Loading...
Fire Station No. 2 - JFK Parking Lot Reconstruction ProjectTHE CITY OF DUBUQUE Masterpiece on the Mississippi Dubuque All-American City 2007 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Fire Station No. 2 - John F. Kennedy Road Parking Lot Reconstruction DATE: December 8, 2008 City Engineer Gus Psihoyos is recommending acceptance of the Fire Station No. 2 - John F. Kennedy Road Parking Lot Reconstruction Project, as completed by Portzen Construction, Inc., in the final contract amount of $73,470.34, which is a 7.4% decrease from the original contract in the amount of $79,328.70. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistnat City Managr Gus Psihoyos, City Engineer THE CITY OF Dubuque " ' DUB E All-Aroe~caCiry j_ Masterpiece on the Mississippi 2007 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer i ,~ , ~. _~~~~~ DATE: December 8, 2008 SUBJECT: Fire Station No. 2 -John F. Kennedy Road Parking Lot Reconstruction Project (CIP 1012055) INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Fire Station No. 2 -John F. Kennedy Road Parking Lot Reconstruction Project. BACKGROUND The Fire Station No. 2 -John F. Kennedy Road Parking Lot Reconstruction Project involved the reconstruction of the existing driveway entrance and parking lot for Fire Station No. 2. The new driveway entrance and parking lot were constructed of 8-inch concrete pavement on an improved granular sub-base to better handle the heavy axle loads imposed by emergency vehicles. An additional 9 feet of concrete pavement along the easterly edge of the parking lot was provided for additional staff parking. The project also included the installation of a new storm sewer intake that connected to the existing storm sewer system to manage the parking lot surface drainage. DISCUSSION The Fire Station No. 2 -John F. Kennedy Road Parking Lot Reconstruction Project was completed by Portzen Construction, Inc. of Dubuque, Iowa, in the final contract amount of $73,470.34, which is a 7.4% decrease from the original contract in the amount of $79,328.70. RECOMMENDATION I recommend that the City Council accept the improvements and establish the final contract for the Fire Station No. 2 -John F. Kennedy Road Parking Lot Reconstruction Project at $73,470.34. BUDGET IMPACT The project cost summary for the Fire Station No. 2 -John F. Kennedy Road Parking Lot Reconstruction Project is as follows: Construction Contract Contingency Construction Engineering & Inspection Total Project Cost The project funding summary is as follows: CIP No. Fund Description Bid Award Final $ 79,328.70 $ 73,470.34 8,178.93 0 13,495.22 $ 7,781.75 $101,002.85 $ 81,252.09 Fund Amount 1012055 Fire Station No. 2 - JFK Parking Lot Reconstruction Total Project Funding ACTION TO BE TAKEN $ 81,252.09 $ 81,252.09 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $73,470.34 to Portzen Construction, Inc. for the Fire Station No. 2 -John F. Kennedy Road Parking Lot Reconstruction Project. Prepared by Greg Doeden, Civil Engineer Bob Schiesl, Assistant City Engineer cc: Jenny Larson, Budget Director Dan Brown, Fire Chief RESOLUTION NO. 424-08 ACCEPTING THE FIRE STATION NO. 2 -JOHN F. KENNEDY ROAD PARKING LOT RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE CONTRACTOR Whereas, the Public Improvement Contract for the Fire Station No. 2 -John F. Kennedy Road Parking Lot Reconstruction Project (the Project) has been completed and the City Engineer has examined the work and filed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Fire Station No. 2 - JFK Parking Lot Reconstruction CIP (1012055) appropriation for the contract amount of $73,470.34 less any retained percentage provided for therein as provided in Iowa Code chapter 573, and to pay such retainage only in accordance with the provisions of Iowa Code chapter 573. Passed, approved and adopted this 15th day of December, 2008. Roy D. Buol, Mayor Attest: Jeanne F. Schneider, CMC, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE FIRE STATION NO. 2 - JOHN F. KENNEDY ROAD PARKING LOT RECONSTRUCTION PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Fire Station No. 2 - John F. Kennedy Road Parking Lot Reconstruction Project, that the Project has been performed in compliance with the terms of the Public Improcement Contract, and that the total cost of the completed work is $81,252.069. Dated this 15th day of December, 2008. City Engineer Filed in the office of the City Clerk on the 15th day of December, 2008. Jeanne F. Schneider, CMC, City Clerk Clty of Dubuque - Engmeering Dlvlslon Final Payment Form PAYMENT NO: COUNCIL FINAL DATE: December 8, 2008 PROJECT NAME: FIRE STATION N0.2 - JFK PARKING LOT RECONSTRUCTION CONTRACTOR: Portzen Construction, Inc. BID ITEM DESCRIPTION DEMOLITION &_REMOVAL 1 Remove Pavement CONTRACT AMOUNT: $79,328.70 UNIT UNIT COST Q O DATE AMOTO DATENED SY $3.00 225.0 $ 675.00 $ - EXCAVATION & STONE 2 Excavation, Unclassified CY $10.00 530.0 $ 5,300.00 3 Backfill, Topsoil SY $4.00 515.0 $ 2,060.00 4 Granular Sub-Base Ton $13.00 329.66 $ 4,285.58 5 3" Crushed Stone Base Ton $12.00 161.27 $ 1,935.24 $ - PAVEMENT 6 PC Concrete Pavement, (7"), Class "C" SY $32.00 154.72 $ 4,951.04 7 PC Concrete Pavement, (8") w/ Integral Curb, Class "C", SY $44.50 660.33 $ 29,384.69 w/CD Baskets Both Ways 8 PC Concrete Driveway, 8", Remove & Construct SY $40.00 27.25 $ 1,090.00 9 PC Concrete Sidewalk, 4", Remove & Construct SF $6.00 147.54 $ 885.24 10 PC Concrete Curb and Gutter, 2.5', Construct (Optional) LF $15.00 151.5 $ 2,272.50 11 6" Subdrain, Perforated Plastic Drain Tile LF $9.00 86.0 $ 774.00 $ - STORMSEWER 12 Intake 101-B Each $2,000.00 1.00 $ 2,000.00 13 Manhole 48" Diameter, Complete Each $1,700.00 0.00 $ - 14 Storm Sewer, 12" RCP, CL V LF $28.00 0.00 $ - $ - MISCELLANEOUS 15 Sawcut, Concrete LF $3.00 $ - 16 Sod SY $5.50 515.0 $ 2,832.50 17 Watering MGAL $66.00 $ - 18 Pavement Markings, 4" White LF $3.30 $ - 19 Erosion Control Plan -Operating Procedures LS $400.00 1 $ 400.00 20 Traffic Control & Safety Control LS $1,550.00 1 $ 1,550.00 21 Mobilization LS $3,700.00 1 $ 3,700.00 BASE BID EARNED TO DATE: $ 64,095.79 RLTERNATE NO. 1 EXCAVATION 8~ STONE 1 Excavation, Unclassified 2 Granular Sub-Base 3 3" Crushed Stone Base CY $ 3.00 65.0 $ 195.00 Ton $ 13.00 40.0 $ 520.00 Ton $ 12.00 0.0 $ - pAVEMENr 4 PC Concrete Pavement, (8") w/ Integral Curb, Class "C", SY $ 44.50 98.9 $ 4,401.05 w/CD Baskets Both Ways 5 PC Concrete Curb and Gutter, 2.5', Construct (Optional) LF $ 15.00 0.0 $ - 6 6" Subdrain, Perforated Plastic Drain Tile LF $ 9.00 0.0 $ - ALTERNATE NO. 1 EARNED TO DATE: $ 5,116.05 TOTAL AMOUNT EARNED TO DATE: $ 69,211.84 CHANGE ORDER{FIRE STATION NO. 2) -EXTRA WORK ITEMS C1 Removing Foundation LS $481.00 1 $ 481.00 C1 Extra Manhole (Material Only) LS $575.00 1 $ 575.00 C1 Storm Piping (PVC) LS $2,812.50 1 $ 2,812.50 C1 Additional Curb & Gutter LS $390.00 1 $ 390.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 4,258.50 TOTAL AMOUNT EARNED TO DATE (BASE BID+ALT.+CO's): $ 73,470.34 TOTAL DUE CONTRACTOR: $ 73,470.34 ENGINEERING: $7,781.75 TOTAL CONSTRUCTION COST: $81,252.09 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct a ount o work required to complete the above improvement. APPROVED: Michael Van Milligen, er City of D uq owa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Portzen COriStruCtiOni InC. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: POrtzen COriStruCtl017~. InC. BY:~i..tic U ~ V ~ _ ''~lvv~iichael ~~Por tzen TITLE: PrPSirlPnt 12/8/08 DATE: City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL PROJECT NAME: FIRE STATION N0.2 - JFK PARKING LOT RECONSTRUCTION CONTRACTOR: Portzen Construction, Inc. DATE: December 8, 2008 CONTRACT AMOUNT: $79,328.70 BID ITEM DESCRIPTION UNIT UNIT COST (TO DATE AMOTO DATENED DEMOLITION. ~ FtEMOVAI_ 1 Remove Pavement SY $3.00 225.0 $ 675.00 $ - EXCAVATION & STONE 2 Excavation, Unclassified CY $10.00 530.0 $ 5,300.00 3 Backfiil, Topsoil SY $4.00 515.0 $ 2,060.00 4 Granular Sub-Base Ton $13.00 329.66 $ 4,285.58 5 3" Crushed Stone Base Ton $12.00 161.27 $ 1,935.24 $ - PAVEMENT 6 PC Concrete Pavement, (7"), Class "C" SY $32.00 154.72 $ 4,951.04 7 PC Concrete Pavement, (8") w/ Inte ral Curb Class "C" SY $44.50 660.33 $ 29,384.69 w/CD Baskets Both Ways 8 PC Concrete Driveway, 8", Remove & Construct SY $40.00 27.25 $ 1,090.00 9 PC Concrete Sidewalk, 4", Remove & Construct SF $6.00 147.54 $ 885.24 10 PC Concrete Curb and Gutter, 2.5', Construct (Optional) LF $15.00 151.5 $ 2,272.50 11 6" Subdrain, Pertorated Plastic Drain Tile LF $9.00 86.0 $ 774.00 $ - STORM SEWER 12 Intake 101-B Each $2,000.00 1.00 $ 2,000.00 13 Manhole 48" Diameter, Complete Each $1,700.00 0.00 $ - 14 Storm Sewer, 12" RCP, CL V LF $28.00 0.00 $ - $ - MISCELLANEOUS 15 Sawcut, Concrete 16 Sod 17 Watering 18 Pavement Markings, 4" White 19 Erosion Control Plan -Operating Procedures 20 Traffic Control & Safety Control 21 Mobilization ALTERNATE NO. 7 BASE BID EARNED TO DATE: $ 64,095.79 EXCAVATION 8~ STONE 1 Excavation, Unclassified CY $ 3.00 65.0 $ 195.00 2 Granular Sub-Base Ton $ 13.00 40.0 $ 520.00 3 3" Crushed Stone Base Ton $ 12.00 0.0 $ - PAVEMENT 4 PC Concrete Pavement, (8") w/ Integral Curb, Class "C" w/CD Baskets Both Ways 5 PC Concrete Curb and Gutter, 2.5', Construct (Optional) 6 6" Subdrain, Pertorated Plastic Drain Tile SY $ 44.50 98.9 $ 4,401.05 LF LF $ $ 15.00 9.00 0.0 0.0 $ - $ - LF $3.00 $ _ SY $5.50 515.0 $ 2,832.50 MGAL $66.00 $ _ LF $3.30 $ _ LS $400.00 1 $ 400.00 LS $1,550.00 1 $ 1,550.00 LS $3,700.00 1 $ 3,700.00 ALTERNATE NO. 1 EARNED TO DATE: $ 5,116.05 TOTAL AMOUNT EARNED TO DATE: $ 69,211.84 CHANGE ORflER M=IRE STATION NO. 2) -EXTRA WORK ITEMS C1 Removing Foundation LS $481.00 1 $ 481.00 C1 Extra Manhole (Material Only) LS $575.00 1 $ 575.00 C1 Storm Piping (PVC) LS $2,812.50 1 $ 2,812.50 C1 Additional Curb & Gutter LS $390.00 1 $ 390.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 4,258.50 TOTAL AMOUNT EARNED TO DATE (BASE BID+ALT.+CO's): $ 73,470.34 TOTAL DUE CONTRACTOR: $ 73,470.34 ENGINEERING: $7,781.75 TOTAL CONSTRUCTION COST: $81,252.09 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the correct a ount o~y work required to complete the above improvement. APPROVED: ~!!! ~t Michael Van Milligen, Cit Manager City of Dubu ,Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, pnrt-~an C'nnetr7lCtlI111y Trir contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: p C BY: ~ ~ N President ichael E. rtzen TITLE: DATE: 12 ~ $ ~~$ City of Dubuque -Engineering Division Final Payment Form PAYMENT NO: COUNCIL FINAL PROJECT NAME: FIRE STATION N0.2 - JFK PARKING LOT RECONSTRUCTION CONTRACTOR: Porizen Construction, Inc. DATE: December 8, 2008 CONTRACT AMOUNT: $79,328.70 BID ITEM DESCRIPTION UNIT UNIT COST ~ O DATE AMO O DATENED DEMOLITION ~ REMOVAL 1 Remove Pavement SY $3.00 225.0 $ 675.00 $ - EXCAVATION & STONE 2 Excavation, Unclassified CY $10.00 530.0 $ 5,300.00 3 Backfill Topsoil SY $4.00 515.0 $ 2,060.00 4 Granular Sub-Base Ton $13.00 329.66 $ 4,285.58 5 3" Crushed Stone Base Ton $12.00 161.27 $ 1,935.24 $ - PAVEMENT 6 PC Concrete Pavement, (7"), Class "C" SY $32.00 154.72 $ 4,951.04 7 PC Concrete Pavement, (8") w/ Integral Curb, Class "C", SY $44.50 660.33 $ 29,384.69 w/CD Baskets Both Ways 8 PC Concrete Driveway, 8", Remove & Construct SY $40.00 27.25 $ 1,090.00 9 PC Concrete Sidewalk, 4", Remove & Construct SF $6.00 147.54 $ 885.24 10 PC Concrete Curb and Gutter, 2.5', Construct (Optional) LF $15.00 151.5 $ 2,272.50 11 6" Subdrain, Pertorated Plastic Drain Tile LF $9.00 86.0 $ 774.00 $ - STORM SEVYER 12 Intake 101-B Each $2,000.00 1.00 $ 2,000.00 13 Manhole 48" Diameter, Complete Each $1,700.00 0.00 $ - 14 Storm Sewer, 12" RCP, CL V LF $28.00 0.00 $ - $ - MISCELLANEOUS 15 Sawcut, Concrete 16 Sod 17 Watering 18 Pavement Markings, 4" White 19 Erosion Control Plan -Operating Procedures 20 Traffic Control & Safety Control 21 Mobilization LF $3. 00 $ - SY $5. 50 515.0 $ 2,832.50 MGAL $66. 00 $ - LF $3. 30 $ - LS $400 .00 1 $ 400.00 LS $1,550. 00 1 $ 1,550.00 LS $3,700 .00 1 $ 3,700.00 BASE BID EARNED TO DATE: $ 84,095.79 ALTERNATE NO. ~ 'EXCAVATION & STONE 1 Excavation, Unclassified 2 Granular Sub-Base 3 3" Crushed Stone Base CY $ 3.00 65.0 $ 195.00 Ton $ 13.00 40.0 $ 520.00 Ton $ 12.00 0.0 $ - PAVEMENT 4 PC Concrete Pavement, (8") wt Integral Curb, Class "C" w/CD Baskets Both Ways 5 PC Concrete Curb and Gutter, 2.5', Construct (Optional) 6 6" Subdrain, Pertorated Plastic Drain Tile SY $ 44.50 98.9 $ 4,401.05 LF $ 15.00 0.0 $ - LF $ 9.00 0.0 $ - ALTERNATE NO. 1 EARNED TO DATE: $ 5,118.05 TOTAL AMOUNT EARNED TO DATE: $ 69,211.84 J CHANGE ORDER (SIRE STATION NO. 2) -EXTRA WORK ITEMS C1 Removing Foundation LS $481.00 1 $ 481.00 C1 Extra Manhole (Material Only) LS $575.00 1 $ 575.00 C1 Storm Piping (PVC) LS $2,812.50 1 $ 2,812.50 C1 Additional Curb & Gutter LS $390.00 1 $ 390.00 TOTAL AMOUNT EARNED TO DATE -CHANGE ORDERS: $ 4,258.50 TOTAL AMOUNT EARNED TO DATE (BASE BID+ALT.+CO's): $ 73,470.34 TOTAL DUE CONTRACTOR: $ 73,470.34 ENGINEERING: $7,781.75 TOTAL CONSTRUCTION COST: $81,252.09 CERTIFICATE OF THE CITY MANAGER: I hereby certify that the above statement shows in detail the corre amou~t Jof all work required to complete the above improvement. APPROVED: (/ Michael Van Milli ager City of Dub ,Iowa APPROVED: Gus Psihoyos, City Engineer City of Dubuque, Iowa CERTIFICATE OF THE CONTRACTOR: The undersigned, Portzen COnStruCtlOn, IriC. contractor for the above improvement, does hereby accept the above "Total Due Contractor", as full settlement for all claims for said improvement. CONTRACTOR: POrtZeri Michael E. Portzen TITLE: President DATE: 12~$~O$~$