Federal Building Ext Window et al AcceptanceT~~ crrY of Dubuque -~... ~~~ ~ All-Air~ricaCitY IVIGtStCY~71LC~ 011 f~2L' MIS52SS1~~11 ~„ s 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Federal Building Exterior Window Lead Paint Removal & Painting, and Renovated Areas Window Repair, Glass Replacement, Interior Window Lead Paint Removal & Painting Project CIP 1001841 DATE: October 14, 2008 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Federal Building Exterior Window Lead Paint Removal & Painting, and Renovated Areas Window Repair, Glass Replacement, Interior Window Lead Paint Removal & Painting Project, as completed by Tricon General Construction, in the final contract amount of $453,524.82, which is an 11.1 % increase from the original contract in the amount of $408,000. The additional $45,425.82 was due to change orders to modify procedure to remove the asbestos window joint compound ($29,503.52), painting of the basement window grates and hand railings around the window wells ($14,924.47), and painting of vents and louvers around the perimeter of the building ($997.83) I concur with the recommendation and respectfully request Mayor and City Council approval. ~~ Michae C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque Du Ems' '~II~~' Masterpiece on the Mississippr Zoos TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer ~ - DATE: October 14, 2008 SUBJECT: Federal Building Exterior Window Lead Paint Removal & Painting, and Renovated Areas Window Repair, Glass Replacement, Interior Window Lead Paint Removal & Painting Project CIP 1001841 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Federal Building Exterior Window Lead Paint Removal & Painting, and Renovated Areas Window Repair, Glass Replacement, Interior Window Lead Paint Removal & Painting Project. BACKGROUND This phase of the Historic Federal Building renovation included the following work: Federal Building Interior -Third Floor Renovated Areas: 1) Window lead paint removal. 2) Steel and wood window repair. 3) Thermopane glass replacement in steel windows. 4) Window painting preparation work and painting. Federal Building Exterior: 1) Window and spandrel panel and lead paint removal. 2) Window and sprandel panel painting preparation and painting. DISCUSSION The Federal Building Exterior Window Lead Paint Removal & Painting, and Renovated Areas Window Repair, Glass Replacement, Interior Window Lead Paint Removal & Painting Project was completed by Tricon General Construction of Dubuque, Iowa, in the final contract amount of $453,425.82, which is a 11.1 % increase from the original contract in the amount of $408,000. During the project, change orders were issued totaling $45,425.82. Additional work required during the construction phase included: • Modification of the procedures to remove the asbestos window joint compound in order to be in compliance with Federal and State regulations ($29,503.52). • Painting of the basement window grates and hand railings around the window wells ($14,924.47). • Painting of vents and louvers around the perimeter of the building to match the new window color ($997.83). RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract at $453,425.82. BUDGET IMPACT The project cost summary for Federal Building windows is as follows: Bid Award Window Paint & Repair Contract $408,000.00 CIP No. Fund Description 1001841 /102/ 290/350 Federal Building Renovation ACTION TO BE TAKEN Final $453,425.82 Funded Amount $453,425.82 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $453,425.82 to Tricon General Construction for the Federal Building Exterior Window Lead Paint Removal & Painting, and Renovated Areas Window Repair, Glass Replacement, Interior Window Lead Paint Removal & Painting Project. Prepared by: Steve Sampson Brown, Project Manager cc: Jenny Larson, Budget Director K:\PROJECTS\Federal Building -Phase 2\Council Documentation\Contract 2\Acceptance\Federal Building Exterior Window Lead Paint Removal & Painting...Acceptance Memo.doc RESOLUTION NO. 363-08 ACCEPTING THE FEDERAL BUILDING EXTERIOR WINDOW LEAD PAINT REMOVAL & PAINTING, AND RENOVATED AREAS WINDOW REPAIR, GLASS REPLACEMENT, INTERIOR WINDOW LEAD PAINT REMOVAL & PAINTING PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Federal Building Exterior Window Lead Paint Removal & Painting, and Renovated Areas Window Repair, Glass Replacement, Interior Window Lead Paint Removal & Painting Project. (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Federal Building Renovation appropriation for the contract amount of $453,425.82 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 20th day of October, 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY'S ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE FEDERAL BUILDING EXTERIOR WINDOW LEAD PAINT REMOVAL & PAINTING, AND RENOVATED AREAS WINDOW REPAIR, GLASS REPLACEMENT, INTERIOR WINDOW LEAD PAINT REMOVAL & PAINTING PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Federal Building Exterior Window Lead Paint Removal & Painting, and Renovated Areas Window Repais, Glass Replacement, Interior Window Lead Paint Removal & Paintin Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $453,425.82. City Engineer Filed in the office of the City Clerk on the 16th day of October, 2008. Jeanne F. Schneider, CMC, City Clerk APPLICATION AND CERTIFICATE FOR PAYMENT AIA DOCUMENT G702 TO OWNER: PROJECT: City of Dubuque Federal Building Exterior and Interior 50 West 13th Street Window Lead Paint Removal & Painting Dubuque, IA 52001 350 West 6th Street Dubuque, IA 52001 FROM CONTRACTOR: Tricon General Construction 2245 Kerper Blvd, Ste 2 Dubuque,lA 52001 CONTRACT FOR: General Construction CONTRACTOR'S APPLICATION FOR PAYMENT Application is made for payment, as shown below, in connection with the Contract. Continuation Sheet, AIA Document G703, is attached. 1. ORIGINAL CONTRACT SUM 2. Net change by Change Orders 3. CONTRACT SUM TO DATE (Line 1 +/_ y) 4. TOTAL COMPLETED 8 STORED TO DATE (Column G on G703) 5. RETAINAGE: a. 5% of Completed Work (Column D + E on G703) b. 5 % of Stored Material (Column F on G7o3) TOTAL RETAINAGE (Lines 5a + Sb or Total in Column I of G703) 6. TOTAL EARNED LESS RETAINAGE 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) 8. CURRENT PAYMENT DUE 9. BALANCE TO FINISH, INCLUDING RETAINAGE (line 3 less Line 6) CHANGE ORDER SUMMARY Total changes approved in previous months Total approved this Month TOTALS ADDITIONS $45,425.82 $45,425.82 NET CHANGES by Change Order: ~ $45,425.82 $aos,ooo 00 $45,425.82 $453,425.82 $453,425.82 $0.00 $0.00 $o.Do $453,425.82 $449,725.82 $3,700.00 $0.00 DEDUCTIONS PAGE ONE OF TWO PAGES APPLICATION NO: 08 Distribution to: APPLICATION DATE: 08/14/08 OWNER PERIOD TO: 08/14/08 CONSTRUCTION MANAGER ARCHITECT CONTRACT DATE: 05/11/07 CONTRACTOR OTHER OTHER VIA Citl/ of Dubuque Engineering: Steven Sampson Brown The undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the Work covered by this application for Payment has bee completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Certificates for Payment were issued and payments received from the Owner, and that current payment shown herein is now due. CO~ ~~T~ yOR: Tricon onstruction Group By: ~. -t. 1~.L~r Date: State of: Iowa County of: Dubuque Subscribed and sworn to before me this 14th day ~' ~ ~ b!egs f~oDO_s>w . ~ A A ~ w w w .. ~ • ~' < O P A `: =~''ia'Sd MARTHA E BROTZMAN ; Notary Public: ~ /1- p ~ ~ ~ NotarV Public -State of Iowa ;- ( ~ ~ ~nTTTTRRT rnm ~~ CERTIFICAT~FORPAY ~ IOWA My Commission Expires July25,Z0111 > In accordance with the Contract Documents, based on on-site observations and the date c~m{~risiKg tf~is~apiflic~dtiolS, tlSe ~ ~ ~ ~ ~ ~ w v a Construction Manager and Architect certify to the Owner that to the best of their knowledge, information and belief the Work has progressed as indicated, the quality of the Work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. $ `, AMOUNT CERTIFIED .QF(~ r~ (Attach explanation if amount certified differs from amount applied for Initial all fgures on this Application and on the Continuation Sheet that changed to conform to the amount certifed. City of q gi Bring: $0.00 B -- ~-I S-D~ Y r~ _ Date: ~ J This Certificate is yRit negotiable. the AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, payment and acceptance of payment are without prejudice to any rights of the Owner or Contractor under this Contract. AIA DOCUMENT G702 APPLICATION AND CERTIFICATE FOR PAYMENT CONSTRUCTION MANAGER ADVISER 1992 EDITION AIA THE AMERICAN INSTITUTE OF ARCHITECTS, 1745 NEW YORK AVE. N.W. WASHINGTON, DC 20006-5292 Users may obtain validation of this document by requesting of the license a completed AIA Document D401-Certification of Document's Authenticity CONTINUATION SHEET AIA DOCUMENT G703 PAGE TWO OF TWO PAGES AIA DOCUMENT G702, APPLICATION AND CERTIFICATION FOR PAYMENT, containing APPLICATION NO: 08 Contractor's signed certification is attached. APPLICATIO N DATE: 8/1 4/2008 In tabu lations below, amounts are stated t the nearest dollar. PERIOD TO: 8/1 4/2008 Use Column I on Contracts where variable retainage for line items may apply. A B C D ~ E F G H ITEM DESCRIPTION OF WORK SCHEDULED WORK COMPLETED MATERIALS TOTAL % BALANCE RETAINAGE NO. VALUE FROM PREVIOUS THIS PERIOD PRESENTLY COMPLETED (G / C) TO FINISH (IF VARIABLE APPLICATION STORED AND STORED (C - G) RATE) (D + E) (Not in D or E) TO DATE I I I (D+E+F) 01 I General Conditions I $17,100.00 I I $17,100.00 I I $17,100.00 100.0% $0.00 $0.00 1 02 I Bonds I $6,971.001 $6,971.001 1 I $6,971.00( 100.0% $0.00 $0.00 03 I Equipment I $34,275.001 $34,275.001 ~ I $34,275.001 100.0%I $0.00 $0.00 04 I Glass Cleaning I $3,312.00 ~ $3,312.00 I I 1 $3,312.00 I 100.0%I $0.00 1 $0.00 05 I Paint Stripper I $2,500.00 I $2,500.00 1 I I $2,500.00 1 100.0%1 $0.00 I $0.00 06 I Steel Stops I $6,392.00 I $6,392.00 I I I $6,392.00 1 100.0%1 $0.00 1 $0.00 07 I Misc Material I $8,474.00 I $8,474.00 I I I $8.474.00 I 100.0%I $0.00 I $0.00 08 1 Caulking I $14,527.001 $14,527.001 1 1 $14,527.001 100.0%I $0.001 $0.00 09 I Glazing I $24,500.001 $24,500.001 I I $24,500.001 100.0%1 $0.001 $0.00 10 I Painting I $107,058.001 $107,058.001 I I $107,058.001 100.0%1 $0.001 $0.00 11 I Labor I $162.229 f10 1 $162,229.00 $162,229.00 1 100.0%1 $0.00 1 $0.00 12 I OHP I $20,662.00 $20,662.00 $20,662.001 100.0%I $0.001 $0.00 13 I Change Order#1 I $29,503.521 $29,503.521 I ~ $29,503.521 100.0%1 $0.001 $0.00 14 I Change Order#2 I $14.924.471 $14,924.471 I I $14,924.471 100.0%1 $0.001 $0.00 15 I Change Order #3 I $997.83 1 $997.83 1 I I $997.83 1 100.0%1 $0.00 I $0.00 16 I I I I I I I I I I 17 I I I I I I I I I I 18 I I I I I I I I I 19 I I I I I I I I I 20 I I I I I I I I f 21 I I I I I I I I I 22 I I I I I I I I I 23 I I I I I I I I I 2a I I I I I I I I I 25 I I I I I I I I I 26 ( I I I I I I I I 27 I I I I I I I I I 28 I I I I I I I I I 29 I I I I I I I I ~ 30 I I I I I I I I I 31 I I I I I I I I I I 32 I I I I I I I I I I (Grand Total ~ $453,425.82 ~ $453,425.82 I $0.00 ~ $0.00 ~ $453,425.82 ~ 100.0% $O.OOI $O.OOI Users may obtain validation of this document by requesting of the license a completed AIA Docu ment D401 -Certification of Document's Authenticity