Loading...
Phase 3/HMA Pavement Milling and Resurfacing Project US52 White/11th Streets Copyrighted May 7, 2018 City of Dubuque Items to be set for Public Hearing # 4. ITEM TITLE: Phase 3 — HMA Pavement Milling and Resurfacing Project US52 /White Street(9th to 11 th Streets)and 11 th Street (White to Elm Streets) Initiate SUMMARY: City Manager recommending initiation of the public bidding procedure for the HMA Pavement Milling and Resurfacing Project on US52 /White Street from 9th to 11 th Streets and on 11 th Street from White to Elm Streets, and further recommends that a public hearing be set for May 21, 2018. RESOLUTION PreliminaryApproval of plans, specifications, form of contract, and estimated cost; setting date of public hearing on plans, specifications, form of contract, and estimated cost; and ordering the advertisement for bids SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s), Set Public Hearing for May 21, 2018 ATTACHMENTS: Description Type HMA Pavement Milling and Resurfacing on US52 White City Manager Memo Street-NNM Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Phase 3 — HMA Pavement Milling and Resurfacing Project US52 White Street (9�h to 11�h) and 11�h Street (White to Elm) lowa DOT Project No. NHSN-052-2 (141)-2R-31 CIP 2502274, 7101335, 7202274, 7401405 DATE: May 2, 2018 Assistant City Engineer Bob Schiesl recommends initiation of the public bidding procedure for the HMA Pavement Milling and Resurfacing Project on US52 White Street from 9�h to 11�h Street and on 11�h Street from White to Elm Street, and further recommends that a public hearing be set for May 21 , 2018. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Bob Schiesl, Assistant City Engineer THE CTTY OF Dubuque �" ai��oeNe�qh DUB E 'il��i;� Masterpiece on the Mississippi Z°°' Z°'Z 7A13 2017 TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer SUBJECT: Phase 3 - HMA Pavement Milling and Resurfacing Project US52 White Street (9�h to 11�h) and 11�h Street (White to Elm) lowa DOT Project No. NHSN-052-2 (141)--2R-31 CIP 2502274, 7101335, 7202274, 7401405 DATE: May 1, 2018 INTRODUCTION The enclosed resolutions authorize the initiation of the public bidding procedure for the HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11th Street and on 11th Street from White to Elm Street. BACKGROUND The HMA Milling and Resurfacing Project on US52 White Street and 11th Street is the 3rd phase of a 4-phase project that is a joint partnership between the City and the lowa Department of Transportation (lowa DOT). The scope of the multi-year joint pavement rehabilitation project includes the following: • Phase 1 - Central Ave (21 st to 32nd) Pavement Rehab Project (completed in 2011) • Phase 2 -White Street (11th to 21st) Pavement Rehab Project (completed in 2014) • Phase 3 -White (9th to 11th), 11th (White to Elm) Pavement Rehab (construction in 2018) • Phase 4 - Central Ave (9th to 21st) Pavement Rehab Project (construction in 2019) DISCUSSION The Phase 3 - HMA Milling and Resurfacing Project on US52 White Street and 11th Street will provide for the following improvements: • Pavement milling on White Street, from 9�h to 11th Street and 11�h Street from White Street to Elm Street. • Transverse and longitudinal joint repair as needed. • Pavement sub-base repair and patching as needed. • Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. • Spot curb, driveway, and sidewalk replacement. • Storm sewer improvements. • Water main replacement. • Installation of ADA pedestrian access curb ramps (4 total). Through the cooperative agreement, the lowa DOT will be responsible for the eligible construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each direction from roadway centerline) and 50°k of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street). The City will be responsible for the costs associated with pavement rehabilitation of the parking lanes and the costs for curb and sidewalk replacement, underground utility work, 50°k of the costs associated with the pedestrian access curb ramps at all the intersection quadrants on U.S. 52 (White Street) and landscape restoration. All other associated costs, such as engineering design, contract administration, construction engineering and inspection will be funded solely with City funding. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process May 7, 2018 Publish Notice to Bidders, Advertise for Bids May 11 , 2018 Publish Public Hearing Notice on Plans &Specifications May 11 , 2018 Public Hearing on Plans & Specifications May 21 , 2018 Receipt of Bid Proposals (Bid-Letting) May 24, 2018 Award Construction Contract (Subject to DOT Concurrence) June 4, 2018 Project Completion Date November 16, 2018 RECOMMENDATION I recommend that the City Council establish a date for the public hearing and authorize the City Clerk to advertise for proposals. BUDGETIMPACT The estimate of probable cost for Phase 3 - HMA Milling and Resurfacing Project on US52 White Street and 11 th Street is as follows: Description Estimate Construction Contract $ 508,000.00 Contingency 50,800.000 Contract Admin / Construction Engineering 83,820.00 Total Project Cost $ 642.620.00 The project funding summary is as follows: CIP Fundinq Source Amount 2502274 lowa DOT Funding $ 163,000.00 2502274 Hwy 52 - White Street / 11th Street Pavement Rehab 332,620.00 7202274 Storm Sewer/ Intake Improvement 89,000.00 7101335 Sanitary Manhole Replacement 5,000.00 7401405 Water Main Replacement 53,000.00 Total Project Funding $ 642.620.00 ACTION TO BE TAKEN I respectfully request that the City Council grant preliminary approval to the construction plans and specifications; and establish May 21 , 2018 as the date of the public hearing; and hereby authorized the City Clerk to advertise for bid proposals for the Phase 3 - HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11th Street and on 11 th Street from White to Elm Street through adoption of the attached resolutions. Prepared by: Greg Doeden, Civil Engineer cc: Jenny Larson, Alexis Steger, Budget Department Deron Muehring, Civil Engineer Denise Ihrig, Brant Schueller, Water Department Ken Yanna, lowa DOT F:\PROJECTS\HWY 52-White 9th-11th and 11th White-Elm\Council &Staff Documents\Initiate RESOLUTION NO. 133-18 PHASE 3 - HMA PAVEMENT MILLING AND RESURFACING PROJECT US52 WHITE STREET FROM 9TH TO 11TH STREET AND 11TH STREET FROM WHITE TO ELM STREET PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Phase 3 - HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11th Street and on 11th Street from White to Elm Street in the estimated amount $642,620.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 21st day of May 2018, at 6:00 p.m. in the Historic Federal Building Council Chambers (second floor) 350 W. 6th Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Phase 3 - HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11th Street and on 11th Street from White to Elm Street is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Clerk is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the Notice to Bidders to be published on the City of Dubuque website and a contractor plan room service with statewide circulation, which notice shall be published not Tess than thirteen but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 24th day of May 2018. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:00 p.m. on the 4th day of June 2018, in the Historic Federal Building Council Chambers (second floor), 350 est 6th Street, Dubuque, Iowa. Passed, adopted and approved this the 7th day of May 2018. Attest: 9 Kevin , . irnstahl, CM , City Clerk oy D. Buol, Mayor NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE PHASE 3 - HMA PAVEMENT MILLING AND RESURFACING PROJECT ON US52 WHITE STREET FROM 9TH TO 11TH STREET AND ON 11TH STREET FROM WHITE TO ELM STREET. NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, lowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Phase 3 - HMA Pavement Milling and Resurfacing Project on US52 White Street from 9th to 11th Street and on 11th Street from White to Elm Street, in accordance with the provisions of Chapter 26, Code of lowa, at 6:00 p.m., on the 21 S� day of May, 2018, in the Historic Federal Building Council Chambers (second floor), 350 West 6�h Street, Dubuque, lowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: • Pavement milling on White Street, from 9�h to 11th Street and 11�h Street from White Street to Elm Street. • Transverse and longitudinal joint repair as needed. • Pavement sub-base repair and patching as needed. • Hot mix asphalt (HMA) resurfacing of both thru lanes and parking areas. • Spot curb, driveway, and sidewalk replacement. • Storm sewer improvements. • Water main replacement. • Installation of ADA pedestrian access curb ramps (4 total). Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 7th day of May 2018. Kevin S. Firnstahl, CMC, City Clerk