Loading...
Seippel Road Water Main Relocation Project Landfill Access Frontage Road_Initiate Copyrighted March 4, 2019 City of Dubuque Items to be set for Public Hearing # 2. ITEM TITLE: Seippel Road Water Main Relocation Project Landfill Access Frontage Road Initiate SUMMARY: City Manager recommending initiation of the public bidding procedure for the Seippel Road Water Main Relocation Project, and requests the City Council grant preliminary approval of the construction plans and specifications, and establish March 18, 2019 as the date of the public hearing. RESOLUTION Preliminaryapproval of plans, specifications, form of contract, and estimated cost; setting date of public hearing on plans, specifications, form of contract, and estimated cost SUGGESTED DISPOSITION: Suggested Disposition: Receive and File; Adopt Resolution(s), Set Public Hearing for March 18, 2019 ATTACHMENTS: Description Type Seippel Road Water Main Relocation Project-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Aerial Exhibit Supporting Documentation Cost Estimate Supporting Documentation THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Seippel Road Water Main Relocation Project Landfill Access Frontage Road Initiate Public Improvement Bidding Process CIP 7402594 DATE: February 27, 2019 Assistant City Engineer Bob Schiesl recommends initiation of the public bidding procedure for the Seippel Road Water Main Relocation Project, and requests the City Council grant preliminary approval of the construction plans and specifications, and establish March 18, 2019 as the date of the public hearing. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Bob Schiesl, Assistant City Engineer THE CITY OF Dubuque � All-America City UB E � r � Mas terpiece on the Mississippi Zoo,.2012.Zo13 TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer DATE: February 26, 2019 SUBJECT: Seippel Road Water Main Relocation Project Landfill Access Frontage Road Initiate Public Improvement Bidding Process CIP 7402594 INTRODUCTION The purpose of this memorandum is to provide the City Council with information related to the Seippel Road Water Main Relocation Project and request concurrence to initiate the public bidding procedure and establish the date for the public hearing. BACKGROUND The lowa DOT is developing a project to reconstruct US Highway 20, beginning at Cottingham Road and ending at Seippel Road, and constructing a new system interchange at the intersection of US Highway 20 and Swiss Valley Road. This project, known as the Swiss Valley Road Interchange Project will tie into the Southwest Arterial Project. As part of the US Highway 20 safety improvements, Priority 1 access control will be implemented along the corridor between the Old Highway intersection and the new Swiss Valley interchange, requiring all existing at-grade access locations be eliminated. This will result in the existing landfill access to US20 will be removed and a new frontage road access be created. The new Landfill Access Frontage Road will connect directly to Seippel Road, near the Southwest Arterial interchange. Once completed, the Landfill Access Frontage Road will fall under the jurisdiction of the City as a local public street. DISCUSSION As part of the Southwest Arterial - US Highway 20 Interchange Grading Project, the City had to relocate water main along both US20 and Seippel Road so that it was outside the footprint of the future interchange and would not be impacted by the grading and the construction of the overpass bridge. After the water main relocation was completed on Seippel Road, the lowa DOT established the alignment for the new Landfill Access Frontage Road and determined it would connect directly to Seippel Road, near the Southwest Arterial interchange. As the final design for the Landfill Access Frontage Road was completed, it was determined that the relocated water main on Seippel Road would be impacted and would need to be lowered at the location