1999 PC Paving -No. 1CITY OF DUBUQUE, IOWA MEMORANDUM March 28, 2001 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager 1999 P.C. Concrete Paving Project - No. 1 Public Works Director Mike Koch is recommending approval of a water main and sanitary sewer assessment for a vacant lot described as Rettenberger Place Lot 2, as requested by the property owners, and adoption of the Final Assessment Schedule for the 1999 P.C. Concrete Paving Project -No. 1 including Bryant Street, Booth Street and Van Buren Street. I concm' with the recommendation and respectfully request Mayor and City Council approval. MiChael C. Van Milligen MCVM/jh Attachment cc: Barry- Lindahl, Corporation Counsel Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM TO: FROM: SUBJECT: Michael C. Van Milligen, City Manager March 27, 2001 Michael A. Koch, Public Works Director 1999 P.C. Concrete Paving Project - No. 1 (Bryant Street, Booth Street, and Van Buren Street) INTRODUCTION The enclosed resolutions provide for the adoption of the Final Assessment Schedule for the 1999 P.C. Concrete Paving Project - No. 1 (Bryant Street, Booth Street, and Van Buren Street). DISCUSSION At the City Council meeting of February 18, 2001, the City Council adopted a Preliminary Schedule of Final Assessment for the project. The adoption of this Preliminary Schedule allows the City approximately 45 days of administrative time to process final assessment applications for Iow- to moderate-income families assessed on the project. The deadline for filing applications for this financial assistance was March 26, 2001. As of March 27, 2001, 35 owners have applied for financial assistance in the total amount of $40,604.58. These payments ranged from 20 percent to 100 percent of the street assessments for these eligible property owners. The enclosed Schedule of Final Assessments has been modified from the previous schedule as follows: Property Sewer Watermain Owner Address Assessment Assessment Karl A., Sr., and Freda A. Rettenberger 2665 Beverly $1,833,90 $785.87 RECOMMENDATION I would recommend the adoption of the enclosed Resolution approving the Final Schedule of Assessments for the 1999 P.C. Concrete Paving Project - No. 1. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution. MAK/vjd Prepared by Michael Felderman, Civil Engineer SOLUTION NO. 122-01 RESOLUTION OF NECESSITY Whereas, proposed plans have been duly prepared and approved by the City Council of the City of Dubuque and are now on file in the office of City Clerk showing among other things the plans, specifications, form of contract, estimated cost and preliminary plat and schedule showing the amount proposed to be assessed against each lot and the valuation of each lot as filed by the City Council, for the 1999 P.C. Concrete Paving Project - No. 1 (Bryant Street, Booth Street, and Van Buren Street). NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements, and unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the resolution of necessity, they shall be deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed and done in accordance with the plans and specifications which have been approved by the City Council and now on file with the City Clerk. That the cost and expense of making such improvement will be assessed partially or totally against privately owned property lying with the assessment limits, and in an amount not to exceed that provided by law, and in proportion to the special benefits conferred. The portion of the cost which shall be borne by the City will be paid from the Street Construction Fund, and special assessment bonds may be issued in anticipation of deferred payments of assessments when a contract has been performed and accepted, and the proceeds thereof used to pay the contractor. The above resolution was introduced, approved and ordered placed on filewith the City Clerk this 2nd dayof April ,2001. Approved and placed on file for final action. Terrance M. Duggan, Mayor Attest: Jeanne F. $chneider, City Clerk RESOLUTION NO. 123-01 A RESOLUTION ADOPTING THE FINAL ASSESSMENT SCHEDULE FOR THE AMENDED 1999 P.C. CONCRETE PAVING PROJECT - NO. 1 (BRYANT STREET, BOOTH STREET, AND VAN BUREN STREET) INCLUDING CERTAIN INFORMATION REQUIRED BY THE CODE OF IOWA, SPECIFICALLY, THE NUMBER OF ANNUAL INSTALLMENTS INTO WHICH ASSESSMENTS ARE DIVIDED, THE INTEREST ON ALL UNPAID INSTALLMENTS, THE TIME WHEN THE ASSESSMENTS ARE PAYABLE AND DIRECTING THE CLERK TO CERTIFY THE FINAL SCHEDULE AND TO PUBLISH NOTICE THEREOF. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That after full consideration of the final schedule of assessments and accompanying plat showing the assessments proposed to be made for the construction of the amended 1999 P.C. Concrete Paving Project - No. 1 (Bryant Street, Booth Street, and Van Buren Street) under contract with Horsfield Construction, Inc. of Epworth, Iowa, which final plat and schedule were filed in the office of the City Clerk on the 28th day of March, 2001, the said schedule of assessments be and the same is hereby approved and adopted. That there be, and is hereby assessed and levied as a special tax against and upon each ofthe lots, the respective sums indicated. Provided, further, that the amounts shown in said final schedule of assessments as deficiencies are found to be proper and levied conditionally against the respective properties benefited by the improvements as shown in the schedule, subject to the provisions of Section 384.63 of the Code of Iowa. Said assessments against said lots are hereby declared to be in Proportion to the special benefits conferred and not in excess of twenty-five percent of the value of same. That the City Clerk be and is hereby directed to certify said schedule to the County Treasurer of Dubuque County, Iowa, and to publish notice of said certification once each week for two consecutive weeks in the manner provided in Section 362.3, the first publication of which shall be not more than fifteen days from the date of filing of the final schedule. On or before the date of the second publication of the notice, the City Clerk shall also mail a copy of said notice to property owners whose property is subject to assessment, as provided and directed in Section 384.60 of the Code of Iowa. That assessments may be paid in full or in part without interest at the office of the County Treasurer, at any time within 30 days after the date of the first publication of this notice of the filing of the final schedule of assessments with the County Treasurer. After 30 days unpaid assessments of $50.00 or more are payable in 10 annual installments and will draw annual interest at nine (9) percent (commencing on the date of acceptance of the work) computed to the December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1 of each year. Property owners may elect to pay any annual installments semiannually in advance. Attest: Passed, approved and adopted this 2nd day of Apri 1, 2001. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk CITY OF DUBUQUE, IOWA BRYANT STREET (DODGE TO GRANDVIEW) PRELIMINARY SCHEDI3LE OF FINAL ASSESSMENTS VALUATION w/ GROSS DEFICIENCY NET PAVING WATER SERVICE SIDEWALK SEWER TOTAL NET OWNER LOT DESCRIPTION LEGAL IMPROVEMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT SULLIVAN'S SUB. Herrig, Sally Jo (Cont,'act fi-om Em'l & Rosemary Tcgoler) I 10-36-102-008 $93,870.58 $2,020.58 $0.00 $2,020,58 $0,00 $0.00 $0.00 $2.020,58 Hancoek-Shaffer Pat~nel'sl~p 2-2 10-36-102-007 $57,729,76 $499.76 $0.00 $499.76 $0.00 $0.00 $0.00 $499.76 Hartman, Dorls 1-2 10-36-102-006 $114,729.37 $1,109,37 $0.00 $I,109.37 $0.00 $0.00 $0.00 $1,109.37 S & S lnvostments 3 10-36-102-005 $52,685.78 $1,215.78 $0.00 $1,215.78 $0.00 $0.00 $0.00 $1,215.78 CITY OF DUBUQUE, IOWA BRYANT STREET (DODGE TO GILANDVIEW) pRELIMINARY SCHEDULE OF FINAL ASSESSMENTS VALUATIONw/ GROSS DEFICIENCY NETPAVING WATERSERVICE SIDEWALK SEWER TOTALNET OWNER LOT DESCRIPTION LEGAL [MPROVEM[~NT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT GRACE CLEVELAND AVENUE PLACE I 10-25-361-012 $36,746.94 $126.94 $0.00 $126.94 $0.00 $0.00 $0.00 $126.94 2 I0-25-36 l-0I 1 $35,287.65 $177.65 $0,00 $177.65 $0.00 $0.00 $0,00 $177.65 UNION ADD 78 10-25-361-013 $80,060.45 $150,45 $0.00 $150.45 $0.00 $0.00 $0.00 $150.45 8.50'-I-76 & 77 10-25-361-003 $62,234.22 $944.22 $0.00 $944.22 $0.00 $0.00 $0.00 $944.22 2A-76 & 77 10-25-361-003 2A-76 & 77 10-25-361-001 2A-76 & 77 10-25-361-002 2A-76 & 77 10-25-361-007 l-2-76 & 77 10-25-361-001 $64,794.48 $1,214.48 $0.00 $1,214.48 $0.00 $0.00 $0.00 $1,214.48 2-2-76 & 77 10-25-361-002 $64,376.20 $1.276.20 $0.00 $1,276.20 $0.00 $0.00 $0.00 $1,276,20 S.40'-3-2-76 & 77 10-25-361-003 4-2-76 & 77 10-25-361-004 $48,388.49 $798.49 $0.00 $798.49 $0.00 $0.00 $0.00 $798.49 N,8'-5-2-76 & 77 [0-25-361-004 1 -S.42'-5-2-76 & 77 10-25-361-005 $27,929.38 $599,38 $0.00 $599.38 $0.00 $0.00 $0.00 $599.38 2-S.42'-5-2-76 & 77 10-25-361-007 $25.130.63 $410.63 $0.00 $410.63 $0.00 $0.00 $0.00 $410,63 1-145 & 146 10-25-361-008 $83,330.05 $1,450.05 $0,00 $1.450.05 $694.35 $0.00 $0.00 $2,144.40 2-145 & 146 10-25-361-008 3-145 & 146 10-25-361-009 $65,034.50 $684.50 $0.00 $684.50 $694,35 $0,00 $0.00 $1,378.85 4-145 & 146 10-25-361-010 $62,437.66 $917.66 $0.00 $917.66 $0.00 $0,00 $0,00 $917.66 5-145 & 146 10-25-361~019 $66,238,60 $388.60 $0.fl0 $388.60 $0.00 $0,00 $0.00 $388.60 6-145 & 146 10-25-361-019 1-7-145 & I46 10-25-361-006 $I98.69 $18.69 $0.00 $18.69 $0.00 $0.00 $0,00 $18,69 2-7-145 & 146 10-25-361-007 144 10-25-361-020 $99,923,64 $343.64 $0.00 $343.64 $0.00 $0.00 $0.00 $343.64 143 I0-25-361-021 $59,551,72 $181,72 $0.00 $181.72 $0.00 $0.00 $0.00 $181.72 142 10-25-361-022 $71.303.86 $43.86 $0.00 $43.86 $0.00 $0.00 $0.00 $43.86 155 10-36-103-001 $19,145.61 $175,61 $0.00 $175.61 $0.00 $0.00 $0.00 $175.61 154 10-36-103-001 SUB 1 & 8 - ML 45-1-MLA7 & 153 UNION ADD. 2-1 10-36-103-005 $47,837.27 $2,717,27 $0.00 $2,717.27 $0.00 $0.00 $0.00 $2,717.27 1-1 10-36-103-004 $361,184.56 $1,354.50 $0.00 $1.354.56 $0.00 $0B0 $0.00 $1.354.56 2 10-36-103-005 MIN LOT 45 COLUMBIA ADD. I 10-36-107-001 $80,500.70 $l,070.70 $0B0 $1,070.70 $746.57 $0.00 $0.00 $I,817.27 2 10-36-107-002 $83,598.24 $888.24 $0,00 $888.24 $0.00 $0.00 $0.00 $888.24 3 10-36-107-003 $101.438.24 $888.24 $0.00 $888,24 $720.46 $0,00 $0.00 $1,608.70 4 10-36-107-004 $73,337.21 $777.21 $0.00 $777.21 $659.55 $0.00 $0.00 $1,436.76 $50,711.89 $0.00 $50.711.89 $12,777.54 $0.00 $0.00 $63,489.43 CITY OF DUBUQUE, IOWA BOOTH STREET (DODGE TO FiFTH) FINAL SC}IEDULE OF ASSESSMENTS CITY OF DUBUQUE CITY OF DUBUQUE YMCA-YWCA CORPORATION, 'rite YMCA-YWCA BUILDING COP-P,, THE YMCA-YWCA BUILDING CORP., THE YMCA-YWCA WEIDENBACHER,DAVID L. SCHIJMACHER, MARY M. ~IENNING,WILLIAM G, & DIANE M. WEBER, DAVID J. & WALTERS, MELINDA 5. YMCA-YWCA BUILDING CORP., THE YMCA-YWCA BUILDING CORP., THE HENNING,WILLIAM G. & DIANE M. PARADISO, PIHILIP O. & SUSAN A. BELKEN, SCOTT J, & LUDOVISSY, SHANNON M. ALBERT, GREGORY K. & DEBRA J. BROWN, YVONNE BASSLER, EUGENE P & GENEVIVE F. WALSH, KEVIN J, KUBESBESKI, JOHN T. 8: LENORE GHEER, RICK L. & DEBORA J. GHEER, RICK L. & DEBORA J. REDING, CHRISTOPHER N. & CINDy K. LORENZ, MATH[AS K. aka LORENZ, MATIt]AS K1EBEL LORENZ, MATHIAS K. aka LORENZ, Iv~'rlqlAs KIEBEL SANDERS, ~rfLLARD N. & JOYCE H. REDING, CIiRISTOPNER N. & CINDY K. SLAI~FERY, ROGER T. HOUSELOG, ROBIN J. GOEDERT, RUTH O'BRIEN, J UL1E A. OAKWOOD INVESTMENTS G.P. SPANGLER, RICHARD J. & DARLENE L. SPANGLER, RICHARD J. & DARLENE L. TOMMARO. iVlERLYN C. IA D.O.T. LOT $40,919.13 $919.13 $0.00 $9/9.13 $0.00 $0.00 $0.00 $919.13 IA D.O.T. LOT $12,103.55 $2,I03.55 $0.00 $2,103.55 $0.00 $0.00 $0.00 $2,103.55 MIN. LOT 158 BAL. 2-1-2-1-1-5 10-26-426-015 $1,470,071.90 $301.90 $0.00 $301.90 $0.00 $0.00 $0.00 $301.90 2-2-1-1-1-4 10-26-426-006 $53,667.46 $2,037.46 $0.00 $2,037.46 $0.00 $0.00 $0.00 $2,037.46 S.32.55'-8.182,55'-S.Pt.-2-3 10-26-426-006 NORTH BOOTH STREET PLACE 2 10-26-426-011 $5.992.48 $1,592.48 $94,36 $1,498.12 $0.00 $0.00 $0.00 $1,498.12 1 10-26-426-010 $78,761.33 $1,981.33 $0.00 $1,981.33 $0.00 $0.00 $0.00 $1,981.33 MIN. LOT 158 I~i-N.Pt.-2-3 10-26-426-009 $100,874.11 $2,254.11 $0.00 $2,254.11 $0.00 $0.00 $0.00 $2,254.11 2-1 -N.Pt.-2-3 10-26-287-025 $96,738.39 $2,028.39 $0.00 $2,028.39 $816.18 $0.00 $0.00 $2,844.57 2-N.Pt.-2-3 10-26-287-024 $55,481.86 $1,401.86 $0.00 $1,401.86 $798.78 $0.00 $0.00 $2,200.64 DIAMOND PI.ACE 2-2 10-26-426-004 $2,152.48 $1,262.48 $724.36 $538.12 $0.00 $0.00 $0.00 $538.12 2-1 10-26-426-004 1-1 10-26-287-012 $3,322.09 $1,442.09 $611.57 $830.52 $0.00 $0.00 $0.00 $830.52 SUNNYSIDE ADD. 37 10-26-287-023 $72,488.09 $1,088.09 $0.00 $1,088.09 $807,48 $0.00 $0.00 $1,895.57 36 10-26-287-022 $73,618.09 $1,088.09 $0.00 $1,088.09 $0.00 $0.00 $0.00 $I,088.09 35 10-26-287-021 $73,468.09 $1,088.09 $0.00 $1,088.09 $798.78 $0.00 $0.00 $1,886.87 34 10-26-287-020 $57,298.09 $1,088.09 $0.00 $1,088.09 $798.78 $0.00 $0.00 $1,886.87 33 10-26-28%019 $69,218.77 $978.77 $0.00 $978.77 $781.37 $0.00 $0.00 $1,760;14 32 10-26-287-018 $96,992.34 $672.34 $0.00 $672.34 $0.00 $0.00 $0.00 $672:34 O~qEILL'S SUB. S.58'-1 10-26-282-015 $65,781.56 $711.56 $0.00 $711.56 $807.07 $0.00 $0.00 $l,518.63 N. 2'.1 10-26-282-014 $69,041.71 $911.71 $0.00 $911.71 $0.00 $0.00 $0.00 $911.71 8.38'-2 10-26-282-014 N22'-2 10-26-282-013 $58,285.21 $1,015.21 $0.00 $1,015.21 $807.07 $0.00 $0.00 $1,822.28 W.30'-3 10-26-282-007 $60,920.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 W.40'-4 10-26-282-006 $94,870.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Oq'4EILL'S NO.2 SUB. N. 40'-8 10-26-282-012 $47,585.21 $1,015.21 $0.00 $1,015.21 $807.07 $0.00 $0.00 $1,822.28 S.]/2-9 10-26-282:011 $63,216.86 $736.86 $0.00 $736.86 $807.07 $0.00 $0.00 $1,543.93 N1/2-9 10-26-282-010 $54,206.86 $736.86 $0.00 $736.86 $807.07 $0.00 $0.00 $1,543.93 10 10-26-282-009 $54,273.98 $1,473.98 $0.00 $1,473.98 $807.07 $0.00 $0.00 $2,281.05 1I 10-26-282-008 $41,223.98 $1,473.98 $0.00 $1,473.98 $0.00 $0.00 $0.00 $1,473.98 KUEIINLE'S SUB. S.49'9"-2 10.26-278-026 $73,359.76 $1,289.76 $0.00 $1,289.76 $0.00 $0.00 $0.00 $1,289.76 W.28'-N.9.2'-2 10-25-357-026 E.72'-Ng.T-2 10-26-278-025 $66,286.02 $1,166.02 $0.00 $1,166,02 $0.00 $0.00 $0.00 $1,166.02 Pt. MIN LOT 159 Clq~ OF DUBUQUE, IOWA BOOTH STREET (DODGE TO FIFTE) FfNAL SCI~EDULE OF ASSESSMENTS VALUATION w/ GROSS DEFICIENCY NETPAViNG WATER SERVICE SIDEWALK SEWER TOTALNET OWNER LOT DESCRIPTION LEGAL IMPROVEMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT COLLINGS, WILLIAM N. COLLINGS, WILLIAM N. Pov~rERS, MICHAEL J. & KARLA A. TWINiNG, ROBERT T. & CONS'lANCE L. AYLERS, JACK L. & JO ANN L, HAEGER, ANNE MARIE F/K/A ANNE MAR~ RANDOLF WALLACE, JOSEPH E. & CHARLOTTE WALLACE, JOSEPH E. & CHARLOTTE LiVELY~ M/CIqAEL E. & SI1ARON K. LIVELY~ MICHAEL E. & SI~kRON K. HUSEMANN, LAV~T(EN CE L SZYMANSKI,GEORGE L. KUETER, CHEISTOPHER J, & GRETCHEN S. LENSTRA, TERRANCE P. & JIJLIE L. FUERST, STEVEN A. FUERST~ STEVEN A. TOPF, MARK & ELIZABETH M. KERSCH, MATTHEW J. & COLLEEN M. KERSCH, MATIHEW J. & COLLEEN M. OLDS, ROY D. & ANGELA M, CORRIGAN, GERALD T. & ANNA M. CORRIGAN, GERALD T. & ANNA M. DRURY, ROBERT N. & POLLY J. DRURY, ROBERT N. & POLLY L CAPEL, KR1STINE K. + COYLE, DANIAL J. FEDERAL NATIONAL MORTGAGE ASSOC. VAHE, WILLIAM H. & RUTH H. LUENSMAN, RICI~AB~D J. 8~ HAINES, CY N~rlIA CRAY, GREGORY & NANCY J. CRAY, GREGORY & NANCY J. NOEI~ JOHN L. & RITA M. BURKE, STEVEN W. & BRENDA G. BURKE, STEVEN W. & BRENDA G. (to be paid by airy) KREASSIH, MELViN J. CONNOLLY, JAMES B. SULLIVAN. TERRENCE JAMES & SHEILA BLAHA SULLIVAN, 33ERRENCE JAMES & SHEILA BLAHA UDELIiOFEN, JEFI~I~EY W. & DENISE A. ERSCHEN, ROBERT J. & JUANITA M. ERSCHEN, ROBERT J. & JUANITA M. N. 17.5'-1-2-8 10-26-278-022 $65,111.08 $1,961,08 $0.00 $1,961.08 $807.07 $0.00 $0.00 $2,768.15 1-8 10-26-278-022 S.M. LANGWORTHY ADD. 1 10-26-278-021 $79,833.90 $1,633.90 $0.00 $1,633.90 $0.00 $0.00 $0.00 $1,633.90 2 10-26-278-020 $74,359.89 $1,549.89 $0.00 $1,549.89 $0.00 $0.00 $0.00 $1,549.89 3 I0-26-278-019 $74,541.15 $1,551.15 $0.00 $1.551.15 $807.07 $0.00 $0.00 $2,358.22 4 10-26-278-018 $72,542.17 $1,552.17 $0.00 $1,552.17 $807.07 $0.00 $0.00 $2,359.24 S.50'-5 10-26-278-017 $58,795.22 $1,265.22 $0.00 $1,265.22 $807.07 $0.00 $0.00 $2,072.29 S.50'-N.112.9'-5 10-26-278-007 $55,061,16 $2,071,16 $0.00 $2,071.16 $859.69 $0.00 $0.00 $2,930.85 N.112.9'-6 10-26-278-006 $60,535.70 $785.70 $0,00 $785.70 $0.00 $0.00 $0.00 $785.70 7 10-26-278-005 $59,488.44 $618.44 $0.00 $618.44 $0,00 $0.00 $0.00 $618.44 1-8 10-26-278-004 $82,177.39 $157.39 $0.00 $157.39 $0.00 $0E0 $0.00 $157.39 T.S. NA1RN'S DUB. ADD. W,25.3'-N. 117.5'-23 10-26-279-001 $54,784.13 $1,424.13 $0.00 $1,424.13 $0.00 $0.00 $0.00 $1,424.13 E.24.T-N.117.5'-23 10-26-279-002 $67,669.13 $1,549.13 $0,00 $1,549.13 $0.00 $0.00 $0.00 $1,549113 25 10-26-279-001 $93,194.48 $434.48 $0.00 $434.48 $0.00 $0.00 $0.00 $434.48 8.46'-24 10-26-279-005 $75,764.00 $1,164,00 $0.00 $1,164.00 $616.04 $0.00 $0,00 $1,780,04 SA6'-23 10-26-279-005 N.40'-22 10-26-279-006 $74,494.16 $1,094,16 $0.00 $1,094.16 $0.00 $0.00 $0.00 $1,094.16 S1ff-22 10-26-279-007 $73,334.16 $1,094.16 $0.00 $1,094.16 $616.04 $0.00 $0.00 $1,710.20 N.3ff-21 10-26-279-007 S.20'-21 10-26-279-008 $85,954.16 $1,094.16 $0.00 $1,094.16 $616.04 $0.00 $0.00 $1,710.20 N,20'-20 10-26-279-008 S.30'-20 10-26-279-009 $65,004.16 $1,094.16 $0.00 $1,094.16 $598.63 $0.00 $0,00 $I,692.79 S.40'-19 10-26-279-010 $73,404.16 $1,094.16 $0.00 $1,094.16 $633.44 $0.00 $0.00 $1,727.60 IS I0-26-27%011 $64,847.95 $1,367.95 $0.00 $1,367,95 $616.04 $0.00 $0.00 $1,983.99 17 10-26-279-012 $6,877.95 $1,367.95 $0.00 $1,367.95 $0.00 $0.00 $0.00 $1,367.95 16 10-26-279-013 $62,837.95 $1,367.95 $0.00 $l,367.95 $0.00 $0.00 $0.00 $1,367.95 15 10-26-279-014 $72,607,95 $1,367.95 $0.00 $l,367.95 $0.00 $0.00 $0.00 $1,367,95 S.M. LANGWORTHY'S SUB. 12 10-26-283-001 $73,643.97 $2,053.97 $0.00 $2,053.97 $0.00 $0.00 $0.00 $2,053.97 10-26-283-001 $240.00 $240.00 $0.00 $0.00 $0.00 $240.00 11 10-26-283-002 $84,005.65 $885.65 $0.00 $885.65 $0.00 $0.00 $0~00 $885.65 N.36M0 10-26-283-003 $65,834.84 $984.84 $0.00 $984.84 $616.04 $0.00 $0.00 $1,600.88 S.18.5-10 10-26-283-004 $70,077.02 $1.997.02 $0,00 $l,997.02 $616.04 $0.00 $0.00 $2,613.06 9 10-26-283-004 1-1-2-N.