2006, a determination was made to conduct more detailed studies of the existing building condition and the
remaining service life of all mechanical (HVAC), electrical and window systems within the building. Since cost/benefit decisions of a particular mechanical system
are interrelated to other supporting mechanical system upgrades, a comprehensive study was the only way to create a cost effective plan for determining to what
extent each system should be upgraded. City staff involved with the operation of the Federal Building reviewed the completed studies by the consultant and
worked with them to identify certain long-term capital improvement needs. This phased project incorporates those recommendations to provide adequate funding
for the long-term building operation and maintenance costs of the studied systems.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Ten: To provide, maintain, and improve City-owned buildings, structures, facilities, and
properties, objectives 10.1) Support maintaining and improving the energy efficiency and aesthetic qualities of City-owned buildings, structures, facilities, and
properties and 10.2) Support accessibility to City-owned buildings, structures, facilities and properties, and Cultural Arts Goal Two: To provide a variety of
affordable and accessible cultural arts activities and resources for all ages, objective 2.5) Consider expanded, affordable use of public facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility, Green Buildings and Smart Energy Use.
282
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C
Engineering/Miscellaneous General Government Port of Dubuque - Parking Lot 1 DEPARTMENT: 55 TOTAL
Remediation Closure PROJECT
FD/CIP NO: 360-2487 COST
$ 75,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 10,000 $ 10,000
Consultant Services $ 15,000
Construction $ 40,000
$ — $ — TOTAL $ 25,000 $ 50,000 $ — $B. PROJECT FINANCING
$ — Greater Downtown TIF $ 25,000 $ 50,000
Is — $ — TOTAL $ 25,000 $ 50,000
PROJECT DESCRIPTION
In June 2003, the City was awarded a $200,000 EPA Brownfields cleanup grant to remediate residual petroleum plume impacts in the vicinity of Parking Lot No. 1
in the Port of Dubuque. A remediation system was installed in 2005 and was operated until completion in 2007. Following the termination of remediation activities,
the Iowa DNR required a two-year site monitoring period to document site conditions following remedial actions and to demonstrate that residual concentrations of
petroleum contaminants are declining. The site monitoring data indicates that the remedial actions were successful and that concentrations of petroleum
contaminants have significantly declined, are stable and have not migrated. The next action step is for the City to officially request a Site Closure Acceptance
Certification from the Iowa DNR. Following the site closure approval, the City can then begin to abandon underground remediation system that was originally
installed.
JUSTIFICATION
By receiving the official Site Closure Acceptance Certification from the Iowa DNR and abandoning the remediation system, this will complete the Port of Dubuque
Brownfields Redevelopment Project that was started in 2003.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Eleven: To plan for, build, or improve infrastructure systems to meet anticipated growth and
development needs. This project also implements the Comprehensive Plan's Land Use and Urban Design Goal One: To protect and enhance the viability, livability
and affordability of the city's residential neighborhoods while integrating multifamily development throughout the community and Goal Eight:
To provide physical accessibility throughout the city. In addition, this project supports the Comprehensive Plan's Transportation Goal One: To provide, maintain and
improve safe and efficient movement on the City's street system.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Community Design, Reasonable Mobility, and Community Health and Safety.
283
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Miscellaneous Public Works Downtown Neighborhood Street Lights DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 360-2671 COST
$ 150,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 2,500 Design & Engineering $ 2,500 $ 2,500 $ 2,500 $ 2,500 $ 2,500 $ 2,500
$ 22,500 Construction $ 22,500 $ 22,500 $ 22,500 $ 22,500 $ 22,500 $ 22,500
$ - $ 25,000 TOTAL $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000
B. PROJECT FINANCING
[$L__25,000 Greater Downtown TIF $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000
$ - $ 25,000 TOTAL $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000
PROJECT DESCRIPTION
This project provides for the addition of approximately 130 mid block street lights within the Downtown Urban Renewal District and CDBG areas. These additional
street lights would be installed on new Alliant poles. Also, the City would provide LED lights to be installed on either commercial building or residential if property
owner agrees to install and pay for the electrical costs. It is anticipated that this portion of the CIP could eliminate the need to install 20% of the 130 street lights
that are currently planned, with a net savings of approximately$13,000. This project also includes the installation of new city owned streetlight poles and related
equipment. In addition, operating costs for these street lights will amount to approximately$10,000 per year.
JUSTIFICATION
The Enhanced Neighborhood Support group comprised of Housing staff, Leisure Services Staff, Planning staff, Engineering staff, Health Dept. staff and Police,
have met to address the communities desire for increased street light levels. Additional street lighting was also requested through the safe community task force
study. The additional street lighting should improve the comfort level of walking at night in this neighborhood.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities and Transportation Goal One: To provide, maintain and improve safe and efficient movement on the
City's street system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout,
speed limits, street signage, street pavement striping, and traffic signals, 1.3) Support maintaining the street system's continuity and safety and 1.4) Support
providing adequate street lighting which minimizes light pollution, maximizes energy efficiency, and ensures compatibility with neighborhoods.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
284
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Miscellaneous Public Works Harbor Area Maintenance DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 350-1466 COST
300-1466 $ 237,815
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 5,000 Design & Engineering $ 1,000 $ 1,000 $ 1,000 $ 1,000 $ 1,000 $ 5,000
$ 121,523 $ 61,292 Construction $ 9,000 $ 9,000 $ 9,000 $ 9,000 $ 9,000 $ 20,000
$ 121,523 $ 66,292 TOTAL $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 25,000
B. PROJECT FINANCING
$ 121,523 $ 31,292 Sales Tax Fund (20%) $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 25,000
$ 35,000 Sales Tax Fund (30%)
$ 121,523 $ 66,292 TOTAL $ 101000 $ 101000 $ 101000 $ 101000 $ 101000 $ 25,000
PROJECT DESCRIPTION
This annual reoccurring budget provides for dredging harbor areas and the disposal of the spoil material to maintain adequate harbor and channel depths for the
Port of Dubuque Marina and the Ice Harbor.
JUSTIFICATION
The City had a previous contractual obligation under various riverfront-leased properties to maintain adequate harbor depths and to perform maintenance dredging
operations for commercial barge and recreational navigation. However as leases are renewed or new lease agreements are approved, the maintenance dredging
requirements are no longer the responsibility of the City. Beginning in Fiscal Year 2014, the City is no longer responsible for maintenance dredging at any industrial
leased properties within Dove Harbor. On an annual basis, the budget allocation is evaluated and adjusted to reflect a more accurate determination of the dredging
needs and the City attempts to provide sufficient funds for dredging of the City's waterfront , however the cost of dredging continues to significantly increase on a
yearly basis. The temporary disposal site located along the east shoreline of the Peosta channel and adjacent to the 16th Street Bridge can hold approximately
7,500 cubic yards of dredge material. This annual reoccurring budget includes funds for annual riverfront maintenance dredging as required at boat launch ramp
locations, River's Edge Plaza and along the Riverwalk lower pier wall to accommodate excursion boat mooring.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Seven: To provide, maintain and improve the floodwall, harbors, fishing piers, and boat
docks and ramps for industrial, commercial, and recreational use of the riverfront, objective 7.5) Promote adequate harbor, channel, and dock depths and
Recreation Goal Eight: To optimize the recreational amenities offered by the city's riverfront, objective 8.3) Encourage more attractions at the Port of Dubuque.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainability Principle of Regional Economy and Clean Water.
285
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Miscellaneous Public Works Neighborhood Related Improvement DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 260-1239 COST
$ 209,750
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 47,750 $ 13,400 Construction $ 93,400 $ 13,400 $ 13,400 $ 13,400 $ 15,000 $ 15,000
$ 47,750 $ 13,400 TOTAL $ 93,400 $ 13,400 $ 13,400 $ 13,400 $ 15,000 $ 15,000
B. PROJECT FINANCING
$ 47,750 $ 13,400 CDBG Grant $ 93,400 $ 13,400 $ 13,400 $ 13,400 $ 15,000 $ 15,000
$ 47,750 $ 13,400 TOTAL $ 93,400 $ 13,400 $ 13,400 $ 13,400 $ 15,000 $ 15,000
PROJECT DESCRIPTION
This project provides for the repair of public steps and sidewalks, pavement overlays, installation of railing, and other infrastructure items in neighborhoods
primarily inhabited by low and moderate income persons. The project funds will be used to provide grants to low and moderate income homeowners for 75
percent of the cost of sidewalk repair and to buy materials for Public Works Department crews to install overlays using their own equipment and manpower. Funds
will also be used to install railings where needed to targeted neighborhoods. This program consolidates the former Neighborhoods Street Improvement and
Neighborhood Step/Sidewalk Programs.
JUSTIFICATION
The consolidated plan, which is prepared by the Community and Economic Development Advisory Commission with citizen input, identified neighborhood
preservation as a number-one priority. Maintenance of public facilities will contribute to neighborhood preservation and improve public safety.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Land Use and Urban Design Goal One: To protect and enhance the viability, livability and affordability of the
city's residential neighborhoods while integrating multifamily development throughout the community, objectives 1.3) Encourage connecting and interrelating
neighborhoods with greenbelts or other pathways, commercial nodes, or public facilities and 1.7) Encourage neighborhood identity, planning, and pride of place,
and Goal Eight: To provide physical accessibility throughout the city, objectives 8.1) Encourage and facilitate urban accessibility by walking, cycling and/or public
transit as well as by auto, 8.3) Facilitate, where possible, enhanced accessibility within existing development and 8.4) Encourage the development of pathways
that link the community together in a cohesive manner.
This project also implements the Comprehensive Plan's Infrastructure Goal Five: To provide for, maintain and improve safe, accessible public sidewalks and steps
throughout the community, where possible, objective 5.1) Support maintaining and improving the condition of public sidewalks, steps, walks, and handrails.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Community Knowledge.
286
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Miscellaneous Public Works Washington Neighborhood Street Lights DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-2615 COST
$ 72,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 5,203 $ 14,797 Equipment $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 12,000 $ 12,000
$ 5,203 $ 14,797 TOTAL $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 12,000 $ 12,000
B. PROJECT FINANCING
$ 5,203 $ 14,797 Sales Tax Fund (30%) $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 12,000 $ 12,000
$ 5,203 $ 14,797 TOTAL $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 12,000 $ 12,000
PROJECT DESCRIPTION
This project provides for the addition of 39 mid block street lights between Elm Street and Central Avenue from 11th street to 22nd street. 29 of these street lights
would require new poles and 10 street lights would be placed on existing poles. This project provides for the operating cost to have Alliant Energy install the lights
and cover the electric costs for these 80 watt LED street lights.
JUSTIFICATION
The Washington Neighborhood Association and other parties have requested to increase the light street light levels. Additional street lighting was also requested
through the safe community task force study. The additional street lighting should improve the comfort level of walking at night in this neighborhood.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities and Transportation Goal One: To provide, maintain and improve safe and efficient movement on the
City's street system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout,
speed limits, street signage, street pavement striping, and traffic signals, 1.3) Support maintaining the street system's continuity and safety and 1.4) Support
providing adequate street lighting which minimizes light pollution, maximizes energy efficiency, and ensures compatibility with neighborhoods.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
287
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Miscellaneous Public Works Street Lights outside the Downtown Area DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-2672 COST
$ 60,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 1,000 Design & Engineering $ 1,000 $ 1,000 $ 1,000 $ 1,000 $ 1,000 $ 1,000
$ 9,000 Construction $ 9,000 $ 9,000 $ 9,000 $ 9,000 $ 9,000 $ 9,000
$ - $ 10,000 TOTAL $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
B. PROJECT FINANCING
$ 10,000 Sales Tax Fund (30%) $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
Is - $ 10,000 TOTAL $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
PROJECT DESCRIPTION
This project provides for the addition of mid block street lights meeting the adopted 300 foot spacing requirement outside the Downtown Urban Renewal District/
TIFF district.
JUSTIFICATION
The Enhanced Neighborhood Support group comprised of Housing staff, Leisure Services Staff, Planning staff, Engineering staff, Health Dept. staff and Police,
have met to address the community's desire for increased street light levels. Additional street lighting was also requested through the safe community task force
study. The additional street lighting should improve the comfort level of walking at night in this neighborhood.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities and Transportation Goal One: To provide, maintain and improve safe and efficient movement on the
City's street system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout,
speed limits, street signage, street pavement striping, and traffic signals, 1.3) Support maintaining the street system's continuity and safety and 1.4) Support
providing adequate street lighting which minimizes light pollution, maximizes energy efficiency, and ensures compatibility with neighborhoods.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
288
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Miscellaneous Public Works Ports of Dubuque - Security Camera DEPARTMENT: 55 TOTAL
Expansion PROJECT
FD/CIP NO: 102-1963 COST
$ 80,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 20,000 Equipment $ 20,000 $ 20,000 $ 20,000
$ — $ 20,000 TOTAL $ — $ — $ 20,000 $ 20,000 $ 20,000 $
B. PROJECT FINANCING
$ 20,000 DRA Distribution $ 20,000 $ 20,000 $ 20,000
$ — $ 20,000 TOTAL $ — $ — $ 20,000 $ 20,000 $ 20,000 $ —
PROJECT DESCRIPTION
This annual funding program will provide for the installation of additional security and surveillance cameras within the Port of Dubuque. The locations identified for
surveillance coverage include, the northerly end of the Riverwalk, Riverwalk shade structures, the Alliant Amphitheatre, the Historic Shot Tower, the Bell Street
corridor and along Ice Harbor Drive. There are several public parking lots in the Port area that do not have camera coverage, they include; Grand River Center
north parking lot, National Mississippi River Museum and Aquarium parking lot, Mississippi Plaza parking lot, River's Edge Plaza parking lot, Brewery parking lot
and the McGraw Hill - Special Events parking lot. As camera coverage is expanded in the Port of Dubuque, additional cameras will be added to the network so that
each of the Emergency Call Box locations has security and surveillance coverage. The FY2018 - 2022 program also includes video server, video software, and
storage replacement.
JUSTIFICATION
This project will expand and enhance security and surveillance coverage within the Port of Dubuque which will compliment the Riverwalk security camera system
which was installed in response to the ongoing vandalism along the Port of Dubuque's Riverwalk. The expanded security and surveillance coverage will curtail
vandalism and will also assist law enforcement officials with crowd control monitoring during large public events.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Seven: To provide, maintain and improve the floodwall, harbors, fishing piers, and boat
docks and ramps for industrial, commercial, and recreational use of the riverfront, objective 7.2) Support providing, preserving, and maintaining aesthetically
attractive waterfront areas and Public Safety Goal Three: To prevent, control, and investigate volatile, at risk situations, and criminal behavior, objective 3.3)
Support identifying criminal activity and volatile, at risk situations, and take appropriate action.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Community Design.
289
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Miscellaneous Public Works Riverfront Leasehold Improvements DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 360-1053 COST
350-1053 $ 329,414
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 4,414 $ 53,754 Design & Engineering
$ 251,246 Construction $ 10,000 $ 10,000
$ 4,414 $ 305,000 TOTAL $ — $ — $ 10,000 $ 10,000 $ — $
B. PROJECT FINANCING
$ 4,414 Sales Tax Fund (20%) $ 10,000 $ 10,000
$ 305,000 Greater Downtown TIF
$ 4,414 $ 305,000 TOTAL $ — $ — $ 101000 $ 101000
PROJECT DESCRIPTION
This project provides for environmental mitigation, structure demolition, appraisal and other related property improvement studies to the City's leased properties
along the riverfront.
JUSTIFICATION
City leases for several riverfront properties have recently expired, or are set to expire or be terminated by mutual agreement over the next ten years. These funds
allow for the needed environmental testing and similar type studies, as well as the removal of abandoned leasehold improvements, and the clean-up of vacant city
properties in preparation for redevelopment. The City also periodically facilitates commodity shipping at existing vacant sites in order to generate revenue. These
temporary agreements sometimes require the removal of buildings or other out dated infrastructure in order to accommodate a particular need of the new lessee.
FY20 - FY21 includes $10,000 in construction funds to address unscheduled maintenance needs.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Land Use and Urban Design Goal Four: To balance open space and environmental preservation with the
community's development needs, objective 4.7) Support protection and enhancement of riverfront and related wetlands, waterway corridors and other sensitive
land areas, Goal Five: Encourage that the physical character and form of the city reflects its historic setting and that the built environment is compatible with the
city's natural environment, objective 5.3) Promote quality in the design and construction of new public and private development, and Goal Seven: To encourage
redevelopment opportunities within the city in an effort to revitalize unused or underused property while promoting the preservation of viable and affordable
housing stock, objectives 7.1) Encourage redevelopment or adaptive reuse of vacant or underutilized buildings and sites and 7.3) Promote redevelopment that
maximizes existing infrastructure. This project also implements the Comprehensive Plan's Infrastructure Goal Seven: To provide, maintain and improve the
floodwall, harbors, fishing piers, and boat docks and ramps for industrial, commercial, and recreational use of the riverfront, objectives 7.2) Support providing,
preserving, and maintaining aesthetically attractive waterfront areas and 7.3) Encourage the development and maintenance of riverfront facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Regional Economy and Community Design.
290
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C
Engineering/Miscellaneous Public Works Port of Dubuque Riverfront Dock DEPARTMENT: 55 TOTAL
Expansion PROJECT
FD/CIP NO: 360- COST
$ 150,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Design & Engineering $ 50,000 $ 100,000
Consultant Services $ 100,000 $ 150,000
Construction $ 3,100,000
$ — $ — TOTAL $ — $ — $ — $ — $ 150,000 $ 3,350,000
B. PROJECT FINANCING
$ — Greater Downtown TIF $ 150,000 $ 550,000
State/Federal Grant $ 2,800,000
$ — $ — TOTAL $ — $ — $ — $ — $ 150,000 $ 3,350,000
PROJECT DESCRIPTION
The proposed project is to expand the existing riverfront docking facility to accommodate large excursion boats in the Port of Dubuque. The City's proposed
infrastructure plan is to extend the lower Riverwalk Pier Wall approximately 300 feet to the north. The extension of the lower pier wall will connect Riverwalk Stair
No. 1 and Stair No. 2 and create a new landing platform near the bottom of Stair No. 2. The new north pier wall landing platform will be connected to the Riverwalk
by an ADA compliant ramped walkway. The excursion boats will moor against new pipe pile clusters and will access land from floating platform docks which will
connect to the north pier wall landing platform via ADA compliant gangways. The expanded docking facility will accommodate excursion boats 400 feet in length or
greater.
JUSTIFICATION
The new expanded pier and docking facility will create significant tourism in Dubuque. Increased employment in retail, dining, ground transportation, excursions
and local attractions, and other tourism-related sectors will result following local investment. Between 2017 and 2018, the Dubuque Area Convention and Visitors
Bureau estimates an economic impact of$4.86 million based upon this tourism growth.
RELATIONSHIP TO OTHER PROJECTS
The proposed project to expand the existing riverfront docking facility to accommodate large excursion boats in the Port of Dubuque will support the continued
development of the North Port and also support the future redevelopment efforts of the South Port area.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Regional Economy, Community Design and Reasonable Mobility.
291
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 6C
Engineering/Miscellaneous Public Works Port of Dubuque Riverfront Dock DEPARTMENT: 55 TOTAL
Expansion PROJECT
FD/CIP NO: 360- COST
$ 25,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
Consultant Services $ 25,000
$ — $ — TOTAL $ — $ — $ — $ — $ 25,000 $
B. PROJECT FINANCING
$ — Greater Downtown TIF $ 25,000
$ — $ — TOTAL $ — $ — $ — $ — $ 25,000 $ —
PROJECT DESCRIPTION
This project would allow the city to evaluate redevelopment options for the industrial sight on 7th street along Dove Harbor, as well as a site along Kerper Blvd at
the Peosta Channel.
JUSTIFICATION
The leases on these properties will be expiring, and while industrial use is probably the highest and best use of these parcels, the city should look at the
possibilities of other redevelopment. Especially with the Alliant Energy power plant being decommissioned.
RELATIONSHIP TO OTHER PROJECTS
Goal Five: Encourage that the physical character and form of the city reflects its historic setting and that the built environment is compatible with the city's natural
environment, objective 5.3) Promote quality in the design and construction of new public and private development, and Goal Seven: To encourage redevelopment
opportunities within the city in an effort to revitalize unused or underused property while promoting the preservation of viable and affordable housing stock,
objectives 7.1) Encourage redevelopment or adaptive reuse of vacant or underutilized buildings and sites and 7.3) Promote redevelopment that maximizes existing
infrastructure. This project also implements the Comprehensive Plan's Infrastructure Goal Seven: To provide, maintain and improve the floodwall, harbors, fishing
piers, and boat docks and ramps for industrial, commercial, and recreational use of the riverfront, objectives 7.2) Support providing, preserving, and maintaining
aesthetically attractive waterfront areas and 7.3) Encourage the development and maintenance of riverfront facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Regional Economy and Community Design.
292
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 4C
Engineering Miscellaneous Culture & Recreation Trails and Complete Streets Projects DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 350-2430 COST
$ 1,784,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 145,000 Construction $ 455,000 $ 180,000 $ 680,000 $ 180,000 $ 315,000
Design & Engineering $ 42,000 $ 20,000 $ 62,000 $ 20,000 $ 29,000
$ - $ 145,000 TOTAL $ - $ 497,000 $ 200,000 $ 742,000 $ 200,000 $ 344,000
B. PROJECT FINANCING
State Grant $ 222,000 $ 267,000 $ 244,000
$ 20,000 DRA Distribution $ 100,000 $ 100,000 $ 100,000
Federal Grant $ 175,000 $ 175,000
$ 125,000 State REAP Grant $ 200,000 $ 200,000 $ 200,000
$ - $ 145,000 TOTAL $ - $ 497,000 $ 200,000 $ 742,000 $ 200,000 $ 344,000
PROJECT DESCRIPTION
This project provides City funds to leverage Iowa Department of Natural Resources and/or Iowa Department of Transportation state and federal pass-through
grants for trails and complete streets projects as the City implements capital projects identified as high priorities in the Tri-State Trail Plan and City's Complete
Streets Policy. The focus is on three phases of the Kerper Bike Trail, an off-road, multi-use bike/hike trail that would circle the 16th Street Detention Basin.
Phase 1 would connect to the Bee Branch Trail near the Sycamore Street Bridge and extend along the 16th St. Detention Basin to 12th St. Phase 1 is budgeted for
FY2017-2018 and is shown as the green line on the attachment. Phase 2 would begin where Phase 1 ends on 12th St. and circle the detention basin to the
intersection of 16th St. and Kerper Blvd. Phase 2 is budgeted for FY2019-2020 and is shown as the red line on the attachment. Phase 3 would begin where Phase
1 ends at 12th St. and then extend along 12th St. to point where a safe transition can be made to 11th St., and then would extend past the new Jule Operations &
Maintenance Facility, across railroad tracks, and along 10th St. to the Intermodal Transportation Center. Phase 3 is budgeted in FY2021-2022, and is shown in
yellow/blue on the attachment.
JUSTIFICATION
Competitive grant applications include a local match for trails and other bike/hike projects. This CIP provides that competitive local match. If the City is
unsuccessful in achieving a grant award in a fiscal year, the City funds can be carried over for a more substantial local match, or used to implement complete
streets projects such as signs and striping for bike lanes and sharrows.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Land Use and Urban Design Goal Eight: To provide physical accessibility throughout the city, objectives 8.1)
Encourage and facilitate urban accessibility by walking, cycling and/or public transit as well as by auto, 8.3) Facilitate, where possible, enhanced accessibility
within existing development and 8.4) Encourage the development of pathways that link the community together in a cohesive manner, Transportation Goal Eight:
293
To establish improved hike and bike routes in the city to encourage alternative modes of transportation, objectives 8.2) Promote a more bicycle- and pedestrian-
friendly transportation network, 8.3) Consider relevant bicycle and pedestrian elements in all new transportation projects, 8.4) Encourage development patterns
more compatible with non-motorized travel, 8.5) Promote bike trails along arterials wherever possible and 8.7) Promote bicycles as a viable alternative mode of
transportation, using signs, striped lanes, and safe crossings, Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional
surface transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings,
traffic signs, street name signs, walls and other related facilities, and Recreation Goal One: To provide a safe park and recreation system that continues to meet
the community's needs for usable and accessible park and open space, objectives 1.3) Continue to identify potential park and recreation sites and hike/bike trails
to meet the needs identified in the Comprehensive Plan, 1.5) Support parks, green space, trails, and similar park/open space uses easily accessible to residents
at neighborhood level, 1.6) Encourage and consider development of incentives for providing common open/green space, hike/bike trails, and landscaping in all
new development wherever possible and 1.7) Strive to establish Dubuque as a bicycle friendly town, with bike lanes and bike trails where feasible.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainability Principles of Community Design, Green Buildings, and Community Knowledge.
294
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Signalization Program DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1011 COST
$ 597,337
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 42,037 $ 5,000 Design & Engineering $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 10,000
$ 4,022 $ 96,278 Construction $ 105,000 $ 25,000 $ 95,000 $ 95,000 $ 105,000 $ 100,000
$ 46,059 $ 101,278 TOTAL $ 110,000 $ 30,000 $ 100,000 $ 100,000 $ 110,000 $ 110,000
B. PROJECT FINANCING
$ 46,059 $ 101,278 Sales Tax Fund (30%) $ 110,000 $ 30,000 $ 100,000 $ 100,000 $ 110,000 $ 110,000
$ 46,059 $ 101,278 TOTAL $ 110,000 $ 30,000 $ 100,000 $ 100,000 $ 110,000 $ 110,000
PROJECT DESCRIPTION
This project provides for the improvement of existing traffic signals, replacement of signal controllers and/or the signalization of additional intersections as the need
may arise. This project also covers engineering staff time related to additional signals and is combined with other programs such as Traffic Signal Intersection
Reconstruction and Traffic Signal Interconnect to make a project viable.
JUSTIFICATION
Each year appropriations are intended to fund the signalization of intersections through the City as the need may arise. New signals will be given consideration
utilizing the warrants established in the Iowa Manual on Uniform Traffic Control Devices. Currently, each new signal installation can cost approximately$225,000
and there are multiple locations under consideration.
RELATIONSHIP TO OTHER PROJECTS
White Street Pavement Rehabilitation from 11th to 21st Street. This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain
and improve safe and efficient movement on the City's street system, objective 1.1) Support continuing the ongoing street construction program, providing for
timely maintenance, repair and reconstruction of the City street system and Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and
functional surface transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement
markings, traffic signs, street name signs, walls and other related facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principles of Reasonable Mobility, Healthy Air and Community Design.
295
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Grandview Street Light Replacement DEPARTMENT: 55 TOTAL
Program PROJECT
FD/CIP NO: 300-1210 COST
$ 582,160
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 3,008 $ 5,000 Design & Engineering $ 10,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ 13,511 $ 103,441 Construction $ 190,000 $ 95,000 $ 95,000 $ 52,200 $ 45,000
$ 16,519 $ 108,441 TOTAL $ 200,000 $ - $ 100,000 $ 100,000 $ 57,200 $ 50,000
B. PROJECT FINANCING
$ 16,559 $ 108,441 Sales Tax Fund (30%) $ 200,000 $ 100,000 $ 100,000 $ 57,200 $ 50,000
$ 16,559 $ 108,441 TOTAL $ 200,000 $ - $ 100,000 $ 100,000 $ 57,200 $ 50,000
PROJECT DESCRIPTION
This CIP would fund the replacement of 60 concrete streetlights along Grandview Avenue with historic LED fixtures. The project limits include Grandview at Delhi
to the North to Grandview at 151 to the south. Included in this project is 12,000 feet of fiber optic cable and 20 security cameras at key locations along Grandview
which will be completed with FY 2017 and FY 2019 funds. Beginning in FY 2020 the new street lights will be installed.
JUSTIFICATION
The existing streetlights along Grandview Avenue are made out of concrete poles. These poles require yearly maintenance and replacement due to rebar rusting
from within. The Engineering department buys replacement poles each year, but the newer poles seem to be breaking down quicker than the older poles. This
CIP would fund the replacement of these 60 in increments of 10 poles per year. New conduit and lighting cabinets would also be part of this project. The concrete
poles removed would be used to replace weathered poles in the older section until they are fully replaced. The Grandview Avenue corridor is a great opportunity
to connect fiber optic lines between major roadways. This fiber line will tie US 61/151 into US 20 fiber optics and provide future feeds to neighborhoods along the
way. This fiber will support the installation of 20 cameras along the route.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits,
street signage, street pavement striping, and traffic signals, 1.3) Support maintaining the street system's continuity and safety and 1.4) Support providing adequate
street lighting which minimizes light pollution, maximizes energy efficiency, and ensures compatibility with neighborhoods and Infrastructure Goal Four: To provide,
maintain, and improve a cost-effective, safe and functional surface transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails,
street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and other related facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
296
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Traffic Signal Mastarm Retrofit DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1133 COST
$ 370,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 66,498 $ 3,500 Construction $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ 1,350 $ 68,652 Equipment $ 55,000 $ 55,000 $ 75,000 $ 75,000 $ 85,000 $ 90,000
$ 67,848 $ 72,152 TOTAL $ 60,000 $ 60,000 $ 80,000 $ 80,000 $ 90,000 $ 95,000
B. PROJECT FINANCING
$ 67,848 $ 72,152 Sales Tax Fund (30%) $ 60,000 $ 60,000 $ 80,000 $ 80,000 $ 90,000 $ 95,000
$ 67,848 $ 72,152 TOTAL $ 60,000 $ 60,000 $ 80,000 $ 80,000 $ 90,000 $ 95,000
PROJECT DESCRIPTION
This program would provide for reconstruction of intersection mastarm retrofit for key intersections in the Central Business District.
JUSTIFICATION
White and Central Avenue contain a mix of different styles of traffic signalization. Some locations have pedestal mounted signal heads, other location have
Mastarm mounted heads. The differing location of the traffic signals sometimes causes some motorists to react to the 2nd signal ahead as opposed to their nearer
intersection. This program would provide for installing Mastarm mounted signals along Loras, White and Central Corridors. Intersections: 14th at Jackson, White
at 20th and Jackson at 22nd. This would standardize the location of the signal heads along the major arterial routes. This project has been extended out to cover
increased costs. Recently, Central at 5th and 7th were reconstructed using these funds. High priority locations include signals along Loras Blvd including Jackson,
Washington and Elm.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objective 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits,
street signage, street pavement striping, and traffic signals and 1.3) Support maintaining the street system's continuity and safety and Infrastructure Goal Four: To
provide, maintain, and improve a cost-effective, safe and functional surface transportation system, objective 4.4) Support maintaining and improving city alleys,
guardrails, street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and other related facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
297
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Traffic Signal Vehicle Detection DEPARTMENT: 55 TOTAL
Conversion PROJECT
FD/CIP NO: 300-1816 COST
$ 444,034
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 5,000 Design & Engineering $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ 62,745 $ 64,289 Construction $ 62,000 $ 55,000 $ 55,000 $ 55,000 $ 60,000 $ 60,000
$ 62,745 $ 69,289 TOTAL $ 67,000 $ 60,000 $ 60,000 $ 60,000 $ 65,000 $ 65,000
B. PROJECT FINANCING
$ 62,745 $ 69,289 Sales Tax Fund (30%) $ 67,000 $ 60,000 $ 60,000 $ 60,000 $ 65,000 $ 65,000
$ 62,745 $ 69,289 TOTAL $ 67,000 $ 60,000 $ 60,000 $ 60,000 $ 65,000 $ 65,000
PROJECT DESCRIPTION
This project provides for the conversion of 2 signalized intersections a year to a new vehicle detection system and stop bar video cameras.