of the future Seippel - Landfill Road intersection. In follow up coordination discussions with the lowa DOT, the state agreed to pay for the costs to relocate the water main on Seippel Road that will be impacted by the Landfill Access Frontage Road. The City has agreed to be the lead agency for completing the Seippel Road water main relocation and the lowa DOT will reimburse the City for all eligible costs. The City is currently working with the lowa DOT on a funding agreement which will outline the reimbursable costs by the state. As part of the water main relocation, the City will be installing new hydrants and salvaging the existing two (2) hydrant assemblies. The City has agreed that the cost to remove and salvage the hydrant assemblies will be a non-participating cost, estimated at approximately $4,750. PROJECT SCHEDULE The schedule for the project is as follows: Initiate Public Bidding Process March 4, 2019 Publish Notice to Bidders, Advertise for Bids March 8, 2019 Publish Public Hearing Notice on Plans &Specifications March 8, 2019 Public Hearing on Plans & Specifications March 18, 2019 Receipt of Bid Proposals (Bid-Letting) March 21 , 2019 Award Construction Contract April 1 , 2019 Project Completion Date May 31 , 2019 RECOMMENDATION I recommend that the City Council establish a date for the public hearing and authorize the City Clerk to advertise for proposals for the Seippel Road Water Main Relocation Project. BUDGETIMPACT The estimate of probable cost for the Seippel Road Water Main Relocation Project are summarized in the following table: Description Cost Estimate Construction $ 113,432.00 Engineering Design 3,000.00 Construction Administration & Inspection 3,650.00 Total Construction Cost Estimate $ 120,082.00 The proposed project funding is summarized as follows: CIP No. Fund Description Fund Amount 740 2594 lowa DOT Reimbursement $ 115,332.00 740 2594 SW Arterial - Water Main Extension 4,750.00 City Non-Eligible Participating Costs Total Project Funding $ 120,082.00 ACTION TO BE TAKEN I respectfully request that the City Council grant preliminary approval to the construction plans and specifications; and establish March 18, 2019 as the date of the public hearing; and hereby authorized the City Clerk to advertise for bid proposals for the Seippel Road Water Main Relocation Project through adoption of the attached resolutions. cc: Jenny Larson, Budget Director Denise Ihrig, Water Dept Manager Brant Schueller, Water Distribution Supervisor Ken Yanna, lowa DOT F:\PROJECTS\SOUTHWEST ARTERIAL\Interchange- US20 Paving (44)\Watermain Relocation - Landfill Road\Council&Staff Documents\Initiate RESOLUTION NO. 82-19 SEIPPEL ROAD WATER MAIN RELOCATION PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section1. The proposed plans, specifications, form of contract and estimated cost for the Seippel Road Water Main Relocation Project in the estimated amount $113,432.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. Section 2. A public hearing will be held on the 18th day of March, 2019, at 6:00 p.m. in the Historic Federal Building Council Chambers (second floor) 350 W. 6th Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. Section 3. The Seippel Road Water Main Relocation Project is hereby ordered to be advertised for bids for construction. Section 4. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. Section 4. The City Engineer is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the attached Notice to Bidders to be published in the Master Builders of Iowa Plan Room, The Construction Update Network and posted on the City of Dubuque website at www.cityofdubuque.orq/bids and which notice shall be published not Tess than thirteen but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 21st day of March, 2019. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:00 p.m. on the 1st day of April 2019, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, adopted and approved this the 4th day of March 2019. Attest: Kevin S irnstahl, SMG; City Clerk A Roy D. Buol, Mayor NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE SEIPPEL ROAD WATER MAIN RELOCATION PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, lowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Seippel Road Water Main Relocation Project, in accordance with the provisions of Chapter 26, Code of lowa, at 6:00 p.m., on the 18�h day of March, 2019, in the Historic Federal Building Council Chambers (second floor), 350 West 6�n Street, Dubuque, lowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Seippel Road Water Main Relocation Project Provide for the removal of existing water main and the installation of approximately 440 linear feet of new 12-inch water main, including hydrants, valves, and appurtenances. Any visual or hearing-impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 8th day of March 2019. Kevin S. Firnstahl, CMC, City Clerk �� �_ . � ; . �-r �xf�� R+A � ti fi '5•; i�:7l�,� �F_: I 1 l t::'.. .. -__ �". r�4ay�;��-�,1' .- � �.w� ����`. �, �°�- "� _�"��. "`� a �� ���� _^ , WATER MAIN RELOCATION - EXHIBIT A �`� :��h � R � .��. �� p.. -,+,g+e r� +n 'x y>, . sa^�. @ , 5. � .. ./r `.� ..+=,�'"y-r^"i ,>a ..,�ie-r `.�.... :.i9� 3�n , ._ �j,,T`• . . .. . n ' - �a�� 113 y �� ���,�' �� . u':.�peJ�' ., C"��'�yy�f � � '•t �� r �•'�� ..� s�. '.�F.=S -:,1 yky� - -� "�' `�-� �� 112 �.. --""� ��y�� r • �.�-,.:'__ _ , "",� _ �a"�f' --� � -- _~.— � � . _ . �..�r �� � ,. 4 � _�� ' �.. 1'J� �� � �.. � \ J�+�+ : . . .. � ______ � �°� i . � � ' .� rt:-'� �/ _/--_`� � —� � � � � se-. ,a f8l:: — ' �"Li��� —��//'/ i n� �— �` 1 ��� r. . � '*<- '�- � . � y��� '�'��e� i � ' �� ,3,.; � . . #'.i! a��4��.�a;x.. � � . 5 '.`'..�Pli� � .� r r n "+ \ � �T*.��A� _ � -M'' - � 106 � � ��� , . , � � �-� � � � �kd�, ��z y — -- — ��y�3�°�' R - �� �, �wE`�z -" . . SP� ws .r"�'� �. �� "� '��r,� ` �'� y � �� , �' �� � ; �` r., �� ,? 's`.d � V • Y . # �.. �� � . * .. l y � F✓ y+fi � Y���3,` . � yf.y{�r.' �r', �,' / l� � > � ,f'� ' ,��t''.',i. .. � .Y'�f���'��� T���✓ 14 .. �ml� J/ �.i �_ . .. `.fi(.fF f ,, � � Landfill Access Road Water Main Relocation COST ESTIMATE-EXH IBIT B NHSX-020-9(251)--3H-31 US 2�Interchange Paving NHSX-032-1(44)--3H-31 ��� Cort Ertlmatz 1JJ21/Ltt0 erqinees•pbnnm•IaM su�ors omi:io�i: arvovouaunuecosr�reiMaurseoaviowaorn� omi:io�z arvovouaunuecon�rvorvParnaParme� omi o�3: omi o�a: omi:io�s: nemmae ieem ume om.i om.z umevrme ioorcon erym:e i zeie-iee-o-i ropso�i, o�-s�te cv se 5 s.o 5 w000 5 z zeie-iee-x-e s�eease, co�o�s agg�egate - s�aaatm� i3 (asrm z) rory 9s 9 zz.o 9 z,os000 9 3 zeie-iee-�-3-a aemo�ai a o�spose of K�ow� c�pe a�a co�a��t �F 33e S io.o S 3,3000o S a 3eie-iee-c-e r�e�m vo��aatm� rory se 9 zzs 9 i,usoo 9 5 3010-108-�-0 Betltling Material, 1" Commecial Clean Stone i0N 310 $ 10.0 $ 5,50000 $ 6 3010-108-�-0 Peplacement oF Onsuitable BackFill Material Gratlation 32 i0N 230 $ 26.0 $ 5,90000 $ ] 5010-108-A-1 Water Main, irencFetl, �IP, 12" LF 440 $ )0.0 $ 30,00000 $ 8 5010-108-L2 Fittings by WeigFt, �I LBS 1149 $ 10.0 $ 11,49000 $ 9 Pemoval antl Salvage - Fire Hytl, Fittings antl Appurtenances LS 1 $ 2,500.0 $ $ 2,500.00 10 5020-108-A-0 Valve, Gate, �IP, 12" EA 3 $ 2,600.0 $ J,00000 $ 11 5020-108-A-0 Valve, BF, �IP, 16" EA 2 $ q,000.0 $ 9,60000 $ 12 5020-108-LB Fire Hytlrant Assembly EA 3 $ 3,500.0 $ 1q50000 $ 13 9010-108-A-0 Conventional - Seetling, Fertilizing, antl MulcFing, iype 4 AC 0.15 $ q,500.0 $ 6J500 $ 14 9010-108-FS Wattles, Wootl Fibeq 9" LF 380 $ 3.0 $ 1,14000 $ 15 1090-105-� Mobilization LS 1 $ 10,000.0 $ 10,00000 $ Division 1 SUMofal $ 100,620 Division 3 SUMofal $ 2,500 1VM[on[ingenry $ 10,063 $ 3W Sub[o[al $ 110,683 $ 3.]W To[al $ 113,432 5[a[e To[al Div.l $ 130,fi82 Ci[yTo[al Di¢2 $ 2,)50 Consul[an[PE Services�WHKS� $ 3,000 Cons[ruRionSurvey�WHKS� $ fi50 CE Services�Ci[y� $ 3,000 Salvage Hydran[Assembly�Q[y 2� Cretlit $ (2,000� Eligible Reimburseable Cort�DOT� estimare $ 115,332