Loading...
Acceptance of the 30th Street to Leibe Street Sanitary Sewer Reconstruction Project Copyrighted March 4, 2019 City of Dubuque Consent Items # 11. ITEM TITLE: Acceptance of the 30th Street to Leibe Street Sanitary Sewer Reconstruction Project SUMMARY: City Manager recommending acceptance of the construction contract for the 30th Street to Leibe Street Sanitary Sewer Reconstruction Project, as completed by Temperley Excavating, Inc. RESOLUTION Accepting the 30th Street and Leibe Street Sanitary Sewer Reconstruction Project and authorizing the payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt Resolution(s) ATTACHMENTS: Description Type 30th Street to Leibe Street Sanitary Sewer Staff Memo Reconstruction Project-MVM Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Cert Supporting Documentation THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 30�h Street to Leibe Street Sanitary Sewer Reconstruction Project DATE: February 27, 2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 30�h Street to Leibe Street Sanitary Sewer Reconstruction Project, as completed by Temperley Excavating, Inc., in the final contract amount of$91 ,405.02, which is an increase from the original contract in the amount of$69,568.50. The additional cost is primarily due to encountering two abandoned underground structures, requiring additional work to repair them to a condition where they could be backfilled. A water main relocation and re-routing a storm line that drained the area parking lot that was tied directly into the sanitary sewer was part of the additional cost of the cost. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque �rt--��cr�-x o� � D �J L � MA'A�I'�6it� i�..I'. .'I�r � Masterpiece c.�r� tlie MissxssipPi Z°°'•Zolz 2013•2017 TO: Michael C. Van Milligen, City Manager ...�'�):� _.._.._> FROM: Gus Psihoyos, City Engineer :�� ,_�-��-.' DATE: February 26, 2019 RE: 30�r' Street to Leibe Street Sanitary Sewer Reconstruction Project INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 30t'' Street to Leibe Street Sanitary Sewer Reconstruction Project. BACKGROUND The project provided for the replacement of 850 feet of 8-inch diameter clay pipe with 8- inch PVC running through the former H & W site. This project was constructed per the Consent Decree USEPA approved Corrective Action Plan for Sewershed 10. The project rerouted an existing sanitary sewer main that previously ran und�rneath the Dubuque Malting and Brewing Company (H&W) building at 30th and Jackson Street. The sewer main was rerouted to an alignment between the Dubuque Malting and Brewing Company and Dubuque Stamping and Manufacturing buildings and tied into the existing sanitary sew�r on 30'�' Street. This project relocated the sewer to alleviate the current inflow and infiltration issues under and in th� vicinity of the Dubuque Malting and Brewing building. DISCUSSION The 30th and Leibe Stre�t Sanitary Sewer Reconstruction Project was completed by Temperley Excavating, Inc. of East Dubuque, Illinois in thP final contract amount of $91,405.02, which is an increase from the original confiract in the �mount of $69,568.50. Yh� additional cost is �rimariiy due to the encounteriny oi two abandonec� underground structures, requiring addition�l work to rep�ir them to a conc�ition whsre th�;y could be backfilled. A water main relocation �nd re-routing a storm line that drainPd the area p�rkinc� lot th�t was tied c�irectly into fih� s�nit�ry sewer was part of the addifiional cost for the project. BUDGE7' IMPAC`T Th� summ�ry c�f cost for th� 3U"' and Leibe Slreefi Sanit�ry S�w�;r Reconstruction Project is summ�riz�d below: Description Estimate Award Final Construction $ 89,015.U0 � 69,568.50 �91,4U5.U2 Contingency £3,901.50 8,901.50 0.00 Contract Admin / Consfiruction Engineering 14,687.50 14,687.50 23,727.80 Total Project Cost 1 6 93 157.50 1 132.82 The projPct funding summary is as follows: CIP Fundin Source Amount 7102720 30��' & J�ckson Sanitary Sewer Reconstruction $ 115,132.82 REQUESTED ACTION The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $91,405.02 to Temperley Excavating, Inc., for the 30tr' & Jackson Sanitary Sewer Reconstruction Project. GNP:kb Attachment cc: Jenny Larson, Budget Director Deron Muehring, Civil Engineer II Tom Freund, Engineering Tech Charlie Gau, Engineering Tech 2 RESOLUTION NO. 74-19 ACCEPTING THE 30t" STREET AND LEIBE STREET SANITARY SEWER RECONSTRUCTION PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 30t" Street to Leibe Street Sanitary Sewer Reconstruction Project (the Project) has been completed by the Contractor, Temperley Excavating, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $91,405.02; and WHEREAS, the Contractor has previously been paid $86,834/7, leaving a balance of $4,570.25; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $4,570.25 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 4th day of March 2019. Attest: Pt Roy Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 30th STREET AND LEIBE STREET SANITARY SEWER RECONSTRUCTION PROJECT The und�rsigned City Engineer of the City of Du�uquP, low�a, hereby certifiPs that he h�s inspected the 30th Streefi to Leibe Street Sanit�ry Sewer Reconstruction Project has been performed in compliance with the terms of the Public Improvement Contract, and thafi the total cost of the completed work is $115,132.82. �f`l� �� DatEd this ✓ / day of Y�l ' , 201�. � ' /(�' �i l l �� . _ . . a 0/L'- .�. Gus Psihoyos, City Engineer Filed in the office of the City CIPrk on th� .�✓ �1day of ���� � ,'2019. � � r r , •-•- „ �,- �: Kevin S�! irnstahl, CMC, City Clerk