JUSTIFICATION
Traffic signals require vehicle detection to minimize delay. Some older installations did not have vehicle detection or have faulty loop detectors (loops cut into the
roadway that measure inductance to detect if a car is waiting or not). Video and wireless detection is an easy, safe alternative that we have been using throughout
the City at new installations FY15 used for US20 at Devon, Century and Old Hwy, completing all of Highway 20 except Locust which will be completed in FY 2018.
Locations that currently are in need of maintenance and potential candidates include NW Arterial at Holliday, NW Arterial at Plaza, NW Arterial at JFK, and
University at Penn. 2016 new model of equipment allows this technology to be installed at more existing locations. Three intersections, Locust/Hwy 151/Jones, will
be completed in FY 2020.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system and 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits, street
signage, street pavement striping, and traffic signals and Goal Two: To plan long-range for both local and regional street and highway systems to ensure safe,
efficient access into and through the city and to support urban growth in an appropriate development pattern, objective 2.3) Support improving the existing street
network to reduce traffic capacity restraints and improve safety. This project also implements the Comprehensive Plan's Infrastructure Goal Four: To provide,
maintain, and improve a cost-effective, safe and functional surface transportation system, objectives 4.1) Support the ongoing street reconstruction, rehabilitation,
and maintenance overlay programs, ensuring the timely maintenance, repair and reconstruction of the city's streets and bridges and 4.2) Identify new
technologies, new materials and new concepts for street maintenance, restoration, and reconstruction.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
298
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Traffic Signal Fiber Optic Network Program DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1631 COST
$ 684,582
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 28,139 $ 5,320 Design & Engineering $ 10,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ 95,608 $ 96,515 Construction $ 154,000 $ 85,000 $ 85,000 $ 110,000 $ 100,000
$ 123,747 $ 101,835 TOTAL $ 164,000 $ - $ 90,000 $ 90,000 $ 115,000 $ 105,000
B. PROJECT FINANCING
$ 123,747 $ 101,835 Sales Tax Fund (30%) $ 164,000 $ 90,000 $ 90,000 $ 115,000 $ 105,000
$ 123,747 $ 101,835 TOTAL $ 164,000 $ - $ 90,000 $ 90,000 $ 115,000 $ 105,000
PROJECT DESCRIPTION
This will be an annual project that provides for the necessary fiber optics communication equipment to be installed along key corridors that will allow for the
interconnection network of traffic signals via fiber optics back to the Traffic Operations Center at City Hall and the Traffic Shop located at the Municipal Service
Center. This also covers fiber used by many other city entities including Traffic and Security Cameras, Information Services, Police, and Fire.
JUSTIFICATION
In the summer of 2004, the signals along US 20 from Devon Drive to Menards (9 signals) were interconnected with fiber optic communication line. Four of these
connections were completed in FY 2016 and the remaining five still need replacement. This connection method allows great flexibility in timing control of traffic
signals along with remote management, troubleshooting and error reporting along with many other benefits. In the fall of 2004, another project placed fiber optic
conduit along the NW Arterial from US 20 to the intersection of Kohl's (6 total). In the summer of 2008, there will be a ICAAP project that will connect the these 6
signals+ one a JFK into the system that is used along US 20. The City of Dubuque has invested heavily into the installation of fiber optics conduits throughout the
City. This project provides for the necessary fiber optics and communications equipment to be installed within these conduits so that we can start making use of it.
All of the new traffic signal installations in the last three years have been installed to be fiber ready, We now have communications standards in place and will be
installing fiber optics and communication equipment throughout the city starting with the major traffic corridors including US 20, NW Arterial, Central Ave, White
Street, Loras Blvd, Locust Connector, US 61/151. One of the primary goals of this project is to complete a fiber optic communication loop around the City utilizing
US 20, NW Arterial, US 52 down Central to Locust and back onto US 20. Fiber optics communications will also replace the existing Central Business District traffic
7 wire interconnect. This changed out to fiber will occur over the upcoming years. ATraffic Management Center has been installed on the third floor of City that
will house the electronics to allow remote management of the signals though a standard internet protocol communications. There are many older signals through
town that need to be updated prior to going on this new system. These signals will be added to the system as they are updated.
RELATIONSHIP TO OTHER PROJECTS
This project allows us to utilize many of our fiber optic conduits throughout town. This has the potential to benefit many other city entities such as fire, police,
information services, etc. This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and
functional surface transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement
markings, traffic signs, street name signs, walls and other related facilities and Goal Eleven: To plan for, build, or improve infrastructure systems to meet
299
anticipated growth and development needs, objective 11.4) Investigate usefulness of technological advances to optimize services.
This project also implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's
street system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed
limits, street signage, street pavement striping, and traffic signals and 1.3) Support maintaining the street system's continuity and safety and Goal Three:To
facilitate improved four-lane access for surface transportation from Dubuque to major cities in the region, objective 3.3) Support a street and highway system which
meets current and future traffic needs.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
300
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Traffic Signal Interconnect Conduit DEPARTMENT: 55 TOTAL
Replacement PROJECT
FD/CIP NO: 300-1266 COST
$ 428,080
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 1,268 $ 5,000 Design & Engineering $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ 88,884 $ 87,928 Construction $ 35,000 $ 30,000 $ 45,000 $ 55,000 $ 55,000 $ 66,000
$ 90,152 $ 92,928 TOTAL $ 40,000 $ 35,000 $ 50,000 $ 60,000 $ 60,000 $ 71,000
B. PROJECT FINANCING
$ 90,152 $ 92,928 Sales Tax Fund (30%) $ 40,000 $ 35,000 $ 50,000 $ 60,000 $ 60,000 $ 71,000
$ 90,152 $ 92,928 TOTAL $ 40,000 $ 35,000 $ 50,000 $ 60,000 $ 60,000 $ 71,000
PROJECT DESCRIPTION
This project provides for reconstruction of a portion of the underground wiring system for the traffic signal interconnect system. It will also tie in some
miscellaneous intersections that were not part of the original interconnect. As part of the project, the conduit will be upsized to a multi-duct conduit system so that
it could be utilized as part of the City's Fiber Optic Network.
JUSTIFICATION
Much of the underground galvanized steel conduit and wiring is in excess of 25 years old and is in need of replacement. Currently, annual repairs are needed to
maintain the traffic signal coordination system operating in the downtown area. Much of the system is corroded to the extent that new wiring cannot be pulled
through the old conduit, thereby requiring several spotted areas of conduit removal and replacement each year. The majority of the new conduit would be bored
under the streets and sidewalks to minimize the need for street patches. When this interconnect fails, traffic lights go out of coordination and run free. Many times
the power feed is also interrupted. High priority signals to interconnect include Asbury at Carter and at Chaney and St. Ambrose, 14th at Elm and Jackson, Locust
at Charter, Bryant and Mt. Loretta,
RELATIONSHIP TO OTHER PROJECTS
New technology now allows the traffic controllers to report back to a master controller in City Hall with error and malfunction notices. This project implements the
Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface transportation system, objective
4.2) Identify new technologies, new materials and new concepts for street maintenance, restoration, and reconstruction and 4.4) Support maintaining and
improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and other related facilities, and
Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street system, objectives 1.1) Support continuing the
ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street system and 1.2) Encourage implementation of
sound safety engineering principles and practices in the area of street lighting, street layout, speed limits, street signage, street pavement striping, and traffic
signals.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
301
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Street Light Replacement and New DEPARTMENT: 55 TOTAL
Installation PROJECT
FD/CIP NO: 300-1549 COST
$ 202,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 1,426 $ 6,000 Design & Engineering $ 6,000 $ 6,000 $ 6,000 $ 6,000 $ 6,000 $ 6,000
$ 5,580 $ 60,257 Other $ 17,000 $ 33,000 $ 40,000 $ 41,000 $ 41,000 $ 42,000
$ 7,006 $ 66,257 TOTAL $ 23,000 $ 39,000 $ 46,000 $ 47,000 $ 47,000 $ 48,000
B. PROJECT FINANCING
$ 7,006 $ 66,257 Sales Tax Fund (30%) $ 23,000 $ 39,000 $ 46,000 $ 47,000 $ 47,000 $ 48,000
$ 7,006 $ 66,257 TOTAL $ 23,000 $ 39,000 $ 46,000 $ 47,000 $ 47,000 $ 48,000
PROJECT DESCRIPTION
This project initiates a scheduled replacement of older street lights throughout the City, and will also include the installation of new street lights when conditions
warrant. Currently, the City owns approximately 2,200 street lights. In many older subdivisions the entire light fixture, base, pole and conduits need replacing.
Currently there are around 60 lights in 24 locations that are in need of replacement.
JUSTIFICATION
Typical cost of reconstructing streetlights runs high because of obstacles, rerouting feeder lines etc. In many cases the new lines need to be directionally bored.
Average cost of reconstruction is around $1,500 to $2,000 each. This would allow for replacement of 12-15 lights per year. The City is also looking into alternative
lighting technologies but when comparing the differences between installing Solar vs. LED (Light Emitting Diodes), the cost differential is quite significant. If the
local utility company installs a pole, luminaire, and power it will approximately cost $14.96 per month or$179.52 annually versus the cost for a solar streetlight
which is$3,400. Engineering is not enamored with solar street lights since the prime areas with lighting needs are in the downtown neighborhoods, which have a
lot of trees and would affect performance. Other issues include the high cost of installation, the impact of weather (i.e.. snow) affect the panels and related
maintenance, aesthetics (large solar panels at each install), and reliability.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities and Transportation Goal One: To provide, maintain and improve safe and efficient movement on the
City's street system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout,
speed limits, street signage, street pavement striping, and traffic signals, 1.3) Support maintaining the street system's continuity and safety and 1.4) Support
providing adequate street lighting which minimizes light pollution, maximizes energy efficiency, and ensures compatibility with neighborhoods.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
302
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Traffic Signal Controller Replacement DEPARTMENT: 55 TOTAL
Project PROJECT
FD/CIP NO: 300-1274 COST
$ 329,080
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 63,274 $ 70,806 Equipment $ 45,000 $ 15,000 $ 45,000 $ 45,000 $ 45,000 $ 46,000
$ 63,274 $ 70,806 TOTAL $ 45,000 $ 15,000 $ 45,000 $ 45,000 $ 45,000 $ 46,000
B. PROJECT FINANCING
$ 63,274 $ 70,806 Sales Tax Fund (30%) $ 45,000 $ 15,000 $ 45,000 $ 45,000 $ 45,000 $ 46,000
$ 63,274 $ 70,806 TOTAL $ 45,000 $ 15,000 $ 45,000 $ 45,000 $ 45,000 $ 46,000
PROJECT DESCRIPTION
This project initiates a scheduled replacement of the older traffic signal controllers throughout the City. This project would provide for the replacement of
approximately 3 of the City's 115 traffic signal controllers per year.
JUSTIFICATION
The new controllers are needed for compatibility with the pre-emption program for the traffic signals being proposed by the Fire and Police Departments. All new
intersections are currently compatible. The cost of a single controller is approximately $14,000 plus$6,000 for a battery backup system and $6,000 for pre-
emption. Recently, the cost of these cabinets have increased due to advanced technical equipment within the cabinet. This appropriation would allow for two to
three replacements per year. This replacement schedule also is in keeping up with the replacement needs for the older controllers, purely from a maintenance
perspective. We are currently redesigning our cabinet standards and drawing down our existing stock as we prepare for the new cabinet standards. Carter and
Chaney on Asbury Road will be updated in FY 2017. University & Nevada and Charter& Locust will be connected to fiber with new cable placed in FY 2017.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system and 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits, street
signage, street pavement striping, and traffic signals and Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
303
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Street Lighting and Traffic Signal DEPARTMENT: 55 TOTAL
Knockdown/Insurance Storm Fund PROJECT
FD/CIP NO: 300-2252 COST
$ 284,080
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 63,274 $ 70,806 Construction $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000
$ 63,274 $ 70,806 TOTAL $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000
B. PROJECT FINANCING
$ 7,154 $ 10,000 Insurance Reimbursements $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000
$ 56,120 $ 60,806 Sales Tax Fund (30%) $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
$ 63,274 $ 70,806 TOTAL $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000
PROJECT DESCRIPTION
This fund will be used to purchase and track replacement traffic control and street lighting equipment and would be used as a depository to track insurance claims.
JUSTIFICATION
The City of Dubuque replaces equipment that is damaged or destroyed due to accidents and weather related activities. Many of the new traffic cabinets along the
major corridors may contain $60,000 to $75,000 of equipment. In some instances this equipment is purchased to replace equipment that was damaged due to an
accident in which there is an insurance claim. Insurance reimbursements are put back into the project to fund expenditures. This makes it very hard to track cost
due to accidents, and how much is spent by the City on hit and runs. Major storm events due to lightening alone can expend the budget.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's City Fiscal Goal Six: To improve City government productivity and service delivery and identify alternative
means of service delivery, objective 6.1) Review all City services and programs for operational efficiencies to improve service levels and delivery, and/or to
implement cost containment measures.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Resource Management.
304
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Fiber Optic Conduit - Miscellaneous DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-2144 COST
$ 318,195
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 760 $ 5,012 Design & Engineering $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ 26,280 $ 61,143 Construction $ 35,000 $ 30,000 $ 45,000 $ 45,000 $ 45,000 $ 45,000
$ 27,040 $ 66,155 TOTAL $ 40,000 $ 35,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
B. PROJECT FINANCING
$ 27,040 $ 66,155 Sales Tax Fund (30%) $ 40,000 $ 35,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
$ 27,040 $ 66,155 TOTAL $ 40,000 $ 35,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
PROJECT DESCRIPTION
This improvement provides an annual program for installing conduit for fiber optic in miscellaneous projects throughout the community.
JUSTIFICATION
Installation of fiber conduit into existing infrastructure typically ranges from $25 to $35 a linear foot when installed in a stand along project. When combined with
other projects the cost can drop to around $10 to $20 a linear foot. This improvement item funds the installation of fiber conduit along other unscheduled City
projects and in conjunction with other private utility projects where it is convenient and at a cost savings to the community. This budget item would extend fiber
optic conduit as part of the City wide effort to create a network of City owned fiber optic systems and will also aid linking adjacent projects together. This fiber, once
installed, is used by many City entities including Information Services, Fire, and Police Department. FY 2017 and FY 2018 funding will provide fiber across the
cedar cross bridge.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities, Goal Eight: To provide, maintain, and improve an accessible and functional communication
infrastructure, objective 8.1) Promote compatibility and connection of Dubuque's communication infrastructure to key state, regional, national, and global networks
and systems and Goal Eleven: To plan for, build, or improve infrastructure systems to meet anticipated growth and development needs, objectives 11.5) Plan for
orderly replacement and upgrade of public and private communication infrastructure with attention to features, capacity, compatibility, and future growth and 11.6)
Consider opportunities for buried public and private communication infrastructure during planning for street, water, and sewer construction projects.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
305
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works ITS Traffic Control Equipment DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-2253 COST
250-2253 $ 285,942
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 24,500 $ 31,442 Construction $ 30,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
$ 24,500 $ 31,442 TOTAL $ 30,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
B. PROJECT FINANCING
$ 24,500 $ 25,000 Road Use Tax Fund $ 50,000 $ 50,000
$ 6,442 Sales Tax Fund (30%) $ 30,000 $ 50,000 $ 50,000 $ 50,000
$ 24,500 $ 31,442 TOTAL $ 30,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
PROJECT DESCRIPTION
This project provides funds for the maintenance and expansion of the Traffic Management Center's ITS Improvements including remote management and
monitoring of the City's traffic signals along with automated vehicle counters, cameras, classifiers, variable message boards etc. along key city corridors along with
ITS equipment located within the Traffic Management Center located at City Hall. This fund would also be used as match money in joint projects that are being
suggested by the Iowa DOT.
JUSTIFICATION
ITS Technologies improve the efficiency of traffic control equipment using state of the art electronics, congestion, air improvement, travel improvements, citizen
concern, and green communities. Examples of these technologies include traffic counters, traffic monitoring equipment for speeds and occupancy, variable
message boards to inform the traveling public. The 1-80 detour through Dubuque in the Summer of 2008 used some our existing ITS technologies to aid the flow
of traffic through Dubuque.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic
signs, street name signs, walls and other related facilities, Goal Eleven: To plan for, build, or improve infrastructure systems to meet anticipated growth and
development needs, objective 11.4) Investigate usefulness of technological advances to optimize services; Transportation Goal One: To provide, maintain and
improve safe and efficient movement on the City's street system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in
the area of street lighting, street layout, speed limits, street signage, street pavement striping, and traffic signals and 1.3) Support maintaining the street system's
continuity and safety and Goal Three: To facilitate improved four-lane access for surface transportation from Dubuque to major cities in the region, objective 3.3)
Support a street and highway system which meets current and future traffic needs, and City Fiscal Goal Five: To emphasize the use of fees and user charges to
maintain existing City services and reduce reliance on local property taxes while remaining sensitive to program access, affordability, and availability for those with
low or moderate incomes or disabilities, 5.1) Pursue federal, state and private funding to help finance City services and minimize the property tax burden, but avoid
service or funding commitments after such outside funding ends.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
306
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C TOTAL
Engineering/Traffic Public Works Street Camera Installation DEPARTMENT: 55 PROJECT
FD/CIP NO: 300-2421 COST
$ 178 766
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 8,966 $ 44,800 Equipment $ 25,000 $ 25 000 $ 25,000 $ 25,000 $ 25,000 $ 50,000
$ 8,966 $ 44,800 TOTAL $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 50,000
B. PROJECT FINANCING
$ 8,966 $ 44,800 Sales Tax Fund (30%) $ 25,000 $ 25, 00 000 $ 25,000 $ 25,000 $ 25,000 $ 50,000
$ 8,966 $ 44,800 TOTAL $ 25,000 $ 25,0 $ 25,000 $ 25,000 $ 25,000 $ 50,000
PROJECT DESCRIPTION
This project would fund the equipment, installation and software license for the placement of fixed cameras at$2500 each installed near roadways, alleys and
signalized intersections throughout the City of Dubuque.
JUSTIFICATION
Currently, the Traffic Operations Center has communication lines throughout the city along major and minor arterials, city streets and near signalized intersections.
Engineering uses these cameras to remotely monitor and adjust traffic operations. Over the last few years engineering and police have worked together using
these cameras to aid the police in accident and crime investigations on a daily basis.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objective 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system, 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits, street
signage, street pavement striping, and traffic signals and 1.3) Support maintaining the street system's continuity and safety, Infrastructure Goal Four: To provide,
maintain, and improve a cost-effective, safe and functional surface transportation system, objectives, 4.4) Support maintaining and improving city alleys,
guardrails, street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and other related facilities.
This project also implements the Comprehensive Plan's Public Safety Goal Two: To maintain appropriate readiness response capabilities in all areas of public
safety, objectives 2.1) Support effective and efficient dispatch for public safety personnel for prompt, appropriate responses to calls from the public, 2.2) Support
safe and efficient buildings, facilities, vehicles, and equipment to support efforts of public safety agencies, while striving for state-of-the-art technology.
2.3 Support communications capabilities with operational personnel and equipment, 2.4) Continue to improve and maintain the readiness status of all public safety
personnel by monitoring their operational status and providing adequate training, 2.5) Consider expanding the use of ITS (Intelligent Transportation System)
equipment, including regional partnerships and 2.7) Support appropriate staffing levels and equipment to serve growth and development.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES:
This project implements the Sustainable Principle of Healthy Air, Reasonable Mobility, and Smart Energy Use.
307
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works City-Wide Security Camera Program DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-2676 COST
360-2676 $ 415,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 2,500 Design & Engineering $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ 32,500 Equipment $ 55,000 $ 55,000 $ 55,000 $ 95,000 $ 95,000 $ 95,000
$ - $ 35,000 TOTAL $ 60,000 $ 60,000 $ 60,000 $ 100,000 $ 100,000 $ 100,000
B. PROJECT FINANCING
$ 25,000 Sales Tax Fund (30%) $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000
$ 10,000 Greater Downtown TIF is 10,000 $ 10,000 $ 10,000 $ 50,000 $ 50,000 $ 50,000
$ - $ 35,000 TOTAL $ 60,000 $ 60,000 $ 60,000 $ 100,000 $ 100,000 1$ 100,000
PROJECT DESCRIPTION
This improvement covers the required equipment on the head-end of the citywide camera system and will allow for the continued expansion of cameras in the
field. This covers the immediate need for fiber loops, network switch and storage upgrades, and future years will cover the continued expansion of this system.
JUSTIFICATION
The traffic and security cameras within the City of Dubuque have grown steadily from just a few in the early 2000's to roughly 800 in 2015 and to 1000 in 2016. As
these successful systems progress, additional space and equipment on the back end will be required to support this growing program.
RELATIONSHIP TO OTHER PROJECTS
Public Safety Goal Three: To prevent, control, and investigate volatile, at risk situations and criminal behavior. Objective 3.3) Support identifying criminal activity
and volatile, at risk situations and take appropriate action. This project also implements the Comprehensive plan's Public Safety Goal Two: To maintain appropriate
readiness response capabilities in all areas of public safety, objectives 2.5) Consider expanding the use of ITS (Intelligent Transportation System) equipment,
including regional partnerships, 2.6) Recognize the efficiencies and partnerships created with joint facilities and 2.7) Support appropriate staffing levels and
equipment to serve growth and development.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
308
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works LED Re-lamp schedule DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1916 COST
$ 209,309
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 10,000 $ 38,056 Construction $ 1,000 $ 1,000 $ 1,000 $ 1,000 $ 1,000 $ 1,000
$ 9,253 $ 1,000 Equipment $ 23,500 $ 9,500 $ 28,000 $ 29,000 $ 56,000 $ 29,000
$ 19,253 $ 39,056 TOTAL $ 24,500 $ 10,500 $ 29,000 $ 30,000 $ 57,000 $ 30,000
B. PROJECT FINANCING
$ 19,253 $ 39,056 Sales Tax Fund (30%) $ 24,500 $ 10,500 $ 29,000 $ 30,000 $ 57,000 $__-30 0-
0000
$ 19,253 $ 39,056 TOTAL $ 24,500 $ 10,500 $ 29,000 $ 30,000 $ 57,000 $ 30,000
PROJECT DESCRIPTION
In 2001-2002, the city traffic signals were converted from 150 watt incandescent bulbs to 10 watt LED lamps. This conversion also included a large rebate
incentive from the local power company along with drastically reduced electrical consumption. These new LED fixtures have a life-span of 5 - 7 years. This
appropriation will provide for the re-Tamping of approximately 1/10th of the City owned traffic signal lamps in each year. Currently the City has 115 traffic signals
that with an average of about 40 lamps per intersection. Each lamp runs approximately $70 each. New LED signal heads can be purchased with a 15 year
warranty.
JUSTIFICATION
This project will reduce maintenance problems (burnouts/failures) with traffic signals in future years. These existing LED's have lasted approximately twice their
warrantied lifespan, instead of burning out they dim over time and become non-compliant with MUTCD guidelines. This Capital Improvement program will
systematically replace these lamps by corridor starting with the oldest LED's.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits,
street signage, street pavement striping, and traffic signals, 1.3) Support maintaining the street system's continuity and safety and 1.4) Support providing adequate
street lighting which minimizes light pollution, maximizes energy efficiency, and ensures compatibility with neighborhoods, Infrastructure Goal Four: To provide,
maintain, and improve a cost-effective, safe and functional surface transportation system, objective 4.4) Support maintaining and improving city alleys, guardrails,
street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and other related facilities, and Public Safety Goal Four: To
create a safe community environment through increased awareness and education in order to eliminate violent crime, gang activity, drug use, juvenile crime, and
domestic violence, objective 4.4) Emphasize prevention as the preferred and primary method to work toward the elimination of gang activity, substance abuse, and
juvenile crime.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Smart Energy Use.
309
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Traffic Operations Center Video DEPARTMENT: 55 TOTAL
Management Software and Equipment PROJECT
FD/CIP NO: 300-2422 COST
$ 323,796
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 24,994 $ 73,802 Other $ 40,000 $ 40,000 $ 45,000 $ 50,000 $ 50,000 $ 55,000
$ 24,994 $ 73,802 TOTAL $ 40,000 $ 40,000 $ 45,000 $ 50,000 $ 50,000 $ 55,000
B. PROJECT FINANCING
$ 24,994 $ 73,802 Sales Tax Fund (30%) $ 40,000 $ 40,000 $ 45,000 $ 50,000 $ 50,000 $ 55,000
$ 24,994 $ 73,802 TOTAL $ 40,000 $ 40,000 $ 45,000 $ 50,000 $ 50,000 $ 55,000
PROJECT DESCRIPTION
This project would fund the installation of a new video management system that is located in the Traffic Operations Center (TOC). It would include software and
hardware that would connect the 400 plus cameras that feed into the TOC and allow for recording and distribution. This fund would cover additional licenses and
equipment.
JUSTIFICATION
The viewing of live video feeds along with reviewing of archived footage is a integral part of the day to day operations in the TOC. Currently 400 cameras feed
back to the Traffic Operations Center and many more are expected to be added in the future. These cameras are used to view live traffic patterns that can be
adjusted remotely from the TOC. These cameras are also used extensively by police for accident investigations and police searches. Often times this footage is
requested by legal council and is used in court. In 2013 the video management system was updated to Milestone Software. This new software would allow
simultaneous time lines to be traced and exported.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objective 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system and 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits, street
signage, street pavement striping, and traffic signals.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES:
This project implements the Sustainable Principle of Healthy Air and Reasonable Mobility and Smart Energy Use.
310
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Traffic Signal Battery Backup Program DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1229 COST
$ 120,942
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 35,462 $ 20,942 Equipment $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
$ 35,462 $ 20,942 TOTAL $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
B. PROJECT FINANCING
$ 35,462 $ 20,942 Sales Tax Fund (30%) $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
$ 35,462 $ 20,942 TOTAL $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000
PROJECT DESCRIPTION
This project provides needed traffic control at signalized intersections during times of power outages. This project will provide for the purchase and installation of
battery backup systems by City traffic signal technicians in existing traffic signal controllers at various locations throughout the city. These battery backups will
provide backup power to run each intersection on in full colors for up to eight hours during power outages. When power is restored, the controllers will
automatically reset and go back into service. This program would add battery backup systems (BBS) to four intersections a year. These battery backup units also
serve as lighting controllers and can be placed midblock in the Central Business District to serve two intersections with one BBS. Each BBS costs between $6,500
to $9,500. This CIP will fund the addition of 2 to 3 BBS per year.
JUSTIFICATION
In the City of Dubuque, there are 115 traffic controllers located at various intersections and crosswalks throughout the city. During times of power outages, crews
are dispatched to the signalized intersections to place portable stop signs. Depending on when these power outages occur, the response time for crews to load
stop signs and place them averages thirty minutes to one hour. The response time is even longer when outages occur at night and/or on a weekend. During this
time, police officers are dispatched to direct traffic until stop signs can be placed. When major outages occur, many intersections at one time can be affected,
which endanger public safety and severely interrupt both police and maintenance operations. This project allows the City of Dubuque to provide normal traffic
control at intersections during power outages, with the least interruption to the driving public, police and maintenance operations.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits,
street signage, street pavement striping, and traffic signals and 1.3) Support maintaining the street system's continuity and safety. This project also implements the
Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface transportation system, objectives
4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls
and other related facilities, and Public Safety Goal Two: To maintain appropriate readiness response capabilities in all areas of public safety, objectives 2.1)
Support effective and efficient dispatch for public safety personnel for prompt, appropriate responses to calls from the public, 2.2) Support safe and efficient
buildings, facilities, vehicles, and equipment to support efforts of public safety agencies, while striving for state-of-the-art technology, 2.3) Support communications
311
capabilities with operational personnel and equipment, 2.5) Consider expanding the use of ITS (Intelligent Transportation System) equipment, including regional
partnerships.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
312
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Citywide LED Streetlight Retrofit DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-2484 COST
360-2484 $ 182,078
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 35,462 $ 31,616 Equipment $ 25,000 $ 10,000 $ 25,000 $ 25,000 $ 30,000 $ 30,000
$ 35,462 $ 31,616 TOTAL $ 25,000 $ 10,000 $ 25,000 $ 25,000 $ 30,000 $ 30,000
B. PROJECT FINANCING
Greater Downtown TIF $ 25,000 $ 10,000 $ 25,000 $ 25,000 $ 30,000 $ 30,000
$ 35,462 $ 31,616 Sales Tax Fund (30%)
$ 35,462 $ 31,616 TOTAL $ 25,000 $ 10,000 $ 25,000 $ 25,000 $ 30,000 $ 30,000
PROJECT DESCRIPTION
This CIP would fund LED replacement luminaries throughout the City. Currently when street light fixtures burn out they are replaced with matching style high
pressure sodium street lights. This program would fund the use of LED replacement fixtures throughout the city.
JUSTIFICATION
This program would promote the use of high efficiently, long life LED street lighting throughout the City of Dubuque. Current locations of interest include the Port of
Dubuque Riverwalk, Bridge Lighting locations and Miscellaneous subdivision locations. 2016 funds were used to purchase retrofit bulbs used in historic lighting
throughout the downtown along with LED cobra head style lighting.
RELATIONSHIP TO OTHER PROJECTS:
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits,
street signage, street pavement striping, and traffic signals and 1.3) Support maintaining the street system's continuity and safety, and 1.4) Support providing
adequate street lighting which minimizes light pollution, maximizes energy efficiency, and ensures compatibility with neighborhoods. Infrastructure Goal Four: To
provide, maintain, and improve a cost-effective, safe and functional surface transportation system, objectives 4.3) Seek alternative funding sources for construction
and maintenance and 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic signs,
street name signs, walls and other related facilities. This project also implements the Comprehensive plan's Public Safety Goal Two: To maintain appropriate
readiness response capabilities in all areas of public safety, objectives 2.1) Support effective and efficient dispatch for public safety personnel for prompt,
appropriate responses to calls from the public, 2.2) Support safe and efficient buildings, facilities, vehicles, and equipment to support efforts of public safety
agencies, while striving for state-of-the-art technology, 2.3) Support communications capabilities with operational personnel and equipment, 2.4) Continue to
improve and maintain the readiness status of all public safety personnel by monitoring their operational status and providing adequate training, 2.5) Consider
expanding the use of ITS (Intelligent Transportation System) equipment, including regional partnerships, 2.6) Recognize the efficiencies and partnerships created
with joint facilities and 2.7) Support appropriate staffing levels and equipment to serve growth and development.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
313
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Traffic Signal Intersection Reconstruction DEPARTMENT: 55 TOTAL
PROJECT
FD/CIP NO: 300-1615 COST
$ 427,858
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 5,000 Design & Engineering $ 10,000 $ 5,000 $ 5,000 $ 5,000 $ 5,000
$ 12,921 $ 77,937 Construction $ 110,000 $ 60,000 $ 60,000 $ 77,000 $ 77,000
$ 12,921 $ 82,937 TOTAL $ 120,000 $ - $ 65,000 $ 65,000 $ 82,000 $ 82,000
B. PROJECT FINANCING
$ 12,921 $ 82,937 Sales Tax Fund (30%) $ 120,000 $ 65,000 $ 65,000 $ 82,000 $ 82,000
$ 12,921 $ 82,937 TOTAL $ 120,000 $ - $ 65,000 $ 65,000 $ 82,000 $ 82,000
PROJECT DESCRIPTION
This project provides for the reconstruction of one intersection every two years. New findings have prompted the City to accelerate this program.