-23.5'-T&8 10-26-283-005 $84,274.59 $1,504.59 $0.00 $1.504.59 $598.63 $0.00 $0.00 $21103.22 2-1-2-N,23.Y-T&8 10-26-283-006 $111,326.91 $1,946.91 $0.00 $1,946.91 $0.00 $0.00 $0.00 $1,946.91 2-2N.23.5'-T&8 10-26-283-006 03/28/2001 2 CITY OF DUBUQUE, IOWA BOOTH STREET (DODGE TO FIFTH) FINAL SCHEDULE OF ASSESSMENTS ERSCHEN, ROBERT J. & JUANITA M. DUBUQUE COUNTY GRANT, RODNEY J. & PEGGY ANN BROSE, MILDRED E. KELLER, JOSEPH A. & ROBEY, KAREN JO RIES, MiLO L. & MARY JO RIES, MiLO L. & MARY JO SCHUSTER, DANIEL,D SCHUSTER, DANIEL D OAKWOOD INVESTMENTS BLY, ALAN G. & CAROL L. BREITBACH, THOMAS C. & TAMMY L BURDS, MICHAEL W. & NACOS-BURDS, KATi-1LEEN J. BURDS, 1ViICI%'kEL W. & NACOS-BURDS, KATEILEEN L BURDS, MICHAEL W, & NACOS-BURDS, KATHLEEN J. KEARNEy, JAMES V, & PATRICIA A. KEARNEY, JAMES V. & PATRICIA A. KEARNEY, JAMES V. & PATRICIA A, BILLINGTON, MARY E. BILLINGTON, MARY E. BEuLINGTON, MARY E. BiLLINGTON, MARy E. TIFPE, LEO E, & ELAINE T, TIPPE, LEO E. & ELAINE T. TIPPE, LEO E. & ELAINE T. S.26'-6 10-26-288-001 $5,774.97 $724.97 $0.00 $724.97 $0.00 $0.00 $0.00 $724.97 5 10-26-288-002 $49,687.95 $1,367.95 $0.00 $1,367.95 $0.00 $0.00 $0.00 $1,367.95 4 10-26-288-003 $57,317.95 $1,367.95 $0.00 $1,367.95 $0.00 $0.00 $0.00 $1,367.95 3 I0-26-288-004 $66,107.95 $1,367.95 $0.00 $1,367.95 $0.00 $0.00 $0.00 $1,367.95 E.58'-2 10~26-288-006 $62,402.55 $482.55 $0.00 $482.55 $0.00 $0.00 $0.00 $482.55 E.58'-N.23'-I 10-26-288-006 W.64'-2 10-26-288-005 $71,284.72 $1,514.72 $0.00 $1,514.72 $0.00 $0.00 $0.00 $1,514.72 NEVADA PARK RESUE. 1-2-23,24, & 25 10-26-290-001 $67,023.37 $1,943.37 $0.00 $1,943.37 $0.00 $0.00 $0.00 $1,943.37 2-2-23, 24, & 25 10-26-290-002 $55,576.94 $846.94 $0.00 $846.94 $0.00 $0.00 $0.00 $846,94 1-23,24, & 25 10-26-290-003 $70,109.01 $479,01 $0.00 $479.01 $0.00 $0.00 $0.00 $479.01 22 10-26-42%001 $110,124.17 $2,654.17 $0.00 $2,658.17 $642.14 $0.00 $0.00 $3,296.31 S1/2-20 10-26-42%002 $80,549.51 $1,559,51 $0.00 $1,559.51 $0.00 $0.00 $0.00 $1,559.51 2-19 10-26-427-002 2-18 10-26-427-003 $99.964.84 $2,044.84 $0.00 $2,044.84 $0.00 $0.00 $0,00 $2,044.84 1-18 10-26-427-003 1-16 10-26427-004 $68,611.15 $2,091.15 $0.00 $2,091.15 $0.00 $0.00 $0.00 $2,091.15 2-16 10-26-427-004 15 10-26-427-004 $90,577.90 $1,430.29 $89,147.61 $19,900.84 $0.00 $0.00 $109,048.45 03/28/2001 3 CITY OF DUBUQUE, IOWA VAN BOREN STREET (PENNSYLVANIA TO UNIVERSITY) FINAL SCHEDULE OF ASSESSMENTS The lbllowing sc0edule is hereby determined to show each lot pt OFosed to be assessed for the improvement shown in the title together with the amount proposed to be assessed against each lot and the valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the City Council of the City of Dubuque. PARCEL VALUATION w/ NET PAVING SIDEWALK SEWER WATERMAIN DEFICIENCY GROSS WAFER SERVICE TOTAL NET OXJgNER LOT DESCRIPTION No IMPROVEMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT BROWN'S PLACE HOFFMAN, FREUND, & CAROL L5 1-2 10-27-127-001 LENOX ADD. MILLARD, LOREN C. & LOREAINI 287 10-27-129-014 MILLARD, LOREN C. & LORRAINt 288 10-27-129-014 ROLLING RIDGE SUB. ELK. 1 HULS, HOWARD J. & MARGIE C. RILEY, LOR1 A. & GRAHAM DON3 BOLL, DONNA MAE FAUST, CLARENCE C. JR. & SI-IAR HENKEL, RICHARD A & JUDITH ^ HAAS, GEORGE R. & SALLY R. 6 SCItEMMEL~ LEE ANN E. 7 POLSEAN, WAYNE D. & MARY A. 8 REAP. DON, DAVID J. & SHARON ~ 9 REMAKEL, ROBERT J. & JOAN E. 10 LENOX ADD. $62,160.74 $67,639.45 I 10-27-129-015 $74,023.46 2 10-27-129-016 $73,674.87 3 10-27-129-017 $75,034.87 4 10-27-129-018 $87,534.87 5 10-27-129-019 $74,424.87 10-27-129-020 $76,624.87 10-27-129-021 $79,334.87 10~27-129-022 $82,394.87 10-27-129-023 $72,621.70 10-27-129-024 $84,688.40 MANDERS, SANDRA K. & AMLIN( 302 10-27-204-011 $52,526.28 TROY, MICHELE M, 303 10~27-204-027 $91,074.42 TROY, MICHELE M. W1/2-304 10-27-204-027 GARCIA, JOSE J. & MARTA E1/2-304 10-27-204-014 $90,524.42 GARCIA, JOSE J. & MARTA 305 10~27-204-014 PEDERSEN, MICHAEL J. & CAMIE 306 10-27-204-015 $58,006.28 81EVERS, TYLER & MEGHAN E. 307 I 0-27-204-016 $96,566.28 WELSH, ROBERT R. & KERRY A, 5 308 10:27-204-017 $8,366.28 WELSH, ROBERT R. & KERRy A. 5 309 10-27-204-018 $81,066.28 DAVIS, WALTER W. & RITA MAE 310 10-27-204-019 $51,216.28 DAVIS, WALTER W. & RITA MAE 311 10-27-204-020 $8,366.28 RANSDELL, MARK 312 10-27-204-021 $37,906.28 KAISER, KEITIt J. 313 10-27-204-022 $51,726.28 CITY OF DUBUQUE 314 10-27-204-026 $27,509.75 CITY OF DUBUQUE 315 10-27-204-025 $9,195.72 DEMKIER,ROBERT J. 432 10-27-207-021 $1,992.63 DEMKIER,ROBERT J. 431 10-27-207-020 $85,642.90 DE~R,ROBERT J. 430 10-27-207-019 $7,551.82 STEPHENSON, GENEVIEVE 429 10-27-207-018 $58,810.90 8TEPHENSON, GENEVIEVE 428 10-27-207-018 GULYASE, JAMES & ANITA 427 10-27-207-017 $68,319.20 DEMOSS, CRAIG D. & JULIE L. 426 10-27-207-016 $65,110.34 FONDELL, ALLAN J. & JILL C. 425 10-27-207-015 $65.200.94 ARENDT-BALES, TERESA A. 424 10-27-207-014 $76,603.40 HUBER, JEROMIE J. CARRIE M. 423 10-27-207-013 $60~047.13 FLYNN, GERALD T. 433 10-27-207-040 $84,190.10 $4,310.74 $0.00 $0.00 $0.00 $0.00 $1,829.45 $0.00 $0.00 $0.00 $0.00 $1,783.46 $0.00 $0.00 $0.00 $0.00 $1,874.87 $0.00 $0.00 $0.00 $0.00 $1,874.87 $0.00 $0.00 $0.00 $0.00 $I,874.87 $0.00 $0.00 $0.00 $0.00 $1,874.87 $0.00 $0.00 $0.00 $0.00 $1,874.87 $0.00 $0.00 $0.00 $0.00 $1,874.87 $0.00 $0.00 $0.00 $0.00 $1,874.87 $0.00 $0.00 $0.00 $0.00 $1,611.70 $0.00 $0.00 $0.00 $0.00 $2,038.40 $0.00 $0.00 $0.00 $0.00 $1,476.28 $0.00 $0.00 $0.00 $0.00 $2,214.42 $0.00 $0.00 $0.00 $0.00 $2,214.42 $0.00 $0.00 $0.00 $0.00 $1,476.28 $0.00 $0.00 $0.00 $0.00 $1,476.28 $0.00 $0.00 $0.00 $0.00 $1,476.28 $0.00 $0.00 $0.00 $0.00 $1,476,28 $0.00 $0,00 $0.00 $0.00 $1,476,28 $0.00 $0.00 $0.00 $0.00 $1,476,28 $0.00 $0.00 $0.00 $0.00 $1,476,28 $0.00 $0.00 $0.00 $0.00 $1,476.28 $0.00 $0.00 $0.00 $0.00 $2,762.91 $1,576.84 $0.00 $0.00 $0.00 $625.72 $0.00 $0.00 $0.00 $0.00 $498.16 $0.00 $0.00 $0.00 $744.47 $1,602.90 $0.00 $0.00 $0.00 $0.00 $1,101.82 $0.00 $0.00 $0.00 $0.00 $1,110.90 $0.00 $0.00 $0.00 $0.00 $259.20 $0.00 $0.00 $0.00 $0.00 $I70.34 $0.00 $0.00 $0.00 $0.00 $120.94 $0.00 $0.00 $0.00 $0.00 $93.40 $0.00 $0.00 $0.00 $0.00 $47.13 $0.00 $0.00 $0.00 $0.00 $2,800.10 $0.00 $0.00 $0,00 $0,00 $4,310.74 $0.00 $1,829.45 $0,00 $1,783.46 $0.00 $1,874.87 $0.00 $1,874.87 $0.00 $1,874.87 $0.00 $1,874.87 $0.00 $1,874.87 $0.00 $1,874.87 $0.00 $1,874.87 $0.00 $1,611.70 $0.00 $2,038.40 $0.00 $1,476.28 $0.00 $2,214,42 $0.00 $2,214.42 $0.00 $1,476.28 $0,00 $1,476.28 $0.00 $1,476.28 $0.00 $1,476.28 $0.00 $1,476.28 $0.00 $1,476.28 $0.00 $1,476.28 $0.00 $1,476.28 $0.00 $4,339.75 $0.00 $625.72 $0.00 $1,242.63 $0.00 $1,602.90 $0.00 $1,110.90 $0.00 $259.20 $0.00 $170.34 $0.00 $120.94 $0.00 $93.40 $0.00 $47.13 $0.00 $2,800.10 $0.00 $4,310.74 $1,829.45 $1,783.46 $1,874.87 $1,874.87 $1,874.87 $1,874.87 $1,874.87 $1,874.871 $1,874.87 $1,611.70 $2,038.40 $1,476,28 $2,214.42 $2,214~42 $1,476.28 $1,476.28 $Ifi76.28 $1,476.28 $1,476.28 $1,476.28 $1,476.28 $1,476.28 $4,339.75 $625.72 $498.16 $1,602.90 $1,101.82 $1,110.90 $259.20 $170.34 $120.94 $93.40 $47.13 $2,800.10 03/26/2001 CITY OF DUBUQUE, IOWA VAN BUREN STREET (PENNSYLVANIA TO UNIVERSITY) FINAL SCHEDULE OF ASSESSMENTS The following schedule is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the amount proposed to be assessed against each lot and thc valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the City Council of the City of Dubuque. PARCEL VALUATION w/ NET PAVING SIDEWALK SEWER WATEKMAIN DEFICIENCY GROSS WATER SERVICE TOTAL NET FLYNN, GERALD T. 434 10-27-207-040 FLYNN, GERALD T. S1/2-435 10-27-207-040 DUSCHEN, DONALD M. & LINDA ~ N1/2-435 10-27-207-039 $61,728.32 DUSCI-IEN, DONALD M. & L1NDA. 436 10-27-207-039 WEISS, JOYCE A. 437 10-27-207-038 $67,645.95 STECKEL JEFFREY D. & 'riNAL. 438 10-2%207-037 $84,901.97 STECKEL JEFFREY D. & TINA L, 439 10-27-207-037 SCHULZ, JACK W. & CYNTHIA L. 440 10-27-207-036 $75,422.99 SCIIULZ, JACK W, & CYNTHIA L S1/2-441 10-27-207-035 $3,714.29 WAGNER, TEVlOTHY P. & KlM M. N1/2-441 10-27-207-034 $91,073.03 WAGNER~ TIMOTHY P. & KlM M, 442 10-27-207-034 MESCALL, RONALD T, 480 10-27-208-040 $94.241.78 BIRKETI', DAVID P. & WAN CItA 479 10-27-208-041 $120,980.78 BIRKETT, DAVID P. & WAN CHA 478 10-27-208-041 DAVIS, MARY ELIZABETH 477 10-27-208-019 $60,580.43 DAVIS, MARY ELIZABETH 476 10-27-208-019 HIRSCH,DALE A. & LINDA A. 475 10-27-208-018 $92,495.11 HIRSCH,DALE A. & LINDA A. S I/2-474 10-27-208-037 $3,669.68 GLAB, DAVID J. 481 10-27-208-039 $27,437.62 GLAB, DAVID J. 482 I0-27-208-039 GLAB, DAVID J. 483 10-27-208-039 GLAB, DAVID J. 484 10-27-208-039 LESSEI, STEVEN A. & AMY L. 485 10-27-208-038 $74,664.03 ItOWELL, RANDY LANE & CONNI 486 I0-27-208-037 $73.664.76 KAESBAUER, SANDRA 487 10-27-208-036 $46,063.31 HUFF, VICTORY F. & MARY R. 577 10-27-228-040 $73,657.36 HUFF, ViCTORY F. & MARY R. 1-576 10-27-228-039 $6,019.48 SCHREIBER, MERLIN 2-576 10-27-228-038 $60~261.75 SCNREIBER, MERLIN 575 10-27-228-038 SCHREIBER, MERLIN 1-574 10-27-228-038 DUEHR, FRANK J. & CAROL A. 2-574 10-27-228-037 $100,214.98 DUEHR, FRANK J, & CAROL A. 573 10-27-228-037 STRUMBERGER, DONALD J. & CA 572 10-27-228-036 $77,431.35 GRACANIN~ MUiIAMED & ASIMA 553 10-27-228-018 $56,838.07 DELANEY. RICHARD J. 578 10-27-229-004 $48,413.40 CONNOLLY, TODD R. & GINA M. 579 10-27-229-005 $79,401.52 CONNOLLY, TODD R. & GINA M. 580 10-27-229-006 $5,609.98 SCNULTZ, ROBERT H. SR. & PHYI 581 10-27-229-007 $67,487.31 DELANEY~ RICHARD J. 1-2-582 10-27-229-004 $46,757.70 CONNOLLY, TODD R & GINA M 2-2-582 10-27-229-005 $43.44 SCHULTZ, ROBERT H. SR. & PHYI 585 10-27-229-007 ROBINSON, MAXINE A. e/o MAXI~ 586 10-2%229-008 $46,104.56 RING RANDALL & SANDRA 587 10-27-229-009 $55,007.90 $1,068.32 $0.00 $0.00 $0.00 $365.95 $0.00 $0.00 $0.00 $361.97 $0.00 $0.00 $0.00 $112.99 $0.00 $0.00 $0.00 $44.29 $0.00 $0.00 $0.00 $63.03 $0.00 $0.00 $0.00 $1,241.78 $0.00 $0.00 $0.00 $I,800.78 $0.00 $0.00 $0.00 $380.43 $0.00 $0.00 $0,00 $95.11 $0.00 $0.00 $0.00 $49.68 $0.00 $0.00 $0.00 $3.367.62 $0.00 $0.00 $0.00 $174.03 $0.00 $0.00 $0.00 $104.76 $0.00 $0.00 $0.00 $63.31 $0.00 $0.00 $0.00 $547.36 $0.00 $0.00 $0.00 $349.48 $0.00 $0.00 $0.00 $441.75 $0.00 $0.00 $0.00 $204.98 $0.00 $0.00 $0.00 $101.35 $0.00 $0.00 $0.00 $78.07 $0.00 $0.00 $0.00 $1,703.40 $0.00 $0.00 $0.00 $1,371.52 $0.00 $0.00 $0.00 $1,209.98 $0.00 $0.00 $0.00 $2,387.31 $0.00 $0.00 $0.00 $47.70 $0.00 $0.00 $0.00 $10.86 $0.00 $0.00 $0.00 $1,164.56 $0.00 $0.00 $0.00 $I,177.90 $0.00 $0.00 $0.00 $0.00 $1,068.32 $0.00 $365.95 $0.00 $361.97 $0.00 $112.99 $0.00 $44.29 $0.00 $63.03 $0.00 $1,241.78 $0.00 $1,800.78 $0.00 $380.43 $0.00 $95.1l $0.00 $49.68 $0.00 $3,367.62 $0.00 $]74.03 $0.00 $104.76 $0.00 $63.31 $0.00 $547.36 $0.00 $349.48 $0.00 $441.75 $0.00 $204.98 $0.00 $101.35 $0.00 $78.07 $0.00 $1,703.40 $0.00 $1,371.52 $0.00 $1,209.98 $0.00 $2,387.31 $0.00 $4T70 $32.58 $43.44 $0.00 $1,164.56 $0.00 $1,177.90 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $3,367.62 $0.00 $174.03 $0.00 $104.76 $0.00 $63.31 $0.00 $547.36 $0.00 $349.48 $0.00 $441.75 $0.00 $204.98 $0.00 $101.35 $0.00 $78.07 $0.00 $1,703.40 $0.00 $1,371.52 $0.00 $1,209.98 $0.00 $2,387.31 $0.00 $47.70 $0.00 $10.86 $0.00 $1,177.90 $1,068.32 $365.95 $361.97 $112.99 $44.29 $63.03 $1,241.78 $1,800.78 $380.43 $95.11 $49.68 CITY OF DUBUQUE, IOWA VAN BUREN STREET (PENNSYLVANIA TO UNIVERSITY) FINAL SCHEDULE OF ASSESSMENTS The followlng schedule is hereby de,ermined to show each lot proposed to be assessed for tile improvement shown in lhe title together with the amount proposed to he assessed against each lot mid tho valuations shown opposite each lot are hereby fixed as the true valualions of such lots by the City Council of thc City of Dubuque. PARCEL VALUATION w/ NET PAVING SIDEWALK SF~WER WATERMAIN DEFICIENCY GROSS WATER SERVICE TOTAL NET BLASEN, JOSEPH M. JR. & KATHL 588 10-27-229-012 $70,397.28 $1,677.28 $0.00 $0.00 $0.00 $0.00 $1,677.28 $0.00 $1,67T28 BLASEN, JOSEPH M. JR. & KATHIDT 1 LENOX ADD I 10-27-229-012 LAIJ, DAVID A. & SUSAN K. DT 2 LENOX ADD I 10-27-229-015 O'MEARA, DONALD & KATHERIN 598 10-27-232-011 BRITBACH, JERRY A. 597 10-27-232-012 PIKE, TERRY & Leu ANN WI/2-596 10-27-232-027 PIKE, TERRY & Leu ANN E1/2-596 10-27-232-027 PIKE, TERRY & Leu ANN 595 10-27-232-027 1J. AGERTY, JOHN T. a/k/a HAGERT 594 10-27-232-015 AUSTIN'S SBB. pARKINS, MILDRED M, 1-14 I 0-27-232-017 PARKINS, MILDRED M. 1-Wl/2-13 I0-27-232-017 KUBITZ, DONALD J. & MARY JAN 2-14 10-27-232-016 KUB1TZ, DONALD J. & MARY JAN 2~W1/2-13 10-2%232-016 SCHWlND, MARY KAy E1/2-13 10-27-232-018 SCI-FC/IND, MARY KAy W.37.5'-12 10-27-232-018 KENKEL, NAOMI M. & ALBERT J. E.12.5'-12 10-27-232-019 KENKEL, NAOMI M. & ALBERT J. 11 10-2%232-019 PUCKETT, STEVEN R. & GOLrRLE' 1-10 10-27-232-020 DUlqWOODY, KEVIN J. & RAMON 2-10 10-27-232-022 OINTER, NANCY E. 9 10-27-232-021 DUNWOODY, KEViN 3. & RAMON 8 10-27-232-022 DURKIN, ROBERT L. & DIANE 7 ! 0-27-232-023 CRUISE, JENNIFER L. 6 10-27-232-024 PREISINGER, JOSEPH E. & DORIS 5 10-27-232-025 ROTH, DORIS M. 4 10-27-232-026 LENOX ADD. RANSDELL, MARY S. a/k/a MARY i 2 RANSDELL, MARY S. a/k/a MARY 2 3 DUBUQUE MEDICAL TRANSPOR~I 4 DUBUQUE MEDICAL TRANSPOR'I 5 KALB, CHERYL J. & ~ If. 1-6 BRLIXVOORT, STEVEN C. & HENI: 2-6 LAMPE, SItAWN L & TINA M. 52 LAMPE, SHAX3~q J. & TINA M. 1-51 LAMPE, SHAWN J. & TINA M. 2-7 PAPIN, PAUL JOHN 1-7 PAl?IN, PAUL JOHN 2-51 PAPIN, PAUL JOHN 50 PAPIN, PAUL JOHN 49 PAPIN, PAUL JOHN 48 PAPIN, PAUL JOHN 47 PAPIN, PALrL JOHN 46 10-27-279-023 10-27-279-023 10-27-279-022 10-27-279-021 10-27-279-020 10-27-279-009 ~0-27-279-009 10-27-279-009 10~27-279-009 10-27-279-019 10.27-279-008 10-27-279-007 10,27-279-007 10-27-279-007 10-27-279-007 10-27-279-007 $47,000.66 $39,982.87 $47.226.23 $67,809.72 $49,948.58 $47,660.30 $61,163.81 $57,847.52 $50}272.42 $55,726.14 $54,507.41 $50,620.62 $52,959.50 $62,046.9I $68,326.39 $76,684.56 $182,215.36 $10,178.46 $63.472.11 $51,482.40 $13,007.98 $1,466,37 $61,340.00 $790.66 $0.00 $0,00 $1,100.00 $0.00 $386.96 $0.00 $0.00 $0.00 $0.00 $802.87 $0.00 $0.00 $550,00 $0.00 $2;556.23 $0.00 $0.00 $0.00 $0.00 $1,367.26 $0.00 $0.00 $592.46 $0.00 $1,694.88 $0.00 $0.00 $843.70 $0.00 $490.30 $0.00 $0.00 $0.00 $0.00 $2,108.81 $0.00 $0.00 $825.00 $0.00 $2,163.32 $0.00 $0.00 $684.20 $0.00 $1,632.42 $0.00 $0.00 $550.00 $0.00 $246.14 $0.00 $0.00 $0.00 $0.00 $47.41 $0.00 $0.00 $0.00 $0.00 $350.62 $0.00 $0.00 $0.00 $0.00 $1,419.50 $0.00 $0.00 $550.00 $0.00 $1,466.91 $0.00 $0.00 $660.00 $0.00 $386.39 $0.00 $0.00 $0.00 $0.00 $2,204.56 $0,00 $0.00 $0.00 $0.00 $1,316.62 $128.73 SRO0 $0.00 $0.00 $968.46 $0.00 $0.00 $0.00 $0.00 $372.11 $0.00 $0.00 $0.00 $0.00 $2,650.20 $1,612.20 $0.00 $0.00 $0.00 $137.98 $0.00 $0.00 $0.00 $0.00 $133.72 $62.65 $0.00 $0.00 SR00 $3,771.04 $448.96 $0.00 $0.00 $0.00 $1,890.66 $476.81 $386.96 $0.00 $1,352.87 $0.00 $2,556.23 $0.00 $1,959.72 $0.00 $2,538.58 $898.15 $490.30 $898.15 $2,933.81 $824.88 $2,847.52 $898.15 $2,I82.42 $755.27 $246.14 $0.00 $47.41 $0.00 $350.62 $0.00 $1,969.50 $842.29 $2,126.91 $755.27 $386.39 $594.55 $2,204.56 $0.00 $1,445.36 $0.00 $968.46 $0.00 $372,11 $0.00 $4,262.40 $0.00 $137.98 $0.00 $196.37 $0.00 $4,220.00 $0.00 $2,367.47 $386.96 $1,352.87 $2,556.23 $1,959.72 $3,436.73 $1,388.45 $3,758.69 $3,745.67 $2,937.69 $246.14 $47.41 $350.62 $2,811.79 $2,882.18 $980.94 $2,204.56 $1,445.36 $968.46 $372.11 $4,262.40 $137.98 $196.37 $4,220.00 03/2612001 CITY OF DUBUQUE, IOWA VAN BUREN STREET (PENNSYLVANIA TO UNIVERSITY) FINAL SCHEDULE OF ASSESSMENTS The fbllowing schedule is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the mnount proposed to be assessed against each lot and the valuations shown opposile each lot are hereby fixed as tho true valuations of such lots by the City Council of the City of Dubuque. PARCEL VALUATION w/ NET PAVING SIDEWALK SEWER WATERMAIN DEFICIENCY GROSS WATER SERVICE TOTAL NET ANDERSON, CAROL F. 53 10-27-230-009 $9,882.92 ANDERSON, CAROL F, 54 10-27-230-008 $50,786.81 VANDERBILT, ESTHER A. 55 10-27-230-007 $64,029.29 RETTENBERGER PLACE 10-27-230-010 $11,953.20 10-27-230-010 $13,887.69 RETTENBERGER, KARL A. SR. & 1 2 RETTENBERGER, KARL A. SR. & 1 2 LENOX ADD. VONDRAN. WILLIAM A. & INEZ R 88 10-27-230-002 $6,609.38 VONDRAN, WILLIAM A. & INEZ R 87 10-27-230-001 $66,108.93 LENOX PLACE BALSAMO, ANTHONY J. & MARY 2 10-27-252-023 $118,936.20 BALSAMO, SUSAN MARY 1 10-27-252-022 $142,377.03 LENOX ADD ROTH, DAVID H. & BAMBI L. 96 10-27-252-002 $6,672.37 ROTH, DAVID H. & BAMBI L. 97 10-27-252-001 $73,248,52 BALSAMO, S1JSAN MARY 98 10-27-252-024 $771.73 KOTH, DAVID H. & BAMB1 L. 102 10-27-252-008 $2,116.03 ROTH, DAVID H, & BAMBI k 103 10-27-252-009 $1,819.93 ERSCHEN MICI-IAEL E. & DENISE 104 I0-27-252-010 $522.17 ERSCHEN MICItAEL E. & DENISE 105 10-27-252-011 $2,308.73 SCHMITT, KENNETIt W. & CATH5 113 10-27-251-014 $3,194.25 8 CI-IMITT, KENNETH W. & CATH'~ 114 10-27-251-013 $3,230.88 KONRARDy, DAVID J. 115 10-27-251-012 $2,785.04 KO~Y, DAVID J, 116 10-27-251-011 $74,433,74 MAAS, RODNEY J. 117 10-27-251-010 $87,534.98 MAAS, RODNEY J. 118 10-27-251-010 BASTEN, MOCHAEL W. & SALLY. 1-119 10-27-251-009 $81,959,66 KJOS, JACQUELINE J. 2-119 10-27-251-001 $63,925.38 KJOS, JACQUELINE J, 120 10-27-251-001 KJOS, JACQUELINE J. 121 10-27-251-001 KJOS, JACQUE~.INE J. 122 10-27-251-001 KAISER, JEFFREY G. & BETlt A. 123 10-27-251-002 $87,222.19 KAISER, JEFFREY G, & BETH A. 124 10-27-251-003 $5,640.97 SMITH, RONNIE M, & COLLEEN A 125 10-27-251-004 $ 51,719.20 SMITH, RONNIE M, & COLLEEN A 126 10-27-251-004 MONTGOMERY, EVELYN L. 127 10-27-251-005 $3.103.88 KLEIN, COREY P. 8: CONNIE R. 139 10-27-205-027 $76,792,19 HONAKER, RICHARD DR. c/o BP.I- 140 10-27-205-013 $79,263.13 ERICKSON, JOI4N & RUTH 141 10-27-205-012 $79,611.39 8CNROEDER, DONALD R. & BETI 2-142 10-27-205-025 $82,513.85 ERICKSON, JoI~q & RUTH 10142 10-27-205 -011 $ 7,609.12 LAMBERT, CATItERINE E. 143 10-27-205-010 $81,790.70 LAMBERT, CATHERINE E. 144 10~27-205-010 $1,062.92 $0.00 $0.00 $0.00 $0.00 $946.81 $0.00 $0.00 $0.00 $0.00 $1,229.29 $0.00 $0.00 $0.00 $0.00 $1,497.97 $0.00 $0.00 $0.00 $1,085.23 $0.00 $0.00 $1,833.90 $785.87 $1,897.93 $1,259.38 $0.00 $0.00 $0.00 $0.00 $1,508.93 $0.00 $0.00 $0.00 $0.00 $3,366.20 $0.00 $0.00 $0.00 $0.00 $3,147.03 $0.00 $0.00 $0.00 $0,00 $1,462.37 $0.00 $0.00 $0.00 $0.00 $1,348.52 $0.00 $0.00 $0.00 $0.00 $41.73 $0.00 $0.00 $0.00 $0.00 $529.01 $0.00 $0.00 $0.00 $47.02 $279.93 $0.00 $0,00 $0.00 $0.00 $130.54 $0.00 $0.00 $0.00 $21.63 $108.73 $0,00 $0.00 $0.00 $0.00 $94.25 $0.00 $0.00 $0,00 $0,00 $130.88 $0.00 $0,00 $0.00 $0.00 $195.04 $0.00 $0.00 $0.00 $0.00 $353,74 $0.00 $0.00 $0.00 $0.00 $1,724.98 $0.00 $0.00 $0.00 $0.00 $2,109.66 $0.00 $0.00 $0.00 $0.00 $4,165.38 $0.00 $0.00 $0.00 $0.00 $462.19 $0.00 $0,00 $0.00 $0.00 $250.97 $0.00 $0.00 $0.00 $0.00 $259,20 $0.00 $0.00 $0.00 $0.00 $63.88 $0.00 $0.00 $0.00 $0.00 $552.19 $0.00 $0.00 $0.00 $0.00 $1,433.13 $0.00 $0.00 $0.00 $0,00 $1,481.39 $0.00 $0.00 $0.00 $0.00 $23.85 $0.00 $0.00 $0.00 $0.00 $1,479.12 $0.00 $0.00 $0.00 $0.00 $3,690.70 $0.00 $0.00 $0.00 $0.00 $1,062,92 $0.00 $946.81 $0.00 $I,229.29 $0.00 $2,583.20 $990.22 $4,517.69 $0.00 $1,259.38 $0.00 $1,508.93 $0.00 $3,366.20 $0.00 $3,14T03 $0.00 $1,462.37 $0,00 $1,348.52 $0.00 $41.73 $0.00 $576,03 $0.00 $279.93 $0.00 $152.17 $0.00 $108.73 $0.00 $94.25 $0.00 $130.88 $0.00 $195.04 $0.00 $353.74 $0.00 $1,724.98 $0,00 $2,109.66 $0.00 $4,165.38 $0,00 $462.19 $0.00 $250.97 $0,00 $259.20 $0.00 $63.88 $0.00 $552.19 $0.00 $1,433.13 $0.00 $23.85 $0.00 $1,479.12 $0.00 $3,690.70 $0.00 $1,062.92 $946.81 $1,229.29 $2,488,19 $2,619.76 $1,259.38 $1,508.93 $3,366.20 $3,147.03 $1,462.37 $1,348.52 $41.73 $529.01 $279.93 $130.54 $108.73 $94.25 $130.88 $195,04 $353,74 $1,724.98 $2,109.66 $4,165.38 $462.19 $250.97 $259.20 $63.88 $552.19 $1,481.39 $23.85 $1.479.12 $3,690.70 CITY OF DUBUQUE, IOWA VAN BUREN STREET (PENNSYLVANIA TO UNIVERSITY) FINAL SCHEDULE OF ASSESSMENTS The following schedule is hereby detennined to show each lot proposed to be assessed for the improvement shown in file title together witfi the m'nount proposed to be assessed against each lot and the valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the Cily Council oft. he City of Dubuque. PAKCEL VALUATION w! NET PAVING SIDEWALK SF~WER WATERMAIN DEFICIENCY GROSS WATER SERVICE TOTAL NET OIVNER LOT DESCPdP T1ON NO. IMPROVEMENT ASSES SiV~NT ASSESSMENT ASSESSMENT ASSESSMF_NT ASSESSMENT ASSESSMENT ASSESSMENT ASSESSMENT LAMBERT, CATHERINE E. MEJIA, FERNANDO & LORI ME JlA, FERNANDO & LORI SCHUSTER, MERLIN N, & NORMA SCHUSTER, MERLIN N. & NORMA WE1DERT, RICHARD JAMES & SA WEIDERT, RICHARD JAMES & SAJ YOST, FREDERIC V. JUDKA1N J. YOST, FREDERIC ¥. JUDILAIN J. DRISCOLL, FLOYD J. & JANET M. DRISCOLL, FLOYD J. & JANET M. BLASER, RICHARD J. E.25'- 145 10-27-205-010 W.25'-145 10-27-205-009 $4,978.14 E,40'-146 10-27-205-008 $66,841.02 W, 10'-146 10-2%205-007 $77,453.91 1-147 10-27-205-007 2-147 10-2%205-006 $85,483.91 148 10-27-205-006 149 10-27-205-005 $75,756.28 150 10-27-205-004 $8,366.28 151 10-2%205-003 $92,546.28 152 10-27-205-002 $10,316.28 153 10-27-205-001 $86,846.28 VAN ANNAPLACE BLUML, DONALD E. & CAROL J. SCHMELZER, KEITH S. & DOROTI SCHREIBER, ROBERT D. & DIANA HEDLEY, JEREMY L 13 LANGE, TERRENCE T. & JOANET~ 12 TURNMEYER, EUNICE E. & RICH~ 11 RANG, FRANCIS W, & JANET L. 10 LENOX ADD. 16 10-27-190-012 $116.523.98 15 10-27-130-011 $102,163.45 14 10-27-130-0 l0 $112,803.45 10-27-130-009 $99,143.45 10-27-130-008 $98,723,45 10-27-130-007 $95,613.45 10-27-130-006 $93,033.45 HENKEL, LORA A. 164 10-2%130-005 BENLEL, LORA A. 165 10-27-130-004 WHITE, RONALD R. 166 10-27-130-003 McCREADY, LARRY A. & EVELYb 2-167 10-27-130-002 KUTSCH, CHARLES J, & CINDY S. 1-167 10-27-130-001 FREISINGER, PAUL H. & DARLENI 177 10-27-130-014 FREISINGER, PAUL H. & DARLENI 178 10-27-131h015 BROWN'S PLACE McCREADY, LARRY A. & EVELYb 2-1-2-2 10-27-130-002 KUTSCH, CHARLES & CINDY S. 1-1-2-2 10-26-426-001 PATZNER, VERNU8 L, & FERN A. 2-2-2 10-26-426-013 MICHELS, CARL J. & LUDWlTZ, Ki 145 10-26-233-008 $8,756.28 $46,546.28 $83.298.33 $101,025,63 $103,786,69 $8,607.22 $45,550.21 $127,672,69 $67,900.00 $738.14 $0.00 $0.00 $0.00 $0.00 $1,181.02 $0,00 $0.00 $0.00 $0.00 $1,623.91 $0.00 $0.00 $0.00 $0.00 $l,623.91 $0.00 $0.00 $0,00 $0.00 $1,476.28 $0.00 $0.00 $0.00 $0.00 $1,476.28 $0,00 $0.00 $0.00 $0.00 $1,476.28 $0.00 $0.00 $0.00 $0.00 $1,476,28 $0.00 $0.00 $0.00 $0.00 $1,476.28 $0.00 $0.00 $0.00 $0.00 $2,953.98 $0.00 $0,00 $0.00 $0.00 $1,963.45 $0.00 $0.00 $0.00 $0.00 $1,963.45 $0,00 $0.00 $0.00 $0,00 $1,963.45 $0.00 $0.00 $0.00 $0.00 $1,963.45 $0.00 $0~00 $0.00 $0,00 $1,963.45 $0,00 $0.00 $0.00 $0.00 $1,963.45 $0.00 $0.00 $0.00 $0.00 $1,476,28 $0.00 $0.00 $0.00 $0.00 $1,476.28 $0.00 $0.00 $0.b0 $0.00 $1,468.33 $0.00 $0.00 $0.00 $0.00 $2,605.63 $0.00 $0.00 $0.00 $0.00 $2,126.69 $0.00 $0.00 $0.00 $0.00 $837.22 $0.00 $0.00 $0,00 $0.00 $370.21 $0.00 $0.00 $0.00 $0.00 $2,752.69 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $738.14 $0.00 $1,181.02 $0.00 $1,623.91 $0.00 $1~76.28 $0.00 $I,476,28 $0,00 $1,476.28 $0.00 $1,476,28 $0.00 $1,476.28 $0.00 $2,953.98 $0.00 $1,963.45 $0.00 $1,963.45 $0.00 $1,963.45 $0.00 $1,963.45 $0.00 $1,963.45 $0.00 $1,963.45 $0,00 $1~76.28 $0,00 $1,476,28 $0.00 $1,468.33 $0,00 $2,605.63 $0.00 $2.126,69 $0.00 $837.22 $0.00 $370.21 $0.00 $2,752.69 $0.00 $0.00 $594.55 $738,14 $1,623.91 $1,623.91 $1,476.28 $1,476.28i $1,476.28 $1,476.28 $1,476.28 $2,953.98 $1,963.45 $1,963.45 $I,963.45 $1,963.45 $1,963.45 $1,963.45 $1,476.28 $1,476.28 $1,468.33 $2,605.63 $2,126.69 $837.22 $370.21 $2,752.69 $594.55 $181,625.90 $3,829.38 $1,833.90 $7,141.23 $3,828.86 $198,259.26 $8,528.29 $202,958.69 03/26/2001 NOTICE OF FILING OF THE FINAL SCHEDULE OF ASSESSMENTS AGAINST BENEFITED PROPERTIES FOR THE CONSTRUCTION OF THE 1999 P.C. CONCRETE PAVING PROJECT - NO. 1 (BRYANT STREET, BOOTH STREET, AND VAN BUREN STREET) WITHIN THE CITY OF DUBUQUE, IOWA TO THE PERSONS OWNING LAND LOCATED WITHIN THE DISTRICT DESCRIBED AS THE 1999 P.C. CONCRETE PAVING PROJECT - NO. I (BRYANT STREET, BOOTH STREET, AND VAN BUREN STREET), WITHIN THE CITY OF DUBUQUE, IOWA: The improvement type(s) and the location(s) is (are) as follows: Bryant Street, Booth Street, and Van Buren Street and 2665 Beverly, owned by Karl A. Rettenberger, Sr. and Freda A. Rettenberger Consisting of the properties which are described as follows: All property included with the areas described so as to include one-half of the privately-owned property between each such street to be improved and the next street, whether such privately-owned property abuts upon the street to be improved or not. In no case shall property situated more than 300 feet from the street to be improved be assessed, including sewer and water assessments for 2665 Beverly, You are hereby notified that the final schedule of assessments against benefited properties within the District described as the 1999 P.C. Concrete Paving Project- No. 1 (Bryant Street, Booth Street, and Van Buren Street), has been adopted and assessments confirmed and levied by the City Council of Dubuque, iowa, and that said schedule of assessments has been certified to the County Treasurer of Dubuque County, iowa. YOU ARE FURTHER NOTIFIED THAT ASSESSMENTS MAY BE PAID IN FULL OR IN PART WITHOUT INTEREST AT THE OFFICE OF THE COUNTY TREASURER, DUBUQUE COUNTY COURTHOUSE, 720 CENTRAL AVENUE, DUBUQUE, IOWA, 52001 UNTIL After unpaid special assessments of $50.00 or more are payable in 10 annual installments and will draw annual interest at nine (9) percent computed to the December 1 next following the due dates of the respective installments as provided in Section 384.65 of the Code of Iowa. Each installment will be delinquent from October 1 following its due date on July 1st of each year. Property owners may elect to pay any annual installment semiannually in advance. All properties located within the boundaries of the 1999 P.C. Concrete Paving Project- No. 1 (Bryant Street, Booth Street, and Van Buren Street) above described have been assessed for the cost of the making of said improvements, the amount of each assessment and the amount of any conditional deficiency assessment having been set out in the schedule of assessments accompanying the same, which are now on file in the office of the County Treasurer of Dubuque County, Iowa. For further information you are referred to said schedule of assessments. This Notice given by direction of the City Council of the City of Dubuque, Iowa, as provided in Section 384.60 of the Code of Iowa. Jeanne F. Schneider City Clerk CiTY OF DUBUQUE, IOWA MEMORANDUM Febrtmry 15, 2001 3 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager 1999 P.C. Concrete Paving Project - No. 1 Public Works Director Mike Koch is reconm~ending acceptance of the construction contract for the 1999 P.C. Concrete Paving Project-No. 1 as completed by Horsfield Construction in the amount of $2,160,641.20. The final amount of the special assessments have been reduced by. $43,320.33 (I 1.7%) below the preliminary estimates. He further recommends that a public hearing be set for April 2, 2001 on a new watermain and sanitary sewer assessment added to the project at the request of a property owner. I concur with the recommendation and respectfully request Mayor and City Council approval. Michael C. Van Milligen MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Tim Moerman, Assistant City Manager Michael A. Koch, Public Works Director CITY OF DUBUQUE, IOWA MEMORANDUM TO: FROM: SUBJECT: February 12, 2000 Michael C. Van Mitligen, City Manager Michael A. Koch, Public Works Director 1999 P.C. Concrete Paving Project - No. 1 (Bryant Street, Booth Street, and Van Buren Street) INTRODUCTION The enclosed resolutions provide for th~ acceptance of the construction contract of the 1999 P.C. Concrete Paving Project - No. 1, give preliminary approval to a Resolution of Necessity, establish the final schedule of assessments, and establish the date for a public hearing on the Resolution of Necessity. DISCUSSION Horsfield Construction, Inc. has completed work on the reconstruction of Bryant Street, Booth Street, and Van Buren Street in the amount of (;2,160,641.20. Based upon final construction costs, the final amount of the special assessments for the paving improvement have been reduced by $43,320.33, which is 11.7 percent (11.7%) below the preliminary estimates that were mailed to property owners for the public hearing. A portion of the assessments related to the cost of paving may qualify for the City's Iow- and moderate-income special assessment assistance program. Local Option Sales Tax Funds will provide 20% to 100% of the street assessments for eligible owner-occupied property. A summary of the income qualifications of the financial assistance program is attached. To allow sufficient administrative time to process financial assistance payments for low- and moderate-income families, the adoption of a final schedule of assessments will be delayed for approximately 45 days. In its place is a resolution adopting a preliminary schedule of final assessments. Property owners may use this period to apply for and receive final assistance that may reduce the amount of the assessment payable by the property owner. A new watermain and sanitary sewer assessment has been added at the request of a property owner of a vacant lot to have the public water and sewer extended and the laterals stubbed into the lot. The special assessment to the County is for a vacant lot which the County received in back taxes. RECOMMENDATION I wobld recommend that the City Council accept the improvements and that the final contract be established at $2,160,641.20. BUDGET IMPACT A summary of the project is as follows: Bid Final Construction Contract Contingency Engineering Traffic Signal Equipment $1,961,829.38 203,142.88 335,185.75 $2,160,641.20 .00 226,867.33 6,543.00 Total Project Cost 82,506,701.01 $2,394,051.53 The project will be funded as follows: Street Construction Fund Local Option Sales Tax Fund Special Assessments to Private Properties for Street Improvements Special Assessment Deficiency to be Paid by City Special Assessment to City-Owned Property Special Assessment to County Property (Paid by City) Special Assessment for Sidewalk Special Assessment to City-Owned Property for Sidewalk Watermain Assessment Special Assessment for Water Service Lines Sanitary Sewer Assessment Sanitary Sewer Construction Fund Water Depreciation Fund $ 759,432.67 1,060,892,90 346,589.87 2,799.89 4,241.21 0 12,754,96 1,816,05 0 65,992.92 0 102,493.28 149,687.26 724,459.40 975,259.82 313,371.52 5,259.16 7,388.91 724.97 2;252.54 1,576.84 7,141.23 42,013.74 1,833.90 125,138.24 180,848.26 Total Project Cost $2,506,701.01 $2,394,051.53 The Paving Project will be funded through the Fiscal Year 2000 appropriation of $3,029,700 of the Street Construction Fund. The project, as outlined, will require $1,715,7t 2.94 of the Street Construction Fund. ACTION TO BE TAKEN The City Council is requested to adopt the final resolutions accepting the improvement, establishing the final contract amount, giving preliminary approval to the Resolution of Necessity, approving the preliminary final schedule of assessment, and establishing the date of the public hearing through adoption of the enclosed resolutions. MAK/vjd Prepared by Michael Felderman, Civil Engineer Prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13th Street, Dubuque. IA 52001-4864 RESOLUTION NO. -01 ACCEPTING IMPROVEMENT Whereas, the contract for the 1999 P.C. Concrete Paving Project - No. 1 (Bryant Street, Booth Street, and Van Buren Street) has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according to the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OFTHE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the Street Construction Fund in amount equal to the amount of this contract, less any retained percentage provided for therein. Passed, approved and adopted this day of ,2001. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13th Street, Dubuque. IA 52001-4864 RESOLUTION NO. -01 FINAL ESTIMATE Whereas, the contract for the 1999 P.C. Concrete Paving Project- No. 1 (Bryant Street, Booth Street, and Van Buren Street) has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW THEREFORE, BE tT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $2,160,641.20. Section 2. That $376,303.64 of the cost thereof shall be assessable upon private property and $1,715,712.94 shall be paid from the Street Construction Fund. Passed, approved and adopted this day of ,2001. Attest: Terrance M. Duggan, Mayor Jeanne F. Schneider, City Clerk Prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO. -01 RESOLUTION APPROVING PRELIMINARY FINAL SCHEDULE OF ASSESSMENTS NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached sheets, to inclusive, are hereby determined to be the schedule of proposed assessments for the 1999 P.C. Concrete Paving Project- No. 1 (Bryant Street, Booth Street, and Van Buren Street) and the valuations set out herein are hereby approved. Passed, approved and adopted this day of _ , 2001. Attest: Terrance M. Duggan, Mayor Jeanne F. Schneider, City Clerk Prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO. -01 FIXING DATE OF HEARING ON RESOLUTION OF NECESSITY Whereas, the City Council of the City of Dubuque, Iowa, has given its preliminary approval on the proposed plans, specifications and form of contract and placed same on file in the office of the City Clerk for public inspection, for the 1999 P.C. Concrete Paving Project - No. 1 (Bryant Street, Booth Street, and Van Buren Street); and, Whereas, the proposed Resolution of Necessity for said improvement has been introduced and is now on file in the City Clerk's office for public inspection. NOW THEREFORE, BE IT RESOL~/ED BY THE CiTY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That on the 2nd day of April, 2001, a public hearing will be held at 6:30 o'clock p.m. in the Public Library Auditorium in the City of Dubuque at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a resolution of necessity and the City Clerk be and is hereby authorized and directed to cause a notice of time and place of such headng to be published in a newspaper having general circulation in the City of dubuque, Iowa, which notice shall be published once each week for two consecutive weeks, the first publication of which shall be not less than ten days prior to the day fixed for its consideration. Unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the Resolution of Necessity they shall be deemed to have waived all objections thereto. Passed, adopted and approved this day of .,2001. Attest: Terrance M. Duggan, Mayor Jeanne F. Schneider, City Clerk Prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13th Street, Dubuque, IA 52001-4864 RESOLUTION NO. -01 RESOLUTION OF NECESSITY Whereas, proposed plans have been duly prepared and approved by the City Council of the City of Dubuque and are now on file in the office of City Clerk showing among other things the plans, specifications, form of contract, estimated cost and preliminary plat and schedule showing the amount proposed to be assessed against each lot and the valuation of each lot as filed by the City Council, for the 1999 P.C. Concrete Paving Project - No. I (Bryant Street, Booth Street, and Van Buren Street). NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements, and unless property owners at the time of the final consideration of this proposed resolution have on file with the City Clerk objections to the resolution of necessity, they shall be deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed and done in accordance with the plans and specifications which have been approved by the City Council and now on file with the City Clerk. That the cost and expense of making such improvement will be assessed partially or totally against privately owned property lying with the assessment limits, and in an amount not to exceed that provided by law, and in proportion to the special benefits conferred. The portion of the cost which shall be borne by the City will be paid from the Street Construction Fund, and speciat assessment bonds may be issued in anticipation of deferred payments of assessments when a contract has been performed and accepted, and the proceeds thereof used to pay the contractor. The above resolution was introduced, approved and ordered placed on file with the City Clerk this day of ., 2001. Approved and placed on file for final action. Attest: Terrance M. Duggan, Mayor Jeanne F. Schneider, City Clerk Prepared by: Michael A. Koch, Public Works Director Address: 50 W. 13th Street, Dubuque, IA 52001~4864 RESOLUTION NO. -01 NOTICE TO PROPERTY OWNERS Notice is given that there is now on file for public inspection in the office of the City Clerk of Dubuque, Iowa, a proposed Resolution of Necessity, an estimate of cost, and a plat and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Cou ncil of Dubuque, Iowa, for an improvement of the type(s) and in the location(s) as follows: Installation of a copper water service and sanitary lateral for the properties which are described as follows: That the proposed district to be benefited and subject to assessment for the cost of such improvements is described as follows: Karl A. Rettenberger, Sr., and Freda A. Rettenberger Rettenberger Place Lot 2 (Parcel No. 10-27~230-10) The City Council will meet at 6:30 p.m. on the 2nd day of April, 2001 at the Public Library Auditorium, at which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a resolution of necessity. A property owner will be deemed to have waived all objections unless at the time of hearing he has filed objections with the City Clerk. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (319) 589-4120 or TDD (319) 589-4193 in the Human Rights Department at least 48 hours prior to the meeting. Published by order of the City Council given on the ,2001. day of Jeanne F. Schneider City Clerk SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS pAR~ALPAYMENT: PROJECTN~ME: CONTRACTOR: CODE C id' of Dubuque FINAL 1999 PCC Paving Projects #1 (Bryant St.,N. Booth and Van Buren) Horsfield Construction, Inc. ITEM DATE: Feb. 1,2001 CONTRACT AMOUNT: $1,961,829.38 QTY. UNiT COST TO DATE COST 2 3 ' 5 6 7 8 9 13 I4 16 20 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 1103.0200 Excavafion, Unclassified 1103.0210 Excavation, Rock 1103.0100 Backfill Limestone 1105.0102 Backfill Topsoil 1201.0100 Graded St6neBase 1202.0100 Granular Subbase (Special) 1203.0100 3" Crushed Stone Base 1205.0200 Bedding Stone. (I") Clean I301.03~0 Removal of Asphalt Pavement 1301.1302 ACC Surface Course (Headers) 1301.2100 Asphalt, Surfacing of Driveway*md Patches 1402.0162 PC Concrete Pavement. (7") w/Integral Curb. Class "C" CY CY Ton SY Ton Ton Ton Ton SY Ton Ton SY 1401.1600 PC Concrete Pavement. M4 (differenfiate cost adjustment to PCC Concretl SY I402.0168 PCC Concrete Pavement 8" w/Integral Curb. Class "C" w/CD Baskets SY 1402.0500 Removal of Concrete pavement (w/curbs) 1402.0700 Adjustment of Fixture in Concrete Pavement 1403.0301 Remove and Replacement of PC Concrete Curb & Gutter 1404.0114 PCC Sidewalk, 4" 1404.0546 PCC Driveway. 6". Remove and Con~trtlct 1404.0554 PCC Sidewalk, 4". Remove and Constmet 1501.1010 Sanitary Sewer Pipe Location: Bryant S~reet Pipe Repair 1BR 1501.1010 Sanitmy Sewer Pipe. Repair Location: Bryant Street Pipe Repair IBR Pipe Repair 2BR Pipe Repair 3BR Location: Booth Street Pipe Repair 3BO Location: Van Buren Street Pipe Repair tVB Pipe Repair 2VB Pipe Repair 3VB Pipe Repair 4VB Pipe Repair 5VB 1501.2280 Sanitary Sewer Manhole. Replace Cone Section 1501.2370 Sanitary Sewer Manhole. Complete Location: Bryant Street Manhol* No. A 1501.2370 Sanitary Sewer Manhole, Replace, Complete Location: Bryant Street Manhole No. IBR Manhole No. 2BR ivlanhol¢ No. 3BR Manhole No. 4BR Manhole No. 5BR Manhole No. I-A BR Manhole NO.2-A BR Manhole No.3-A BR Manhole NO.4-A BR Location: Booth Street Mmahole No. 1BO Manhole No. 2BO Manhole No. 3BO Manhole No. 4BO Manhole No. $BO Manhole No. 6BO Manhole No. 7BO 1501.2801 Sanitary Sewer. Tee !5" x 4" 1501.2802 Sanitary' Sewer, Wye 12"x4" SY Each LF SF SY SF LF LS LS LS LS 54.00 22775.87 591,103.4~8 $60 00 89.74 $5.384.40 54.50 10061.38 545.276.2I $1.75 6118.2 $10,706.85 $8.25 2107.44 $17.386.38 $8.25 20689.02 $170,684.42 $8.25 19109.7 $157.655.03 $8.25 1267.02 $10,452.92 $1.50 15414.09 $23,121.14 $55.00 704.64 538,75120 540.00 17.14 $685.60 $22.60 22069.1 $498.761.66 $6.00 539.24 $3.235.44, $23.40 6016.37 5140.783.06 52.50 11353.27 $28,383.18 $150.00 83 $12,450.00 $15.00 604.2 $9,063.00 $2.50 1.386.2 $3,465.50 $28.00 1579.54 $44,227.12 $2.50 42170.9 $105,427.25 $0:00 0 $0.00 50.00 0 $0.00 548.00 15 5720.00 $0.00 0 $0.00 $0.00 0 $0.00 $845.00 1 $845.00 $5,160.00 l $5,16000 $5,035.00 I $5,035.00 $0.00 0 50.00 5950.00 1 $950.00 $0.00 0 $0.00 LS $2.035.00 1 $2,03500 LS $II,730.00 I $11,730 00 LS $3,300.00 I $3,300.00 LS 5995.00 1 $995.00 LS $3,320.00 1 $3,320.00 Each $775.00 2 $1,550.00 $0.00 0 $0.00 $0.00 0 $0.00 LS $2.175.00 I $2.175.00 50.00 0 S0.00 $0.00 0 $0.00 LS $2,515.00 I $2~1500 LS $2,400.00 1 $2,400.00 LS $2,300.00 1 $2,300.00 LS $2,095.00 I $2,095.00 LS $2,800.00 1 $2,80000 LS $2.300.00 1 $2,300.00 LS $2,525.00 I $2,525.00 LS $2,550.00 l $2,550.00 LS $2.235.00 1 $2.235.00 $0.00 0 $0,00 LS $2.420.00 1 $2,420.00 LS $2.225.00 I $2225.00 LS $2,665.00 I $2.665.00 LS $2,210.00 I $Z210.00 LS $2,230.00 I $2230.00 LS $2,730.00 . I $2.73000 LS $2.230.00 1 $2.230.00 Each $1.400.00 0 $0.00 Each -$765.00 0 50.00 pARTIAL PAYMENT: PROJECT NAME: CONTRACTOR: -52 ' 53 54 55 56 57 58 59 6O 61 62 63 64 65 66 67 68 69 70 71 72 73 74 79 83 84 86 87 88 89 90 93 94 95 96 98 99 I02 CiD' of Dubuque FINAL 1999 PCC Paving Projects #1 (B~ant St.,N. Booth and Van Buren) Horsfield Construction. Inc. CODE ITEM UNIT 1501.290o Sanitary Sewer, 4" C.I.P. Lateral with Tap and Saddle Location: B~jant Street Laterial No. 333 Later/al No. 620 Laterial No; 330 Laterial No. 360 Laterial No. 648 Laterial No. 658 1502.1020 Storm Sewer. Repair Location: Booth Street Stm No. I 15o2.2112 RCP Storm Sewer 12" 1502.2115 RCP Storra Sewer 15" 1502.2115 RCP Storm Sewer I5" Special 1502.2118 RCP Storm Sewer 18" 1502.2118 RCP Storm Sewer 18" Special 1502.2124 RCP Storm Sewer 24" I502.2124 RCP Storm Sewer 24' Special 1502.2127 RCP Storm Sexver 30" 1502.2130 RCP Storm Sewer 30" Special 1502.2201 Storm Sewer Manhale, Complete DATE: Feb. 1, 2001 CONTRACT AMOb2%rr: $1.961.829.38 QTY. UNIT COST TO DATE COST 1502.2202 Storra Sewer Manhole, R~move and Replace. Complete $0.00 0 $0.00 $0.00 0 $0.00 $900.00 1 $900.00 $900.00 I $900.00 $900.00 I $900.00 $900.00 I $900.00 $900.00 1 $900.00 $900.00 1 $900.00 $I00.00 6.25 $625.00 50.00 0 $0.00 $0.00 0 $0.00 $4,090,00 1 $4,090.00 $23.00 16 $368.00 $24.00 770.7 $18.496.80 $36.50 2306.6 584,190.9~0 $27.50 67.5 $1,856.25 $41.00 926 $37,966.00 545.50 378 $17,199.00 535.00 9 $315.00 $47.00 6543 ..~530,752. I0 $45.00 21,5 $967.50 $55.00 150 $8,250.00 $1,165.00 0 $0.00 $L450,00 1 $1,450.00 $1,200.00 55 $66,~00.00 $1,600.00 7 $II,20000 $1,800.00 3 $5,40000 $2,000.00 0 $0.00 $660.00 2 $I,320.00 $90.00 0 50 O0 $660.00 0 $0.00 $500.00 2 $1,00000 LS LS LS LS LS LS LF i502.2510 Storm Sewer, Intake I01-B 1502.2511 Stona Sewer, Intake 10 I-B Special 1502.2540 Storm Sewer. Intake 104-B 1502.2545 Storm Sewer, Intake 104-B Special Tap existing 5x5 RCP Box Fillet existing 5x5 RCP Box Tap existing 84 RCP Storm 8exver, Intake Remove and Reuse Grates 1502.2560 Storm Water Curb Opening Neenah R-3262-3 LS LF LF LF LF LE LF LF LF LF LF Each Each 1503.1000 Watermain Cormect to existing main w/Valve Box 1503.1261 Watermain 6' DIP, Push on Joint w/Pol~varp. Class 52 1503.1280 Watermain 8" DIP, Push on Joint w/Polywarp. Class 52 15o3.1281 Watermaln 10" DIP, Push on Joint w/Polywarp. Class 52 Each Each Each Each Each CY Each Each $70.00 23 $1.610.00 $1.145.00 0 $0.00 $23.50 1782.21 $41.881.94 1503.2616 Fitting 6x6x6 MJ Tee 15032646 Fitting 6x6x6 Anchor Tee 1503.2646 Fitting 8xSx6 Anchor Tee 1503.2648 Fitting 12x12x8 Anchor Tee 1503.2649 Fitting 8xSx6x6 Four Way 1503.2660 Bend 6' (45 des) MJ 1503.2660 Bend 6" (22 l~deg) MJ 1503.2660 Bend 6' (11 1/4des) MJ 15032663 ReducerS"x6' MJ PE 1503.2700 Valve. Gate (6") RS "O" Ring MJ 1503.2700 Valve. Gate (gm) RS "O" Ring MJ 1503.270l Valve. Gate (I0') RS "O' Ring MJ 1503.2795 Mego Lug Retainer Glands 6" 1503.2718 Water Valve Box Adjustment, Repair and Clean I503.2719 Water Valve Box. (Street) Replace Upper Sections and Lids 1503.2900 Hydrants MJ New 1503.4256 Sleeve 6" 441 1503.4256 Sleeve 10" 44I 1503.7006 Water Service Line, 3/4" Copper pipe 1503.7001t Water Service Lines stop Box. 3/4' Tap Installation 1503.7006 Water Service Li~e. I" Copper pipe 1503.7008 Water Service Lines stop Box. I" Tap Installation Water $e.wice Disconnect Water Service Line. Corp 3/4" Each LF LF LF Each Each Each Each Each Each Each Each Each Each Each Each Each $26 25 104939 $27,546.49 $50.00 0 $0.00 $230.00 2 $460.00 $335.00 3 $1,005.00 $420.00 2 $840.00 $540.00 2 $1,080.00 $445.00 2 $890.00 $200.00 12 $2,400.00 $200.00 3 $600.00 $200.00 5 $1,000.00 $200.00 I $200.00 $500.00 16 $8~00.00 $660.00 3 $1,980.00 $900.00 I $900.00 $170.00 33 ~$5.610.00 $115.00 7 $805.00 $115.00 11 $I,26500 $1.500.00 4 $6.000.00 $265.00 30 $7.950.00 $400.00 I $400.00 $1575 1212 $19.089.00 $400.00 64 $25.600.00 $30.00 40 $1.200.00 $550.00 2 51,100.00 $500~00 11 $5,50000 $35000 5 $1,750 O0 PARTIAL PAYMENT: PROJECT NAME: CONTRACTOR: CODE City. of Dubuque FINAL 1999 PCC Paving Projects #1 (B~ant St.,N. Booth and Van Buren) Horsfield Construction, Inc. ITEM UN1T DATE: Feb. 1,200I CONTRACT AMOUNT: $1,961,829.38 QTY. UNIT COST TO DATE COST 108 I09 120 122 123 124 125 126 127 128 I29 130 132 133 134 135 136 I37 138 t39 140 142 143 144 145 146 147 148 I49 150 152 153 154 155 I57 158 159 160 t62 I63 164 t65 166 Watar Service Line. Cap 1" pipe Watermain Installation xv/Extruded Sty:o£oam 1506.0100 Removal of Intakes [602.0100 Sodding _ I703.0110 ~chdmin, Perforated Plastie Pipe 6" die 1703.0I 10 Subdrain, Perforated Plastic Pipe 6" die -Tee 1704.0102 PCC Steps. Remove and Construct 1704.o201 Retaining Wall. (Standard Segmental) 1705.0100 Sawcut Concrete 1705.0200 Asphalt Sawcut 180 L~O00 Puvement Marking 1901.0100 Traffic Signal and Street Light. Conduit I ~ PVC. in Trench 1901.0100 Traffic Signal and Street Light, Conduit I I/I2~ PVC, in Trench 1901.0t00 Traffic Signal and Street Light, Conduit 2" PVC. in Trench 1902.0100 Electrical Cable in conduit # 14 AWG 12C 1902.0100 Electrical CaNe in conduit #I4 AWG 2C Shielded 1902.0100 Electrical Cable in conduit #8 AWG 1903.0100 PCC Foundation, Traffm Signal 24" Die x 54" Deep 19o4.0100 Traffic Signal PUle Installation I906.0100 Tra.ffic Signal Head Installation. pole 1909.0100 Eleetrica] Service Installation 1910.0000 Junction Box, as per plan 1911.0100 Controller 1912.0100 Loop Detector 1913.O100 Pedestrian Pushbut~on And Sign 1913.0100 Removal of Traffic Signals, Equipment and Foundations 2000.0000 Traffic Control EXTIL~, WORK LatamI 4" Watermain 12" DIP, Push on Joint w/Poly~varp. Class 52 Bend 12~ (45 deg) MJ Fitting 12x12x6 Anchor Tee Reducer 12x 10 Sleeve 12" 441 Sleeve I2" Solid ~ Mega I2" Water Value. Gate 12" Sleeve 8" #441 Sanitary Sewer. 8" x 4" Tee Compression Coup[ling Water Service Line, 1 1/4" Copper pipe Storm Tap Sanitary Sewer, 8 DIP Sanitary Sewer. 8" Band Seal Storm Server 12 DIP RCP Storm Sewer 24" Tongue and Groove Removal of Storm Sewer Storm Sewer I0 DIP Cap 6" MJ Sanitary Sewer 15" DIP Tree Removal 9" -12" Storm Sewer intake I0142 Adjustment of Fixture in Asphalt Ring and Cover REplace Clay Sanitao/W/8" DIP Load Excess Pipe for Delivery to City Yard Adjust CB 29 and 35 Rebut #4 PVC 6" Pipe Each $250.00 I $250.00 LF 53.00 16 $48.00 Each $300.00 13 $3,900.00 SY 53.75 6288.21 $23,580.79 LF $6.50 8932 $58.058.00 LF $30.00 18 5540.00 Each $50.00 14.55 $72-7.50 SF $21.00 195 $4,095.00 LF $3.00 593.3 $1.779.90 LF $2.00 1377.9 $2.755.80 LF $0.34 0 $0.00 LF $I 1.80 24.5 $289.10 LF $11.21 I22.8 $1,376.59 LF $11.73 117.5 $ 1,378.28 LF $2.84 228 $647.52 LF $2.10 21 $44.10 LF $2.44 18 $43.92 Each $449.00 4 $I ,796.00 Each $195.84 4 $783.36 Each $202.23 4 $808.92 Each 5272.13 1 5272.13 Each $212.49 2 $424.98 Each $499.82 1 $499.82 Each $619.40 3 $I.858.20 Each $62.38 6 $374.28 LS $18,548.00 I $18.548.00 $0.00 0 $0BO $0.00 0 $0.00 LF $15.00 224.93 53.373.95 LF $29.95 70.11 $2.099.79 Each $198.30 8 $1,586.40 Each $306.75 1 $306.75 Each $t59.60 2 $319.20 Each $198,30 13 $2,577.90 Each $188.50 1 $188.50 Each $90.60 I $90.60 Each $112.39 10 $1,123.90 Each $1,394.75 4 $5.579.00 Each $137.75 2 $275.50 Each $I62,00 5 $81000 Each $13.98 2 $27.96 LF $15.00 8 $I20.00 LS $300.00 1 $300.00 LS $27.75 40.2 $1.115.55 LS 576.45 5 5382.25 LF $29,95 166.9 $4.99866 LF $36.60 15.6 $570.96 LF $6.00 121 $726.00 LF $27.61 53.6 $1.479.90 Each $55.60 I $55 60 LF $43.90 27 $1,185.30 Each $442.75 I $442,75 Each $2,073.20 1 $2,073,20 Each $150.00 17 52,550,00 Each $315.10 17 $5;356,70 LF $25.00 18 $450.00 Hours $77.00 1.5 5115.50 L~ $400.00 I $40000 LF 50.50 1840 $920.00 LF $I7.50 8 $140.00 PARTIAL PAYMENT: PROJECT NAME: CONTRACTOR: CODE CiD' of Dubuque FINAL 1999 PCC Paving Projects #1 (B~nt St.,N. Booth and Van Buren) Hor'sfield Construction, Inc. ITEM UNIT DATE: Feb. 1,2001 CONTRACT AMOUNT: $ 1,961,829.38 QTY. UNIT COST TO DATE COST 167 ~spbalt Milling 168 Remove Sod 169 Relocate Curb Stop 170- Relocate Eire Hydrant 171 Fiat Grade Repair - Lower Booth St. 172 ~CP To City Yard 173 4" San. Laterals Complete w/ Tee 174 4" San. Laterals Complete w/o Tee 175 Tarrozo Driveway SY $56.93 60.71 $3.456.22 LS $485.00 I $485.00 Each $75.00 2 $150.00 Each $442.00 2 $884.00 LS $2,437.00 I $2,437.00 LS $3,499.17 I $3,499.17 Each $1,700.00 5 $8,500.00 Each $1,400.00 8 $11,200.00 LS $5,219.67 I $5,219.67 I hereby certirT that the above statement shows'in detail the TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST $2,160,641.20 $226,867.33 $2,387,508.53 2 7Z -of The undersigned, , con~zactor for the above improvement, does hereby accept the above "Total Due Contractor', as CONTRACTOR:; /rY~r'~'~