TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Plymouth Court Sanitary Sewer Extension Project
DATE: October 14, 2008
City Engineer Gus Psihoyos is recommending acceptance of the Plymouth Court
Sanitary Sewer Extension Project, as completed by Drew Cook & Sons Excavating Co.,
Inc., in the final contract amount of $69,792.34, which is a 55% increase from the
original contract in the amount of $44,892.34.
The cost increase was due to an expansion of the work to be performed above and
beyond the sanitary sewer work. While the street appeared to be in fair condition, the
construction activity associated with the sanitary sewer project (use of heavy
equipment, loaded dump trucks, etc.) accelerated its breakdown. The Engineering
Department determined that additional repairs to the existing pavement, as well as the
curb and gutter were needed.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
l/
Michael C. Van Milligen
MCVM/jh
Attachment
cc: Barry Lindahl, City Attorney
Cindy Steinhauser, Assistant City Manager
Gus Psihoyos, City Engineer
THE CITY OF Dubuque
DT T~ ~ AN-AmerlcaCilY
V
Masterpiece on the Mississippi ,
2007
TO: Michael C. Van Milligen, City Mana
FROM: Gus Psihoyos, City Engineer
SUBJECT: Plymouth Court Sanitary Sewer Extension Project
(CIP 7101798)
DATE: October 14, 2008
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for the
Plymouth Court Sanitary Sewer Extension Project.
BACKGROUND
The Plymouth Court Sanitary Sewer Extension Project involved the replacement of
approximately 525 feet of 6-inch clay pipe with 8-inch PVC from the intersection of
Logan and Victoria Streets north 250 feet and then west on Plymouth Court 280 feet.
The original 6-inch sanitary clay pipe had many offset and broken joints that proved to
be a maintenance problem.
The project was awarded based on a competitive quotation process for public
improvements in accordance with Iowa Code, Section 26.14.
DISCUSSION
The Plymouth Court Sanitary Sewer Extension Project was completed by Drew Cook &
Sons Excavating Co., Inc., in the final contract amount of $69,792.34, which is a 55%
increase from the original contract in the amount of $44,892.34.
The cost increase was due to an expansion of the work to be performed above and
beyond the sanitary sewer work. While the street appeared to be in fair condition, the
construction activity associated with the sanitary sewer project (use of heavy
equipment, loaded dump trucks, etc.) accelerated its breakdown. Engineering
determined that additional repairs to the existing pavement as well as the curb and
gutter were needed. This resulted in an increased quantity of graded stone base,
pavement replacement, and 6-inch PCC and additional 3-inch breaker run, 6-inch drain
tile, and a catch basin. Only 8 percent (8%) of the overage was related to the sanitary
sewer work.
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize the payment
of the contract amount of $69,792.34 to Drew Cook & Sons Excavating Co., Inc., for the
Plymouth Court Sanitary Sewer Extension Project.
BUDGET IMPACT
The project funding summary is as follows:
CIP No. Fund Description Fund Amount
7101798 Plymouth Court Sanitary Sewer $47,000.00
7201066 General Storm Sewer Repairs 4,383.50
3001972 Savings from Cleveland Ave Street Reconstruction 27,007.25
Total Project Funding $Z$~~.7.
ACTION TO BE TAKEN
The City Council is requested to adopt the attached resolution to accept the
improvements and to authorize the payment of the contract amount of $69,792.34 to
Drew Cook & Sons Excavating Co., Inc., for the Plymouth Court Sanitary Sewer
Extension Project.
Prepared by Deron Muehring, Civil Engineer II
cc: Jenny Larson, Budget Director
Bob Schiesl, Assistant City Engineer
Jon Dienst, Civil Engineer II
K:\PROJECTS\Storm and Sanitary\Plymouth Ct Sanitary\Documents\Plymouth Court Sanitary Sewer Project
Acceptance Memo.doc
RESOLUTION NO. 364-08
ACCEPTING THE PLYMOUTH COURT SANITARY SEWER EXTENSION PROJECT
AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
Whereas, the Public Improvement Contract for the Plymouth Court Sanitary
Sewer Extension Project (the Project) has been completed and the City Engineer has
examined the work and filed a certificate stating that the Project has been completed
according to the terms of the Public Improvement Contract and that the City Engineer
recommends that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved and the Project
is hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from
the Plymouth Court Sanitary Sewer Capital Improvement Project, the General Storm
Sewer Repairs Capital Improvement Project appropriations and savings from the
Cleveland Avenue Reconstruction Project for the contract amount of $69,792.34 less
any retained percentage provided for therein as provided in Iowa Code chapter 573,
and to pay such retainage only in accordance with the provisions of Iowa Code chapter
573.