JUSTIFICATION
Much of the underground galvanized steel conduit and wiring is in excess of 25 years old and is in need of replacement. Many times when repairs are needed the
conduit at the intersection is corroded to the extent that new wiring cannot be pulled through thereby requiring several spotted areas of conduit to be removed and
replaced each year. Anchor bolts and bases are often times corroded or rusted off requiring new foundations and equipment during which time the signal remains
down or in an "all RED"flash status. New findings this year have brought to our attention a potentially urgent situation. Mastarms that were installed in the early
1980's as part of a major signalization effort are now in need of replacement. Most of these poles are the white painted signal poles in the area of White Street at
9th, Elm at 16th street, Iowa, Main at Bluff, and 9th at Bluff. These poles and transformer bases are rusting from the inside out. We found that many of the
transformer bases looked ok from the outside but were nearly completely rusted through. Many additional intersections are in need of rebuilding. In the fall of
2004 we did a temporary fix by welding new plate steel on all four corners of the transformer bases to in an attempt to hold them over till replacement. New
mastarm equipment is fully galvanized with many of the attached parts composed of plastic, aluminum or stainless steel which virtually eliminates this type of
corrosion problem. These newly rebuilt intersections will have pre-emption and battery backups. Future high priority intersections include Loras Blvd Signals east
of White Street, Charter at Locust and signals along Asbury Road. Including various improvements in the 1-way to 2-way corridors.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objectives 4.2) Identify new technologies, new materials and new concepts for street maintenance, restoration, and reconstruction and 4.4)
Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and
other related facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility.
314
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Flashing Yellow Left Turn Arrow DEPARTMENT: 55 TOTAL
Conversion PROJECT
FD/CIP NO: 300-2557 COST
$ 80,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 10,117 $ 39,883 Construction $ 20,000 $ 10,000
$ 10,117 $ 39,883 TOTAL $ 20,000 $ 10,000 $ — $ — $ — $
B. PROJECT FINANCING
$ 10,117 $ 39,883 Sales Tax Fund (30%) $ 20,000 $ 10,000
$ 10,117 $ 39,883 TOTAL $ 20,000 $ 10,000 $ — $ — $ — $ —
PROJECT DESCRIPTION
The flashing yellow arrow replaces the circular green signal used in the traditional left-turn signal configuration to indicate the need for left-turning vehicles to yield
to oncoming traffic and pedestrians.
JUSTIFICATION
The flashing yellow left-turn arrow signal is a new traffic management tool aimed at keeping traffic moving, increasing safety and reducing fuel consumption.
The flashing yellow left-turn arrow is has three distinct advantages:
Help prevent crashes. A national study demonstrated that drivers found flashing yellow left-turn arrows more understandable than traditional yield-on-green
indications. Often times accident victims confuse the green arrow with a green ball, with the flashing left turn arrow there is less confusion.
Reduce traffic delays. There are more opportunities to make a left turn with the flashing yellow left-turn arrow than with the traditional three-arrow, red, yellow and
green indications. This helps reduce delays at intersections, which save time and fuel.
Provide more traffic management flexibility. The new traffic signals provide traffic engineers with more options to handle variable traffic volumes.
This CIP covers the costs associate with converting 20 approaches along the NW Arterial intersections in FY16, 20 approaches along JFK and 151 in FY 17 and
10 approaches in the Central Business District in FY18.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system., objective 1.3) Support maintaining the street system's continuity and safety and Public Safety Goal Two: To maintain appropriate readiness response
capabilities in all areas of public safety, objective 2.2) Support safe and efficient buildings, facilities, vehicles, and equipment to support efforts of public safety
agencies, while striving for state-of-the-art technology, Goal Three: To prevent, control, and investigate volatile, at risk situations, and criminal behavior, objective
3.2) Support response to crimes, accidents, and other emergency situations and take the appropriate action promptly and efficiently, and Infrastructure Goal Four:
To provide, maintain, and improve a cost-effective, safe and functional surface transportation system, objective 4.4) Support maintaining and improving city alleys,
guardrails, street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and other related facilities.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
315
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Surge and Grounding Improvements at DEPARTMENT: 55 TOTAL
Signals City-Wide PROJECT
FD/CIP NO: 300-2420 COST
$ 106,812
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 31,812 Construction $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000
$ — $ 31,812 TOTAL $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000
B. PROJECT FINANCING
$ 31,812 Sales Tax Fund (30%) $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000
$ — $ 31,812 TOTAL $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000
PROJECT DESCRIPTION
This project would add additional surge protection to the 116 traffic signals and misc camera systems currently operated by the City of Dubuque.
JUSTIFICATION
Newer ITS signalized intersections are becoming more complex with advanced communications networks, battery backup systems, pre-emption equipment ,
cameras and high end detection equipment making them more susceptible to lightning, surge and grounding issues. This project would fund the retrofitting of
these signals with surge protection ranging from$500 to $2000 at each intersection (depending on the degree of equipment at each location). During the summer
of 2011 twenty intersections were hit by lightning during two storm events that caused an estimated $100,000 in damages. All newly installed intersections and
camera locations will be designed with this additional surge protection.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objectives 4.1) Support the ongoing street reconstruction, rehabilitation, and maintenance overlay programs, ensuring the timely
maintenance, repair and reconstruction of the city's streets and bridges, 4.2) Identify new technologies, new materials and new concepts for street maintenance,
restoration, and reconstruction and 4.4) Support maintaining and improving city alleys, guardrails, street lights, traffic control lights, street pavement markings,
traffic signs, street name signs, walls and other related facilities, Transportation Goal One: To provide, maintain and improve safe and efficient movement on the
City's street system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the
City street system and 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits,
street signage, street pavement striping, and traffic signals and Public Safety Goal Two: To maintain appropriate readiness response capabilities in all areas of
public safety, objective 2.5) Consider expanding the use of ITS (Intelligent Transportation System) equipment, including regional partnerships.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES:
This project implements the Sustainable Principle of Healthy Air, Reasonable Mobility, and Smart Energy Use.
316
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Downtown Streetlight Replacement DEPARTMENT: 55 TOTAL
Schedule PROJECT
FD/CIP NO: 360-1608 COST
$ 357,228
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 468 Design & Engineering $ 5,000 $ 10,000 $ 6,000 $ 10,000 $ 6,000 $ 5,000
$ 5,760 Construction $ 40,000 $ 90,000 $ 45,000 $ 92,000 $ 47,000 $ 45,000
$ 6,228 $ - TOTAL $ 45,000 $ 100,000 $ 51,000 $ 102,000 $ 53,000 $ 50,000
B. PROJECT FINANCING
$ 6,228 Greater Downtown TIF $ 45,000 $ 100,000 $ 51,000 $ 102,000 $ 53,000 $ 50,000
$ 6,228 $ - TOTAL $ 45,000 $ 100,000 $ 51,000 $ 102,000 $ 53,000 $ 50,000
PROJECT DESCRIPTION
This project provides for a replacement program of the existing 30-foot white streetlights located in downtown Dubuque. Currently there are approximately 70
white streetlights remaining. The project would replace all remaining white poles and install lighting controllers with meters. In certain cases, these would be
replaced with historical streetlights.
JUSTIFICATION
Many of the streetlights in the downtown area were installed in early 1950's. These are the white 30-foot style found along Central, Main, Iowa, Locust and Bluff
Streets. Many of these streetlights utilize a direct burial style feed and unique service panel which makes it very difficult and costly to maintain. Current projects
include 5 Flags lighting replacement, City Hall lighting replacement, Prescott School area lighting and a portion was used to paint downtown lights in summer of
2007. The use of LED (Light Emitting Diodes) lights saves energy and operating expenses. The City is also looking into alternative lighting technologies including
LED and induction. When comparing the differences between installing Solar vs. LED, the cost differential is quite significant. If the local utility company installs a
pole, luminaire, and power it will approximately cost $14.96 per month or$179.52 annually versus the cost for a solar streetlight which is$3,400. Engineering is
not enamored with solar street lights since the prime areas with lighting needs are in the downtown neighborhoods, which have a lot of trees and would affect
performance. Other issues include the high cost of installation, the impact of weather (i.e.. snow) affect the panels and related maintenance, aesthetics (large solar
panels at each install), and reliability.
RELATIONSHIP TO OTHER PROJECTS
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.1) Support continuing the ongoing street construction program, providing for timely maintenance, repair and reconstruction of the City street
system and 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits, street
signage, street pavement striping, and traffic signals, and Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface
transportation system, objective 4.2) Identify new technologies, new materials and new concepts for street maintenance, restoration.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Smart Energy Use.
317
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Fiber Optics Communications from DEPARTMENT: 55 TOTAL
Downtown to Airport PROJECT
FD/CIP NO: 300-2491 COST
350-2491 $ 1,035,517
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 39,385 Design & Engineering $ 10,000
Equipment $ 20,000
$ 649,438 $ 221,694 Construction $ 95,000
$ 688,823 $ 221,694 TOTAL $ 125,000 $ — $ — $B. PROJECT FINANCING
$ 688,823 $ 221,694 Sales Tax Fund (30%) $ 125,000
$ 688,823 $ 221,694 TOTAL $ 125,000 $ — $ — $
PROJECT DESCRIPTION
This program would install conduit for future fiber optic communications from Locust at Dodge to the new airport terminal.
JUSTIFICATION
All Funds prior to FY 17-18 used for fiber to Airport Project from Maquoketa to the airport. FY 17-18 Funds will cover fiber and equipment to install fiber conduit
from Locust at Charter to Locust at Grandview and install 144 strand fiber from the downtown to 151 at Grandview.
RELATIONSHIP TO OTHER PROJECTS:
This project implements the Comprehensive Plan's Transportation Goal One: To provide, maintain and improve safe and efficient movement on the City's street
system, objectives 1.2) Encourage implementation of sound safety engineering principles and practices in the area of street lighting, street layout, speed limits,
street signage, street pavement striping, and traffic signals and 1.3) Support maintaining the street system's continuity and safety, and Goal Three: To facilitate
improved four-lane access for surface transportation from Dubuque to major cities in the region, objective 3.3) Support a street and highway system which meets
current and future traffic needs, Infrastructure Goal Four: To provide, maintain, and improve a cost-effective, safe and functional surface transportation system,
objectives 4.3) Seek alternative funding sources for construction and maintenance and 4.4) Support maintaining and improving city alleys, guardrails, street lights,
traffic control lights, street pavement markings, traffic signs, street name signs, walls and other related facilities. This project also implements the Comprehensive
plan's Public Safety Goal Two: To maintain appropriate readiness response capabilities in all areas of public safety, objectives 2.1) Support effective and efficient
dispatch for public safety personnel for prompt, appropriate responses to calls from the public, 2.2) Support safe and efficient buildings, facilities, vehicles, and
equipment to support efforts of public safety agencies, while striving for state-of-the-art technology, 2.3) Support communications capabilities with operational
personnel and equipment, 2.4) Continue to improve and maintain the readiness status of all public safety personnel by monitoring their operational status and
providing adequate training, 2.5) Consider expanding the use of ITS (Intelligent Transportation System) equipment, including regional partnerships, 2.6) Recognize
the efficiencies and partnerships created with joint facilities and 2.7) Support appropriate staffing levels and equipment to serve growth and development.
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility and Smart Energy Use.
318
DEPARTMENT: STATE PROGRAM: PROJECT TITLE: PROGRAM: 2C
Engineering/Traffic Public Works Northwest Arterial Turn Lane DEPARTMENT: 55 TOTAL
Improvements PROJECT
FD/CIP NO: 300-2675 COST
$ 182,000
2016 2017
ACTUAL AMENDED BEYOND
EXP BUDGET PROJECT BUDGET 2017-18 2018-19 2019-20 2020-21 2021-22 2022
A. EXPENDITURE ITEMS
$ 50,000 Design & Engineering $ 132,000
$ — $ 50,000 TOTAL $ 132,000 $ — $ — $ — $ — $
B. PROJECT FINANCING
$ 50,000 Sales Tax Fund (30%) $ 132,000
$ — $ 50,000 TOTAL $ 132,000 $ — $ — $ — $ — $ —
PROJECT DESCRIPTION
This Improvement will cover the engineering and inspection costs associated with the construction of left turn lanes at two locations along the NW Arterial. These
locations include Pennsylvania and JFK.
JUSTIFICATION
Currently there are traffic safety and delay issues at these two locations. These locations were identified for possible grant recipients. In the summer of 1015 the
City of Dubuque and ECIA submitted grants for these two locations.
RELATIONSHIP TO OTHER PROJECTS
Transportation Goals: 1. To provide, maintain and improve safe and efficient movement on the city street system.
Public Safety Goals: 2. To maintain appropriate readiness response capabilities in all areas of public safety.
2.5 Consider expanding the use of ITS equipment, including regional partnerships.
4.4 Support, maintain and improving city allies, guardrails, street lights, traffic control lights, street pavement markings, traffic signs, street name signs, walls and
other related facilities
RELATIONSHIP TO SUSTAINABILITY PRINCIPLES
This project implements the Sustainable Principle of Reasonable Mobility, Community Design, Clean Air and Smart Energy Use.
319
Engineering
-119-
This page intentionally left blank.
-120-
ENGINEERING DEPARTMENT
FY 2016 FY 2017 FY 2018 % Change From
Budget Highlights Actual Budget Requested FY 2017 Budget
Expenses
Employee Expense 3,190,053 3,280,038 2,912,948 (11.2)%
Supplies and Services 623,257 1,760,051 1,680,075 (4.5)%
Machinery and Equipment 244,955 695,810 470,350 (32.4)%
Payment to Construction Fund %
Less Recharges to Service Funds (2,489,868) (2,048,069) (1,869,563) (8.7)%
Administrative Overhead Charges 980,105 499,607 470,613 (5.8)%
Total Expenses 2,548,502 4,187,437 3,664,423 (12.5)%
Resources
Operating Revenue - General 2,293,975 2,103,212 2,186,940 4.0 %
Administrative OH Recharges 179,977 320,250 426,265 33.1 %
Road Use Tax Funds 196,779 350,742 398,033 13.5 %
Utility Charges - Stormwater 1,270,399 1,806,096 1,765,244 (2.3)%
Utility Charges-Sanitary 97,227 528,041 198,838 (62.3)%
Total Resources 4,038,357 5,108,341 4,975,320 (2.6)%
Debt Service
Stormwater debt abated with Stormwater User
Fees 8,507,862 2,529,198 2,374,416 (6.1)%
Stormwater debt abated with Sales Tax
Increment 1,056,091 1,085,750 2,067,597 90.4 %
Street Projects Debt abated with Sales Tax Fund
(30%)/RUT 240,873 262,955 250,573 (4.7)%
America's River Debt Abated with TIF &General 921,930 922,904 918,617 (0.5)%
Total Debt Service 10,726,756 4,800,807 5,611,203 16.9 %
Property Tax Support (1,489,855) (920,904) (1,310,897) (389,993)
Percentlncrease/(Decrease) 42.3 %
Personnel -Authorized FTE 33.62 34.62 29.29
-121-
STORMWATER UTILITY
FY 2016 FY 2017 FY 2018 % Change From
Budget Highlights Actual Budget Requested FY 2017 Budget
Expenses
Employee Expense 246,291 978,914 783,090 (20.0)%
Supplies and Services 238,535 989,154 1,037,034 4.8 %
Payment to Construction Fund %
Less Recharges to Service Funds (213,324) (760,464) (630,038) (17.2)%
Machinery and Equipment 501 2,215 675 (69.5)%
Administrative Overhead Recharge 980,105 499,607 470,613 (5.8)%
Park Stormwater Maintenance Charges 54,754 122,171 156,841 28.4 %
Public Information Office 18,291 96,670 103,870 7.4 %
Public Works Stormwater Maintenance Charges 248,967 226,807 268,577 18.4 %
Debt Service 9,563,954 3,614,948 4,442,013 22.9 %
Total Expenses 11,138,074 5,770,022 6,632,675 15.0 %
Resources
Operating Revenue 10,507,671 4,614,870 4,810,414 4.2 %
Sales Tax Increment 1,056,091 1,085,750 2,067,597 90.4 %
Total Resources 11,563,762 5,700,620 6,878,011 20.7 %
Net Operating Surplus (Deficit) 425,688 (69,402) 245,336 314,738
Personnel -Authorized FTE 8.75 11.75 7.35
Stormwater User Fee Rate Increase 6.69% 6.74% 6.75%
Stormwater User Fee(per SFU) $ 6.38 $ 6.81 $ 7.27
Revenue 1% Rate Increase Generates $ 39,196
* FY 2017 Amended results in a net operating surplus of$361,490 for Stormwater.
Improvement Package Summary
Stormwater Fund
1 of 1
This decision package provides additional funds for engineering consulting services, Storm Sewer System
Hydrological and Hydraulic Model using EPA based XPSWMM model. This improvement package
provides for the expansion of the current XP-SWMM computer model of the City's storm sewer system
that was created with the development of the Drainage Basin Master Plan and Bee Branch Watershed
Flood Mitigation Project. XPSWMM allows for holistic modeling: Hydrology, Hydraulics and Water Quality.
Experts know that a change to one element in a system may affect the performance of the entire system.
XPSWMM allows for the evaluation and interaction of all system elements - channels, pipes, streets,
control structures, ponds, weirs, pumps, catchments, groundwater table, overland floodplains, rain
gardens, infiltration trenches and more in a single model. XPSWMM is widely used and accepted; it is EPA
tested and FEMA approved. Countless regulatory organizations around the country are familiar with
XPSWMM and prefer modeling performed with its powerful tools. It is a fully dynamic hydraulic and
hydrologic modeling software that can calculate upstream to downstream flow down streets, through storm
sewers, through detention ponds, through roadside ditches illustrating what truly happens to at various
points in the stormwater system, sewer system, and floodplain areas when waters flow, development/
redevelopment occurs, or when catastrophic events hit.
-122-
The City's current XPSWMM model is limited to the Bee Branch Creek/storm sewer with input from
tributary systems such as up Kaufmann Avenue and W. Locust Street. Expansion of the model to all
drainage systems in the city will allow for identifying poor performing elements throughout the City that
exhibit poor drainage characteristics and contribute to flooding under various circumstances. Expanding
the system will inform decisions as to the appropriateness of proposed changes to the drainage system to
ensure newly constructed facilities provide for the expected level of flood protection and do not bring about
new drainage problems that lead to downstream property damage. Expanding the model would facilitate
the engineering design of new systems done through the development or redevelopment of private
property as the capacity of downstream facilities will be better understood in the early stages of
development. Expanding the model will help illustrate the impacts watershed improvements have on the
Bee Branch Creek both in terms of flood control water quality.
Related Cost: $ 35,000 Stormwater User Fee Recurring- 6 Years Recommend - No
Stormwater User Fee Impact 0.89%
Activity: Stormwater
Multi-Funds
1 of 7
This improvement package will provide for a full-time Low Voltage Electrician (GE-29) for camera and I&I
SCADA Systems. The engineering department with the addition of a low voltage electrician would be
looking to reduce ongoing maintenance and improvement costs associated with outsourcing the traffic
center's security camera operations and the City's consent decree inflow and infiltration program's build
out and maintenance of a supervisory control and data acquisition (SCADA) system. The staff member
would provide the following services to the department:
1. Configure, install and test low voltage communications.
2. Install and configure lPequipment inthe field and inthe office. Thisincludes itemssuchas cameras, vehicle
sensors, lighting controllers, and other traffic control equipment. Utility automated control systems operation,
including, but not limited to: radio/cellular/ethernet communications systems, programmable logic controller
hardware and software, SCADA system hardware and software operation.
3. Knowledge and hands on experience of surge protection including proper grounding and bonding
techniques.
4. Familiarity of the NEC, NEMA and MUTCD standards.
5. Knowledge and experience in fiber optic communications.
6. Electrical schematic and construction plan reading
7. Construction inspection
This improvement package supports the five year organizational goal of: Financially Responsible City
Government and High Performance Organization.
Related Cost: $ 35,229 Sanitary User Fee Recurring Recommend - No
Related Cost: $ 35,229 Tax Funds Recurring
Total Cost: $ 70,458
Property Tax Impact: $ 0.0149 0.14%
Sanitary User Fee Impact 0.35%
Activity: Traffic Engineering/Sanitary Sewer
2 of 7
This improvement package would provide the funding to purchase add one laptop computer to be used by
engineering department staff for presentations.
Currently the engineering department uses an 8 year old recycled computer to present at conferences,
staff meetings, and other events. The current computer is near end of life. The computer does not need to
-123-
have a city network connection. It would need to have access to the Office 365 applications the City is
adopting.
This improvement package supports the five year organizational goal of: Financially Responsible City
Government and High Performance Organization.
Related Cost: $ 1,000 Tax Funds Non-Recurring Recommend - No
Property Tax Impact: $ 0.0004 —%
Activity: Traffic Engineering/Sanitary Sewer
3 of 7
This improvement package would provide the funding for a recruitment, development & retention
strategies consultant. The Engineering Department's staffing level is authorized at 32 positions. During
past vacancies, the department has experienced significant difficulties sourcing a pool of qualified
applicants to fill engineering and other technical positions. This includes the currently vacant
Environmental Engineer position which is requiring a second round of advertising. Adding additional
pressures to recruiting top candidates is the recovering construction industry and continued modest
graduation rates in the field of civil engineering and in general Science, Technology, Engineering,
Mathematics (STEM) compared to other industries. This will require casting a broader net to recruit new
employees from other areas of the country and population that to date have been unwilling to consider
Dubuque as their home.
Related Cost: $ 7,000 Tax Funds Non-Recurring Recommend - No
Property Tax Impact: $ 0.003 0.03%
Activity: Engineering Administration
4of7
This improvement package would provide the funding for engineering department storage area
improvements. The Engineering Department is allocated approximately 1,200 square feet of storage
space in the basement of City Hall. The area is used by the Engineering Department for Capital
Improvement Project record keeping and equipment storage for general fund, stormwater and sanitary
sewer projects. The area is very dusty and has high humidity levels which are not good for long term
storage of documents. This improvement would fund an initial renovation phase of this space by allowing
rough finished gypsum walls and additional lighting to be installed along with repairs to the floor.
This improvement supports the Five Year Organizational Goal of Financially Responsible City Government
and High Performance Organization.
Related Cost: $ 8,100 Tax Funds Non-Recurring Recommend - No
Property Tax Impact: $ 0.0034 0.03%
Activity: Engineering Administration
5of7
This improvement package would provide the funding for one intern for 12 months to complete all of the
outstanding encroachment permit documents so that they can be submitted to the Army Corp of
Engineers.
The Army Corp of Engineers as a matter of maintaining a federally accredited levee, requires the City to
document all fixed objects located within the regulated areas of the floodwall. The Engineering, Legal and
Public Works Departments started this effort in the summer of 2013. Remaining work includes getting
signed encroachment permits for three sites north of 16th Street along with all building sites south of 16th
-124-
Street still need encroachment permits to be drafted and signed. Currently the Engineering Department
does not have available staff resources to complete this assignment in the near future.
Related Cost: $ 9,771 Tax Funds Non-Recurring Recommend - No
Property Tax Impact: $ 0.0041 0.04%
Activity: Project Engineering
6 of 7
This improvement package would provide the funding for access industry safety and legal experts and
consultants to advise on the development of a new set of comprehensive City administrative policies and
construction specifications related to construction safety standards for both city employees and hired
contractors. Over the past two years, the Engineering and Legal Departments have made significant
updates to the City's construction contract specifications that are used by all city departments for capital
improvement projects. During the review process, it was determined that a more comprehensive update
to the City's current policies and standards related to OSHA compliance and protection of the public during
construction projects is needed. Recurring funds in the amount of$1,500 are requested to subscribed to a
web hosted training site that provides OSHA regulatory analysis and employee safety training tools that
will be used by the Engineering Department to train its staff.
Related Cost: $ 500 Sanitary User Fee Recurring Recommend -Yes
Related Cost: $ 500 Stormwater User Fee Recurring
Related Cost: $ 500 Tax Funds Recurring
Related Cost: $ 4,000 Sanitary User Fee Non-Recurring
Related Cost: $ 4,000 Stormwater User Fee Non-Recurring
Related Cost: $ 4,000 Tax Funds Non-Recurring
Total Cost: $ 13,500
Property Tax Impact: $ 0.0019 0.02%
Sanitary User Fee Impact 0.04%
Stormwater User Fee Impact 0.11%
Activity: Traffic Engineering/Sanitary Sewer
7 of 7
This improvement package would provide funding for Traffic Operations Center Improvements. The Traffic
Operation Center (TOC) was constructed in 2006 and is used on a daily basis for the control and
operation of the city's traffic operations and city surveillance systems. The TOC is also used daily for
meetings and webinars. When the TOC was built its usefulness as a meeting room was unknown and
therefore low cost materials were used to keep the construction within budget. Over the last 11 years the
carpet has become worn, and in some places, stained and torn. The eight chairs around the main
meeting table have also been heavily used and are worn and torn. This improvement covers the cost of
new commercial carpet and chairs in the TOC along with paint touch-ups.
Related Cost: $ 14,000 Tax Funds Non-Recurring Recommend - No
Property Tax Impact: $ 0.0059 0.05%
Activity: Traffic Operations
-125-
Significant Line Items
Employee Expense
1. FY 2018 employee expense reflects a 2.0% wage package increase.
2. The Iowa Public Employee Retirement System (I PERS) City contribution is unchanged at 8.93% and
the employee contribution is unchanged at 6.18% in FY 2018.
3. The City portion of health insurance expense is unchanged from $1,325 in FY 2017 to $1,325 in FY
2018 per month per contract.
4. Overtime is unchanged from $59,500 in FY 2017 to $59,500 in FY 2018. FY 2016 Actual was $90,712.
5. Sick leave payout expense decreased from $13,417 in FY 2017 to $7,540 in FY 2018.
6. During FY 2016, the City Council approved a limited term Engineering Technician position to assist
with construction inspections on the Bee Branch Project. This position expires July 2017 (-0.94 FTE or
savings of$75,126). The employee expense related to this position in FY 2018 is $4,900 which is
charged to Stormwater projects.
7. In FY 2018, the part-time confidential account clerk hours were reduced from 1,560 hours to 1,310
hours annually to reflect the approved level of hours (reduction of 0.125 FTE).
8. A Traffic Engineering Assistant position is frozen until June 30, 2018 with cost savings of$83,366 in
FY 2018.
9. The following positions are recommended to be eliminated in FY 2018:
i. Full-Time Environmental Engineer (-1.00 FTE) cost savings of$125,359.
ii. Full-Time I&I Inspectors (-2.00 FTE) cost savings of$146,953.
iii. Seasonal Engineering Aides (-1.50 FTE) cost savings of$58,584.
iv. Seasonal Engineer Assistants (-0.50 FTE) cost savings of$25,808.
10. A part-time I&I Inspector (0.72 FTE or 1,508 hours annually) is recommended to be added in FY 2018
to replace the eliminated full-time I&I Inspectors for flow monitoring and fats, oils and grease
inspections with a cost of$41,675.
Supplies & Services
11. Consultant Services decreased from$581,209 in FY 2017 to $460,397 in FY 2018. Sanitary Project
Engineering decreased from $105,000 in FY 2017 to $0 in FY 2018. Stormwater Project Engineering
increased from $5,000 in FY 2017 to $26,397 in FY 2018. Stormwater Detention Basin Maintenance
decreased from $59,000 in FY 2017 to $29,000 in FY 2018.
12. Inspection Reimbursement decreased from $65,000 in FY 2017 to $48,000 in FY 2018 based on the
completion of three subdivisions that require reimbursement of inspection fees paid that weren't used,
per contract.
13. Pay to Other Agency increased from $97,555 in FY 2017 to $104,332 in FY 2018. This line item
represents the contract with East Central Iowa Association for transportation planning which increased
$6,000 (from $9,000 in FY 2017 to $15,000 FY 2018), the refund of the Dubuque Historical Society
lease ($44,799), and the Catfish Creek Watershed Partnership payment ($44,533).
-126-
14. Grant expense increased from $322,300 in FY 2017 to $351,681 in FY 2018. This line item is the
stormwater enterprise fund subsidies for low income ($17,461), residential farms ($9,173), and
property tax-exempt properties ($320,047), as well as streambank rehabilitation grants ($5,000). The
increase represents the planned 6.75% increase in the Stormwater User Fee in FY 2018. There are
118 customers that receive the property tax-exempt subsidy, of which the top ten include schools,
universities and hospitals, which account for 71% of the property tax-exempt subsidy paid. There are
20 customers that receive the residential farm subsidy and there are 465 customers that receive the
low income subsidy.
15. Sales Tax increased from$130,900 in FY 2017 to $130,991 in FY 2018 based on increased
stormwater rates in FY 2018. This expense is directly offset by sales tax revenue.
16. Software License increased from $100,362 in FY 2017 to $127,926 in FY 2018 based on additional
cameras added which has increased the software license cost. FY 2016 Actual was $45,469.
17. Property Tax decreased from $168,458 in FY 2017 to $88,120 in FY 2018. FY 2016 Actual was
$99,486. This line item represents the property taxes paid on property that the City leases to other
entities and is offset by lease revenue.
18. Education and Training decreased from $46,641 in FY 2017 to $42,360 in FY 2018. $1,200 was added
for the Traffic Engineer in FY 2018.
19. Machinery and Equipment Maintenance decreased from $49,032 in FY 2017 to $47,573 in FY 2018.
FY 2016 Actual was $40,913. The decrease is due to no longer having nuclear meters and the
associated expense.
Machinery & Equipment
20. Equipment replacement items at the maintenance level include ($470,350):
Engineering Administration
Emergency Radios (3) $ 7,500
Label Maker $ 200
Smart Phone $ 475
Project Engineering General Fund
Label Maker $ 200
Digital Cameras (5) $ 1,000
ASTM Manuals $ 1,000
Air Meters (4) $ 1,600
Tripods (2) $ 500
Prism Poles (2) $ 300
Tilting Prism (2) $ 720
Topcon Robotic Total Station $ 25,000
2009 Ford F150 (2) $ 50,000
Security Cameras $ 65,930
Field Equipment $ 1,000
Smart Phone $ 595
Traffic Engineering Road Use Tax Fund
Label Maker $ 200
-127-
PTZ Cameras (5) $ 16,000
Milestone Video Server (1) $ 30,000
Virtual Servers (1) $ 8,000
110" Video Projector $ 4,000
Network Switch - Brocade Fiber (1) $ 11,500
Hardened Intersection Switches $ 36,000
Video Monitor CPU (2) $ 10,000
Axis Server (10) - Replaced w/Cameras $ 6,500
Battery Back-Ups (7) $ 3,000
Dust filtration system $ 500
ITERIS Cameras (2) $ 9,600
Axis Cameras (35) $ 41,000
Batteries (50) $ 12,000
Battery Back-Up Systems (4) $ 25,000
LCD Monitors 70" $ 5,000
Wireless Secure Access Field Equipment $ 7,500
Traffic Counters (3) $ 4,500
Cell Phone $ 535
Project Engineering Sanitary Sewer Fund
Label Maker $ 200
Flow Meters (4) $ 9,500
Weather Station $ 600
Metal Detector $ 2,000
General Sanitary Sewer Repairs/Maintenance $ 70,000
Field Equipment $ 400
Cell Phone (2) $ 120
Project Engineering Stormwater Fund
Digital Camera $ 200
Cell Phone $ 475
Total Equipment $ 470,350
Debt Service
21. Debt Service payments for FY 2018 are as follows ($5,611,203):
Final Call
Amount Debt Series Source Purpose Payment Date
$ 21,267 2009A G.O. Sales Tax 30% Fiber Optic & Street Light 2029 2025
$ 187,294 2009A G.O. Stormwater Fees Stormwater Improvements 2029
$ 908,931 2009C G.O. GDTIF/General America's River Project 2021 2025
$ 404 2010A G.O. Sales Tax 30% Street Improvements 2030 2025
$ 54,720 2006 SRF Stormwater Fees North Catfish Creek 2030
$ 126,440 2009 SRF Stormwater Fees West 32nd Detention Basin 2030
$ 74,168 2011A G.O. Sales Tax 30% Southwest Arterial 2031 2018
$ 164,817 2011A G.O. Stormwater Fees Stormwater Improvements 2031 2018
$ 128,332 2012B G.O. Stormwater Fees Stormwater Improvements 2031 2020
$ 9,686 2012D G.O. Sales Tax 30% FEMA Flood Buyout 2027 2019
-128-
Final Call
Amount Debt Series Source Purpose Payment Date
$ 30,500 2012D G.O. Stormwater Fees Stormwater Improvements 2033 2019
$ 81,803 2012E G.O. Sales Tax 30% Southwest Arterial 2032 2018
$ 8,925 2012E G.O. Stormwater Fees Stormwater Improvements 2032 2018
$ 413,617 2010 SRF Stormwater Fees Lower Bee Branch 2032
$ 323,100 2014A G.O. Sales Tax Increment Bee Branch Watershed 2029 2024
$ 54,126 2014B G.O. Sales Tax 30% Street Improvements 2034 2021
$ 63,120 2014 SRF Sales Tax 30% Lower Bee Branch 2034
$ 981,847 2015B SRF Sales Tax Increment Upper Bee Branch 2035
$ 762,650 2015A Revenue Sales Tax Increment Bee Branch Watershed 2029 2026
$ 726,600 2016B G.O. Sales Tax 20% Stormwater Refunding 2036 2024
$ 18,805 2016C G.O. Stormwater Fees Federal Building Roof 2037 2024
$ 470,051 2018 SRF Stormwater Fees Bee Branch Watershed 2038
$5,611,203 Total Engineering Debt Service
Revenue
22. Riverfront Leases increased from $1,809,621 in FY 2017 to $1,855,361 in FY 2018 based on the
projected revenue which is as follows:
Lease FY17 Budget FY17 Projected FY18 Budget
Artco Fleeting Service $ 1,050 $ 1,050 $ 1,200
Colleen Bradley Lindstrom $ 3,600 $ 3,600 $ 3,600
Dubuque Historical Society $ 44,024 $ 43,921 $ 44,799
Dubuque Marina $ 30,845 $ 30,474 $ 31,084
Dubuque River Rides $ 13,500 $ 13,500 $ 12,500
Dubuque Terminals - South Port Inland $ - $ 14,190 $ 13,900
Dubuque Terminals Ice Harbor $ 12,365 $ 12,365 $ -
Dubuque Terminals Dove Harbor $ 120,237 $ 120,237 $ 120,501
Dubuque Yacht Basin $ 24,015 $ 24,213 $ 24,549
Flint Hill Resources $ 663,000 $ 650,000 $ 663,000
Freebird II, LLC - Lease 2 $ 6,792 $ 6,792 $ 6,792
Freebird III, LLC $ 53,400 $ 58,000 $ 107,100
Hawkeye Truck& Trailer $ 22,910 $ 22,910 $ 20,160
Hodge Company $ 6,419 $ 96,180 $ 6,548
Hodge Transit Warehouse Co $ 12,000 $ - $ 12,000
Klauer Manufacturing $ 100 $ 100 $ 100
Gavilon - Land By City Salt Pile $ 261,927 $ 254,278 $ 259,312
Gavilon Dove Harbor $ 533,437 $ 517,859 $ 528,216
Total $ 1,809,621 $ 1,869,669 $ 1,855,361
-129-
23. Wharfage Fees on Leased Property increased from $87,000 in FY 2017 to $105,000 in FY 2018 and is
dependent on how much business is being conducted at the Wharf.
Lease FY17 Budget FY18 Budget
Freebird II, LLC - Lease 2 $ 18,000 $ 20,000
Gavilon Dove Harbor $ 35,000 $ 55,000
Gavilon - Salt Site $ 12,000 $ 12,000
Flint Hill Resources $ 22,000 $ 18,000
Total $ 87,000 $ 105,000
24. Non-Riverfront Lease increased from $169,621 in FY 2017 to $194,612 in FY 2018. There is 5.85
acres that is not leased.
Lease FY17 Budget FY17 Projected FY18 Budget
ABC Building $ 46,009 $ - $ 47,271
Dubuque Rescue Mission $ 1 $ 1 $ 1
HHH Enterprises $ 2,072 $ 2,052 $ 2,093
Hartig Drug $ 1,705 $ 1,722 $ 1,722
Key City Moving $ - $ - $ -
16th St. Detention Basin - Rainbo Oil $ 119,834 $ 119,534 $ 121,925
Mobile One & Horizon Small Cell $ - $ - $ 21,600
16th St. Detention Basin - 5.85 Acres $ - $ - $ -
Total $ 169,621 $ 123,309 $ 194,612
25. Stormwater Penalties decreased from $27,060 in FY 2017 to $26,000 in FY 2018 based on FY 2015
actual of$25,690.
26. The FY 2018 Stormwater User Fee is increased from $6.81 per SFU to $7.27 per SFU, a 6.75%
increase, consistent with Ordinance 16-14 passed on March 5, 2014.
FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022
Adopted Per
Ordinance 21-12 $ 8.50 $ 9.00 $ 9.00 $ 9.00 $ 9.00 $ 9.00 $ 9.00
Adopted Per
Ordinance 16-14 $ 6.38 $ 6.81 $ 7.27 $ 7.76 $ 8.29 $ 8.85 $ 9.00
% Decrease From
Ordinance 21-12 -24.94% -24.33% -19.22% -13.78% -7.89% -1.69% -%
*The recommended rates for FY16 through FY20 reflect the rates previously established by
Ordinance 16-14 following the State's approval of$98.5 million in State Flood Mitigation state sales
tax increment funds for the Bee Branch Watershed Flood Mitigation Project. Ordinance 21-12 was the
ordinance adopted prior to the City receiving the Flood Mitigation grant.
-130-
ENGINEERING DEPARTMENT
The mission of the Engineering Department is to promote public safety by providing engineering
services related to the planning, development, construction, and maintenance of the City's public
infrastructure systems.
Engineering
Administration Right-of-Way Stormwater Sanitary Sewer Traffic
and Special Management Management Collection Engineering
Projects and Streets
SUCCESS IS ABOUT PLANNING, PARTNERSHIPS AND PEOPLE
LEADING TO OUTCOMES
PEOPLE PLANNING
Engineering continues in its Engineering coordinates its project
emphasis on public information planning with multiple City Departments.
meetings concerning projects that In addition the department is involved in
have a significant impact on the Dubuque Metropolitan Area
property owners. These meetings Transportation Study and works with the
provide an opportunity for East Central Intergovernmental Agency
meaningful exchange between the in planning projects. This ensures a
City and property owners on the regional view is considered in project
project scope and its impact. development.
PARTNERSHIPS
The Engineering Department workswith the Iowa
Department of Transportation (IDOT),the Access
Board, Federal Highway Administration (FHWA),
East Central Intergovernmental Agency(ECIA)
Dubuque County, Historic Preservation
Commission, Neighborhood Groups,Tri-State Trail
Vision and many other entities when planning and
constructing projects.
-131-
ENGINEERING DEPARTMENT
Resources
$2,500,000
$2,000,000
$1,500,000
$1,000,000
$500,000
$0
OperaV\C Re�en Pdm\�\strati�ve Recharges Road use Sax Storrnwater Sang 1a Sewer
FY 2016 FY 2017 FY 2018
The Engineering Department is supported by 29.29 full-time equivalent employees, which accounts for
77.57% of the department expense as seen below. Overall, the department's expenses are expected to
decrease by (10.32)% in FY 2018 compared to FY 2017.
$3,190,053
Employee Expense $3,280,038
$2,912,948
$623,257
Supplies and Services $1,760,051
i $1,680,075
$244,955
Machinery and Equipment $695,810
$470,350
Construction Fund $—
$980,105
Administrative Overhead Charges $499,607
$470,613
$0 $500,000 $1,000,000 $1,500,000 $2,000,000 $2,500,000 $3,000,000 $3,500,000
FY 2016 FY 2017 FY 2018
-132-
ENGINEERING DEPARTMENT
Activity: Right-of-way Management and Streets
Right-of-Way Overview
Right-of-way (ROW) is land which is owned by the City to provide a defined area for essential
facilities and services for all such as transportation, communication, water, sewer, power in order
to provide, sustain, enhance and develop a progressive, safe community. Typically, the width of
public ROW is 50, 60, or 64 feet, although other widths may occur. Right-of-Way Management
involves monitoring the public right-of-way for approved, and prohibited, activities and
placements; excavations for utilities, sidewalks and driveways - inspections, installations,
appeals, repairs of new and replacements; dumpsters, sidewalk cafes, retaining walls, snow
clearing, easements, accessibility and licenses of encroachment. This activity also includes the
maintenance of records of above activities for compliance of right-of-way access and amenities.
Streets Overview
Street activity involves planning, inspection and reconstruction and major maintenance for streets and
alleys. The City maintains a pavement management system which contains a ranking and condition which
helps to identify the Capital Improvement Projects for next 5 year period. The projects are designed to
accomplish goals of sustainability, mobility, affordability, constructibility and long lasting results as well as
be in compliance with the latest standards and specifications, federal, state and local regulations.
Assessable projects for reconstructions are prepared by this Activity. This activity is highly called upon
during emergency events and crises. Agency involvement may include Iowa Department of Transportation
(IDOT), State Historical Preservation Office (SHPO) and various railroads.
Right-of-way and Streets Funding Summary
FY 2018
FY 2016 Actual FY 2017 Budget Requested
Expenditures $880,880 $1,778,819 $1,725,051
Resources $2,620,673 $1,473,986 $1,440,432
Right-of-way and Streets Position Summary
FY 2018
City Engineer 0.25
City Engineer-Service Fund 0.25
Assistant City Engineer 0.25
Assistant City Engineer-Svc Fd 0.75
Project Manager 0.40
Project Manager- Service Fund 0.10
Civil Engineer II 0.95
Civil Engineer II -Service Fund 1.55
Survey Technician 0.15
Survey Technician -Service Fund 0.30
Survey Party Chief 0.15
Survey Party Chief- Service Fd 0.30
Engineering Technician 1.60
Engineering Technician - Service Fd 3.00
Engineering Technician - Subdivision 0.10
Engineering Assistant II 1.00
Engineering Assistant II -Service Fd 0.50
Surveyor 10.80
-133-
Right-of-way and Streets Position Summary
FY 2018
Surveyor-Service Fund 0.20
Engineering Aide 0.25
Engineering Aide- Service Fund 1.00
I&I Inspector- Service Fund 0.00
Traffic Engineer 0.60
Traffic Engineer-Service Fund 0.40
Confidential Account Clerk 0.25
Confidential Account Clerk- PT 0.35
Secretary-Admin 0.25
Secretary-Admin Internal Svc 0.25
Utility Locator 0.32
Total FT Equivalent Employees 116.27
Highlights of the Past Year
• Substantial completion of the Upper Bee Branch open channel and related
improvements
• Construction of the Grandview-Delhi-Grace Roundabout
• Deck rehabilitation of 3 bridges. This included Cedar Cross Road, Old Mill Road and
Fremont Avenue bridges.
• Reconstruction of 22 alleys into Green Alleys.
• Worked with the Dubuque Metropolitan Area Transportation Study group and outside
firms on the master plans for different street corridors using Statewide Urban Design
and Specifications for design and construction.
• Chavenelle Road and NWArterial intersection turn lane improvements.
• Beginning of construction for the Menards Frontage Road and beginning of
construction of the Hwy 20 interchange for the Southwest Arterial Project.
Future Initiatives
• Resurfacing of Central Avenue between gth and 21 sc streets
• Design and construction of Washington Street between 7th and gth streets
• Design and construction North Cascade Road between Edval Lane and the bridge
• Design and Construction of the EastM/est Corridor improvements.
• Design and Construction of a roundabout at University Avenue and N. Grandview
Avenue.
• Reconstruction of 22nd Street from Elm Street to Central Avenue (HUD Resiliency
Project)
• Reconstruction of Kauffmann Avenue from Central Avenue to Kane Street (HUD
Resiliency Project)
• Reconstruction of 17th Street from Elm Street to West Locust Street (HUD Resiliency
Project)
• Reconstruction of W. Locust Street from 17th Street to Foye Street (HUD Resiliency
Project)
• Construction of the Chavenelle Hike/Bike Trail from NW Arterial to Seippel Road
• Construction of the remaining phases for the Southwest Arterial
-134-
ENGINEERING DEPARTMENT
Performance Measures
Right-of-Way Management -Activity Statement
Manage the public right of way so that it is safe and accessible for all users.
Streets -Activity Statement
Construct and maintain streets in a fiscally responsible way to also provides for safe and efficient
transportation for all users.
Goal: Social/Cultural Vibrancy Q �wJ
Outcome #1: Provide safe walking pathways throughout the City, including pedestrian
access ramps
Citizen Impact:
Staff react to complaints concerning sidewalks and ramps.
Staff also proactively inspect pedestrian corridors to ensure
people of all abilities have access. By making sure
pedestrian facilities meet current standards, it minimizes the
chance of people tripping and making travel easier for
people with disabilities.
Sidewalk not shoveled
Did you know?
In 2016 the City of Dubuque sent out 464 notices to properties due to either defective sidewalks
or failure to shovel the sidewalk.
Many Dubuque residents have mobility issues. Pedestrian access ramps that are constructed correctly,
improve the accessibility of these limited mobility individuals. When the City resurfaces or reconstructs
streets, the access ramps are evaluated and upgraded to meet current American with Disability Act
requirements.
4
1
Cracked and heaving sidewalk-TripHazard New Enhanced Sidewalk on Asbury Road
-135-
ENGINEERING DEPARTMENT
-WJ Goal: Planned and Managed Growth
Outcome #2: Manage the work in right of way permits.
Citizen Impact:
If work in the right of way is not managed, the City may not
have information on the type of pavement repair that may
have occurred, if the utility is buried at the correct depth,
does the contractor have proper insurance, etc. The City ;
manages all right of way excavations by issuing permits to
work in the right of way. The permits are tracked in a central
database that allows multiple departments to see what work
may have occurred and who performed the work. This
ensures every department has the same information.
Emergency Water main repair in the winter
Did you know?
The City holds monthly coordination meetings with all utilities to help coordinate all utility work that may
occur in the right of way. This coordination effort helps with minimizing the amount of excavations that may
occur in a given area and reduces the inconvenience to the public.
There were 141 excavation permits and 233 driveway/sidewalk permits issued in 2016. The Engineering
Department adopted a new excavation policy so that damage to City streets and other infrastructure is
minimized.
MGoal: Improved Connectivity
Outcome #3: Provide complete, safe and efficient street systems
Citizen Impact:
By constructing streets that utilize perpetual pavements, we create a strong transportation network that
minimizes the inconvenience to the traveling public and reduces long terms costs. The current average
condition rating for all streets in Dubuque is 62 on a scale of 100. The objective is to increase the street
rating each year.
�i
Did you know?
The City of Dubuque has over 300 centerline miles of
streets. All of these streets were scanned in the fall of
2013 and again in the fall of 2015. The Engineering i
Department entered all of this data into a pavement '
management system so the street degradation can be -
measured and future maintenance can be planned
based on the objective data.
Pavement Scanning Van-Measures Smoothness
and cracking
Did you know?
The city saved over $150,000 on the Central Avenue Resurfacing Project in 2012 by using an
asphalt interlayer instead of performing extensive concrete patching. The interlayer reduced the
cracking that sometimes occurs with asphalt pavements over concrete and reduced the amount
of crack maintenance needed in the future.
-136-
ENGINEERING DEPARTMENT
[lip ^ 11� pVIII
CM
Installation of Geogrid over joints New Asphalt Interlayer Installed.Reduces Cracking
Did you know?
The City has a Complete Streets Policy that
was adopted in 2011. As part of that policy, all
street reconstruction projects must attempt to - 1�-
make the street as complete as possible. This
includes accommodations for vehicles, -
transit, bicycles and pedestrians. Recent
projects following the policy include the
Historic Millwork District Complete Streets _
Project, the 9th and 11th Street One-way to
Two-way Conversion Project and the Elm
Street Reconstruction Project (9th to 12th `L -
Streets). The City also has a pavement ,
marking fund that can be used toward bike Bike Lanes on Jackson Street
lanes and shared bicycle area markings
called "sharrows". Additionally, there is a fund
for enhanced cross-walks to help in school
areas and other high traffic pedestrian zones.
Did you know?
The City is actively trying to expand the
amount of hike/bike trails available to citizens.
To date the City has constructed 11.5 miles of
trails since 1999.
Bike Sharrows on 10th Street
-137-
ENGINEERING DEPARTMENT
4ctivity: Stormwater management
Overview
The mission of the City's Stormwater Management Utility is to help protect the health of citizens
and both the natural and built environment by designing, implementing, and maintaining an
effective, efficient municipal stormwater management system. The City of Dubuque has the
responsibility as private property owners: manage stormwater on its property.
Projects range from the construction of new detention basins and the extension of storm sewer
systems to the rehabilitation of existing storm sewer systems. Programs range from ditch, storm
sewer, and detention basin maintenance to limiting pollutants associated with stormwater runoff.
Major projects include the twelve phases of the Bee Branch Watershed Flood Mitigation Project
(Carter Road Detention Basin, W. 32nd Street Detention Basin, Bee Branch Creek Restoration,
Green Alley/Impervious Pavement Reduction, etc.), storm sewer redesign and construction in
conjunction with street reconstruction projects, and the replacement/extension of storm sewer
systems to address specific drainage issues.
Stormwater Funding Summary
FY 2018
FY 2016 Actual FY 2017 Budget Requested
Expenditures $9,973,203 $4,527,879 $4,226,828
Resources $9,973,203 $4,527,879 $4,226,828
Stormwater Position Summary
FY 2018
Civil Engineer II 0.20
Civil Engineer II -Service Fund 1.30
City Engineer 0.10
Environmental Engineer 0.00
Environmental Engineer-Service Fd 0.00
Engineering Technician 1.00
Engineering Technician - Service Fd 1.76
Engineering Assistant II 0.10
Engineering Assistant II -Service Fd 0.40
Engineering Assistant-Seasonal 0.00
Engineering Aide- Service Fund 0.00
Survey Party Chief- Service Fund 0.25
Survey Technician -Service Fund 0.25
Project Manager 0.25
Utility Locator 0.34
I&I Inspector 0.00
Secretary 0.25
Confidential Account Clerk 0.25
Confidential Account Clerk-Service Fd 0.75
Total FT Equivalent Employees 7.20
-138-
ENGINEERING DEPARTMENT
4iahliahts of the Past Yea
• Construction of Upper Bee Branch Creek Restoration Project (Garfield Ave. to 24th
Street) functional in terms of flood mitigation (Phase 7 of the Bee Branch Watershed
Flood Mitigation Project);
• Secured $23.1 million in HUD National Disaster Resiliency Competition grant funding
for the construction of infrastructure improvements associated with the Bee Branch
Watershed Flood Mitigation Project; and
• Design of improvements outlined in the Catfish Creek Watershed Management Plan.
Future Initiatives
• Complete construction of the first four contracts for the Upper Bee Branch Creek
Restoration Project;
• Engineering design of the Bee Branch Flood Control Pumping Station Gates and
Primary Electrical Service Replacement Project (Phase 5 of the Bee Branch Watershed
Flood Mitigation Project);
• Engineering design of the Bee Branch Railroad Culverts Project (part of Phase 7 of the
Bee Branch Watershed Flood Mitigation Project);
• Engineering design of the 22nd St/Kaufmann Ave Storm Sewer Improvements Project
(Phase 8 of the Bee Branch Watershed Flood Mitigation Project); and
• Engineering design of the 17th St/W. Locust St Storm Sewer Improvements Project
(Phase 12 of the Bee Branch Watershed Flood Mitigation Project).
Performance Measures
Stormwater Management -Activity Statement
Provide a storm and surface water system that protects the health and safety of citizens, controls damage
from storms, and protects the environment.
Goal: Social/Cultural Vibrancy
Outcome #1: Engineer, construct, and maintain facilities to mitigate the effects of flooding
The Engineering Department continues to analyze
various segments of the public drainage systems in
order to identify improvements that will mitigate the ^-
effects of flooding. When deficiencies are identified,
improvements throughout the entire watershed are
considered. Some drainage issues involve hundreds
of properties, both public and private. In order to
x.
address these issues, the entire watershed must be
considered and sometimes major drainage
improvements are appropriate.
Basement flooding high water mark on water heaters
-139-
ENGINEERING DEPARTMENT
Citizen Impact:
While most homeowners can install gutters and _ _
downspouts and install landscaping that forces water
to flow away from their house, sometimes they can
be powerless to protect their home from flooding -
flooding that inundates water heaters, furnaces, and -
electrical boxes, and can cause fires.
Street flooding on W. 17th Street
Did you know?
Flood disasters have repeatedly impacted residents and businesses (over 1,370 properties)
in the Bee Branch watershed. Between 1999 and 2011, six Presidential Disasters have
issued due to the damage estimated at $70 million caused by the flooding.
Major Project
Upper Bee Branch Creek Restoration Project
The Upper Bee Branch Creek Restoration involves replacing a half-mile of storm sewer with a
creek and floodplain that resembles the one that traversed the area approximately 100 years
ago. This "day-lighting" of the buried Bee Branch Creek will allow stormwater from flash floods to
safely move through the area without flooding adjacent properties. During heavy rains,
stormwater will rise out of the creek and fill the green space instead of flooding streets and
homes. The project represents one phase of the twelve phase Bee Branch Watershed Flood
Mitigation Project that when complete will prevent an estimated $582 million in damages over the
coming century.
Goal: Improved Connectivity
Outcome #2: Design and oversee construction of street/public right-of-way drainage
systems to mitigate flooding and make the street available to the public during a rain
event.
Drainage systems are designed to strike a balance between initial capital costs, maintenance
costs, and public protection with consideration given to public safety, environmental protection,
and need for maintenance. Storm sewers are evaluated and typically reconstructed in
conjunction with a street reconstruction project. Storm sewer improvements are also evaluated
throughout the City as issues arise. These improvements are prioritized with funding programmed
into the five-year Capital Improvement Program budget.
Citizen Impact:
Street drainage systems allow general traffic and emergency vehicles to
safely utilize the street to travel through the community.
Did you know?
Streets themselves function as part of the overall stormwater drainage system. Curb and gutter
sections collect stormwater and direct it to storm sewer intakes which allow the runoff to enter
into the underground storm sewer pipes.
-140-
ENGINEERING DEPARTMENT
Goal: Environmental Integrity - (-A
Outcome #3: Maintain or improve the quality of stormwater runoff in accordance with the
federal Clean Water Act.
After it rains, the streets look cleaner -- and that's a problem. Stormwater rushing over paved
surfaces picks up everything from oil to pesticides to sediment and then flows, either directly or
via a storm sewer, into the Bee Branch, Catfish Creek, and Mississippi River. The pollutants in
stormwater can lead directly to fish kills and unsafe conditions for citizens.
-
�`
,moi �� ` =f �<.•-
Silt fence failure allowing sediment to leave a construction site Sediment deposition clogging a storm sewer inlet
Did you know?
According to the U. S. Environmental Protection Agency, stormwater runoff is the #1 source of
surface water pollution.
�J Goal: Planned and Managed Growth —J
Outcome #4: Help mitigate the potential for pollution and flooding due to the development
of private property.
The City of Dubuque has ordinances and associated policies in place to mitigate increased runoff
typically associated with land development or land use changes. Development and redevelopment
plans are reviewed and construction sites are inspected to ensure compliance with applicable
ordinances and policies.
Activity: Sanitary Sewer Collection
Overview
The City of Dubuque's Sanitary Sewer Collection system serves just less than 30 square miles of
contiguous property, includes approximately 300 miles of piping, and over 7,000 manholes, with
all sanitary waste processed by an upgraded wastewater treatment facility called the Water and
Resource Recovery Center (W&RRC). Within the service area, homes and properties are served
via a private sanitary sewer pipe or service lateral. The service lateral is owned by the private
property owner. Wastewater from the estimated 21 ,000 private service connections is treated and
cleaned prior to its release into the Mississippi River.
-141-
ENGINEERING DEPARTMENT
Collection system improvements are managed by the City's Engineering Department under the
City Engineer. Operations and maintenance of the collection system are managed by the
W&RRC and the Public Works Departments. Funding for operations, maintenance, and
improvement projects is generated via revenues collected during monthly billings of private and
public users. The funds are collected and maintained in an Enterprise Fund and are only
available for work directly associated with the sanitary sewer collection system and its supporting
departments.
This activity is highly called upon during emergency events and crises.Agency involvement may include
the DNR and EPA.
7FY
Sewer Collection Funding Summary
FY 2018
016 Actual FY 2017 Budget Requested
178,012 $781,194 $464,176
178,012 $781,194 $464,176
Sewer Collection Position Summary
FY 2018
City Engineer 0.10
Environmental Engineer 0.00
Project Manager 0.25
Environmental Engineer- Service Fd 0.00
I&I Inspector 0.00
Engineering Technician 0.10
Engineering Technician -Service Fund 1.50
Survey Party Chief 0.30
Survey Technician 0.30
Secretary 0.25
Confidential Account Clerk 10.25
Confidential Account Clerk-Seasonal 0.15
Utility Locator 10.34
Total FT Equivalent Employees 13.54
Highlight of the Past Year
• Completed installation and implementation a sanitary sewer collection supervisory control
and data acquisition (SCADA) system, for permanent flow metering in five sewersheds.
The system allows flow meter data to be read via hand held devices including cell phones
and tablets. Real time monitoring of the collection system will improve response times to
problems in the system where flow monitoring devices are installed. Data collection and
trending can be analyzed by the engineering department to make further improvements
the to the collection system and the W&RRC operations staff will benefit greatly from
observing behavior in the collection system to make necessary advance preparations at
the receiving treatment facility.
-142-
ENGINEERING DEPARTMENT
• The City received approval from the USEPA and the Iowa DNR to change the scope and
modify the completion dates of several corrective action plan items enabling the City to
complete a more robust project which will include, in many cases, new storm sewer and
water main in addition to sanitary sewer replacement. The approval will allow the City to
maintain compliance with its Consent Decree.
• Over 10,000 lineal feet of sanitary sewer rehabilitation was completed in 2016 along with
over 150 manhole rehabilitations. This work further secures the utility from extraneous
inflow and infiltration.
Future Initiatives
• Maintain compliance with the USEPA, Iowa DNR, and US Department of Justice
requirements as defined in the Consent Decree. In 2011, the City of Dubuque entered into
a Consent Decree with the U.S. Department of Justice, the U.S. Environmental Protection
Agency, and the State of Iowa. The Decree's Purpose is for the City to:
Take all necessary measures to achieve full compliance with the Clean Water
Act
The Iowa water Pollution Control Laws, and
The City's NPDES Permit,with the goal of eliminating all Sanitary Sewer
Overflows.
• Continue installation of the sanitary sewer SCADA system to the next immediate need
areas.
• Continue successful inflow and infiltration reduction measures including sewer pipe
rehabilitation and replacement, manhole rehabilitation and replacement, and source
detection through inspection and flow metering.
Performance Measures
Sanitary Sewer Collection -Activity Statement
Define and implement capital improvements to improve the City's existing sanitary sewer collection
infrastructure and provide direction and standards for future expansion and connections to the system.
0 OGoal: Environmental Integrity \A
Outcome #1: Reduce inflow and infiltration (I&I) into the sanitary sewer collection system
and work to eliminate the source or secure the sanitary sewer from the source
-143-
ENGINEERING DEPARTMENT
t In June 2011, the City of Dubuque began an Inflow
and Infiltration (1&1) Program to reduce sanitary
sewer overflows and sewer back-ups by eliminating
storm water inflow and groundwater infiltration into
' V the City's sanitary sewer collector system. As part
—W of this effort, the City is rehabilitating through the
method of cured-in-place pipe (CIPP) lining and
grouting to eliminate infiltration of groundwater into
\ �oo,o�ua 90;w the sanitary sewer system. The City plans to
/ continue to line 10,000 lineal feet each year.
Contractor eliminating leaking joints and improving the flow
charactersts of a sanitary sewer by installing a new cured in place
pipe(CIPP)liner in the sewer
Did You Know?
It only takes eight (8) sump pumps operating at full capacity or six (6) homes with downspouts
connected to an eight inch diameter sanitary sewer to cause the sewer to be overloaded leading
to Sanitary Sewer overflows. The same eight inch sewer with no illegal sump pump or
downspout connections would typically handle wastewater from up to 200 homes.
Outcome #2: Reduce incidents of Fats, Oils and Grease related SSO's through education,
inspection, corrective action and enforcement
iFats, Oils, and Grease (FOG) Program
Implementing a fats, oils, and grease program is an
important part of the City's compliance with its
Sanitary Sewer Capacity, Management, Operation
and Maintenance Program (CMOM). The City's
CMOM program was developed as part of a
required submission under the terms of the
Consent Decree entered into by the City, the State
of Iowa, and the United States in 2011. The primary
k objective of a FOG Program is to reduce incidents
' of FOG related SSO's through, education,
inspection, corrective action, and enforcement.
Measuring the depth of oil and grease in a sanitary sewer
manhole.
Did you Know?
When hot or warm Fats, Oils, and Grease are poured down a Fats, Oils, and Grease
drain it may appear that it would not clog a sewer, however, Policy, Program, and
when the grease cools it becomes a solid that coats the inside of Enforcement strategy
a sewer pipe restricting the flow of wastewater and without is a City of Dubuque,
continuous maintenance can lead to violations of the Clean Environmental/
Water Act as a result of sanitary sewer overflows, in addition to Ecological Integrity Goal
costly sewer back-ups into homes and businesses.
—144—
ENGINEERING DEPARTMENT
—J Goal: Planned and Managed Growth
Outcome #3: Prepare for future expansion and sanitary sewer service needs
- The expansion of sanitary sewer south
toward the airport provides the City with
C the foundational infrastructure needed for
future utility extensions to serve the
Granger Creek Sewershed consisting of
over 5,700 acres. During 2015,
► - ; 'cs ` construction started on the new sanitary
sewer along highway 151/61 , which has an
anticipated completion date spring of 2016.
During construction, the City was also
presented with an opportunity to better
serve the development of Twin Ridge. The
extension of the utilities south enabled the
logical transfer of both water and sanitary
sewer ownership to the City and the
- -- advancement of the Lake Eleanor Lift
Station for continued safe conveyance of
sanitary wastewater.
Map showing the area served by the extension of sanitary
sewer to the Dubuque Regional Airport
Activity: Traffic Engineering
Overview
This Activity is responsible for overseeing the planning, inspection and daily operation of active
projects for the movement of pedestrians, vehicular traffic, fiber optic expansion, street lighting,
traffic signals, traffic controls, fiber optic and communications infrastructure, traffic and security
cameras, traffic signage and pavement markings throughout the City and provides guidance to
the Public Works Department. Other activities involve the review and recommendations for
parking meter districts, residential parking districts and accessible parking spaces according to
local, state and federal guidelines. This activity is highly called upon during emergency events
and crises. Agency involvement with IDOT, FHWA, State Bureau of Transportation Safety.
Projects included Northwest Arterial Conduit/Fiber Project, Fiber along University Avenue,
Grandview-Delhi-Grace Roundabout Project as well as, fiber maintenance and extensions, traffic
cameras, traffic counts, and pavement markings.
Traffic Engineering Funding Summary
FY 2018
FY 2016 Actual FY 2017 Budget Requested
Expenditures $22,548 $29,238 $22,796
Resources $1,075 $620 $656
-145-
ENGINEERING DEPARTMENT
Traffic Engineering Position Summary
FY 2018
Confidential Account Clerk 0.25
Traffic Engineering Assistant 0.87
Traffic Engineering Assistant-Svc Fd 0.13
Total FT Equivalent Employees 1.25 71
Highlights of the Past Year
• During the 2016 year more than 14.26 miles of fiber duct and 10.92 miles of fiber
cable was installed due in part to joint private/public agreements between the city
and data providers.
• Fiber project along US Highway 61/151 from Maquoketa Drive to the Airport
Terminal
• Fiber project along NWArterial from US 52 to JFK intersection.
• Reconstruction of fiber duct along West Locust from Loras to Grandview.
• Grandview at Delhi roundabout construction
• Completion of Hwy 20 corridor microwave vehicle detection conversion.
Future Initiatives
• Continue work on safety grants
• Reconstruction of fiber optic route along US 20 from Devon Drive to Wacker Drive.
• Installation of fiber and electrical duct along Grandview Avenue from US 151 to
Grandview at Delhi.
• Installation of fiberductalong KerperBoulevard from 11 th at Elm to Kerperat Hawthorne
Street.
• Fiber maintenance and extensions
• Traffic Camera maintenance and additions
• Continued work on Dubuque's STREETS traffic management program.
• Update Pavement Markings
• Continued efforts to improve Dubuque's communications infrastructure and private/
public partnerships to enhance bandwidth and redundancy.
Performance Measures
Traffic Engineering -Activity Statement
Overseeing planning for the movement of pedestrian and vehicular traffic to ensure the City's transportation
infrastructure is in a state of good repair for the purposes of public safety and the efficient movement of
people, goods and services.
Goal: Financially Responsible & High Performance Organization/'
Outcome #1: Reduce energy and maintenance costs as well as increase safety by
replacing existing street lights with LED lighting.
This objective helps vehicles, bikes and pedestrians safely navigate the corridor by providing
lighting that is evenly distributed. LED lighting is also more efficient and don't require the same
maintenance as High Pressure Sodium Lights. The energy costs are reduced by 50% by using
LED lights which last 15 years versus 5 to 6 years for high pressure sodium.
-146-
ENGINEERING DEPARTMENT
z
High Pressure Sodium Lighting LED Lighting
Did you Know? The City of Dubuque owns 2,173 street lights of which:
• 1,433 are high pressure sodium
• 7 are incandescent
• 276 are metal halide
• 457 are LED
The City has also been working with Alliant Energy to install LED lighting. Currently Alliant
Energy operates 2,599 lights for the city of which 1,230 are high pressure sodium and 1,369 are
LED. Maquoketa Valley REC operates 4 high pressure sodium lights for the city.
Goal: Improved Connectivity
Outcome #2: Provide a road network that ensures a high level of safety for vehicles,
cyclists, and pedestrians.
Over the past couple of years the City of Dubuque has been installing microwave detection at
intersections and continues to update several intersections each year. This system provides
multiple benefits since it doesn't have to be replaced during roadway repairs and can detect
vehicles and bikes.
Did you know?
Currently 20 intersections have microwave detection installed at them. Over the next year the
City of Dubuque is planning on installing them at 5 additional intersections. In the future
microwave detection will be installed at the rate of 3 to 4 intersections a year. Microwave
detection improves the efficiency of the intersection. It allows the intersection to be very reactive
at night when the volume of traffic is down since it can detect vehicles that are 140 feet away
which will minimize the time spent at these traffic signals.
Outcome #3: Update traffic signalization infrastructure to Intelligent Transportation
Systems (ITS) by providing improved levels of service and quicker response to signal and
traffic control conditions and issues by connecting them to the Traffic Operations Center.
-147-
ENGINEERING DEPARTMENT
Intersection with microwave traffic detectors uninhibited by Closeup of a microwave traffic detector
extreme weather conditions
The system is interconnected by using fiber that connects to each intersection or key location and
is connected into a switch to communicate to the equipment in the field. This allows the City of
Dubuque make changes to the timings, detection or devices from the Traffic Operations Center.
In case of unforeseen road closures in can be difficult to reach the intersections effected to make
the necessary changes but could be made from the Traffic Operations Center and then sent to
the equipment and can use cameras to monitor the situation.
Citizen Impact. This updated infrastructure has allowed the Traffic Engineering staff the ability to react
faster to changing traffic conditions. Currently there are six different traffic management plans for the US
20 corridor to move traffic. With the coordinated traffic control in this corridor delays have been reduced so
traffic may only stop at one intersection during peak traffic. This is in contrast to previous years where
vehicles would be delayed at multiple intersections.
Outcome #4: Maintain and Seek new grants for Traffic Signal I Intersection Improvements.
The City of Dubuque traffic engineering department has successfully received many grants in the
last 14 year to assist with roadway improvements. In the last few years the engineering
department has received grants for the following that will be constructed starting the Summer of
2017 through the Fall of 2017;
• Grandview Ave at Loras Blvd signal reconstruction (planned for Spring of 2017)
• Grandview Ave at University Ave intersection improvements (roundabout proposed)
• Grandview Ave at Delhi Roundabout project (constructed in Summer of 2016)
• NW Arterial at Pennsylvania westbound right turn lane improvement (planned for Fall of
2017)
• NW Arterial at JFK eastbound right turn lane improvement. (planned for Fall of 2017)
Citizen Impact. This improved infrastructure will allow citizens to get through these intersections quicker
and more safely. These grants often times pay for a majority of the project at minimal cost to the tax
payer. These improvements also help cut vehicle emissions which is better for the environment and
health of the city.
-148-
ENGINEERING DEPARTMENT
Outcome #5: Continued growth of traffic operation cameras and security cameras.
The City of Dubuque now has over 921 security cameras with over 430 of these on the public
streets. These cameras record events for 30 days and are commonly used for the following;
• Observe traffic signal operations and allow engineers in the Traffic Operations Center to
make changes to the signals remotely and view if the changes have the desired effect on
traffic.
• Used during accidents to determine what happed before/during/after the accident along
with assignment of fault.
• Used for investigations of criminal behavior.
Citizen Impact. These cameras help improve the traffic signal timings and operations which help keep
the signals and other transportation systems at optimal efficiency which minimizes daily commute times.
They are also relied upon by police during accident investigations and many citizens request video
evidence of their accident to assist them with their claim. These security cameras also keep the citizens
safer by assisting law enforcement.
Did you know?
The Traffic department for the City of Dubuque currently has over 47 miles of conduit installed
and 30.7 miles of fiber. This fiber is also used for other City entities including police and fire,
sanitary sewer flow metering, and wireless water meter program. This fiber is also the critical
communications pathway for the over 921 cameras located throughout the city.
-149-
This page intentionally left blank.
-150-
Recommended Operating Revenue Budget - Department Total
55- ENGINEERING
FY15 Actual FY16 Actual FY 17 Adopted FYIS Recomm'd
Fund Account Account Title Revenue Revenue Budget Budget
100 42170 MISC-LICENSES 4,235 3,358 2,500 2,500
100 42225 DUMPSTERPERMITS 6,295 5,555 6,000 6,000
100 42240 EXCAVATION PERMITS 17,307 16,709 10,000 12,000
620 42260 PERMIT,MISC 3,545 2,737 10,843 5,000
100 42305 SIDEWALK PERMIT 7,135 8,825 7,000 6,000
100 42315 SUBDIV.INSPECTION FEE 3% 83,249 3,768 10,000 3,768
42-LICENSES AND PERMITS 121,766 40,952 46,343 35,268
620 43110 INVESTMENT EARNINGS 12,669 11,885 10,000 10,000
100 43230 LEASE,PROPERTY 173,626 137,629 169,621 194,612
620 43230 LEASE,PROPERTY 4,968 0 0 0
100 43231 LEASE,RIVERFRONT 1,983,067 1,934,857 1,809,621 1,855,361
100 43233 SIDEWALK CAFE LEASES 800 400 1,000 400
100 43320 LEASE,WHARFAGE 121,750 115,649 87,000 105,000
100 43325 LEASE,OTHER 120 120 120 120
43-USE OF MONEY AND PROPERTY 2,297,000 2,200,540 2,077,362 2,165,493
400 44100 BAB SUBSIDY NON GRANT 1,512 1,765 1,512 1,765
620 44100 BAB SUBSIDY NON GRANT 15,262 14,563 16,718 14,563
44-INTERGOVERMENTAL 16,774 16,328 18,230 16,328
620 51215 PENALTIES 26,530 25,690 27,060 26,000
610 51245 SEWER CONNECTION CHARGES 0 0 15,000 0
620 51805 STORMWATER USER FEE 3,379,403 3,672,066 4,070,141 4,242,243
620 51820 STORMWATER HALF RATE 29,893 30,659 31,908 34,936
51-CHARGES FOR SERVICES 3,435,826 3,728,415 4,144,109 4,303,179
100 53403 IA DISTRICT COURT FINES 0 45 0 45
800 53530 SPECIALIZED SERVICES 2,403,684 2,124,187 2,048,069 1,778,862
100 53605 MISCELLANEOUS REVENUE 576 792 0 792
100 53610 INSURANCE CLAIMS 309 16,675 0 0
100 53615 DAMAGECLAIMS 1,168 0 0 0
100 53620 REIMBURSEMENTS-GENERAL 355 343 350 342
610 53620 REIMBURSEMENTS-GENERAL 31 530 0 530
620 53630 SALES TAX COLLECTION 114,960 125,767 130,900 130,991
53-MISCELLANEOUS 2,521,083 2,268,339 2,179,319 1,911,562
100 54105 LAND SALES 0 49,249 0 0
620 54210 GO BOND PROCEEDS 0 6,270,000 0 0
620 54220 BOND DISCOUNT 0 354,303 0 0
54-OTHER FINANCING SOURCES 0 6,673,552 0 0
400 59100 FR GENERAL 566,659 560,675 561,175 566,747
400 59240 FR DOWNTOWN TIF 365,086 361,255 361,729 351,870
400 59250 FR ROAD USE TAX 20,428 7,466 7,239 21,267
400 59300 FR STREET CONSTRUCTION 165,392 217,110 220,686 210,097
400 59340 FR SALES TAX INCREMENT 309,638 1,056,091 1,085,750 2,067,597
400 59350 FR SALES TAX CONSTRUCTION 14,123 16,297 35,030 19,209
620 59350 FR SALES TAX CONSTRUCTION 0 0 317,300 346,681
100 59610 FR WPC OPERATING 163,718 105,996 242,877 330,040
100 59620 FR STORMWATER OPERATING 32,461 73,981 77,373 76,041
100 59640 FRWATERUTILITY 158,960 0 0 20,184
59-TRANSFER IN AND INTERNAL 1,796,465 2,398,871 2,909,159 4,009,733
55-ENGINEERING TOTAL 10,188,914 17,326,997 11,374,522 12,441,563
-151-
Recommended Operating Expenditure Budget - Department Total
55- ENGINEERING
FY15 Actual FY16 Actual FY 17 Adopted FY 1S Recomm'd
Fund Account Account Title Expense Expense Budget Budget
100 61010 FULL-TIMEEMPLOYEES 367,232 391,136 579,006 540,464
610 61010 FULL-TIMEEMPLOYEES 14,941 20,313 63,413 61,764
620 61010 FULL-TIMEEMPLOYEES 24,046 26,954 216,299 146,818
800 61010 FULL-TIMEEMPLOYEES 1,548,171 1,575,835 1,222,324 1,145,350
100 61020 PART-TIME EMPLOYEES 830 225 0 13,195
610 61020 PART-TIME EMPLOYEES 0 49 0 0
620 61020 PART-TIME EMPLOYEES 0 0 0 35,749
800 61020 PART-TIME EMPLOYEES 87,067 90,604 52,444 33,922
100 61030 SEASONAL EMPLOYEES 5,666 3,701 8,242 8,375
620 61030 SEASONAL EMPLOYEES 0 33 0 0
800 61030 SEASONAL EMPLOYEES 55,517 45,882 104,208 33,500
100 61050 OVERTIMEPAY 6,676 9,707 5,250 5,250
610 61050 OVERTIME PAY 545 118 0 0
620 61050 OVERTIME PAY 468 45 0 0
800 61050 OVERTIMEPAY 53,967 80,842 54,250 54,250
100 61091 SICK LEAVE PAYOFF 13,417 13,417 13,417 7,540
100 61092 VACATION PAYOFF 0 4,255 0 0
800 61092 VACATION PAYOFF 1,755 0 0 0
100 61310 IPERS 33,501 35,759 52,909 50,657
610 61310 IPERS 1,380 1,843 5,663 5,514
620 61310 IPERS 2,189 2,411 19,315 16,302
800 61310 IPERS 153,883 157,032 127,984 113,145
100 61320 SOCIAL SECURITY 28,900 30,930 46,354 43,974
610 61320 SOCIAL SECURITY 1,136 1,514 4,851 4,725
620 61320 SOCIAL SECURITY 1,783 1,953 16,546 13,965
800 61320 SOCIAL SECURITY 127,501 130,526 109,645 96,929
100 61410 HEALTH INSURANCE 107,172 107,070 113,447 111,698
610 61410 HEALTH INSURANCE 14,280 16,137 15,741 16,536
620 61410 HEALTH INSURANCE 14,994 17,026 59,466 35,616
800 61410 HEALTH INSURANCE 299,094 335,893 304,247 235,023
100 61415 WORKMENS'COMPENSATION 20,440 21,768 17,488 17,175
610 61415 WORKMENS'COMPENSATION 2,883 3,107 2,916 2,597
620 61415 WORKMENS'COMPENSATION 2,790 2,918 3,061 8,402
800 61415 WORKMENS'COMPENSATION 53,834 57,651 56,288 50,212
100 61416 LIFE INSURANCE 273 302 1,160 1,084
610 61416 LIFE INSURANCE 13 18 127 125
620 61416 LIFE INSURANCE 19 21 433 294
800 61416 LIFE INSURANCE 1,311 1,286 2,444 2,298
800 61417 UNEMPLOYMENT INSURANCE 416 0 0 0
100 61640 SAFETY EQUIPMENT 417 230 500 250
100 61660 EMPLOYEE PHYSICALS 302 367 600 250
620 61660 EMPLOYEE PHYSICALS 75 122 0 0
800 61660 EMPLOYEE PHYSICALS 933 1,054 0 0
61-WAGES AND BENEFITS 3,049,817 3,190,054 3,280,038 2,912,948
100 62010 OFFICE SUPPLIES 7,518 6,689 7,133 6,823
100 62030 POSTAGE AND SHIPPING 428 116 97 116
610 62030 POSTAGE AND SHIPPING 0 0 24 0
800 62030 POSTAGE AND SHIPPING 2,614 1,618 2,745 1,618
-152-
Recommended Operating Expenditure Budget - Department Total
55- ENGINEERING
FY15 Actual FY16 Actual FY 17 Adopted FY 18 Recomm'd
Fund Account Account Title Expense Expense Budget Budget
100 62050 OFFICE EQUIPMENT MAINT 0 783 200 1,300
100 62061 DP EQUIP.MAINT CONTRACTS 21,555 24,878 25,472 27,982
100 62090 PRINTING&BINDING 35 118 596 200
610 62090 PRINTING&BINDING 0 0 0 30
100 62110 COPYING/REPRODUCTION 6,355 5,545 6,482 5,545
610 62110 COPYING/REPRODUCTION 0 5 0 50
800 62110 COPYING/REPRODUCTION 251 452 0 452
100 62130 LEGAL NOTICES&ADS 0 394 0 402
610 62130 LEGAL NOTICES&ADS 0 2,613 0 2,665
100 62170 SUBSCRIPTIONS-BOOKS-MAPS 2,096 1,491 3,376 3,975
250 62170 SUBSCRIPTIONS-BOOKS-MAPS 77 316 600 700
610 62170 SUBSCRIPTIONS-BOOKS-MAPS 0 0 120 325
620 62170 SUBSCRIPTIONS-BOOKS-MAPS 113 0 120 120
100 62190 DUES&MEMBERSHIPS 1,938 2,027 3,177 3,805
250 62190 DUES&MEMBERSHIPS 185 347 760 975
610 62190 DUES&MEMBERSHIPS 121 136 0 230
620 62190 DUES&MEMBERSHIPS 121 240 620 620
100 62204 REFUNDS 0 250 0 255
620 62204 REFUNDS 8,084 1,197 0 1,221
100 62206 PROPERTY INSURANCE 6,332 6,370 6,611 5,550
100 62208 GENERAL LIABILITY INSURAN 9,957 9,585 9,839 10,416
610 62208 GENERAL LIABILITY INSURAN 2,529 2,434 2,499 2,646
800 62208 GENERAL LIABILITY INSURAN 11,628 11,194 11,490 12,163
620 62210 SALES TAX 116,243 126,419 130,900 130,991
100 62211 PROPERTY TAX 114,082 99,486 168,458 88,120
100 62221 DAMAGECLAIMS 1,168 0 0 0
100 62230 COURT COSTS&RECORD FEES 634 1,282 600 1,280
100 62310 TRAVEL-CONFERENCES 7,624 6,001 14,800 16,250
250 62310 TRAVEL-CONFERENCES 3,000 3,654 4,700 4,940
610 62310 TRAVEL-CONFERENCES 1,311 5,196 3,175 965
620 62310 TRAVEL-CONFERENCES 3,800 1,018 4,800 5,315
100 62320 TRAVEL-CITY BUSINESS 240 60 720 660
620 62320 TRAVEL-CITY BUSINESS 244 1 120 120
100 62340 MILEAGE/LOCAL TRANSP 52 43 400 629
620 62340 MILEAGE/LOCAL TRANSP 0 3 0 50
100 62360 EDUCATION&TRAINING 3,661 3,918 24,696 29,755
250 62360 EDUCATION&TRAINING 1,889 1,764 4,500 4,700
610 62360 EDUCATION&TRAINING 2,269 189 13,200 2,710
620 62360 EDUCATION&TRAINING 326 90 4,245 5,195
620 62411 UTILITYEXP-ELECTRICITY0 0 0 15,000
100 62415 UTILITY EXPENSE STORMWATR 0 2,295 6,966 9,307
620 62419 UTILITY EXP-ELEC ST LTNG 1,448 1,524 0 1,555
100 62421 TELEPHONE 16,766 13,343 16,418 13,627
250 62421 TELEPHONE 3,524 1,199 1,255 1,610
610 62421 TELEPHONE 2,374 1,874 2,108 2,560
620 62421 TELEPHONE 192 377 655 2,080
100 62422 TELEPHONE 776 0 0 0
100 62424 RADIO/PAGERFEE 1,815 1,880 6,966 1,936
-153-
Recommended Operating Expenditure Budget - Department Total
55- ENGINEERING
FY15 Actual FY16 Actual FY 17 Adopted FY IS Recomm'd
Fund Account Account Title Expense Expense Budget Budget
100 62436 RENTAL OF SPACE 8,112 9,564 12,860 16,620
100 62511 FUEL,MOTOR VEHICLE 13,308 11,028 11,978 11,028
100 62521 MOTOR VEHICLE MAINT. 6,841 12,854 7,524 13,112
100 62522 VEHICLE MAINT.,ACCIDENT 0 2,400 0 0
100 62528 MOTOR VEH.MAINT.OUTSOUR 1,493 2,727 1,774 2,781
100 62611 MACH/EQUIP MAINTENANCE 2,929 1,443 2,332 500
250 62611 MACH/EQUIP MAINTENANCE 19,150 39,470 46,700 47,073
620 62611 MACH/EQUIP MAINTENANCE 18 0 0 0
100 62614 EQUIP MAINT CONTRACT 0 0 1,480 800
100 62663 SOFTWARE LICENSE EXP 25,320 17,325 20,602 20,516
250 62663 SOFTWARE LICENSE EXP 59,229 17,907 67,430 98,730
610 62663 SOFTWARE LICENSE EXP 998 9,193 9,870 5,170
620 62663 SOFTWARE LICENSE EXP 2,491 1,045 2,460 3,510
100 62664 LICENSE/PERMIT FEES 1,149 650 1,300 1,300
620 62664 LICENSE/PERMIT FEES 0 0 500 0
100 62667 INTERNET SERVICES 0 1,660 1,800 3,120
250 62667 INTERNET SERVICES 0 999 962 8,470
610 62667 INTERNET SERVICES 2,172 1,317 1,213 1,440
620 62667 INTERNET SERVICES 480 795 315 1,440
100 62671 MISC.OPERATING SUPPLIES 0 592 0 0
100 62683 FIELD OPERATIONS SUPPLIES 1,000 555 2,000 2,000
100 62696 OUTSIDE COLLECTOR EXPENSE 8 109 20 111
620 62696 OUTSIDE COLLECTOR EXPENSE 3,582 3,925 2,632 4,003
100 62713 LEGAL SERVICES 11,473 5,790 0 4,000
610 62713 LEGAL SERVICES 0 0 0 4,000
620 62713 LEGAL SERVICES 0 4,841 0 4,000
100 62716 CONSULTANT SERVICES 1,000 0 5,000 0
610 62716 CONSULTANT SERVICES 0 0 105,000 0
620 62716 CONSULTANT SERVICES 0 25,879 471,209 460,397
620 62721 FINANCIAL CONSULTANT 0 10,643 0 0
100 62726 AUDIT SERVICES 0 3,000 0 4,000
620 62726 AUDIT SERVICES 1,200 1,300 1,400 2,500
100 62731 MISCELLANEOUS SERVICES 44 11,703 0 0
620 62731 MISCELLANEOUS SERVICES 0 56,585 0 0
100 62732 TEMP HELPCONTRACT SERV. 0 3,880 0 3,957
100 62746 ONE CALL OPERATION 0 298 0 0
610 62746 ONE CALL OPERATION 2,010 1,939 2,346 1,966
620 62746 ONE CALL OPERATION 2,010 1,856 2,346 1,893
100 62756 SPIRIT RELATED EXPENSE 0 0 500 500
100 62757 INSPECTION REIMBURSEMENT 19,376 0 65,000 48,000
100 62761 PAY TO OTHER AGENCY 10,000 9,000 53,023 59,799
620 62761 PAY TO OTHER AGENCY 0 0 44,532 44,533
620 62765 GRANTS 0 0 322,300 351,681
100 62811 ENG.DIVISION SERVICES 1,254 0 0 17,000
62-SUPPLIES AND SERVICES 562,022 622,686 1,760,051 1,679,489
620 62724 BOND PAYING AGENT FEE 0 574 0 586
627-CONTRACTUAL SERVICES 0 574 0 586
100 71110 MISC.OFFICE EQUIPMENT 0 0 2,500 0
-154-
Recommended Operating Expenditure Budget - Department Total
55- ENGINEERING
FY15 Actual FY16 Actual FY 17 Adopted FY 1S Recomm'd
Fund Account Account Title Expense Expense Budget Budget
250 71110 MISC.OFFICE EQUIPMENT 0 74 0 0
620 71110 MISC.OFFICE EQUIPMENT 0 134 0 0
100 71112 TYPEWRITERS 0 0 200 400
250 71112 TYPEWRITERS 0 0 200 200
610 71112 TYPEWRITERS 0 0 0 200
100 71118 PROJECTOR/CAMERA 3,000 240 1,000 1,000
250 71118 PROJECTOR/CAMERA 4,304 17,690 67,600 20,000
610 71118 PROJECTOR/CAMERA 0 198 0 0
620 71118 PROJECTOR/CAMERA 0 0 200 200
100 71120 PERIPHERALS,COMPUTER 0 6,550 0 0
250 71120 PERIPHERALS,COMPUTER 11,531 2,076 0 7,500
610 71120 PERIPHERALS,COMPUTER 0 880 0 0
620 71120 PERIPHERALS,COMPUTER 0 99 0 0
100 71123 SOFTWARE 2,322 11,525 0 0
250 71123 SOFTWARE 0 40 0 0
100 71124 MICRO-COMPUTER 0 180 0 0
250 71124 MICRO-COMPUTER 969 0 8,000 0
250 71125 SERVERS 55,825 34,557 68,000 102,000
250 71127 UPS SYSTEM 0 0 0 3,000
610 71156 FURNITURE 4,880 0 0 0
100 71211 DESKS/CHAIRS 653 2,390 2,000 1,000
100 71310 AUTO/JEEP REPLACEMENT 0 48,941 126,500 50,000
610 71310 AUTO/JEEP REPLACEMENT 0 13,502 0 0
620 71312 VAN/PICKUP/WAG REPL 12,196 0 0 0
250 71410 SHOP EQUIPMENT 0 0 0 500
100 71411 TRAFFIC CONTROL EQUIPMENT 0 6,520 13,120 65,930
250 71411 TRAFFIC CONTROL EQUIPMENT 16,623 76,686 79,500 92,100
100 71412 SURVEY EQUIPMENT 4,494 5,970 14,700 26,520
100 71413 LABORATORY EQUIPMENT 2,615 1,008 8,000 1,000
610 72113 OTHER SAFETY EQUIPMENT 6,150 433 3,600 2,400
100 72410 PAGER/RADIOEQUIPMENT 0 108 0 7,500
250 72414 TELEVISION 2,714 0 0 5,000
620 72414 TELEVISION 0 0 500 0
610 72415 ELECTRONIC DATA COLLECTOR 0 0 600 600
100 72418 TELEPHONE RELATED 2,160 667 5,965 1,070
250 72418 TELEPHONE RELATED 106 0 535 535
610 72418 TELEPHONE RELATED 0 0 1,575 120
620 72418 TELEPHONE RELATED 50 268 1,515 475
610 72510 FLOW TEST EQUIPMENT 0 14,218 20,000 9,500
100 72515 TEST EQUIPMENT,OTHER 7,787 0 0 1,600
71-EQUIPMENT 138,379 244,954 425,810 400,350
610 73211 CONST.CONTR-NOT BLDG 0 0 270,000 70,000
73-CIP EXPENDITURES 0 0 270,000 70,000
400 74111 PRINCIPAL PAYMENT 828,407 876,370 924,203 1,473,407
620 74111 PRINCIPAL PAYMENT 1,158,543 7,697,565 1,280,618 1,539,374
400 74112 INTERESTPAYMENT 612,764 1,344,289 1,348,918 1,763,380
620 74112 INTERESTPAYMENT 845,997 810,298 1,248,580 835,042
74-DEBT SERVICE 3,445,711 10,728,522 4,802,319 5,611,203
-155-
Recommended Operating Expenditure Budget - Department Total
55- ENGINEERING
FY15 Actual FY16 Actual FY 17 Adopted FY IS Recomm'd
Fund Account Account Title Expense Expense Budget Budget
620 91100 TO GENERAL 329,315 480,105 499,607 470,613
400 91350 TO SALES TAX CONSTRUCTION 1,666 0 0 0
620 91720 TO STORM SEWER CONST 530,000 500,000 0 0
91-TRANSFER TO 860,981 980,105 499,607 470,613
55-ENGINEERING TOTAL 8,056,910 15,766,895 11,037,825 11,145,189
-156-
Recommended Expenditure Budget Report by Activity & Funding Source
55- ENGINEERING
ENGINEERING ADNIIN.
FUNDING SOURCE: ENGINEERING SERVICE
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
EQUIPMENT 2,165 27,625 8,175
SUPPLIES AND SERVICES 165,718 310,977 246,770
WAGES AND BENEFITS 2,111,862 487,021 377,573
ING ADMIN. 2,279,745
PROJECT ENGINEERING -55400
FUNDING SOURCE: DEBT SERVICE
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
CIP EXPENDITURES 0 270,000 70,000
DEBT SERVICE 1,164,568 1,187,371 1,169,190
EQUIPMENT 239,715 365,910 386,940
SUPPLIES AND SERVICES 193,858 444,447 314,941
TRANSFER TO 0 0 0
WAGES AND BENEFITS 728,229 1,554,395 1,455,952
rA" ROJECT ENGINEERING 2
FELDERMAN SUBDIV -5540
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
WAGES AND BENEFITS 0 0 0
owFELDERMAN SUB DIV
ASBURY PLAZA PHASE II !-5!5!405
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 0 0 65,000
WAGES AND BENEFITS 328 0 9,366
WMASBTYLAZA PHASE II 328 0 74,366
ASBURY PLAZA- 12 5
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
WAGES AND BENEFITS 0 0 0
UMSBURY PLAZA-12 0
ASBURY BUSINESS PARK 2 -55408
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 2,086 0 0
WAGES AND BENEFITS 138 0 0
ASBURY BUSINESS PARK 2 2,224 0 0
WINGATE PLACE NO 3 -55410
-157-
Recommended Expenditure Budget Report by Activity & Funding Source
55- ENGINEERING
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
WAGES AND BENEFITS 0 0 0
LACE NO 3 0
ENGLISH RIDGE -55412
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
WAGES AND BENEFITS 0 0 0
r�ENGLISH RIDGE 0
HARVEST VIEW 5TH
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 0 0 0
WAGES AND BENEFITS 0 0 0
MEST VIEW 5TH 0
_PEBBLE COVE _ -55415
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
WAGES AND BENEFITS 0 0 0
MILFM�PEBBLE COVE 0
TIMBER-HYRST PHASE I -55418
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 27 0 0
WAGES AND BENEFITS 1,224 0 0
WVTHYRSTPHASEI 1,251
TIMBER-HYRST PHASE II -55419
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 0 0 0
WAGES AND BENEFITS 0 0 0
MWMBER-HYRST PHASE II 0 0
YNSTONE -55421
FUNDING SOURCE: GENERAL
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 9,522 0 0
WAGES AND BENEFITS 1,669 0 0
WYNSTONE w 0
STONEBROOK -55424
FUNDING SOURCE: GENERAL
-158-
Recommended Expenditure Budget Report by Activity & Funding Source
55- ENGINEERING
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 105 0 0
WAGES AND BENEFITS 203 0 0
STONEBROOK 308 0 0
SANITARY SEWER INT SERV - 55610
FUNDING SOURCE: ENGINEERING SERVICE
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
WAGES AND BENEFITS 80,797 253,153 269,838
MrNITARY SEWER INT SERV 80,797 253,153
STORMWATER UTILITY O&M -55620
FUNDING SOURCE: ENGINEERING SERVICE
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
CONTRACTUAL SERVICES 574 0 586
DEBT SERVICE 8,507,862 2,529,198 2,374,416
EQUIPMENT 501 2,215 675
SUPPLIES AND SERVICES 237,961 517,945 597,448
TRANSFER TO 980,105 499,607 470,613
WAGES AND BENEFITS 246,200 978,914 783,090
STORMWATER UTILITY O&M 9,973, 4,527,
TRAFFIC ENGINEERING -55700
FUNDING SOURCE: ENGINEERING SERVICE
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
EQUIPMENT 2,574 30,060 4,560
SUPPLIES AND SERVICES 13,405 15,473 16,330
WAGES AND BENEFITS 19,313 6,555 17,129
EErFFIC ENGINEERING 35,292 52,088
NPDES DISCHARGE ELIM SYST-55750
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 0 10,000 10,000
"DISCLIM SYST 0
NPDES EROSION&SID CONTR-55751
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 0 40,000 40,000
WAGES AND BENEFITS 35 0 0
NPDES EROSION&SED CONTR 35 40,000 40,000
NPDES DISCHARGE DETECTION-55752
-159-
Recommended Expenditure Budget Report by Activity & Funding Source
55- ENGINEERING
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 0 10,000 10,000
F7DEMSDWIE DETECTION 0
NPDES MUNICIPAL OPERATION-55753
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 0 10,000 10,000
MWAL OPERATION
dffNPUBLIC EDUCATION -55754
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 0 10,000 10,000
KNPDES PUBLIC EDUCATION 0 10,0
NPDES PUBLIC PARTICIPATIO-55755
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 0 10,000 10,000
DES PUBLIC PARTICIPATIO 0 10,000
NPDES POST CONSTRUCTION -55756
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 0 50,000 50,000
WAGES AND BENEFITS 56 0 0
NPDES POST CONSTRUCTION 56
SALES TAX INCR DEBT -55800
FUNDING SOURCE: DEBT SERVICE
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
DEBT SERVICE 1,056,091 1,085,750 2,067,597
1,056,091 1,085,750
TORMWATER I&I PREVENT-55900
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FY18 Recomm'd Budget
SUPPLIES AND SERVICES 0 200,000 200,000
STORMWATER I&I PREVEN 0 200,000
-160-
Recommended Expenditure Budget Report by Activity & Funding Source
55- ENGINEERING
STORMWATER DITCH REMEDIAT-55910
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 0 40,000 40,000
R DITCH REMEDIAT 0 40,000
STREAMBANK REHAB ASSIST -55911
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 0 2,209 5,000
W=BANKREHAB ASSIST 0 2,209
DETENTION BASIN MAINTENAN-55920
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 0 59,000 29,000
DETENTION BASIN MAINTENAN 0 59,000
STORM SEWER INSP&CLEAN-55930
FUNDING SOURCE: STORM WATER OPERATION
Account FY 16 Actual Expense FY17 Adopted Budget FYIS Recomm'd Budget
SUPPLIES AND SERVICES 0 30,000 25,000
ORM SEWER INSP&CLEAN
T30,000
ENGINEERING TOTAL 137,825.00
-161-
CITY OF DUBUQUE, IOWA
DEPARTMENT DETAIL-PERSONNEL COMPLEMENT
55 ENGINEERING DEPARTMENT
FY 2016 FY 2017 FY 2018
FD JC WP-GR JOB CLASS FTE BUDGET FTE BUDGET FTE BUDGET
61010 Full Time Employee Expense
100 9425 GE-44 CITY ENGINEER 0.75 $ 98,029 0.75 $ 100,154 0.25 $ 33,922
610 9425 GE-44 CITY ENGINEER 0.00 $ - 0.00 $ - 0.10 $ 13,569
620 9425 GE-44 CITY ENGINEER 0.00 $ - 0.00 $ - 0.10 $ 13,569
800 9425 GE-44 CITY ENGINEER 0.25 $ 32,676 0.25 $ 33,385 0.55 $ 74,628
100 3125 GE-40 ASSISTANT CITY ENGINEER 0.25 $ 25,863 0.25 $ 26,421 0.25 $ 26,846
800 3125 GE-40 ASSISTANT CITY ENGINEER 0.75 $ 69,754 0.75 $ 71,262 0.75 $ 80,538
100 4060 GE-40 PROJECT MANAGER 0.16 $ 16,231 0.16 $ 16,581 0.40 $ 42,278
800 4060 GE-40 PROJECT MANAGER 0.84 $ 85,214 0.84 $ 87,049 0.60 $ 63,416
620 5525 GE-38 CIVIL ENGINEER II 0.25 $ 23,251 0.25 $ 23,754 0.20 $ 19,214
100 5525 GE-38 CIVIL ENGINEER II 1.10 $ 100,861 1.10 $ 103,185 0.95 $ 87,482
800 5525 GE-38 CIVIL ENGINEER II 2.65 $ 243,390 2.65 $ 238,623 2.85 $ 262,763
610 2230 GE-35 ENVIRONMENTAL ENGINEER 0.15 $ 13,544 0.15 $ 13,837 0.00 $ -
620 2230 GE-35 ENVIRONMENTAL ENGINEER 0.10 $ 9,030 0.10 $ 9,225 0.00 $ -
800 2230 GE-35 ENVIRONMENTAL ENGINEER 0.75 $ 67,722 0.75 $ 69,186 0.00 $ -
100 5700 GE-36 SURVEYOR 0.80 $ 58,690 0.80 $ 63,244 0.80 $ 67,348
800 5700 GE-36 SURVEYOR 0.20 $ 14,631 0.20 $ 15,811 0.20 $ 16,837
100 5550 GE-33 TRAFFIC ENGINEERING ASSISTANT 0.87 $ - 0.87 $ - 0.87 $ -
800 5550 GE-33 TRAFFIC ENGINEERING ASSISTANT 0.13 $ - 0.13 $ - 0.13 $ -
100 GE-35 TRAFFIC ENGINEER 0.00 $ - 0.00 $ - 0.60 $ 48,316
800 GE-35 TRAFFIC ENGINEER 0.00 $ - 0.00 $ - 0.40 $ 32,211
100 5575 GE-33 SURVEY PARTY CHIEF 0.15 $ 10,670 0.15 $ 10,900 0.15 $ 11,165
800 5575 GE-33 SURVEY PARTY CHIEF 0.85 $ 60,465 0.85 $ 61,768 0.85 $ 63,266
100 2700 GE-31 ENGINEERING ASSISTANT II 1.15 $ 74,759 1.15 $ 76,363 1.00 $ 67,547
620 2700 GE-31 ENGINEERING ASSISTANT II 0.00 $ - 0.00 $ - 0.10 $ 6,697
800 2700 GE-31 ENGINEERING ASSISTANT II 0.85 $ 54,906 0.85 $ 56,083 0.90 $ 60,333
100 2700 GE-31 ENGINEERING TECHNICAN 1.50 $ 98,384 2.00 $ 133,880 1.70 $ 112,203
610 2700 GE-31 ENGINEERING TECHNICAN 0.51 $ 31,957 0.50 $ 32,002 0.10 $ 6,504
620 2700 GE-31 ENGINEERING TECHNICAN 0.36 $ 22,782 1.05 $ 67,869 1.00 $ 65,647
800 2700 GE-31 ENGINEERING TECHNICAN 7.63 $ 491,140 7.45 $ 477,650 6.26 $ 408,442
100 2725 GE-30 SURVEY TECHNICIAN 0.15 $ 9,077 0.15 $ 9,275 0.15 $ 9,423
800 2725 GE-30 SURVEY TECHNICIAN 0.85 $ 51,436 0.85 $ 52,558 0.85 $ 53,402
610 4870 GE-28 UTILITY LOCATOR 0.34 $ 17,202 0.34 $ 17,574 0.34 $ 18,826
620 4870 GE-28 UTILITY LOCATOR 0.34 $ 18,139 0.34 $ 18,527 0.34 $ 18,826
800 4870 GE-28 UTILITY LOCATOR 0.32 $ 17,071 0.32 $ 17,438 0.32 $ 17,718
610 GE-26 I&I INSPECTOR 0.00 $ - 0.00 $ - 0.00 $ -
620 GE-26 I&I INSPECTOR 2.00 $ 90,536 2.00 $ 96,924 0.00 $ -
800 GE-26 I&I INSPECTOR 0.00 $ - 0.00 $ - 0.00 $ -
100 225 GE-25 SECRETARY 0.55 $ 25,246 0.55 $ 25,794 0.25 $ 11,796
610 225 GE-25 SECRETARY 0.00 $ - 0.00 $ - 0.25 $ 11,796
620 225 GE-25 SECRETARY 0.00 $ - 0.00 $ - 0.25 $ 11,796
800 225 GE-25 SECRETARY 0.45 $ 20,656 0.45 $ 21,104 0.25 $ 11,796
100 1000 GE-25 CONFIDENTIAL ACCOUNT CLERK 0.45 $ 20,656 0.45 $ 16,697 0.50 $ 22,138
610 1000 GE-25 CONFIDENTIAL ACCOUNT CLERK 0.00 $ - 0.00 $ - 0.25 $ 11,069
620 1000 GE-25 CONFIDENTIAL ACCOUNT CLERK 0.00 $ - 0.00 $ - 0.25 $ 11,069
800 1000 GE-25 CONFIDENTIAL ACCOUNT CLERK 0.55 $ 25,246 0.55 $ 20,407 0.00 $ -
TOTAL FULL TIME EMPLOYEES 29.00 $ 1,999,214 30.00 $2,084,530 26.06 $ 1,894,396
61020 Part-Time Employee Expense
100 1000 GE-25 CONFIDENTIAL ACCOUNT CLERK 0.00 $ - 0.00 $ - 0.35 $ 13,195
-162-
800 1000 GE-25 CONFIDENTIAL ACCOUNT CLERK 1.37 $ 49,854 1.37 $ 52,444 0.90 $ 33,922
TOTAL PART TIME EMPLOYEES 1.37 $ 49,854 1.37 $ 52,444 1.98 $ 82,866
61030 Seasonal Employee Expense
100 5325 NA-34 ENGINEERING AIDE-SEASONAL 0.25 $ 8,070 0.25 $ 8,242 0.25 $ 8,375
800 5325 NA-46 ENGINEERING ASSIST-SEASONAL 2.00 $ 69,746 0.50 $ 21,788 0.00 $ —
800 5325 NA-34 ENGINEERING AIDE-SEASONAL 1.00 $ 32,280 2.50 $ 82,420 1.00 $ 33,500
TOTAL SEASONAL EMPLOYEES 3.25 $ 110,096 3.25 $ 112,450 1.25 $ 41,875
TOTAL ENGINEERING 33.62 $ 2,159,164 34.62 $2,249,424 29.29 $2,019,137
-163-
CITY OF DUBUQUE, IOWA
ACTIVITY PERSONNEL COMPLEMENT SUMMARY
FY 2016 FY 2017 FY 2018
ACCT FD JC WP-GR POSITION CLASS FTE BUDGET FTE BUDGET FTE BUDGET
Engineering Administration-FT General Fund
10055100 61010 100 225 GE-25 SECRETARY 0.55 $ 25,246 0.55 $ 25,794 0.25 $ 11,796
10055100 61010 100 1000 GE-25 CONFIDENTIAL ACCOUNT CLERK 0.45 $ 20,656 0.45 $ 16,697 0.25 $ 11,069
10055100 61010 100 3125 GE-40 ASSISTANT CITY ENGINEER 0.25 $ 25,863 0.25 $ 26,421 0.25 $ 26,846
10055100 61010 100 4060 GE-40 PROJECT MANAGER 0.16 $ 16,231 0.16 $ 16,581 0.40 $ 42,278
10055100 61010 100 9425 GE-44 CITY ENGINEER 0.75 $ 98,029 0.75 $ 100,154 0.25 $ 33,922
Total 2.16 $ 186,025 2.16 $ 185,647 1.40 $ 125,911
Engineering Administration-PT Service Fund
10055100 61020 100 1000 GE-25 CLERK CONFIDENTIAL ACCOUNT 0.00 $ - 0.00 $ - 0.35 $ 13,195
Total 0.00 $ - 0.00 $ - 0.35 $ 13,195
Engineering Administration-FT Service Fund
CONFIDENTIAL ACCOUNT
80055100 61010 800 1000 GE-25 CLERK 0.55 $ 25,246 0.55 $ 20,407 0.00 $ -
80055100 61010 800 3125 GE-38 ASSISTANT CITY ENGINEER 0.75 $ 69,754 0.75 $ 71,262 0.75 $ 80,538
80055100 61010 800 4060 GE-40 PROJECT MANAGER 0.84 $ 85,214 0.10 $ 10,363 0.10 $ 10,570
80055100 61010 800 225 GE-25 SECRETARY 0.45 $ 20,656 0.45 $ 21,104 0.25 $ 11,796
80055100 61010 800 9425 GE-44 CITY ENGINEER 0.25 $ 32,676 0.25 $ 33,385 0.25 $ 33,922
Total 2.84 $ 233,546 2.10 $ 156,521 1.35 $ 136,826
Engineering Administration-PT Service Fund
80055100 61020 800 1000 GE-25 CLERK CONFIDENTIAL ACCOUNT 0.75 $ 27,243 0.30 $ 11,739 0.00 $ -
Total 0.75 $ 27,243 0.30 $ 11,739 0.00 $ -
Project Engineering-FT General Fund
10055400 61010 100 2700 GE-31 ENGINEERING ASSISTANT II 1.15 $ 74,759 1.15 $ 76,363 1.00 $ 67,547
10055400 61010 100 2220 GE-31 ENGINEERING TECHNICIAN 1.50 $ 98,384 2.00 $ 133,880 1.60 $ 105,545
10055400 61010 100 2725 GE-30 SURVEY TECHNICIAN 0.15 $ 9,077 0.15 $ 9,275 0.15 $ 9,423
10055400 61010 100 5575 GE-33 SURVEY PARTY CHIEF 0.15 $ 10,670 0.15 $ 10,900 0.15 $ 11,165
10055400 61010 100 4710 GE-35 TRAFFIC ENGINEER 0.00 $ - 0.00 $ - 0.60 $ 48,316
10055400 61010 100 5525 GE-38 CIVIL ENGINEER II 1.10 $ 100,861 1.10 $ 103,185 0.95 $ 87,482
10055400 61010 100 5700 GE-36 SURVEYOR 0.80 $ 58,690 0.80 $ 63,244 0.80 $ 67,348
Total 4.85 $ 352,441 5.35 $ 396,847 5.25 $ 396,826
Project Engineering-Seasonal General Fund
10055400 61030 100 5325 NA-34 ENGINEERING AIDE-SEASONAL 0.25 $ 8,070 0.25 $ 8,242 0.25 $ 8,375
Total 0.25 $ 8,070 0.25 $ 8,242 0.25 $ 8,375
Project Engineering Subdivision Inspection-FT General Fund
10055405 61010 100 2220 GE-31 ENGINEERING TECHNICIAN 0.00 $ - 0.00 $ - 0.10 $ 6,658
Total 0.00 $ - 0.00 $ - 0.10 $ 6,658
Project Engineering-FT Service Fund
80055400 61010 800 2710 GE-26 I&I INSPECTOR 0.00 $ - 0.00 $ - 0.00 $ -
80055400 61010 800 4870 GE-28 UTILITY LOCATOR 0.32 $ 17,071 0.32 $ 17,438 0.32 $ 17,718
80055400 61010 800 2700 GE-31 ENGINEERING ASSISTANT 11 0.85 $ 54,906 0.35 $ 23,131 0.50 $ 33,547
80055400 61010 800 2220 GE-31 ENGINEERING TECHNICIAN 3.90 $ 256,674 3.40 $ 230,160 3.00 $ 196,870
80055400 61010 800 2725 GE-30 SURVEY TECHNICIAN 0.55 $ 33,282 0.55 $ 34,008 0.30 $ 18,848
80055400 61010 800 5575 GE-33 SURVEY PARTY CHIEF 0.55 $ 39,125 0.55 $ 39,968 0.30 $ 22,329
-164-
CITY OF DUBUQUE, IOWA
ACTIVITY PERSONNEL COMPLEMENT SUMMARY
FY 2016 FY 2017 FY 2018
ACCT FD JC WP-GR POSITION CLASS FTE BUDGET FTE BUDGET FTE BUDGET
80055400 61010 800 5525 GE-38 CIVIL ENGINEER II 1.90 $ 173,638 1.90 $ 167,362 1.55 $ 137,630
80055400 61010 800 4710 GE-35 TRAFFIC ENGINEER 0.00 $ - 0.00 $ - 0.40 $ 32,211
80055400 61010 800 5700 GE-36 SURVEYOR 0.20 $ 14,631 0.20 $ 15,811 0.20 $ 16,837
Total 8.27 $ 589,327 7.27 $ 527,878 6.57 $ 475,990
Project Engineering-Seasonal Service Fund
80055400 61030 800 5325 NA-34 ENGINEERING AIDE-SEASONAL 1.00 $ 32,280 1.00 $ 32,968 1.00 $ 33,500
Total 1.00 $ 32,280 1.00 $ 32,968 1.00 $ 33,500
Traffic Engineering-FT General Fund
CONFIDENTIAL ACCOUNT
10055700 61010 100 CLERK 0.00 $ - 0.00 $ - 0.25 $ 11,069
10055700 61010 100 5550 GE-33 TRAFFIC ENGINEERING ASSIST 0.87 $ - 0.87 $ - 0.87 $ -
Total 0.87 $ - 0.87 $ - 1.12 $ 11,069
Traffic Engineering-FT Service Fund
80055700 61010 800 5550 GE-33 TRAFFIC ENGINEERING ASSIST 0.13 $ - 0.13 $ - 0.13 $ -
Total 0.13 $ - 0.13 $ - 0.13 $ -
Project Engineering-FT Sewer Fund
61055400 61010 610 2230 GE-35 ENVIRONMENTAL ENGINEER 0.15 $ 13,544 0.15 $ 13,837 0.00 $ -
61055400 61010 610 4870 GE-28 UTILITY LOCATOR 0.34 $ 17,202 0.34 $ 17,574 0.34 $ 18,826
CONFIDENTIAL ACCOUNT
61055400 61010 610 1000 GE-33 CLERK 0.00 $ - 0.00 $ - 0.25 $ 11,069
61055400 61010 610 9425 GE-44 CITY ENGINEER 0.00 $ - 0.00 $ - 0.10 $ 13,569
61055400 61010 610 2710 GE-26 I&I INSPECTOR 0.00 $ - 0.00 $ - 0.00 $ -
61055400 61010 610 225 GE-25 SECRETARY 0.00 $ - 0.00 $ - 0.25 $ 11,796
61055400 61010 610 2220 GE-31 ENGINEERING TECHNICIAN 0.51 $ 31,957 0.50 $ 32,002 0.10 $ 6,504
Total 1.00 $ 62,703 0.99 $ 63,413 1.04 $ 61,764
Sanitary Utility-FT Service Fund
80055610 61010 800 5525 GE-38 CIVIL ENGINEER 11 0.15 $ 13,950 0.15 $ 14,252 0.00 $ -
80055610 61010 800 9425 GE-44 CITY ENGINEER 0.00 $ - 0.00 $ - 0.15 $ 20,353
80055610 61010 800 2220 GE-31 ENGINEERING TECHNICIAN 1.80 $ 112,791 1.50 $ 96,007 1.50 $ 97,554
80055610 61010 800 2725 GE-30 SURVEY TECHNICIAN 0.15 $ 9,077 0.15 $ 9,275 0.30 $ 18,848
80055610 61010 800 5575 GE-33 SURVEY PARTY CHIEF 0.15 $ 10,670 0.15 $ 10,900 0.30 $ 22,329
80055610 61010 800 2230 GE-35 ENVIRONMENTAL ENGINEER 0.50 $ 45,148 0.50 $ 46,124 0.00 $ -
80055610 61010 800 4060 GE-40 PROJECT MANAGER 0.00 $ - 0.00 $ - 0.25 $ 26,423
Total 2.75 $ 191,636 2.45 $ 176,558 2.50 $ 185,507
Sanitary Utility-PT Service Fund
CONFIDENTIAL ACCOUNT
80055610 61010 800 1000 GE-33 CLERK 0.00 $ - 0.00 $ - 0.15 $ 5,655
Total 0.00 $ - 0.00 $ - 0.15 $ 5,655
Project Engineering-FT Storn-water Fund
62055620 61010 620 2220 GE-31 ENGINEERING TECHNICIAN 0.36 $ 22,782 1.05 $ 67,869 1.00 $ 65,647
62055620 61010 620 4870 GE-28 UTILITY LOCATOR 0.34 $ 18,139 0.34 $ 18,527 0.34 $ 18,826
62055620 61010 620 2230 GE-35 ENVIRONMENTAL ENGINEER 0.10 $ 9,030 0.10 $ 9,225 0.00 $ -
62055620 61010 620 2710 GE-26 I&I INSPECTOR 0.00 $ - 2.00 $ 96,924 0.00 $ -
CONFIDENTIAL ACCOUNT
62055620 61010 620 1000 GE-33 CLERK 0.00 $ - 0.00 $ - 0.25 $ 11,069
62055620 61010 620 9425 GE-44 CITY ENGINEER 0.00 $ - 0.00 $ - 0.10 $ 13,569
62055620 61010 620 2700 GE-31 ENGINEERING ASST 11 0.00 $ - 0.00 $ - 0.10 $ 6,697
-165-
CITY OF DUBUQUE, IOWA
ACTIVITY PERSONNEL COMPLEMENT SUMMARY
FY 2016 FY 2017 FY 2018
ACCT FD JC WP-GR POSITION CLASS FTE BUDGET FTE BUDGET FTE BUDGET
62055620 61010 620 225 GE-25 SECRETARY 0.00 $ - 0.00 $ - 0.25 $ 11,796
62055620 61010 620 1900 GE-38 CIVIL ENGINEER II 0.25 $ 23,251 0.25 $ 23,754 0.20 $ 19,214
Total 1.05 $ 73,202 3.74 $ 216,299 2.24 $ 146,818
Stormwater Utility-PT Stormwater
62055620 61020 620 2710 GE-26 I&I INSPECTOR 0.00 $ - 0.00 $ - 0.73 $ 35,749
Total 0.00 $ - 0.00 $ - 0.73 $ 35,749
Stormwater Utility-FT Service Fund
80055620 61010 800 5525 GE-38 CIVIL ENGINEER 11 0.60 $ 55,802 0.60 $ 57,009 1.30 $ 125,133
80055620 61010 800 9425 GE-44 CITY ENGINEER 0.00 $ - 0.00 $ - 0.15 $ 20,353
80055620 61010 800 2220 GE-31 ENGINEERING TECHNICIAN 1.93 $ 121,675 2.55 $ 151,483 1.76 $ 114,018
80055620 61010 800 2230 GE-35 ENVIRONMENTAL ENGINEER 0.25 $ 22,574 0.25 $ 23,062 0.00 $ -
80055620 61010 800 2700 GE-31 ENGINEERING ASST 11 0.00 $ - 0.50 $ 32,952 0.40 $ 26,786
80055620 61010 800 2725 GE-30 SURVEY TECHNICIAN 0.15 $ 9,077 0.15 $ 9,275 0.25 $ 15,706
80055620 61010 800 4060 GE-40 PROJECT MANAGER 0.00 $ - 0.74 $ 76,686 0.25 $ 26,423
80055620 61010 800 5575 GE-33 SURVEY PARTY CHIEF 0.15 $ 10,670 0.15 $ 10,900 0.25 $ 18,608
80055620 61010 800 2710 GE-26 I&I INSPECTOR 2.00 $ 90,536 0.00 $ - 0.00 $ -
Total 5.08 $ 310,334 4.94 $ 361,367 4.36 $ 347,027
Stormwater Utility-PT Service Fund
CONFIDENTIAL ACCOUNT
80055620 61020 800 1000 GE-25 CLERK 0.62 $ 22,611 1.07 $ 40,705 0.75 $ 28,267
Total 0.62 $ 22,611 1.07 $ 40,705 0.75 $ 28,267
Stormwater Utility-Seasonal Service Fund
80055620 61030 800 NA-34 ENGINEERING AIDE-SEASONAL 1.50 $ 48,705 1.50 $ 49,452 0.00 $ -
ENGINEERING ASSIST-
80055620 61030 800 5325 NA-46 SEASONAL 0.50 $ 21,041 0.50 $ 21,788 0.00 $ -
Total 2.00 $ 69,746 2.00 $ 71,240 0.00 $ -
TOTAL ENGINEERING DIVISION 33.62 $2,159,164 34.62 $2,249,424 29.29 $ 2,019,137
-166-
Capital Improvement Projects by Department/Division
ENGINEERING
CIP FY 15 Actual FY 16 Actual FY 17 Adopted FY 18 Recomm'd
Number Capital Improvement Project Title Expense Expense Budget Budget
1001108 SIDEWALK REPAHUMAINTENAN 4,812 3,038 30,000 30,000
1001549 STREET LIGHT REPLACEMENT 699 0 0 0
1002495 MILLER PROPERTY ACQ 2,676 0 0 0
1002502 ELM COMPLETE STREET 83,683 351 0 0
1011023 INTERSECTION PREEMPTION 4,462 0 0 0
1021023 INTERSECTION PREEMPTION 934 2,751 0 0
1021041 CURB/CATCH BASIN REPL 25,889 0 0 0
1021466 HARBOR AREA MAINTENANCE 1,910 0 0 0
1021609 FIBER OPT CON-PRIV&MISC 23,870 0 0 0
1021630 DECORATIVE CONCRETE MAINT 1,170 0 0 0
1021857 UTILITY FRANCHISE ANALYSI 98,269 202,444 0 0
1021963 RIVERWALK SECURITY CAMERA 0 0 10,000 0
1022673 16TH ST DET BASIN TRAIL 0 0 30,000 0
1022674 KERPER BLVD FIBER AND CAM 0 0 195,000 0
2501017 FIBER OPTIC CONDUIT PROJ 350 0 0 0
2501039 CORRIDOR STUDY ALTERNATES 0 0 0 1,650,000
2501077 BRUNSKILL RD BRIDGE REPLC 25,565 3,713 0 0
2501702 3RD ST OVERPASS-PAINT 0 0 0 100,000
2501916 LED RE-LAMP SCHEDULE 4,263 9,253 0 0
2502253 ITS TRAFFIC CONTROL EQUIP 0 24,500 25,000 0
2502274 US 52/CENTRAL TRAFFIC IMP 0 0 0 751,800
2601236 WHEEL CHAIR RAMPS 42,336 105 12,600 12,600
2601239 NEIGHBORHOOD REL IMPROVEM 11,864 47,750 13,400 93,400
3001011 SIGNALIZATION PROGRAM 66,180 46,059 80,000 110,000
3001023 INTERSECTION PREEMPTION 0 8,253 6,000 0
3001027 GUARDRAIL REPLACEMENT 1,400 12,502 10,000 15,000
3001029 STONE RETAINING WALLS 69,369 102,745 0 275,000
3001034 ACCESSIBILITY BARRIERS 0 0 7,500 0
3001039 CORRIDOR STUDY-ALTERNATES 0 0 50,000 0
3001041 CURB/CATCH BASIN REPL 87,766 66,599 70,000 70,000
3001077 BRUNSKILL RD BRIDGE REPLC 86,689 0 0 0
3001133 TRAFFIC SIGNAL MASTARM RE 0 67,848 70,000 60,000
3001210 GRANDVIEW AVE.LIGHT POLES 0 0 75,000 200,000
3001229 TRAFFIC CONTR BATTERY PCK 3,596 35,462 20,000 20,000
3001256 SPECIAL ASSESSMENT ASSIST 0 0 30,000 0
3001258 BRIDGE REPAIRS/MAINT. 24,421 17,294 100,000 80,000
3001266 TRAFFIC SIGNAL INTERCONNE 31,709 88,906 50,000 40,000
3001274 TRAFFIC CONTROLLERREPLAC 4,916 63,274 45,000 45,000
3001287 SOUTHWEST ARTERIAL 3,871,356 10,777,141 10,095,607 555,000
3001425 SIDEWALK PROGRAM CITY OWN 75,538 48,443 75,000 75,000
3001549 STREET LIGHT REPLACEMENT 4,396 1,426 45,000 23,000
3001615 SIGNAL INTERSEC RECONSTRU 126,744 3,688 60,000 120,000
3001630 DECORATIVE CONCRETE MAINT 0 3,713 25,000 25,000
3001631 TRAFF SIG FIBER OPTIC NET 87,624 110,280 80,000 164,000
3001815 TRAFFIC CONSULTANT SERV 15,459 7,813 10,000 0
3001816 TRAFFIC SIG VIDEO DET CON 62,966 62,745 66,000 67,000
3001916 LED RE-LAMP SCHEDULE 0 10,000 23,500 24,500
3001919 RECON SIGNALS/JFK-WACKER 199,662 159,285 0 0
3001922 SAFE ROUTES TO SCHOOL 0 0 5,000 0
3002021 N CASCADE RD RECONSTRUCT 6,701 5,583 0 0
-167-
Capital Improvement Projects by Department/Division
ENGINEERING
3002044 GREEN ALLEY PILOT PROJECT 9,758 0 0 0
3002137 MILLWORK-ST RECONSTRUCT 69,603 0 0 0
3002139 CEDAR CROSS RECONSTRUCT 60 0 0 0
3002142 STREET CONST-GENERAL 186,875 183,343 100,000 100,000
3002144 FIBER OPTIC CONDUIT-MISC 13,708 11,950 25,000 40,000
3002245 PAVEMENT MARKING 105,886 66,982 110,000 135,000
3002246 CROSSWALK WARNING DEVICES 29,055 0 0 31,000
3002252 STLIGHT/SIGNAL KNOCKDOWN 31,665 24,687 30,000 30,000
3002253 ITS TRAFFIC CONTROL EQUIP 0 0 0 30,000
3002254 JFK @ WACKER SIGNAL RECON 975 0 0 0
3002324 UNI&ASBURY INTER IMPROV 1,583 0 0 0
3002325 VIDEO DET CAMERA UPGRADE 28,216 13,890 0 0
3002327 CATFISH CRK BRIDGE FIBER 31,509 1,143 50,000 0
3002328 SCHOOL ZN CNT-DWN PED SIG 0 3,955 4,000 0
3002420 SRGE AND GRND IMPR SIGNAL 8,118 0 0 15,000
3002421 STREET CAMERA INSTALL 109,710 8,894 25,000 25,000
3002422 TRAFIC OPS CTR VIDEO SOFT 7,998 21,919 20,000 40,000
3002423 TRAFIC OPS CNTR EQUP TEST 1,716 0 0 0
3002482 ASBURY ROAD GRINDING 35,297 14,578 0 0
3002484 LED STREETLIGHT RETROFIT 8,344 15,041 10,000 0
3002491 FIBER OPTICS TO AIRPORT 48,638 669,729 135,000 125,000
3002553 9TH TO 11 TH 1WAY 2WAY RRX 283,396 0 0 0
3002557 FLASH YELLOW LEFT TURN 0 10,000 20,000 20,000
3002558 REPLC LED SIGNS BEACONS 0 0 0 0
3002559 GRANDVIEW SIGNAL RECON 47,883 33,431 70,000 0
3002611 GRANDVIEW/DELHI ROUNDABOU 0 3,919 0 0
3002612 HEEB STREET RECON 0 1,788 0 0
3002613 ROW MANAGEMENT 0 0 0 0
3002614 ASBURY RD WEST CITY ASBUR 0 25,778 0 0
3002615 WAH NEIGH STREET LIGHTS 0 5,203 10,000 10,000
3002616 STREET LIGHT AUDIT 0 0 0 0
3002617 JFK RD COORD WACKER/ASB 0 0 0 0
3002618 WEST LOCUST COMM/CAMERAS 0 0 0 0
3002619 UNIV/ASBURY FIBER/CAMERA 0 44,091 0 0
3002620 FIBER/NETWORK MGMT PROG 0 0 0 0
3002634 SMARTER TRAVEL PROJECT 123,513 120,750 0 0
3002672 NEW ST LIGHTS CITY-WIDE 0 0 10,000 10,000
3002675 NW ARTERIAL TURN LANE IMP 0 0 50,000 132,000
3002676 CITY-WIDE SECURITY CAMERA 0 0 25,000 50,000
3002717 POD IRRIGATION REPLACEMEN 0 0 0 10,000
3002724 GRNDVW/UNVRSTY ROUNDABOUT 0 0 0 250,000
3401654 BEE BRANCH CREEK RESTORAT 6,618,109 8,151,985 2,541,800 0
3402608 GATE REPLC FLOOD MITIGATI 0 0 0 0
3402609 FLOOD CONTROL MAINT FACIE 0 277,670 549,378 0
3501029 STONE RETAINING WALLS 45,370 37,512 100,000 0
3501034 ACCESSIBILITY BARRIERS 288 0 0 0
3501053 RIVERFRONT LEASEHOLD IMPR 16,875 2,174 53,400 0
3501465 REHAB RR TRACK 28,000 4,408 0 0
3501466 HARBOR AREA MAINTENANCE 498 121,523 25,000 10,000
3501608 DWNTWN ST LIGHT REPLACMNT 3,269 0 0 0
3501630 DECORATIVE CONCRETE MAINT 12,844 0 0 0
-168-
Capital Improvement Projects by Department/Division
ENGINEERING
3501841 FEDERAL BUILDING RENOVTN 0 0 0 0
3502021 N CASCADE RD RECONSTRUCT 0 0 1,714,008 0
3601053 RIVERFRONT LEASEHOLD IMPR 0 0 261,600 0
3601608 DWNTWN ST LIGHT REPLACMNT 30,085 6,228 0 45,000
3601841 FEDERAL BUILDING RENOVTN 0 0 0 39,000
3602021 N CASCADE RD RECONSTRUCT 0 0 0 406,000
3602273 NW BIKE/HIKE TRI,PHASE 3 0 0 1,436,300 0
3602442 1WAY TO 2WAY CONVERSION 267,670 9,546 0 0
3602481 18TH ST WALL RECON 3,545 0 0 0
3602483 HWY 52 PHASE II REHAB 787,509 0 0 0
3602484 LED STREETLIGHT RETROFIT 0 0 0 25,000
3602487 POD PARKING LOT 0 0 0 25,000
3602551 CHAVANELLE RD REHAB 0 0 0 1,500,000
3602552 WASH ST RECON STH TO 9TH 3,104 12,781 0 0
3602554 11TH ST STAIRS RECON 3,905 0 0 0
3602671 DOWNTOWN STREET LIGHTS 0 0 25,000 25,000
3602676 DOWNTOWN SECURITY CAMERAS 0 0 0 10,000
3602677 DOWNTOWN SECURITY CAMERAS 0 0 10,000 0
7101012 ANNEXATION STUDY/IMPLEMEN 28,957 2,523 100,000 0
7101067 SEWER CONN ASST-LOW/MOD 5,697 8,124 0 0
7101289 GENERAL SANITARY SEWER RE 336,970 481,182 0 0
7101293 SAN SEWER INTERNAL MAIN 0 0 50,000 65,000
7101294 I&I REDUCTION PROGRAM 351,464 342,197 120,000 110,000
7101297 LATERAL REPL ASST.LOW INC 2,125 4,482 15,000 0
7101309 SEWER LATERAL ASSISTANCE 4,509 0 0 0
7101320 LATERALS-I&I REDUCTION 820 13,731 50,000 0
7101335 SAN SEWER MANHOLE REPLACE 98,523 274,529 295,000 216,000
7101350 SEWER EXTENSIONS NEW DEV. 19,134 128,379 867,000 0
7101636 SEWER CLEARING/GRUBBING 5,501 0 0 0
7101637 SAN SEWER LINING PROGRAM 293,697 681 300,000 350,000
7101638 STREET PROG/RELATED SANIT 5,629 239 0 0
7102350 SEP GREEN ALLEYS 0 0 0 0
7102408 WASH ELM 24TH TO 25TH 1,640 0 0 0
7102409 GRANGER CREEK SAN EXT 223,671 3,359,455 0 0
7102413 RELOC30"MAIN OPW GARAGE 11,332 43,493 665,000 0
7102450 $9.4 GREEN ALLEYS 2,824,521 3,445,284 0 0
7102544 ENVIRON CONSULT SVC 33,051 6,970 0 0
7102545 SANITARY CONNECT FEE 0 0 15,000 0
7102546 TRACK LN SAN SEWER CLEAN 0 0 0 0
7102547 WASH ST SAN 7TH TO 9TH 0 0 43,000 0
7102606 CEDAR/TERM ASSESSMENTS 0 11,429 170,000 785,000
7102607 CATFISH/GRANGER LIFT IMPR 0 0 170,000 0
7102612 HEEB STREET 0 0 150,000 0
7102633 PRIVATE WATER/SEWER PURCH 0 0 -2,791 0
7102638 LAKE ELEANOR LIFT STATION 7,928 41,538 0 0
7102666 GROVE TERRACE SANITARY IM 0 0 120,000 0
7102669 SW ART/MENARD UTLTY RELOC 0 0 50,000 0
7102670 SW ART/HWY 20 UTLTYRELOC 0 0 200,000 0
7102720 30TH&JACKSON SAN SEWER 0 0 0 170,000
7102721 MARQUETTE SAN SEWER 0 0 0 225,000
7201004 STORMWATER DITCH REMEDIAT 31,093 1,209 0 0
-169-
Capital Improvement Projects by Department/Division
ENGINEERING
7201008 STORM SEWER IMPR/EXTENSIO 30,846 28,333 60,000 0
7201066 GENERAL REPAIRS 267,948 136,553 162,000 0
7201081 CATCHBASIN/WESTSIDE STOR 92,096 759 35,000 0
7201208 ARROWHEAD STORM 126,507 6,591 0 0
7201352 STREAMBANK REHAB 453 29 0 0
7201354 DRAIN TILE PROGRAM 136 217 20,000 0
7201355 NPDES PROGRAM 26,468 12,671 0 0
7201359 DETENTION BASIN MAINTENAN 30,512 16,716 0 0
7201363 GUNITE ROCK STORM SEWER 0 0 0 0
7201364 PROP TAX EXEMPT SUBSIDY 261,805 286,144 0 0
7201365 MIDDLE ROAD CULVERT 0 0 0 150,000
7201375 REMOVAL OF SILT 32ND ST. 1,177 175 0 0
7201378 LOW INCOME SFU ASSISTANCE 14,947 15,324 0 0
7201437 ROCKDALE RD STORM SEWER 0 0 0 0
7201654 BEE BRANCH CREEK RESTORAT 3,165,727 18,352,877 13,008,200 0
7201659 STORM SEWER CLEANING 9,694 6,527 0 0
7201809 VILLA ST STORM SEWER PROJ 181 117 0 0
7201906 STRMWTR SUBSIDY-RESFARMS7,916 8,050 0 0
7202015 STORM SEWER SYS ASSESS 2,673 1,920 0 0
7202044 GREEN ALLEY PILOT PROJECT 6,467 0 0 0
7202062 NPDES-EROSION CONTROL 35,972 29,111 0 0
7202063 NPDES-ILLICIT DISCHARGE 2,595 6,847 0 0
7202064 NPDES-MUNICIPAL OPERATION 8,595 3,842 0 0
7202065 NPDES-POST CONSTRUCTION 156,118 34,950 0 0
7202066 NPDES-PUBLIC EDUCATION 5,846 5,081 0 0
7202067 NPDES-PUBLIC PARTICIPATI 1,449 3,091 0 0
7202133 KANEKAUF-STORM SEW CONST 130,175 23,880 0 0
7202238 CEDAR CROSS RD STORM 772 0 0 0
7202239 FLOODWALL BREACH ANALYSIS 3,450 2,308 0 0
7202274 US-52 STORM IMPROVEMENTS 0 0 0 200,000
7202331 CATFISH CRK WATERSHED PRT 32,056 43,446 700,000 0
7202332 STORMWTR INFILT&INFLOW 57,463 107,110 100,000 0
7202333 STORMWTR INFILT&INFLOPRE 135,151 37,269 0 0
7202418 14TH ST RECONSTRUCTION 130 0 0 0
7202547 WASH ST SAN 7TH TO 9TH 0 0 0 0
7202550 CENTER GROVE SAN STORM 374 0 0 0
7202609 FLOOD CONTROL MAINT FACIE 0 0 500,622 0
7202610 ADMIRAL SHEEHY FLOOD GATE 0 0 0 0
7202629 ICE HARBOR/MAUS PUMP STUD 0 0 0 0
7202667 AVOCA STORM IMPROVEMENTS 0 0 49,500 0
7202668 NORTHRIDGE STORM EXTENSIO 0 0 113,000 0
7202669 SW ART/MENARD UTLTY RELOC 0 0 450,000 0
7202670 SW ART/HWY 20 UTLTYRELOC 0 0 300,000 0
7202690 HUD RESILIENCY 0 0 0 1,600,000
7202722 WILBRICHT DETENTION BASIN 0 0 0 50,000
7202723 VAN BUREN STORM OUTLET 0 0 0 65,000
-170-
PRGM
/DPT PROJECT DESCRIPTION FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 TOTAL PAGE
ENGINEERING DEPARTMENT
SANITARY SEWER
Business Type
Sanitary Sewer Lining
Program $ 350,000 $ 355,000 $ - $ 24,000 $ 110,000 $ 839,000 211
Sanitary Sewer Manhole
Replacement/Rehabilitation
Project $ 216,000 $ - $ 100,000 $ 100,000 $ 71,000 $ 487,000 212
1 & I Reduction Program $ 110,000 $ 10,000 $ - $ 110,000 $ 110,000 $ 340,000 213
Sanitary Sewer Internal Main -
New Developments-
Revolving Loan Fund $ 65,000 $ 191,000 $ - $ - $ - $ 256,000 215
Cedar&Terminal Lift Stations
and Force Main $ 785,000 $ - $ - $ - $ - $ 785,000 216
30th and Jackson Sanitary
Sewer Reconstruction $ 170,000 $ - $ - $ - $ - $ 170,000 218
Marquette Place Sanitary
Sewer Improvements $ 225,000 $ - $ - $ - $ - $ 225,000 219
Sanitary Sewer Connection
Assistance $ - $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 40,000 220
Harlan &Euclid Street
Sanitary Reconstruction $ - $ 75,000 $ - $ - $ - $ 75,000 221
Sanitary Sewer External
Extensions- Annexation $ - $ - $ - $ 233,500 $ - $ 233,500 222
STORM WATER
Business Type
General Storm Sewer
Projects
Stormwater Infiltration & Inflow
Elimination Program $ - $ - $ - $ 25,000 $ 110,000 $ 135,000 224
Catch Basin Reconstruction $ - $ - $ - $ 15,000 $ 52,020 $ 67,020 225
Storm Sewer Improvements/
Extensions $ - $ - $ - $ 30,000 $ 62,400 $ 92,400 226
Storm Sewer General Repairs $ - $ - $ - $ 75,000 $ 100,000 $ 175,000 227
Draintile Program $ - $ - $ - $ 20,400 $ 20,810 $ 41,210 228
Specific Storm Sewer
Projects
Wilbricht Lane Detention $ 50,000 $ - $ - $ - $ - $ 50,000 229
Van Buren Storm Outlet $ 65,000 $ - $ - $ - $ - $ 65,000 230
Pennsylvania-Middle Road
Culvert Replacement $ 150,000 $ - $ - $ - $ - $ 150,000 231
US-52 11th&White Street $ 200,000 $ - $ - $ - $ - $ 200,000 232
US-52 Central Avenue $ - $ 100,000 $ - $ - $ - $ 100,000 233
University Ave Storm Sewer $ - $ - $ - $ - $ 175,000 $ 175,000 234
Century Drive Storm Sewer $ - $ - $ - $ 127,000 $ - $ 127,000 235
Saint Anne Drive Storm Sewer
Extension $ - $ - $ - $ - $ 62,500 $ 62,500 236
Northwest Arterial Detention
Basin $ - $ - $ - $ - $ 48,500 $ 48,500 237
Key Way Drive Outfall Project $ - $ - $ - $ - $ 30,100 $ 30,100 238
Hillcrest-Rosemont Detention
Basin $ - $ - $ - $ - $ 98,800 $ 98,800 239
-171-
PRGM
/DPT PROJECT DESCRIPTION FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 TOTAL PAGE
Copper Field Storm Sewer
Extension Project $ - $ - $ - $ - $ 34,700 $ 34,700 240
Roosevelt Culvert
Reconstruction $ - $ - $ - $ - $ 21,000 $ 21,000 241
Cedar Cross Road Storm
Replacement $ - $ - $ - $ - $ 69,700 $ 69,700 242
Seippel Road Culvert
Replacement $ - $ - $ - $ - $ 54,000 $ 54,000 243
Keokuk Storm Sewer
Extension $ - $ - $ - $ - $ 44,600 $ 44,600 244
Bee Branch Watershed
Projects
22nd Street Storm Sewer
Improvements $ 5,310,000 $ 6,654,000 $ 3,186,000 $ - $ - $15,150,000 245
Bee Branch Creek RR
Culverts $ 9,350,000 $ 9,837,750 $ - $ - $ - $19,187,750 246
17th Street Storm Sewer
Improvements $ - $ 2,250,000 $ 5,250,000 $3,681,000 $ - $11,181,000 248
Flood Control Maintenance
Facility $ - $ - $ - $ - $4,100,000 $ 4,100,000 249
STREETS
Public Works
Street Related
Improvements
Street Construction General
Repairs $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 500,000 250
Guardrail Replacement $ 15,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 55,000 251
Pavement Marking Project $ 135,000 $ 135,000 $ 135,000 $ 85,000 $ 135,000 $ 625,000 252
East-West Corridor Capacity
Improvements $ 1,650,000 $ 1,890,000 $ 2,529,000 $1,856,000 $1,796,000 $ 9,721,000 254
Sidewalk Program-City-
Owned Property $ 75,000 $ 75,000 $ 75,000 $ 75,000 $ 85,000 $ 385,000 256
Sidewalk Program Related
Curb and Catch Basin
Replacements $ 70,000 $ 70,000 $ 70,000 $ 70,000 $ 80,000 $ 360,000 257
Sidewalk Inspection Program-
Assessable $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 150,000 258
ADA Curb Ramp Construction
Project $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 12,600 $ 63,000 259
Stone Retaining Walls $ 275,000 $ 25,000 $ 150,000 $ 100,000 $ 50,000 $ 600,000 260
Bridge Repairs/Maintenance $ 80,000 $ 85,000 $ 95,000 $ 100,000 $ 100,000 $ 460,000 261
Decorative Concrete
Maintenance $ 25,000 $ - $ 25,000 $ 25,000 $ 25,000 $ 100,000 262
Street and Alley Assessment
Assistance Program $ - $ 5,000 $ 5,000 $ 5,000 $ 5,000 $ 20,000 263
Southwest Arterial Project $ 555,000 $ 57,000 $ 59,000 $ - $ - $ 671,000 264
North Cascade Road
Reconstruction $ 406,000 $ 1,497,200 $ - $ - $ - $ 1,903,200 267
Grandview& University
Roundabout $ 250,000 $ 900,000 $ - $ - $ - $ 1,150,000 269
Chavenelle Road
Rehabilitation $ 1,500,000 $ - $ - $ - $ - $ 1,500,000 271
Paint Third Street Overpass
Railing $ 100,000 $ - $ - $ - $ - $ 100,000 273
-172-
PRGM
/DPT PROJECT DESCRIPTION FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 TOTAL PAGE
HWY 52 Phase III - 11th Street
(Elm to White) and White
Street(9th to 11th) Pavement
Rehabilitation Project $ 751,800 $ - $ - $ - $ - $ 751,800 274
Crosswalk Warning Devices $ 31,000 $ - $ - $ 31,000 $ - $ 62,000 276
HWY 52 Phase IV- Central
Avenue Pavement
Rehabilitation from 9th Street
to 21stStreet $ - $ 1,923,000 $ - $ - $ - $ 1,923,000 278
Bluff Street Parking Expansion $ - $ - $ 175,000 $ - $ - $ 175,000 280
MISCELLANEOUS
General Government
Federal Building Renovation $ 39,000 $ 70,000 $ 242,000 $ 575,000 $ 120,000 $ 1,046,000 281
Port of Dubuque Parking Lot $ 25,000 $ 50,000 $ - $ - $ - $ 75,000 283
Public Works
Greater Downtown Street
Lights $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 125,000 284
Harbor Area Maintenance $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 50,000 285
Neighborhood Related
Improvement $ 93,400 $ 13,400 $ 13,400 $ 13,400 $ 15,000 $ 148,600 286
Washington Neighborhood
Street Lights $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 12,000 $ 52,000 287
City-Wide Street Lights $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 10,000 $ 50,000 288
Port of Dubuque-Security
Cameras $ - $ - $ 20,000 $ 20,000 $ 20,000 $ 60,000 289
Riverfront Leasehold
Improvements $ - $ - $ 10,000 $ 10,000 $ - $ 20,000 290
Riverfront Dock Expansion $ - $ - $ - $ - $ 150,000 $ 150,000 291
Industrial Site Redevelopment
Study $ - $ - $ - $ - $ 25,000 $ 25,000 292
Culture&Recreation
Trails&Complete Streets $ - $ 497,000 $ 200,000 $ 742,000 $ 200,000 $ 1,639,000 293
TRAFFIC
Public Works
Signalization Program $ 110,000 $ 30,000 $ 100,000 $ 100,000 $ 110,000 $ 450,000 295
Grandview Street Light
Replacement $ 200,000 $ - $ 100,000 $ 100,000 $ 57,200 $ 457,200 296
Traffic Signal Mastarm Retrofit $ 60,000 $ 60,000 $ 80,000 $ 80,000 $ 90,000 $ 370,000 297
Traffic Signal Vehicle
Detection Conversion $ 67,000 $ 60,000 $ 60,000 $ 60,000 $ 65,000 $ 312,000 298
Traffic Signal Fiber Optics $ 164,000 $ - $ 90,000 $ 90,000 $ 115,000 $ 459,000 299
Traffic Signal Interconnect
Conduit Replacement $ 40,000 $ 35,000 $ 50,000 $ 60,000 $ 60,000 $ 245,000 301
Street Light Replacement $ 23,000 $ 39,000 $ 46,000 $ 47,000 $ 47,000 $ 202,000 302
Traffic Signal Controller
Replacement $ 45,000 $ 15,000 $ 45,000 $ 45,000 $ 45,000 $ 195,000 303
Street Lighting and Traffic
Signal Knockdown/Insurance $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 30,000 $ 150,000 304
Fiber Optic Conduit-
Miscellaneous $ 40,000 $ 35,000 $ 50,000 $ 50,000 $ 50,000 $ 225,000 305
ITS Traffic Control Equipment $ 30,000 $ 50,000 $ 50,000 $ 50,000 $ 50,000 $ 230,000 306
Street Camera Installation $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 25,000 $ 125,000 307
-173-
PRGM
/DPT PROJECT DESCRIPTION FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 TOTAL PAGE
City-Wide Security Camera
Program $ 60,000 $ 60,000 $ 60,000 $ 100,000 $ 100,000 $ 380,000 308
LED Re-lamp schedule $ 24,500 $ 10,500 $ 29,000 $ 30,000 $ 57,000 $ 151,000 309
Video Management Software
and Equipment $ 40,000 $ 40,000 $ 45,000 $ 50,000 $ 50,000 $ 225,000 310
Traffic Signal Battery Backup
Program $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 100,000 311
City wide LED Streetlight
Retrofit $ 25,000 $ 10,000 $ 25,000 $ 25,000 $ 30,000 $ 115,000 313
Traffic Signal Intersection
Reconstruction $ 120,000 $ - $ 65,000 $ 65,000 $ 82,000 $ 332,000 314
Flashing Yellow Left Turn
Arrow $ 20,000 $ 10,000 $ - $ - $ - $ 30,000 315
Surge and Grounding
Improvements at Signals City-
Wide $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 15,000 $ 75,000 316
Downtown Streetlight
Replacement Schedule $ 45,000 $ 100,000 $ 51,000 $ 102,000 $ 53,000 $ 351,000 317
Fiber Optics Communications
from Downtown to Airport $ 125,000 $ - $ - $ - $ - $ 125,000 318
Northwest Arterial Turn Lane $ 132,000 $ - $ - $ - $ - $ 132,000 319
Total - Engineering
Department $24,780,300 $27,627,450 $13,593,000 $9,509,900 $9,551,930 $85,062,580
-174-
FISCAL YEAR 2018
BUDGET
Engineering Department
FY17 Engineering Department Organizational Structure
FY17 Engineering Department Organizational Structure
FY18 Engineering Department Organizational Structure
FY18 Engineering Department Organizational Structure
FY2017 FY2018
Interns (6): 2.0 FTEs
8.0 FTEs 2.75 FTEs
FY2018
SANITARY SEWER BUDGET
FY2017 ACCOMPLISHMENTS
30 Inch Force Main Relocation Project (Phase 2)
FY2017 ACCOMPLISHMENTS
Phase 2 of the 30 inch Force Main
Project Completed -$350K
•Contractor: Top Grade Excavating
•Design: IIW of Dubuque, IA
•Construction Engineering: City of
Dubuque Engineering Dept.
•Phase 2 of a 3 Phase Project to
relocate force main from beneath
the Old Public Works Garage on
Kerper Boulevard
FY2017 ACCOMPLISHMENTS
Negotiated a 10 year Extension to
Consent Decree Sanitary Sewer
improvements
Completed design of the Kerper
Boulevard Lift Station and Sanitary
Sewer Replacement
Extended sanitary sewer to the Key
West area
Kerper Blvd 18 inch
Sanitary Sewer -2015
FY2017 ACCOMPLISHMENTS
Completed Sanitary Sewer
Siphon Installation to serve
Timber Hyrst Subdivision
Completed Catfish
Interceptor Manhole and Pipe
Improvements
Timber Hyrst Siphon
Project -2016
Project Description Est.Cost
30 Inch Force Main Relocation Project $615,000
Kerper Boulevard Sanitary Sewer Relocation Project $4,500,000
Consent Decree Sanitary Sewer Pipe and Manhole
Improvements
$500,000
Estimated Total $5,615,000
FY2017 Current Initiatives
CONSENT DECREE
2011, Consent Decree with the U.S. Department of Justice, the U.S.
Environmental Protection Agency, and the State of Iowa. The Decree’s
Purpose:
Take all necessary measures to achieve full compliance with
The Clean Water Act,
The Iowa water pollution control laws, and
The City’s NPDES Permit
Goal of eliminating all Sanitary Sewer Overflows.
Consent Decree Compliance
Focus On:
Public
Improvement
Corrective Actions
Sewer flow
monitoring
Working with
private property
owners to make
corrections.
Project Description Est. Cost
Consent Decree and City Wide Sanitary Sewer Lining Project
(Sewersheds 5 and 7)
$350,000
Consent Decree and City Wide Sanitary Sewer Manhole
Rehabilitation/Replacement Project (Sewersheds 5, 7, and 12)
$216,000
Consent Decree Related Sanitary Sewer Improvement –30th
and Jackson Street
$170,000
Consent Decree Related Sanitary Sewer Improvement –
Marquette Place
$225,000
Cedar and Terminal Street Lift Station and Force Main
Assessment Project
$785,000
FY2018 Key Initiatives
FY2018 FOCUS PROJECT
•Cedar and Terminal
Street Lift Station
and Force Main
Assessment
Project
Terminal LS
Emergency Flow
Redirect -2016
FY2018 Sanitary Sewer Funding Sources
SANITARY
CONST FUND,
$1,470,000.00
SRF LOAN ,
$386,000.00
LOAN
REPAYMENT,
$65,000.00
www.cityofdubuque.org/engineering
FY2018 STORMWATER
MANAGEMENT BUDGET
Stormwater Management
Outcome:Engineer, construct, and help maintain
public facilities to mitigate the effects of flooding
Citizen Impact:While most homeowners can install
gutters and downspouts and install landscaping that
forces water to flow away from their house,
sometimes they are powerless to protect their home
from flooding.
Seven (7) of the top nine (9) wettest years since 1895 occurred
in the past 25 years;
Four (4) of the top nine (9) wettest years since 1895 occurred in
the past eight (8) years.
Dubuque Rainfall Data1
1895 to 2016
1NOAA National Centers for Environmental Information, Climate a Glance: U.S. Time Series, Precipitation, published
October 2016, retrieved on October 27, 2016 from http://www.ncdc.noaa.gov/cag/
Annual Rainfall Totals
Dubuque Rainfall Data1
1895 to 2016
1NOAA National Centers for Environmental Information, Climate a Glance: U.S. Time Series, Precipitation, published
October 2016, retrieved on October 27, 2016 from http://www.ncdc.noaa.gov/cag/
Monthly Rainfall Totals
The 16.01 inches recorded in July of 2011 is the single wettest
month in over a 100 years.
The 12.57 inches recorded in June of 2014 is the third-wettest
month in over a 100 years.
History of Bee Branch Watershed Flooding
Presidential Disasters
Presidential Disaster Declaration: May 21, 1999
Disaster #1277
Reason for Declaration Flooding, severe storms, tornadoes
Cause of Damage 3 inches of rain in 1.5 hours
Presidential Disaster Declaration: June 19, 2002
Disaster #1420
Reason for Declaration Flooding and storms
Cause of Damage 4.9 inches of rain in 24 hours
Presidential Disaster Declaration: June 2, 2004
Disaster #1518
Reason for Declaration Flooding, severe storms, tornadoes
Cause of Damage 3.9 inches of rain in 48 hours
Presidential Disaster Declaration: May 27, 2008
Disaster #1763
Reason for Declaration Flooding, severe storms, tornadoes
Cause of Damage Record 15.7 inches of rain in 2 months
Presidential Disaster Declaration: August 14, 2010
Disaster #1930
Reason for Declaration Flooding, severe storms, tornadoes
Cause of Damage 4.8 inches of rain in 12 hours
Presidential Disaster Declaration: August 30, 2011
Disaster #4018
Reason for Declaration Flooding, severe storms, tornadoes
Cause of Damage 10.2 inches of rain in 12 hours
History of Bee Branch Watershed Flooding
The Damage
Estimated damages due to the six disasters
from 1999 to 2011 totals $69.8 million
Infrastructure Improvement Schedule
Carter Road Detention Basin Complete (2003)
West 32nd Street Detention Basin Complete (2009)
Lower Bee Branch Creek Restoration Functional (2011)
Historic Millwork District Complete Streets Complete (2012)
Flood Mitigation Gate Replacement Est. Completion -2017
Upper Bee Branch Creek Restoration Est. Completion -2017
22nd Street/Kaufmann Storm Sewer Capacity Improvements Est. Completion –2021
Bee Branch Creek Railroad Culverts Est. Completion -2019
17th Street/W. Locust Storm Sewer Capacity Improvements Est. Completion –2021
North End Storm Sewer Capacity Improvements Est. Completion -2022
Flood Mitigation Maintenance Facility Est. Completion -2022
Water Plant Flood Protection Est. Completion -2023
Impervious Surface Reduction (Green Alleys)Est. Completion -2038
Infrastructure Improvement Schedule
Carter Road Detention Basin Complete (2003)
West 32nd Street Detention Basin Complete (2009)
Lower Bee Branch Creek Restoration Functional (2011)
Historic Millwork District Complete Streets Complete (2012)
Flood Mitigation Gate Replacement Est. Completion -2017
Upper Bee Branch Creek Restoration Est. Completion -2017
22nd Street/Kaufmann Storm Sewer Capacity Improvements Est. Completion –2021
Bee Branch Creek Railroad Culverts Est. Completion -2019
17th Street/W. Locust Storm Sewer Capacity Improvements Est. Completion –2021
North End Storm Sewer Capacity Improvements Est. Completion -2022
Flood Mitigation Maintenance Facility Est. Completion -2022
Water Plant Flood Protection Est. Completion -2023
Impervious Surface Reduction (Green Alleys)Est. Completion -2038
Infrastructure Improvement Schedule
Carter Road Detention Basin Complete (2003)
West 32nd Street Detention Basin Complete (2009)
Lower Bee Branch Creek Restoration Functional (2011)
Historic Millwork District Complete Streets Complete (2012)
Flood Mitigation Gate Replacement Est. Completion -2017
Upper Bee Branch Creek Restoration Est. Completion -2017
22nd Street/Kaufmann Storm Sewer Capacity Improvements Est. Completion –2021
Bee Branch Creek Railroad Culverts Est. Completion -2019
17th Street/W. Locust Storm Sewer Capacity Improvements Est. Completion –2021
North End Storm Sewer Capacity Improvements Est. Completion -2022
Flood Mitigation Maintenance Facility Est. Completion -2022
Water Plant Flood Protection Est. Completion -2023
Impervious Surface Reduction (Green Alleys)Est. Completion -2038
STORMWATER MANAGEMENT
FY17 Accomplishments
“Most of (the Lower Bee Branch) side slopes contain a wide
variety of native pollinator plant species . . . . (It is), in my opinion,
an excellent example of pollinator habitat.” John Larson, Ph.D.,
Principal Ecologist
Lower Bee Branch Creek Restoration
Phase 4
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Impervious Alleys
(240)
Green Alleys
(22)
Green Alleys
(56)
Completed
Green Alleys
(59)
Green Alleys
(22)
Green Alleys
(56)
2016
Green Alleys
(22)
Green Alley Construction
Phase 6
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Impervious Surface Reduction
Green Alley Interactive Story Map
www.cityofdubuque.org/greenalleys
Upper Bee Branch Creek Restoration Project
–FUNCTIONAL –
22
nd
St
Ga
r
f
i
e
l
d
Rh
o
m
b
e
r
g
Phase 7
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
–FUNCTIONAL –
22
nd
St
Ga
r
f
i
e
l
d
Rh
o
m
b
e
r
g
Phase 7
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Before
Upper Bee Branch Creek Restoration Project
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Before
End of 2016
Upper Bee Branch Creek Restoration Project
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
–FUNCTIONAL –
22
nd
St
Ga
r
f
i
e
l
d
Rh
o
m
b
e
r
g
Phase 7
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
Before
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
Before
End of 2016
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
–FUNCTIONAL –
22
nd
St
Ga
r
f
i
e
l
d
Rh
o
m
b
e
r
g
Phase 7
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
Before
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
End of 2016
Before
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
24th Street24thStreet
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
–FUNCTIONAL –
22
nd
St
Ga
r
f
i
e
l
d
Rh
o
m
b
e
r
g
Phase 7
FlyoverFlyover
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
Phase 7
FUNCTIONAL
July 20, 2016
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
8 feet
July 20, 2016
FY
1
7
Ac
c
o
m
p
l
i
s
h
m
e
n
t
s
Upper Bee Branch Creek Restoration Project
8
f
e
e
t
8 feet
12 feet
July 20, 2016
STORMWATER MANAGEMENT
FY17 Initiatives
Lower Bee Branch Basin Overlook
Phase 4
FY
1
7
In
i
t
i
a
t
i
v
e
s
Bee Branch Pond
Lower Bee Branch Floating Island(s)
Phase 4
FY
1
7
In
i
t
i
a
t
i
v
e
s
Bee Branch Pond
Phase 4
FY
1
7
In
i
t
i
a
t
i
v
e
s
•Aesthetics
•Habitat
•Water Quality
•Public Outreach/Education
Lower Bee Branch Floating Island(s)
Phase 5
FY
1
7
In
i
t
i
a
t
i
v
e
s
Bee Branch Pond
Flood Mitigation Gate Replacement
Phase 5
FY
1
7
In
i
t
i
a
t
i
v
e
s
Flood Mitigation Gate Replacement
Flood Mitigation Gate Replacement
Phase 5
FY
1
7
In
i
t
i
a
t
i
v
e
s
STORMWATER MANAGEMENT
FY18 Initiatives
FY
1
8
In
i
t
i
a
t
i
v
e
s
Phase 7
Bee Branch Creek Railroad Culverts Project
FY
1
8
In
i
t
i
a
t
i
v
e
s
Phase 7
Bee Branch Creek Railroad Culverts Project
FY
1
8
In
i
t
i
a
t
i
v
e
s
Phase 7
Bee Branch Creek Railroad Culverts Project
Existing Culverts
Proposed Culverts
FY
1
8
In
i
t
i
a
t
i
v
e
s
Phase 7
Bee Branch Creek Railroad Culverts Project
$9 million (Grant)
$10.2 million (SRF Loan)
Bee Branch Creek Railroad Culverts Project
July 20, 2016
Phase 7
Phase 7
Bee Branch Creek Railroad Culverts Project
July 20, 2016 w/Railroad Culverts
5 feet lower
FY
1
8
In
i
t
i
a
t
i
v
e
s
22nd Street/Kaufmann Ave. Storm Sewer Improvements
$11.5 million$11.5 million
Phase 8
July 20, 2016: 12:05 PM
22nd Street (west of Central)22nd Street (east of Central)
22nd Street/Kaufmann Ave. Storm Sewer Improvements
FY
1
8
In
i
t
i
a
t
i
v
e
s
17th Street/W. Locust Storm Sewer Improvements
$2.6 million
Phase 12
July 20, 2016: 12:05 PM
W. Locust (west of 17th Street)
17th Street/W. Locust Storm Sewer Improvements
Motorist Stranded Traffic Pattern Disruption
Infrastructure Improvement Cost
Carter Road Detention Basin $1,076,315
West 32nd Street Detention Basin $4,158,589
Lower Bee Branch Creek Restoration $21,274,685
Historic Millwork District Complete Streets $7,977,311
Flood Mitigation Gate Replacement $2,099,000
Upper Bee Branch Creek Restoration $60,974,636
22nd Street/Kaufmann Storm Sewer Capacity Improvements $15,406,000
Bee Branch Creek Railroad Culverts $18,249,000
17th Street/W. Locust Storm Sewer Capacity Improvements $11,281,000
North End Storm Sewer Capacity Improvements $1,341,000
Flood Mitigation Maintenance Facility $4,660,000
Water Plant Flood Protection $4,397,000
Impervious Surface Reduction (Green Alleys)$57,420,000
Total Cost:$218,742,201*
*Includes Bee Branch Healthy Homes Resiliency Program: $8,427,665
Infrastructure Improvement Cost
Carter Road Detention Basin $1,076,315
West 32nd Street Detention Basin $4,158,589
Lower Bee Branch Creek Restoration $21,274,685
Historic Millwork District Complete Streets $7,977,311
Flood Mitigation Gate Replacement $2,099,000
Upper Bee Branch Creek Restoration $60,974,636
22nd Street/Kaufmann Storm Sewer Capacity Improvements $15,406,000
Bee Branch Creek Railroad Culverts $18,249,000
17th Street/W. Locust Storm Sewer Capacity Improvements $11,281,000
North End Storm Sewer Capacity Improvements $1,341,000
Flood Mitigation Maintenance Facility $4,660,000
Water Plant Flood Protection $4,397,000
Impervious Surface Reduction (Green Alleys)$57,420,000
Total Cost:$218,742,201*
*Includes Bee Branch Healthy Homes Resiliency Program: $8,427,665
Infrastructure Improvement Cost
Carter Road Detention Basin $1,076,315
West 32nd Street Detention Basin $4,158,589
Lower Bee Branch Creek Restoration $21,274,685
Historic Millwork District Complete Streets $7,977,311
Flood Mitigation Gate Replacement $2,099,000
Upper Bee Branch Creek Restoration $60,974,636
22nd Street/Kaufmann Storm Sewer Capacity Improvements $15,406,000
Bee Branch Creek Railroad Culverts $18,249,000
17th Street/W. Locust Storm Sewer Capacity Improvements $11,281,000
North End Storm Sewer Capacity Improvements $1,341,000
Flood Mitigation Maintenance Facility $4,660,000
Water Plant Flood Protection $4,397,000
Impervious Surface Reduction (Green Alleys)$57,420,000
Total Cost:$218,742,201*
Total Grant Funding:$160,000,000
Infrastructure Improvement Cost
Carter Road Detention Basin $1,076,315
West 32nd Street Detention Basin $4,158,589
Lower Bee Branch Creek Restoration $21,274,685
Historic Millwork District Complete Streets $7,977,311
Flood Mitigation Gate Replacement $2,099,000
Upper Bee Branch Creek Restoration $60,974,636
22nd Street/Kaufmann Storm Sewer Capacity Improvements $15,406,000
Bee Branch Creek Railroad Culverts $18,249,000
17th Street/W. Locust Storm Sewer Capacity Improvements $11,281,000
North End Storm Sewer Capacity Improvements $1,341,000
Flood Mitigation Maintenance Facility $4,660,000
Water Plant Flood Protection $4,397,000
Impervious Surface Reduction (Green Alleys)$57,420,000
Total Cost:$218,742,201*
Total Grant Funding:
Total City Share:
$160,000,000
$58,714,536
Infrastructure Improvements Cost
Carter Road Detention Basin $1,076,315
West 32nd Street Detention Basin $4,158,589
Lower Bee Branch Creek Restoration $21,274,685
Historic Millwork District Complete Streets $7,977,311
Flood Mitigation Gate Replacement $2,099,000
Upper Bee Branch Creek Restoration $60,974,636
22nd Street/Kaufmann Storm Sewer Capacity Improvements $15,406,000
Bee Branch Creek Railroad Culverts $18,249,000
17th Street/W. Locust Storm Sewer Capacity Improvements $11,281,000
North End Storm Sewer Capacity Improvements $1,341,000
Flood Mitigation Maintenance Facility $4,660,000
Water Plant Flood Protection $4,397,000
Impervious Surface Reduction (Green Alleys)$57,420,000
Total Cost:$218,742,201*
Total Grant Funding:
Total City Share:
$160,000,000
$58,714,536
The Bee Branch Watershed Flood Mitigation Project
will prevent an estimated $582 million in damages over
the 100-year design life of the project.
Dubuque citizens will save $10 for every dollar invested
US52 Storm Sewer Project
FY
1
8
In
i
t
i
a
t
i
v
e
s
$200,000
Done in conjunction with US HWY 52 resurfacing project.
Millwork District
Pennsylvania -Middle Road Culvert Project
FY
1
8
In
i
t
i
a
t
i
v
e
s
City of Dubuque Share: $150,000
Asbury/Dubuque Joint Project
FY17 FY18 FY19 FY20 FY21 FY22 &
Beyond
Adopted 2012 $9.00 $9.00 $9.00 $9.00 $9.00 $9.00
Adopted 2014*$6.81 $7.27 $7.76 $8.29 $8.85 $9.00
Storm water Management Utility Fee
By Fiscal Year
The Storm water Utility was Established in February of 2003
*Established March 5, 2014 with the passing of Ordinance 16-14.
Storm water Management Utility Fee
Subsidies
Since the establishment of the City’s Stormwater Manament Utility in 2003,
the budget has included a subsidy for property tax exempt organizations,
low-to-moderate income residents, and residential farms.
FY18 Subsidy
Property Tax Exempt Customers (~120)$ 325,000
Low-to-Moderate Income Customers (~465)15,000
Residential Farm Customers (~20)10,000
FISCAL YEAR 2018 TOTAL*$ 350,000
*Funded from DRA ($125,000) and the 20% Local Option Sales Tax ($225,000)
The top ten recipients of the subsidy in FY18 are as follows:
UTILITY CUSTOMER
#1 City of Dubuque
#2 Dubuque Community Schools
#3 University of Dubuque
#4 Mystic Casino
#5 Loras College
#6 Holy Family Catholic Schools
#7 Clarke University
#8 Finley Hospital
#9 Sisters of Charity
#10 Emmaus Bible College
Storm water Management Utility Fee
Subsidies
Top ten:
-Receive more than $5,000 ea.
-Combined receive a total of $236,000
Next 110:
-Receive less than $5,000 ea.
-Receive an average of $810 ea.
Des Moines is 66% higher than Dubuque
Dubuque is 35% higher than the average
Storm water Management Utility Fee
FY18 Rate Comparison (Based on Proposed Rates)
Rank City Rate
10 Des Moines $12.07
9 Dubuque $7.27
8 Ankeny $5.50
7 Cedar Rapids $5.49
Average w/o Dubuque $4.72
6 Iowa City $4.50
5 West Des Moines $4.25
4 Ames $3.45
3 Waterloo $2.75
2 Davenport $2.64
1 Sioux City $1.84
FY2018 STREET BUDGET
Streets
Outcome:Provide complete, safe and efficient street
systems
Citizen Impact:By constructing streets that utilize
perpetual pavements, we create a strong
transportation network that minimizes the
inconvenience to the traveling public and reduces
long terms costs.
Streets PCI = 10
PCI = 100
Pavement Scanning Van –Measures
Smoothness and cracking
AVERAGE STREET NETWORK
PCI = 78
Streets
Pavement Degradation –image courtesy of Federal Highway Administration
FY 18
Budget
Outside
Funding
Annual Street
Construction Program $ 4,557,800 $ 1,973,600
Misc. Street Related
Improvements $ 315,000
Traffic Safety and
Capacity Improvements $1,460,500
StreetsNotable FY2018
Initiatives
FY 18
Budget
Federal /
State
Funding
Street –General Repairs $ 100,000
North Cascade Road $ 406,000
Chavenelle Road $ 1,500,000
Pavement Marking Project $ 135,000
East-West Corridor $ 1,650,000 $ 1,280,000
StreetsNotable FY2018
Initiatives
FY 18
Budget
Federal /
State
Funding
N. Grandview & University
Ave. Roundabout $ 250,000
3rd Street Overpass Railing
Painting Project $ 100,000 $ 30,000
US 52 -11 th Street
Resurfacing $ 751,800 $ 261,660
Crosswalk Warning Devices $ 31,000
StreetsNotable FY2018
Initiatives
Grandview & Delhi
Roundabout
Budget IDOT
$750,000 $500,000
Current Initiatives
Grandview & Delhi Roundabout Current Initiatives
Grandview & Delhi Roundabout Current Initiatives
-Public Engagement Activities
•City Council work session on roundabouts
•Public Information Meetings with nearby
business owners
•Public Information meetings with Washington
Middle School and Dubuque Senior
•City staff and consultant met with city
department heads
Current InitiativesGrandview & Delhi Roundabout
-Public Engagement Activities
Current InitiativesGrandview & Delhi Roundabout
-Public Engagement Activities
•City staff met with adjacent property owners
•Public Information Meeting held at Holy Trinity
Lutheran Church
•Student assemblies held at Washington Middle
School and Lincoln Elementary
•City staff met with Parent-Teacher Organizations
at Senior and Washington
Grandview & Delhi Roundabout Current Initiatives
-Public Engagement Activities
Current InitiativesGrandview & Delhi Roundabout
-Public Engagement Activities
•City staff began regular monthly interviews on
KDTH radio updating the status of the project
•City staff met with Finley staff
•City staff went door to door to 600 homes to
speak with residents on the project
•City staff met with multiple service organizations
about the project
Grandview & Delhi Roundabout Current Initiatives
-Public Engagement Activities
Current InitiativesGrandview & Delhi Roundabout
-Public Engagement Activities
•Letters and promotional materials were mailed
out to residents and provided to nearby
businesses to get the word out about the project
Current InitiativesGrandview & Delhi Roundabout
-Public Engagement Activities
Current InitiativesGrandview & Delhi Roundabout
Grandview &
University
Roundabout
Budget IDOT City
$950,000 $700,000 $250,000
Future Initiatives
East -West Corridor Capacity
Improvements
Current Initiatives
US Highway 20 -Primary East / West Route
Maximum Capacity -Future Traffic Volumes
Current InitiativesEast -West Corridor Capacity
Improvements
PENNSYLVANIA
ASBURY
LORAS
UNIVERSITY
OVERLAP SECTION
Current InitiativesEast -West Corridor Capacity
Improvements
Preliminary Design
Environmental Phase
Property Acquisition
Construction
2016 2017 2018 2019 2020 2021 2022
$2.2 Million
$4 Million
$5 Million
UNIVERSITY
OVERLAP SECTION
Current InitiativesEast -West Corridor Capacity
Improvements
Budget Federal / State
Funding
FY 2016 Design / Environmental $ 1,000,000 $ 800,000
FY 2017 Design / Environmental $ 50,000
FY 2018 Design / Environmental
Property Acquisition $ 1,650,000 $ 1,280,000
FY 2019 Property Acquisition $ 1,890,000 $ 1,472,000
FY 2020 Property Acquisition
Construction $ 2,529,000 $2,029,000
FY 2021 Construction $ 1,856,000 $1,356,000
•Connects U.S. Hwy 20 with U.S. Hwy 61/151
•4-lane Divided Freeway (6.1 Miles)
•Priority 1 Access Control
•Three Interchanges
Hwy 20, Hwy 61/151, N. Cascade Road
•Full Build Cost Estimate $190 Million
Southwest Arterial Project
Southwest Arterial Project
PROJECT PARTNERSHIP
The #1 Surface Transportation Priority in the Dubuque Area For:
Dubuque City Council
Iowa Department of Transportation
Dubuque County Board of Supervisors
Dubuque Metropolitan Area Transportation Study (DMATS)
Greater Dubuque Development Corporation
Dubuque Area Chamber of Commerce
Continuing to move forward with the development of the Southwest Arterial
Military Road
Corridor Alignment
Southwest Arterial
NEPA Clearance -Completed 2004
Preliminary Engineering Design -Completed 2008
Right-of-Way Property Acquisition
100% Complete
Archaeological & Cultural Resource Mitigation
100% Complete
•Final Engineering Design
Underway
•Construction
North Cascade Road Reconstruction Completed
English Mill –Military Road Under Construction
Where Are We Today?
Southwest Arterial
Signing Ceremony
August 9, 2013
Transfer of Jurisdiction -MOU
Southwest Arterial
Local Road Transfer of Jurisdiction
Southwest Arterial
Local Road Transfer of Jurisdiction
Southwest Arterial
Milestone Achievement
Southwest Arterial
Groundbreaking Ceremony
October 2016
Construction: Completed or Under Contract $40 Million
City Responsible to Complete
Final Engineering Design North Cascade Rd Reconstruction
Property Acquisition English Mill Rd Reconstruction
Utility Relocations Military Road Reconstruction
Memorandum of Understanding
Southwest Arterial
Local Road Transfer of Jurisdiction
56 Properties Purchased
90 Total Acquisitions
Property Acquisition Status
Southwest Arterial
20
15161
Construction Schedule
Southwest Arterial
N. Cascade Road Reconstruction Completed
Final Cost $3.7 M
BHE Gas Pipeline Relocation Completed
Final Cost $1.4 M
US 61 -151 Interchange RCB Culvert Completed
Final Cost $1.2 M
English Mill Road Grading & Bridge Complete Spring 17
Contract Cost $3.5 M
Menards Frontage Road Under Construction
Contract Cost $8.8 M
US 20 Interchange Grading Under Construction
Contract Cost $6.4 M
SW Arterial West Grading, 4-Lane Under Construction
Contract Cost $8.8 M
Military Road Reconstruction Start April 2017
Contract Cost $5.2 M
SW Arterial East Grading, 4-Lane Bid March 2017
Cost Projection $6.6 M
SW Arterial Paving, 2-Lane 2018 -2019
SW Arterial -Open to Traffic Fall 2019
Construction Schedule
Southwest Arterial
Construction Projects
Southwest Arterial
North Cascade Road Reconstruction
Southwest Arterial
COMPLETED
COST $3.7 MILLION
Military Road
Southwest Arterial
English Mill Road Reconstruction
English Mill Road Reconstruction
Southwest Arterial
COMPLETED SPRING 2017
COST $3.5 MILLION
Military Road
Southwest Arterial
Military Road Reconstruction
Southwest Arterial
Military Road Reconstruction
2017 Construction
START APRIL 2017
$5.2 MILLION
US 61 -151 Interchange
Southwest Arterial
COST
$1.2M
TRIPLE BOX
CULVERT
CONSTRUCTION
UNDERWAY
US 20 Interchange
Southwest Arterial
COST $6.4M
GRADING UNDERWAY
US 20 Interchange
Southwest Arterial
MENARDS
FRONTAGE ROAD
UNDER CONSTRUCTION
COST $8.8M
US 20 -US 61 / 151 Corridor
Southwest Arterial
EAST GRADING II
BID DECEMBER 2017
COST $7.8 M
EAST GRADING I
BID MARCH 2017
COST $6.6 M
WEST GRADING
UNDER CONSTRUCTION
COST $8.8 M
US20 GRADING
UNDER CONSTRUCTION
COST $6.4 M
15161
20
Recommended
Enhancement Concept
US 20 Interchange
Night Rendering
Current Funding
Southwest Arterial
State Funding (2016 -2019)$ 115.0 Million
•2-Lane Highway
•Hwy 20 to Hwy 61/151
City -Federal Funding $ 32.8 Million
City Funding $ 6.1 Million
Dbq County Funding $ 3.6 Million
TOTAL FUNDING $ 159.4 Million
Traffic Safety Improvements
Southwest Arterial
Current Truck Volumes Southwest Arterial Completed
REDUCE
Traffic Safety Improvements
Southwest Arterial
Current Truck Volumes Southwest Arterial Completed
REDUCE
Safety Impacts $ 29.8 Million
Employment Impacts $ 1.67 Billion
New Housing Impacts $ 80 Million
State / Local Tax Impacts $ 135 Million
Federal Tax Impacts $ 130 Million
Economic Impact Analysis
Southwest Arterial
2020 -2030
FY2018 TRAFFIC OPERATIONS BUDGET
Traffic Operations
Outcome:Update traffic signalization infrastructure to
Intelligent Transportation Systems (ITS) by providing
improved levels of service and quicker response to signal
and traffic control conditions and issues by connecting them
to the Traffic Operations Center.
Citizen Impact: This updated infrastructure has allowed the
Traffic Engineering staff the ability to react faster to changing
traffic conditions. This helps reduce traffic delays.
MAIN DUTIES OF TRAFFIC ENGINEERS
OPERATING IN THE TRAFFIC OPERATIONS CENTER
•Signal Operations
•Traffic Studies and Warrants
•Street Lighting
•Fiber Communications
•Project Management
•Video Management System (Milestone)
MAIN DUTIES OF TRAFFIC ENGINEERS
SIGNAL OPERATIONS
Signal Operations include the Operation and Maintenance
of the following systems:
•Fiber communications network to the 115 Signals
•Central Traffic Management software
•Battery backup systems
•Emergency Vehicle Pre-emption (EVP) system
•Vehicle Detection Systems (Microwave).
•Intelligent Transportation System Improvements
FY 18 Budget
Signalization Program $ 110,000
Traffic Signal Mastarm Retrofit $ 60,000
Traffic Signal Battery Backup $ 20,000
Traffic Signal Controller Replacement
Program $ 45,000
Traffic Signal Intersection
Reconstruction $ 120,000
Notable FY2018
Initiatives
Traffic Signals
FY 18 Budget
Traffic Signal Vehicle Detection
Conversion $ 67,000
Crosswalk Warning Devices $ 31,000
Street Light and Traffic Signal
Knockdown Fund $ 30,000
ITS Traffic Control Equipment $ 30,000
Notable FY2018
Initiatives
Traffic Signals
FY 18 Budget
Flashing Yellow Left Turn Arrow
Conversion $ 20,000
Surge and Grounding Improvements
at Signals $ 15,000
NW Arterial Turn Lane Improvements $ 132,000
LED Re-Lamp Schedule $ 24,500
Notable FY2018
Initiatives
Traffic Signals
MAIN DUTIES OF TRAFFIC ENGINEERS
TRAFFIC STUDIES AND ANALYSIS
•New Developments
•Signal Warrants
•Traffic Counts
•Traffic Safety Audits
Compile accident reports
Archive traffic accident videos (1249 events pulled in 2016)
Site visits and “Fresh Eye” observation followed by review of videos
Often times these meetings result in future traffic safety grant locations
MAIN DUTIES OF TRAFFIC ENGINEERS
STREET LIGHTING
•Operations and Maintenance of City Owned Systems
•Installation of New Lighting Projects
•LED Conversion of street lights and traffic signals
•LED are “Dark Skies” friendly with clean cutoff
MAIN DUTIES OF TRAFFIC ENGINEERS
STREET LIGHTING
High Pressure Sodium LED
MAIN DUTIES OF TRAFFIC ENGINEERS
STREET LIGHTING
High Pressure Sodium LED
MAIN DUTIES OF TRAFFIC ENGINEERS
STREET LIGHTING
High Pressure Sodium LED
Cutoff Comparison
FY 18 Budget
Grandview Avenue Street Light
Replacement $ 200,000
Street Light Replacement and New
Installation $ 23,000
Downtown Streetlight Replacement $ 45,000
LED Streetlight Retrofits $ 25,000
Notable FY2018
Initiatives
Street Lights
FY 18 Budget
Washington Neighborhood Street
Lights $ 10,000
Downtown Neighborhood Street
Lights $ 25,000
Street Lights outside the Downtown
Area $ 10,000
Notable FY2018
Initiatives
Street Lights
MAIN DUTIES OF TRAFFIC ENGINEERS
FIBER COMMUNICATIONS
•Communications Backbone for Public Safety and other City
Departments
•Connecting City Systems Together
Signals
Cameras
City Buildings
Public Safety Infrastructure
Wireless programs
•New Duct / Fiber Cable Standards
•Private / Public Partnerships
FY 18 Budget
Traffic Signal Interconnect $ 40,000
Traffic Signal Fiber Optic Network
Program $ 164,000
Fiber Optic Conduit –Misc.$ 40,000
Fiber Optics Communication from
Downtown to Airport $125,000
Notable FY2018
Initiatives
Fiber Optic
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
New Fiber Optic Technology
FuturePath product has 7
microconduits in the space of a
normal 1.5 inch conduit.
Normal fiber vault spacing is
500 feet. Using Fiber Jetting
technology allows 2500 foot
spacing of vaults
Installation by developers in
subdivisions.
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
•Grant Application Success
Iowa Clean Air Attainment Program (ICAAP)
Traffic Safety Funds (TSF)
Energy Efficiency Block Grants
•Signal Projects
•Fiber Communications Projects
•Lights and Camera Projects
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
•Grant Application Success (2007-2017)
Year Funding Title Amount
2007 Traffic Safety Funds Hempstead Safety Improvements $500,000.00
2008 Iowa Clean Air Attainment US 20 Capacity Improvements $260,370.00
2009 Iowa Clean Air Attainment Locust Street US 61/US 20 $330,090.00
2010 Traffic Safety Funds Mastarm Retrofit Central Ave $36,500.00
2010 Energy Efficiency and
Conservation
Traffic Flow Enhancement Program $500,000.00
2010 Traffic Safety Funds NWA Capacity Improvements $500,000.00
2010 Iowa Clean Air Attainment NWA Capacity Improvements $448,048.00
2011 Iowa Clean Air Attainment US 61/151 Capacity Improvements $400,000.00
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
•Grant Application Success (2007-2017)
Year Funding Title Amount
2014 Traffic Safety Funds Grandview Ave Improvements $250,000.00
2015 Traffic Safety Funds Grandview/Delhi Roundabout $500,000.00
2016 Iowa Clean Air Attainment NWA at JFK Turn Lane $166,202.00
2016 Traffic Safety Funds NWA at Penn Turn Lane $364,000.00
2017 Traffic Safety Funds Grandview/Univ. Roundabout $500,000.00
Total 2007-2017 $4,755,210.00
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
•14.26 miles of fiber duct and 10.92 miles of fiber cable installed due
in part to public/private agreements between city and data
providers.
•Completion of US 20 corridor microwave detection conversion
•Roundabout at Grandview and Delhi
•Fiber optics installed along Locust / West Locust from downtown
to Clarke at Grandview intersection.
•Video management centers installed at dispatch, police captain’s
desk and criminal investigation division office.
Highlights of the Past Year
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
Installation of Fiber Optic Loop around the City.
Fiber and conduit along NW Arterial from US 52
to JFK. $115,000
This completes a 14 mile loop
Highlights of the Past Year
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
Current Project:
Installation of
Fiber Optic
Communications
Cable from
Downtown to the
Airport $125,000
Three part project to provide
fiber communications to the
Airport.
Grandview to Twin Valley -Completed
Charter to Grand View
Maquoketa to the Airport
–Completed
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
NW Arterial at Penn Turn Lane
Improvement. $364,000 TSF
340 foot right turn lane
Right turn overlap
Upcoming Grant Projects: NW Arterial at Pennsylvania Right Turn Lane
NW Arterial
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
250 foot right turn lane
Right Turn Overlap
New Microwave Detection
$166,202 ICAAP Funding
Upcoming Grant Projects: NW Arterial at JFK Right Turn Lane
NW Arterial
JFK
MAIN DUTIES OF TRAFFIC ENGINEERS
PROJECT MANAGEMENT
This Project would include the
following:
8 cameras
4 new street lights
2750 feet of fiber optic duct
5750 feet of fiber optic cable
Fiber Hub Cabinet
Benefit include:
Extend fiber communications to
Sutton Pool, Water Plant and the
City Park Shop. Additional security
Cameras
Under Design: Kerper Blvd Fiber and Camera Project
Funding: $195,000 (DRA Distribution)
MAIN DUTIES OF TRAFFIC ENGINEERS
VIDEO MANAGEMENT SYSTEM
•In 2015 migrated all system cameras onto one
platform (Milestone). Currently 948 cameras
•IT and Maintenance
•Work with Law Enforcement (Tri-State area)
•Citizen and Insurance Company Interaction
•Archival of 1000’s of videos per year
•Misc-Project Inspection,Traffic Studies,Storm Damage
MAIN DUTIES OF TRAFFIC ENGINEERS
VIDEO MANAGEMENT SYSTEM
All city cameras are on one platform (Milestone)
including County and School District.
City currently owns 948 cameras
Dubuque County and School District
MAIN DUTIES OF TRAFFIC ENGINEERS
VIDEO MANAGEMENT SYSTEM
This is the Traffic Operations Center in City Hall
This is the nerve center of the VMS
Meeting place to review video
footage with:
Law Enforcement
Citizens
Insurance Companies
Public Safety Officials
This is where Duane Richter and
myself setup equipment/testing
and perform routine maintenance
of system.
FY 18 Budget
Street Camera Installation $ 25,000
Traffic Operations Center Video
Mgmt. Software $ 40,000
City Wide Security Camera Program $ 60,000
Notable FY2018
Initiatives
Cameras
MAIN DUTIES OF TRAFFIC ENGINEERS
VIDEO MANAGEMENT SYSTEM
City of Dubuque
City Surveillance System
Overview Video
FY2018 MISCELLANEOUS
BUDGET
Miscellaneous Items that Improve Public Safety
Outcome:Provide safe walking pathways throughout
the City for all users regardless of disability
Citizen Impact:Many Dubuque residents have
mobility issues. Pedestrian sidewalks and access
ramps that are constructed correctly, improve the
accessibility for these limited mobility individuals.
Right of Way
Cracked and heaving sidewalk –Trip Hazard
New ADA pedestrian access ramps
FY2018 Initiatives
Budget
Stone Retaining Walls $ 275,000
Sidewalk Program –Curb and
Catch Basin $ 70,000
Sidewalk Program –City Owned
Property $ 75,000
Miscellaneous
Budget
Neighborhood Related
Improvements $ 93,400
Harbor Area Maintenance $ 10,000
Port of Dubuque –Parking
Lot 1 Remediation Closure $ 25,000
FY2018 Initiatives
Recommended FY 2018 Improvements
Amount Funding
Source
Construction Safety Program and
Consultation Services $ 13,500
1/3 Storm,
1/3 Sanitary,
1/3 SalesTax
View Presentation Online at: www.cityofdubuque.org/budget
Engineering Department