Loading...
Plymouth Court Sanitary Sewer Extension ProjectTHE CITY OF Dubuque Au-Am~icaCi111 DUB E 1 Masterpiece on the Mississippi 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Plymouth Court Sanitary Sewer Extension Project DATE: October 14, 2008 City Engineer Gus Psihoyos is recommending acceptance of the Plymouth Court Sanitary Sewer Extension Project, as completed by Drew Cook & Sons Excavating Co., Inc., in the final contract amount of $69,792.34, which is a 55% increase from the original contract in the amount of $44,892.34. The cost increase was due to an expansion of the work to be performed above and beyond the sanitary sewer work. While the street appeared to be in fair condition, the construction activity associated with the sanitary sewer project (use of heavy equipment, loaded dump trucks, etc.) accelerated its breakdown. The Engineering Department determined that additional repairs to the existing pavement, as well as the curb and gutter were needed. I concur with the recommendation and respectfully request Mayor and City Council approval. l/ Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DT T~ ~ AN-AmerlcaCilY V Masterpiece on the Mississippi , 2007 TO: Michael C. Van Milligen, City Mana FROM: Gus Psihoyos, City Engineer SUBJECT: Plymouth Court Sanitary Sewer Extension Project (CIP 7101798) DATE: October 14, 2008 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Plymouth Court Sanitary Sewer Extension Project. BACKGROUND The Plymouth Court Sanitary Sewer Extension Project involved the replacement of approximately 525 feet of 6-inch clay pipe with 8-inch PVC from the intersection of Logan and Victoria Streets north 250 feet and then west on Plymouth Court 280 feet. The original 6-inch sanitary clay pipe had many offset and broken joints that proved to be a maintenance problem. The project was awarded based on a competitive quotation process for public improvements in accordance with Iowa Code, Section 26.14. DISCUSSION The Plymouth Court Sanitary Sewer Extension Project was completed by Drew Cook & Sons Excavating Co., Inc., in the final contract amount of $69,792.34, which is a 55% increase from the original contract in the amount of $44,892.34. The cost increase was due to an expansion of the work to be performed above and beyond the sanitary sewer work. While the street appeared to be in fair condition, the construction activity associated with the sanitary sewer project (use of heavy equipment, loaded dump trucks, etc.) accelerated its breakdown. Engineering determined that additional repairs to the existing pavement as well as the curb and gutter were needed. This resulted in an increased quantity of graded stone base, pavement replacement, and 6-inch PCC and additional 3-inch breaker run, 6-inch drain tile, and a catch basin. Only 8 percent (8%) of the overage was related to the sanitary sewer work. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $69,792.34 to Drew Cook & Sons Excavating Co., Inc., for the Plymouth Court Sanitary Sewer Extension Project. BUDGET IMPACT The project funding summary is as follows: CIP No. Fund Description Fund Amount 7101798 Plymouth Court Sanitary Sewer $47,000.00 7201066 General Storm Sewer Repairs 4,383.50 3001972 Savings from Cleveland Ave Street Reconstruction 27,007.25 Total Project Funding $Z$~~.7. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $69,792.34 to Drew Cook & Sons Excavating Co., Inc., for the Plymouth Court Sanitary Sewer Extension Project. Prepared by Deron Muehring, Civil Engineer II cc: Jenny Larson, Budget Director Bob Schiesl, Assistant City Engineer Jon Dienst, Civil Engineer II K:\PROJECTS\Storm and Sanitary\Plymouth Ct Sanitary\Documents\Plymouth Court Sanitary Sewer Project Acceptance Memo.doc RESOLUTION NO. 364-08 ACCEPTING THE PLYMOUTH COURT SANITARY SEWER EXTENSION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Plymouth Court Sanitary Sewer Extension Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Plymouth Court Sanitary Sewer Capital Improvement Project, the General Storm Sewer Repairs Capital Improvement Project appropriations and savings from the Cleveland Avenue Reconstruction Project for the contract amount of $69,792.34 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 20th day of October, 2008. Roy D. Buol. Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE PLYMOUTH COUTY SANITARY SEWER EXTENSION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Plymouth Court Sanitary Sewer Extension Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and tha the total cost of the completed work is $78,390.75. Dates this 16th day of October, 2008. Jeanne F. Schneider, CMC, City Clerk THE CITY OF DUB E c~~,~cl City of Dubuque Engineering 50. W. 13th Street Dubuque, IA 52001 (563) 589-4270 PROJECT CLOSE OUT FORM rojec ame: PLYMOUTH COURT SANITARY SEWER RECONSTRUCTION PROJECT CIP Number: CIP # 7101796 roject Contract Amount: $4x,892.34 Pro'ect Com letion Date: 2-May-08 on ac or ame: Drew cook & sons Contractor Address: 5200 Wolff Road City, State, Zip: Dubuque, Iowa 52002 COntraCtOr Telephone: 563-582-9292 ITEM NO. CONTRACT ITEM DESCRIPTION CONTRACT ITEM QUANTITY UNIT UNIT PRICE PROJECT TOTAL QUANTITY TOTAL PERCENT COMPLETE ~. ~,> 1 8" PVC 519.2 LF $ 15.00 524.00 $ 7,860.00 100.92% 2 8" x 4" PVC Wye 6 Each $ 50.00 6.00 $ 300.00 100.00% 3 4" PVC Lateral 160 LF $ 18.00 137.00 $ 2,466.00 85.63% 4 Manhole Tap /Connect to Existing Manhole 1 Each $ 940.00 1.00 $ 940.00 100.00% 5 48" Diameter Manhole Base 2 Each $ 400.00 2.00 $ 800.00 100.00% 6 48" Diameter Sidewall 12.38 VF $ 68.00 12.34 $ 839.12 99.68% 7 Manhole Frame and Cover 2 Each $ 250.00 2.00 $ 500.00 100.00% 8 Bedding Stone, 1" Clean 145 Ton $ 12.00 163.97 $ 1,967.64 113.08% 9 Backfill, Limestone 550 Ton $ 5.00 431.93 $ 2,159.65 78.53% 10 Graded Stone Base 325 Ton $ 11.00 508.24 $ 5,590.64 156.38% 11 Pavement Replacement 675 SY $ 31.30 699.67 $ 21,899.67 103.65% 12 PC Curb & Gutter 20 LF $ 16.00 567.00 $ 9,072.D0 2835.00% 13 4" PCC Sidewalk 80 SF $ 4.00 243.32 $ 973.28 304.15% 14 6" PCC Sidewalk /Driveway 40 SF $ 8.00 508.13 $ 4,065.04 1270.33% 15 Landscape Restoration 1 Lump $ 500.00 0.00 $ - 0.00% 16 Traffic Control /Project Safety 1 LS $ 500.00 1.00 $ 500.00 100.00% - CHANGE ORDERS , ..:° . Sub Total -~, $ 59,933.04 ,.,. . . ~ _. No. Date Description Total Change Order Amount Project Total 1 2 3 4 3" Breaker - 157.40 tons @ $17.00 /Ton 6" Drain Tile - 251.0 LF @ $8.501 LF 101-B Catch Basin Seedin , Fertilizin ,and Mulchin $ $ $ $ 2,675.80 2,133.50 2,250.00 2,800.00 $ $ $ $ 2,675.80 2,133.50 2,250.00 2,800.00 100.00% 100.00% 100.00% 100.00% Sub Total $9,859.30 Payment Totals $ 69,792.34 Total Contract Work Performed to Date: Total Change Order Work Performed to Date: Total Contract and Change Order Work Performed to Date: iscellaneous Costs 59,933.04 TOTAL FINAL PROJECT COSTS: $ I hereby certify that the above statement shows, in detail, the correct amount of all work required to complete the above improvement. APPROVED Michael Van Milligen, City Manager Dubuque, Iowa n Gus Psihoyos, City Engineer Dubuque, Iowa 78,390.75 The Undersigned~~'(~ ~f JlJ f ~ n ~, contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. APPROVED: BY: