Loading...
Water Distribution System Pressure Zone 2 Improvements_Roosevelt Street Water Tower Project Copyrighted March 4, 2019 City of Dubuque Public Hearings # 5. ITEM TITLE: Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 125 MG Elevated Water Tower Project SUMMARY: Proof of publication on notice of public hearing to consider approval of the plans, specifications, form of contract and estimated cost of$5,227,672 for the Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 1.25 MG Elevated Water Tower Project, and the City Manager recommending approval. RESOLUTION Approval of plans, specifications, form of contract, and estimated cost for the Water Distribution System Pressure Zone 2: Roosevelt Street 1 .25 MG Elevated Water Tower Project Contracts A and B SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt Resolution(s) ATTACHMENTS: Description Type Roose�lt Street Water Tower Project-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Proof of Publication Supporting Documentation THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Public Hearing for the Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 1 .25 MG Elevated Water Tower Project (CIP 7401672) DATE: February 27, 2019 Water Department Manager Denise Blakeley Ihrig recommends City Council approval of the plans, specifications, form of contract and estimated cost of$5,227,672 for the Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 1 .25 MG Elevated Water Tower Project. I concur with the recommendation and respectfully request Mayor and City Council approval. �L;� 1��, ���,�� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Denise Blakeley Ihrig, Water Department Manager THE CITY OF Dubuque � All-America City UB E � r � Masterpiece on the Mississippi 200,.2012.2013 TO: Michael C. Van Milligen, City Manager FROM: Denise Blakeley Ihrig, Water Department Manager DATE: 26 February 2019 RE: Public Hearing for the Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 1.25 MG Elevated Water Tower Project (CIP 7401672) INTRODUCTION The enclosed resolution is in reference to the public hearing for the Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 1.25 MG Elevated Water Tower Project. DISCUSSION IIW, P.C. working with the City of Dubuque's water department staff has prepared construction plans for improvements to the water distribution system, in pressure zone 2. The plans include the proposed installation of a 1 .25 MG elevated water tower along Roosevelt Street near Peru Road. The project is scheduled to be under two separate contracts. The contracts are based on the type of work to be perFormed, and are described as follows: Contract A: Roosevelt Street Water Tower and Water Distribution Improvements. The extent of the work consists of the construction of a 1.25 MG water tower and associated water main installation. The project also includes various work associated with the site improvements including: earthwork, storm sewer, sanitary sewer service, clearing and grubbing, PCC pavement, seeding, and erosion control. Traffic control is included in the project to maintain a safe work site for both the Contractor and the public. Cost Estimate: $2,900,000. Contract B: Eagle Point Water Treatment Plant and Water Distribution Improvements. The extent of the work consists of the construction of four pressure control stations. Two of the stations will be cast-in-place, 10-foot by 14foot-3inch structures, and two of the stations will be 6-foot diameter precast manhole structures. The stations will include control valves and process piping. The construction of the pressure control stations will include surFace restoration including PCC and HMA pavement patching and associated traffic control. Also included in the project is process piping modifications and pump replacement at the Eagle Point Pumping Facility for pumps #6 and #7 which involves controls and electrical improvements. Cost Estimate: $1 ,026,000. RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and estimated cost the Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 1 .25 MG Elevated Water Tower Project. BUDGETIMPACT The cost estimate for the Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 