Project Acceptance - 2018 Asphalt Overlay Ramp Project Three Copyrighted October 1, 2018 City of Dubuque Consent Items # 12. ITEM TITLE: Project Acceptance -2018 Asphalt Overlay Ramp Project Three SUMMARY: City Manager recommending acceptance of the construction contract for the 2018 Asphalt Overlay Access Ramp Project Three as completed by Midwest Concrete, Inc. RESOLUTION Accepting the 2018 Asphalt Overlay Access Ramp Project Three and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s) ATTACHMENTS: Description Type 2018 Asphalt Overlay Access Ramp Project Three-NNM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Cert Supporting Documentation THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2018 Asphalt Overlay Access Ramp Project Three (CIP 2501227) DATE: September 25, 2018 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2018 Asphalt Overlay Access Ramp Project Three, as completed by Midwest Concrete Inc., in the final contract amount of$139,018.81 , which is 11 .2°k over the contract amount of$125,059.00 due to necessary design changes, sidewalk and curb replacement to meet the required slopes for Public Right of Way Accessibilities Guidelines. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF C Du� s� D V L � AU•A�LMc�City ',I �� �� Masterpiece on the 1Vlississippi Z«►''Z°12 2013•2017 TO: Michael C. Van Milligen, City Manager�_� FROM: Gus Psihoyos, City Engineer _,�'�� - � . _f �� . SUBJECT: 2018 Asphalt Overlay Access Ramp Project Three (CIP 2501227) DATE: October 1, 2018 INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the 2018 Asphalt Overlay Access Ramp Project Three. BACKGROUND The project replaced thirty-one non-compliant access ramps with 37- compliant, directional ramps as per Public Right of Way Accessibilities Guidelines (PROWAG) specifications in conjunction with the Public Works Asphalt Overlay Program and involved the intersections of: • Green Street & Av�ca Street: two double ramps, two single ramps and reconstruction of four storm water intakes to make compliant ramps possible. • Green Street & Alta Place: two single ramps. • Green Street & North Algona Street: one single ramp, one double ramp and reconstruction of one storm water intake. • Dexter Street & North Algona Street: one double ramp, one single ramp and reconstruction of tree storm water intakes. • Dexter Street & Auburn Street: two single ramps. • Dexter Street & Atlantic Street: four single ramps and reconstruction of three storm water intakes, to make compliant ramps possible. • Delaware Street and Atlantic Street: four single ramps. • Delaware Street and Auburn Street: four single ramps. • Delaware Street and North Algona Street: two single ramps. • Delaware Street and Alta Place: one double ramp and two single ramps. • Delaware Street and Avoca Street: one single ramp and one double ramp. DISCUSSION The 2018 Asphalt Overlay Access Ramp Project Three was completed by Midwest Concrete Inc. in the final contract amount of $139,018.81, 11.2% over the contract amount of$125,059.00. Ten storm water intakes required reconstruction because of their location and the inability to work around them with the new ramp installations, the cost of these were $41,930.00 collectively, which was greater than estimated due to necessary design changes; sidewalk and curb replacement were also more than estimated, which is not unusual when making the required slopes for PROWAG. The average cost per ramp was $2,62�.00. BUDGETIMPACT The project cost summary for the 2018 Asphalt Overlay Access Ramp Project Three is as follows: Award Final Construction Contract $125,059.00 $139,018.81 Contingency $12,505.90 Construction Engineering & Inspection $12,505.90 $7391.54 Total Project Cost $150,070.80 $14f,410.35 The funding summary for the project is as follows: CIP Fund Description Fund Amount 2501227 Curb Ramp Program $145,211.85 Total Project Funding $146,410.35 REQUESTED ACTION The City Council is requested to adopt the attached resolutions ac�epting the improvements and establish the final contract amount of$146,410.45 for the 2018 Asphalt Overlay Access Ramp Project Three. Prepared By: Tom Kopp, Engineering Technician cc: John Klostermann, Public Works Director Renee Tyler, Assistant Public Works Director Jenny Larson, Budget Director Jon Dienst, Civil Engineer II Paul Davis, Public Works Supervisor 2 RESOLUTION NO. 286-18 ACCEPTING THE 2018 ASPHALT OVERLAY ACCESS RAMP PROJECT THREE AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2018 Asphalt Overlay Access Ramp Project Three, (the Project) has been completed by the Contractor, Midwest Concrete, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $139,018.81; and WHEREAS, the Contractor has previously been paid $132,067.87, leaving a balance of $6,950.94; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $6,950.94 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 1St day of October 2018. Luis Del Toro, Mayor Pro Tem Attest: Ke\:frn S. Firnstail CMC City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2018 ASPMALT OVEFtLAY ACCESS RAMP PROJECT THREE The unciersigned City �ngineer of th� City oF Dubuque, lowa, hereby certifies that he h�s insp�ctec� the 2018 Asph�lt Overl�y Acc�ss Ramp Proj�ct Three, and that said F'roject ha� b�en p�rformec� in compliancP with the terms of thP Public Improvement Contract, and that the total cost of the completed wark is $146,�1 U.35. Dated this �`'��� d�y ofi-:� `' �G'•�u,���U�2018. ..._ _ � �,� � � �-�' _� --��. Gus Psihoyo�, ity Engin�er � fJ7 �-�;' FiIPd in the offic� of the City Clerk on th�:��day ��� ���018. ,��� r, �� � � Kevi S. Firnstahl, CMC, City Gl�rk