Five Flags Sidewalk Replacement ProjectTHE CTTY OF DUB E Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Five Flags Sidewalk And Lighting Replacement Project CIP 1001179 -Five Flags Sidewalk Replacement CIP 300-A76 -Main Street Historic Lights CIP 1021608 -Downtown Street Light Replacement CIP 1021609 -Fiber Optic Conduit -Private Sub & Misc. CIP 2501615 -Traffic Signal Intersection Reconstruction CIP 3001953 - FY2008 Street Construction Program CIP 7201008 -Storm Sewer Improvements/Extensions DATE: December 8, 2008 Dubuque NhM~t'ical~ty 2007 Project City Engineer Gus Psihoyos is recommending acceptance of the Five Flags Sidewalk and Lighting Replacement Project, as completed by Portzen Construction, Inc., in the final contract amount of $232,158.83, which is a 29% increase from the original contract in the amount of $179,937.65. This increase was due to the replacement of the 5t" and Locust Street traffic signals, the installation of additional conduit and related work for the traffic signal installation at 5th and Locust Street, and the installation of additional storm sewer to resolve a drainage problem on the north side of the building. In addition, the traffic signals at 12th & Iowa were replaced due to favorable installation prices from the contractor. The City supplied the equipment. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque DUB E i""~ i ~~~~® Masterpiece on the Mississippi Zoos TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer ' DATE: December 2, 2008 SUBJECT: Five Flags Sidewalk and Lighting Replacement Project CIP 1001179 -Five Flags Sidewalk Replacement CIP 300-A76 -Main Street Historic Lights CIP 1021608 -Downtown Street Light Replacement CIP 1021609 -Fiber Optic Conduit-Private Sub & Misc. Proj. CIP 2501615 -Traffic Signal Intersection Reconstruction CIP 3001953 - FY2008 Street Construction Program CIP 7201008 -Storm Sewer Improvements/Extensions INTRODUCTION The enclosed resolution authorizes the acceptance of the construction contract for the Five Flags Sidewalk and Lighting Replacement Project. BACKGROUND The Five Flags Sidewalk and Lighting Replacement Project provided for the complete reconstruction of the existing sidewalk and pedestrian access curb ramps with a standard gray-colored main walk section and a brick red-stamped parkway area to match the historic downtown sidewalk streetscape standard along the curb. In conjunction with the sidewalk replacement, the project also included the installation of historic street lighting along with the upgrade and replacement of traffic signalization poles and equipment at the 5th and Locust Street intersection. DISCUSSION The Five Flags Sidewalk and Lighting Replacement Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $232,158.83, which is a 29.0% increase from the original contract in the amount of $179,937.65. This increase was due to the replacement of the 5th and Locust Street traffic signals, the installation of additional conduit and related work for the traffic signal installation at 5th and Locust Street, and the installation of additional storm sewer to resolve a drainage problem on the north side of the building. In addition, the traffic signals at 12th & Iowa were replaced due to favorable installation prices from the contractor. The City supplied the equipment. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $232,158.83 to Portzen Construction, Inc. for the Five Flags Sidewalk and Lighting Replacement Project. BUDGET IMPACT The estimate of final costs for the Five Flags Sidewalk and Lighting Replacement Project is summarized as follows: Construction (Sidewalks and Lighting) Bid Alternate (Traffic Signal Installation) Historic Street Light Fixtures (City Provided) Total Project Cost Bid Award $173,667.65 6,270.00 22,000.00 $201,937.65 $248,746.83 Final $219,618.83 12,540.00 16, 588.00 The final costs for the Traffic Signal Installation include the additional traffic signal installation at 12t" & Iowa Streets. The contract to Portzen Construction, Inc. included the construction cost for sidewalks and lighting and the bid alternate for traffic signals. This installation cost from the contractor amounts to $232,158.83. The project funding summary is as follows: CIP No. Fund Descriation 1001179 Five Flags Sidewalk Replacement 300-A76 Main Street Historic Lights 1021608 Downtown Street Light Replacement 2501615 Traffic Signal Intersection Reconstruction 1021609 Fiber Optic Conduit -Private Subdivisions & Misc. Projects 3001953 FY 2008 Street Construction Program 7201008 Storm Sewer Improvements/Extensions Total Project Funding $139,850.52 16, 588.00 25,124.65 23, 356.96 5,179.30 36,147.50 2,500.00 $248,746.93 ACTION TO BE TAKEN The City Council is requested to adopt the attached improvements and to authorize the payment of the contrac Portzen Construction, Inc. for the Five Flags Sidewalk Project. Prepared by Robert Schiesl, Assistant City Engineer Jon Dienst, Civil Engineer cc: Jenny Larson, Budget Director Gil Spence, Leisure Services Manager David Ness, Civil Engineer resolution to accept the t amount of $232,158.83 to and Lighting Replacement RESOLUTION NO. 423-08 ACCEPTING THE FIVE FLAGS SIDEWALK AND LIGHTING REPLACEMENT PROJECT AND AUTHORIZING TFfE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Five Flags Sidewalk and Lighting Replacement Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Five Flags Sidewalk Replacement Fund, Main Street Historic Lights Fund, Downtown Street Light Replacement Fund, Traffic Signal Intersection Reconstruction Fund, Fiber Optic Conduit-Private Sub & Misc. Projects Fund, FY 2008 Street Construction Program Fund and Storm Sewer Improvements Fund appropriation for the contract amount of $232,158.83 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 15th day of December, 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE FIVE FLAGS SIDEWALK AND LIGHTING REPLACEMENT PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Five Flags Sidewalk and Lighting Replacement Project, that the Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $248,746.83. Dated this 15th day of December, 2008. City Engineer Filed in the office of the City Clerk on the 15th day of December, 2008. Jeanne F. Schneider, CMC, City Clerk City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: December 2, 2008 PROJECT NAME: FIVE FLAGS SIDEWALK AND LIGHTING REPLACEMENT PROJECT - 2007 CONTRACTOR: Porizen Construction, Inc. CONTRACT AMOUNT: $179,937.66 NED Y AMO UNIT UNIT COST ( BID ITEM DESCRIPTION TO DATE TO DATE [?EMOLITION 8 REIVIOYAL t PC Concrete Sidewalk Remove & Dispose SF $ 1.25 9246.9 $ 11,558.59 2 PC Concrete Pavement, Remove & Dispose SF $ 1.00 422.5 $ 422.50 3 PC Concrete Curb and Gutter, Remove & Dispose LF $ 2.00 783.0 $ 1,566.00 a Existing SVeet Light, Remove & Salvage Each $ 600.00 5.0 $ 3,000.00 5 Traffic Signal Pole & Head Remove & Salvage Each $ 600.00 8.0 $ 4,800.00 6 Traffic Controller Remove 8 Salvage Each $ 1,200.00 1.0 $ 1,200.00 7 Tree Removal Each $ 200.Oi1 5.0 $ 1,000.00 e Existing Tree Grates Remove & Salvage Each $ 800.00 9.0 $ 7,200.00 EXCAVAT[QN & STONE 9 Backfill, Limestone Ton 3 7.50 $ - 10 Graded Stone Base, 3/4" Ton S 15.00 270.60 $ 4,059.00 PAVEMENT` tt HMA 300k Surface Course, 1/2" (PG 64-22) Ton $ 110.00 16.49 $ 1,813.90 t2 PC Concrete Curb and Gutter, 2.5', Construct LF $ 25.00 813.50 $ 20,337.50 13 PC Concrete Sidewalk 4"Integral Brick Red, 4' Wide Stamped SF $ 10.50 936.00 $ 9,828.00 14 PC Concrete Sidewalk 4"Integral Brick Red, 5' Wide Stamped SF $ 10.50 2070.00 $ 21,735.00 15 PC Concrete Sidewalk 6" Integral Brick Red, 5' Wide Stamped SF $ 10.75 166.25 $ 1,787.19 16 PC Concrete Sidewalk, 4" Standard Gray, Broom Finish SF $ 6.40 5110.23 $ 32,705.47 t7 PC Concrete Sidewalk, 6" Standard Gray, Broom Finish SF $ 6.75 586.39 $ 3,958.13 18 PC Concrete Driveway, 7" Standard Gray, Broom Finish SF $ 6.95 378.00 $ 2,627.10 19 PC Concrete Access Ramp Detectable Each $ 275.00 3.00 $ 825.00 Et,ECTRICAL - LIGHTING 20 Historic SVeet Light Installation w/ Precast Concrete Foundation Each $ 925.00 6.0 $ 5,550.00 21 Historic Intersection Street Light Installation w/ Precast Conc Founda Each $ 1,050.00 2.00 $ 2,100.00 22 Relocated Street Light Installation w/Precast Conc. Foundation Each $ 1,100.00 2.00 $ 2,200.00 23 Lighting Cabinet Installation w/Precast Concrete Foundation Each $ 1,125.00 1.00 $ 1,125.00 24 2" SCH 40 PVC, Trenched LF $ 7.25 1134.0 $ 8,221.50 25 Electrical Cable, #10 XHHW LF $ 1.30 1465.0 $ 1,904.50 26 Electrical Cable, #8 XHHW LF $ 1.60 1205.0 $ 1,928.00 27 Electrical Cable, #6 XHHW LF $ 1.50 3829.0 $ 5,743.50 28 Pull Box, Standard Gray 11"x18" Each $ 525.00 1.0 $ 525.00 TftAFFtC SIGNALS 29 Traffic Signal Pedestal -Precast Foundation, New Each $ 825.00 8.00 $ 6,600.00 3o Traffic Control Cabinet -Precast Concrete Foundation Each $ 1,250.00 2.00 $ 2,500.00 3t 2" SCH 40 PVC, Trenched LF $ 9.00 651.50 $ 5,863.50 32 2" HDPE Conduit, Bored LF $ 17.00 370.00 $ 6,290.00 33 4" SCH 40 PVC, Trenched LF $ 9.80 106.50 $ 1,043.70 34 4" HDPE Conduit, Bored LF $ 25.00 108.00 $ 2,700.00 35 Pull Box Standard Gray, 11"x18" Each $ 525.00 0.00 $ - 36 Pull Box, Standard Gray, 17"x30" Each $ 650.00 2.00 $ 1,300.00 FTBER QPTICS 37 4" SCH 40 PVC, Trenched LF $ 9.80 292.00 $ 2,861.60 38 4" HDPE Conduit, Bored LF $ 34.25 45.00 $ 1,541.25 39 Pull Box, Colored, 17"x30" Each $ 650.00 1.00 $ 650.00 MISCELLANEOUS a0 Sawcut, Pavement -Regardless of Type LF $ 5.00 917.00 $ 4,585.00 41 Parking Meter Post, Remove & Install Each $ 125.00 12.00 $ 1,500.00 42 Sign Post, Remove & Install Each $ 175.00 12.00 $ 2,100.00 a3 Tree Preservation Measures LS $ 500.00 1.15 $ 575.00 as Erosion ConVol LS $ 1,500.00 1.15 $ 1,725.00 a5 Traffic Control & Safety Control LS $ 2,000.00 1.15 $ 2,300.00 as Mobilization LS $ 6,000.00 1.15 $ 6,900.00 TOTAL AMOUNT EARNED TO DATE -BASE BID: $ 210,766.93 BID ALTERNATE -TRAFFIC SIGNALS Traffic Signal, Equipment Installation LS $ 6,270.00 2.0 $ 12,540.00 TOTAL AMOUNT EARNED TO DATE -BID ALTERNATE: $ 12,540.00 CHANGE ORCaEF2(S) -EXTRA WOF2K;ITEMS Trench Drain, Complete LS $ 2,500.00 1.0 $ 2,500.00 Storm Sewer Catch Basin, Remove & Replace Top LS $ 1,000.00 1.0 $ 1,000.00 1-1/2" conduit LF $ 8.20 48.0 $ 393.60 1"conduit LF $ 7.90 47.0 $ 371.30 Fixture Adjustments Each $ 250.00 2.0 $ 500.00 Curb Around Planters LF $ 15.00 131.0 $ 1,965.00 Waterproof Basement _ SF $ 2.00 279.0 $ 558.00 Water Box Toes Each $ 150.00 2.0 $ 300.00 Install 30x46 Handhole LS $ 750.00 1.0 $ 750.00 Manhole Removal LS $ 250.00 1.0 $ 250.00 Manhole ring and cover for electric vault LS $ 275.00 1.0 $ 275.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 8,862.90 TOTAL AMOUNT EARNED TO DATE: $ 232,158.83 TOTAL DUE CONTRACTOR: $232,158.83 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct amount of all work required to complete the above improvement. APPROVED: Michael C. Va igen, Manager City of Dubu e, Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Portzen Construction, Inc. contractor for the above improvement, does hereby accept the above "Total Due Contractor', as full settlement for all claims for said improvement. CONTRACTOR: Portzen ConstrLCtion. Inc ~ v BY: TITLE: DATE: ~ ~°~ - 3 ~- O (~