Acceptance of Derby Grange Sanitary Sewer Extension Project Copyrighted
May 21 , 2018
City of Dubuque Consent Items # 14.
ITEM TITLE: Acceptance of Derby Grange Sanitary Sewer Extension
Project
SUMMARY: City Manager recommending acceptance of the
construction contract for the Derby Grange Sanitary Sewer
Extension Project, as completed by Connolly Construction.
RESOLUTION Accepting the Derby Grange Sanitary
Sewer Extension Project and authorizing the payment of the
contract amount to the contractor
SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt
Resolution(s)
ATTACHMENTS:
Description Type
Derby Grange Sanitary Sewer Extension Project-NNM City Manager Memo
Memo
Staff Memo Staff Memo
Resolution Resolutions
Engineer's Cert Supporting Documentation
THE CITY OF Dubuque
�
AIFA�erlwGh
UB E '�� III►
Masterpiece on the Mississippi Z°°'�w'2
7A13 2017
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Derby Grange Sanitary Sewer Extension Project (CIP 7102729)
DATE: May 15, 2018
City Engineer Gus Psihoyos is recommending acceptance of the construction contract
for the Derby Grange Sanitary Sewer Extension Project, as completed by Connolly
Construction in the final contract amount of$372,806.79, which is an increase of
14.48°k from the original contract amount of$325,638.00. Two items make up the
majority of the increase in construction costs, they are; rock excavation and the
additional granular backfill material required due to the additional rock removal. It is
currently projected that the Rustic Point Housing Tax Increment Financing District will
begin reimbursement of this expense beginning in Fiscal Year 2027.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
�� �� ���
Mic ael C. Van Milligen �� �
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Teri Goodmann, Assistant City Manager
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
THE CITY OF Dubuque
�
DUB E ������
r � i4 i
��
Masterpiece on the 1'Vlississippi z�''z°'z
ZOt.;�Z���
TO: Michael C. Van Milligen, City Manager ,_�_
FROM: Gus Psihoyos, City Engineer �>���,��l
RE: Derby Grange Sanitary Sewer Extension Project (CIP 7102729)
DATE: May 14, 2018
INTRODUCTION
The enclosed resolution provides for the acceptance of the construction contract for the
Derby Grange Sanitary Sewer Extension Project.
BACKGROUND
By Resolution 69-17 on February 20, 2017, City Council adopted a resolution of
necessity, directing staff to create an Urban Renewal Plan (Plan) for the Derby Grange
Road Housing Urban Renewal Area (Area), creating a tax increment finance district
including the districts of Rustic Point Estates and Timber Ridge Estates. The Plan
related to housing and residential development that was reviewed by the Long-Range
Planning Advisory Commission on March 15, 2017. The City Council received the
Long-Range Planning Advisory Commission recommendation affirming that the Plan is
consistent with the City's Comprehensive Plan for development. The creation of the
Derby Grange Housing Urban Renewal Area will allow for the use of tax increment to
cover reimbursable costs associated with the installation of sanitary sewer infrastructure
in the Area.
DISCUSSIQ�N
The Derby Grange Road sanitary sewer extension project extended gravity sanitary
sewer from the existing Asbury Plaza Lift Station #2 to Rustic Point Subdivision located
at the Northwest corner of Kennedy Road and Derby Grange Road. The project
consists of 1,926.90 LF of 8" and 1,011 LF of 12" SDR-26 PVC pipe, 14 manholes, one
creek crossing, one road crossing, tree removals, field fencing, and pasture re-
establishment.
In addition to serving the proposed Rustic Point Subdivision, the sanitary sewer
extension is capable of serving 255 acres of undeveloped land adjacent to the sewer
project.
The project construction documents followed the Statewide Urban Design and
Specifications 2017 (SUDAS) and City of Dubuque supplemental specifications 2017.
The project was completed under the lowa Department of Natural Resources (IDNR)
construction permit number 2018-0082S.
Connolly Construction of Peosta, lowa, completed the project in the final contract
amount of $372,806.79 which is an increase of 14.48% from the original contract
amount of $325,638.00. Two items make up the majority of the increase in construction
costs, they are; rock excavation and the additional granular backfill material required
due to the additional rock removal.
An additional 105 feet of sanitary sewer was installed by Pirc-Tobin (the Rustic Point
contractor) for the final tie in of the Derby Grange sanitary sewer to the Rustic Point
subdivision sewer. The final cost to lay these 105 feet of sanitary sewer was
$16,590.00.
RECOMMENDATION
I recommend that the City Council accept the improvements and authorize the payment
of the contract amount of $372,806.79 to Connolly Construction of Peosta, lowa, for the
Derby Grange Sanitary Sewer Extension Project.
BUDGETIMPACT
The summary of cost for the Derby Grange Sanitary Sewer Extension is as follows:
Description Estimate Award Final
Construction Contract — Connolly Construction $ 605,656.93 $ 325,638.00 $372,806.79
Construction Contract— Pirc-Tobin 16,590.00
Contingency 60,565.69 60,565.69 0.00
Contract Admin / Construction Engineering &
Inspection _ _99,933.39 99,933.39 79,298.37
Tree Removal & Pasture Rental Reimbursement 1,450.00
Easement Acquisition 60 169.76 60 169.76 60 169.76
Total Project Cost 826 25.78 46 306.84 530,314.92
FUNDING SOURCE
The project funding summary is as follows:
CIP Fundinq Source Amount�
71 Q2729 Derby Grange Sanitary Sewer Extension $ 926,836.00
Total Project Cost $ 530,314.92
*Remaining CIP Balance $396.521.08
2
*Remaining funding will be transferred to CIP No. 7101293 for sanitary sewer
extensions related to future growth areas. This funding is intended for preliminary
engineering costs related to SRF funding requirements and easement acquisition costs.
Ultimately the City will recoup most of the expense from the Rustic Point Housing Tax
Increment Finance District should development at Rustic Point proceed according to
schedule.
ACTION TO BE TAKEN
I request that the City Council adopt the attached resolution accepting the construction
improvements for the Derby Grange Sanitary Sewer Extension Project and establishing
the final contract amount of$372,806.79, and for the payment of the final contract
amount to Connolly Construction.
cc: Jenny Larson, Budget Director
Alexis Steger, Budget Analyst
John Klostermann, Public Works Director
Jean Nachtman, Finance Director
Deron Muehring, Civil Engineer II
Todd Irwin, Engineering Technician
3
RESOLUTION NO. 147-18
ACCEPTING THE DERBY GRANGE SANITARY SEWER EXTENSION PROJECT
AND AUTHORIZING THE PAYMENT OF THE CONTRACT AMOUNT TO THE
CONTRACTOR
Whereas, the Derby Grange Sanitary Sewer Extension Project (the Project) has been
completed and the City Engineer has examined the work and filed a certificate stating
that the Project has been completed according to the terms of the Public Improvement
Contract and that the City Engineer recommends that the Project be accepted; and
NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
DUBUQUE, IOWA:
Section 1. The recommendation of the City Engineer is approved, and the Project is
hereby accepted.
Section 2. The Finance Director is hereby directed to pay to the Contractor from the
Derby Grange Sanitary Sewer Extension appropriation for the contract amount of
$372,806.79 Tess any retained percentage provided for therein as provided in Iowa
Code chapter 573, and to pay such retainage only in accordance with the provisions of
Iowa Code chapter 573.
Passed, approved and adopted this 21St day of May 2018.
Attest:
Ket4n S. FTrnstahi, C C, City Clerk
D,
Roy D. Buol, Mayor
CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE DERBY '
GRANGE SANITARY SEWER EXTENSION PROJECT
;
YH� u���i��i��ed Ci�y Engi��e�o��i�� Ci�y o� Gu�u�ue, Ic�w�, hereby cer�iTies that �
he has inspected the Derby Grange Sanitary Sewer Extension Project, and that the �
Project has been performed in compliance with the terms of the Public Improvement
Contract, and that the total cost of the completed work is $530,314.92. �
a �
Dated this day of 2018. �
i
C �...-� �� `�-
Gus Psihoyos, City Engineer
`� I�
Filed in the office of the City Clerk on the �7 day of 2018.
i
II
. �
�
Kevin S. Firnstahl, City Clerk �
��
il
��
j
�
�
�
�
�
�
d
�
�
�
I