Passed, approved and adopted this 20th day of October, 2008.
Roy D. Buol. Mayor
Attest:
Jeanne F. Schneider, CMC, City Clerk
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE PLYMOUTH
COUTY SANITARY SEWER EXTENSION PROJECT
The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that
he has inspected the Plymouth Court Sanitary Sewer Extension Project, that the Project
has been performed in compliance with the terms of the Public Improvement Contract,
and tha the total cost of the completed work is $78,390.75.
Dates this 16th day of October, 2008.
Jeanne F. Schneider, CMC, City Clerk
THE CITY OF
DUB E
c~~,~cl
City of Dubuque
Engineering
50. W. 13th Street
Dubuque, IA 52001
(563) 589-4270
PROJECT CLOSE OUT FORM
rojec ame: PLYMOUTH COURT
SANITARY SEWER RECONSTRUCTION PROJECT
CIP Number: CIP # 7101796
roject Contract Amount: $4x,892.34
Pro'ect Com letion Date: 2-May-08
on ac or ame: Drew cook & sons
Contractor Address: 5200 Wolff Road
City, State, Zip: Dubuque, Iowa 52002
COntraCtOr Telephone: 563-582-9292
ITEM
NO. CONTRACT ITEM
DESCRIPTION CONTRACT ITEM
QUANTITY UNIT UNIT PRICE PROJECT TOTAL
QUANTITY TOTAL PERCENT
COMPLETE
~. ~,>
1 8" PVC 519.2 LF $ 15.00 524.00 $ 7,860.00 100.92%
2 8" x 4" PVC Wye 6 Each $ 50.00 6.00 $ 300.00 100.00%
3 4" PVC Lateral 160 LF $ 18.00 137.00 $ 2,466.00 85.63%
4 Manhole Tap /Connect to Existing Manhole 1 Each $ 940.00 1.00 $ 940.00 100.00%
5 48" Diameter Manhole Base 2 Each $ 400.00 2.00 $ 800.00 100.00%
6 48" Diameter Sidewall 12.38 VF $ 68.00 12.34 $ 839.12 99.68%
7 Manhole Frame and Cover 2 Each $ 250.00 2.00 $ 500.00 100.00%
8 Bedding Stone, 1" Clean 145 Ton $ 12.00 163.97 $ 1,967.64 113.08%
9 Backfill, Limestone 550 Ton $ 5.00 431.93 $ 2,159.65 78.53%
10 Graded Stone Base 325 Ton $ 11.00 508.24 $ 5,590.64 156.38%
11 Pavement Replacement 675 SY $ 31.30 699.67 $ 21,899.67 103.65%
12 PC Curb & Gutter 20 LF $ 16.00 567.00 $ 9,072.D0 2835.00%
13 4" PCC Sidewalk 80 SF $ 4.00 243.32 $ 973.28 304.15%
14 6" PCC Sidewalk /Driveway 40 SF $ 8.00 508.13 $ 4,065.04 1270.33%
15 Landscape Restoration 1 Lump $ 500.00 0.00 $ - 0.00%
16 Traffic Control /Project Safety 1 LS $ 500.00 1.00 $ 500.00 100.00%
-
CHANGE ORDERS , ..:° . Sub Total
-~, $ 59,933.04
,.,. . .
~ _.
No. Date Description Total Change Order Amount Project Total
1
2
3
4 3" Breaker - 157.40 tons @ $17.00 /Ton
6" Drain Tile - 251.0 LF @ $8.501 LF
101-B Catch Basin
Seedin , Fertilizin ,and Mulchin $
$
$
$ 2,675.80
2,133.50
2,250.00
2,800.00 $
$
$
$ 2,675.80
2,133.50
2,250.00
2,800.00 100.00%
100.00%
100.00%
100.00%
Sub Total $9,859.30
Payment Totals $ 69,792.34
Total Contract Work Performed to Date:
Total Change Order Work Performed to Date:
Total Contract and Change Order Work Performed to Date:
iscellaneous Costs
59,933.04
TOTAL FINAL PROJECT COSTS: $
I hereby certify that the above statement shows, in detail, the correct
amount of all work required to complete the above improvement.
APPROVED
Michael Van Milligen, City Manager
Dubuque, Iowa
n
Gus Psihoyos, City Engineer
Dubuque, Iowa
78,390.75
The Undersigned~~'(~ ~f JlJ f ~ n ~, contractor for the above
improvement, does hereby accept the above "Total Due Contractor", as
full settlement for all claims for said improvement.
APPROVED:
BY: