Loading...
Riverfront Marina Project Worksession Materials TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: WORKSESSION - Riverfront Marina Project DATE: July 2, 2009 City Engineer Gus Psihoyos has provided information on the two options for the location of the Transient Boat Docks. There will be a presentation by the design consultants. No decision is expected tonight. There will be a final recommendation on the July 20, 2009 City Council Agenda. . _____________________________________ Michael C. Van Milligen MCVM:lw Attachment cc: Barry Lindahl, City Attorney Cindy Steinhauser, Assistant City Manager Gus Psihoyos, City Engineer Railroad Bridge Star Brewery Grand River Center Existing transient docks Ice Harbor Main Channel Alternative Ice Harbor Alternative Star Brewery Grand River Center Eagle Roost Debris Deflection Structure Railroad Bridge Wave Attenuator Marina Restrooms Adapt Existing Docks Newt Marine 585 580 575 570 590 590 565 560 585 585 550 580 580 575 570 575 565 560 555 570 565 560 Flat Pool = 592.07 MSL12 River walk Minimum 100ft Debris Deflection Structure River Flow 585 585 580 580 580 585