1 .25 MG Elevated Water Tower Project, including all costs associated with Contracts A and B, is: . � - � . � � - � - � . . . Legal Legal expenses associated with the SRF $25,000 SRF Loan Land and Land and Easements SRF $4,000 Easements Construction ContractA: 1.25 MG Elevated SRF $2,285,000 Storage Tower (Composite) (1.OMG SRF Eligible Portion) Construction ContractA: TowerSite Improvements SRF $315,000 Construction Contract6: Distribution System SRF $699,000 Improvements Construction ContractB: WaterSupply (VVater SRF $260,000 Treatment Plant) Improvements (Pumps 6 and 7) Engineering Onsite inspection SRF $180,000 Construction Design & Engineering Planning and Design SRF $475,000 Engineering Total Estimate SRF Eligible $4,243,000 Construction ContractA: 1.25 MG Elevated Local Funds $300,000 Storage Tower (Composite) (0.25MG additional capacity) Construction Contract B: Distribution System Local Funds $67,000 Improvements— Residential PRV installation Engineering Onsite Inspection Local Funds $101 ,500 Construction Land and Land and Easements Local Funds $38,432 Easements Total Estimate Requiring Local Funds $506,932 Contingency Project contingency SRF Eligible $454,370 Loan Fee Loan Initiation Fee SRF Eligible $23,370 Total Project Cost $5,227,672 2 The Roosevelt Street Water Tower Project available funding is as follows: � - � . . � � � � � . � - � Water Fund Cash from project Local Funds $1 ,412,260 savin s IFA State Revolving Fund Loan SRF $4,697,370 Total Funding Available $6,109,630 The total available funding is greater than the estimate of probable cost. This value will be adjusted following bid and award of all contracts to ensure all projects expenses have been covered. REQUESTED ACTION The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 1 .25 MG Elevated Water Tower Project through adoption of the attached resolution. cc: Jenny Larson, Budget Director Gus Psihoyos, City Engineer Kerry Leppert, Water Engineering Assistant Brant Schueller, Water Distribution Supervisor 3 Prepared by Denise Blakelev-Ihrig. Water Department Manager Address: 901 Hawthorn St.: 563-589-4290 Return to: Kevin Firnstahl, City Clerk Address: City Hall- 50 W. 13th St Telephone: 563-589-4121 RESOLUTION NO. 85-19 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE WATER DISTRIBUTION SYSTEM PRESSURE ZONE 2: ROOSEVELT STREET 1.25 MG ELEVATED WATER TOWER PROJECT CONTRACTS A AND B NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the Water Distribution System Pressure Zone 2 Improvements: Roosevelt Street 1.25 MG Elevated Water Tower Project, identified as Contract A: Roosevelt Street Water Tower and Water Distribution Improvements in the estimated amount of $2,900,000; and Contract B: Eagle Point Water Treatment Plant and. Water Distribution Improvements, in the estimated amount of $1,026,000, for a total combined project amount of $3,926,000, are hereby approved. Passed, adopted and approved this 4th day of March 2019. Attest: Kevii7 . Firnstahl, CMC, City Clerk oy D. Buol, Mayor � STATE OF IOWA {SS• p r Distr�bution Im•' �� rovemeMts �ii � . The extent of the work ,consists of the DUBUQUE COUNTY construction of four � pressure, control sta- tions.'Two of the sta- I� tions will be cast-in-- � piace, 10-foot ,by 14 � CERTIFICATION OF PUBLICATION foot-3inch ,structures, and two of the stations will be 6-foot diameter', i ��� precast manhole struc- i, ' CITY OF DUBUQUE,' tures.The stations will ', i IOWA include control valves ; OFFICIAL NOYICE. and -process piping. h 1, SUZ2T111e P11Ce, a 8111111g CIePl{ fOP WOOC�WaPCl ! HEIARYNG ON PLANS, The ConStruCtion of the SPECIFICATI.ONS, pressure control sta-, Communications, Inc., an Iowa cor oration, ublisher t�°ns `"'n �n�iude Sur- ' p p • FORM-OF CONTRACT, face ;restoration in- ', of the Telegraph Herald, a newspaper of gerieral , co T F��xE w�� �iva�ng Pcc �na�HMa ��� C1T'CU12tlOri pUbI1S11eC� lri tlle Clty Of DubuClue, COU11ty TER, DISTRIBUTION ande associatedatratt9,I�� � SY.STEM PRESSURE control. Also included of Dubuque and State of Iowa; hereby certify that the zor�E s: RoosEVE�T ;n tne pro;e�ti;;s,pro- ' STREET 1.26 1lAG:EL�� cess ,pipmg modifica- �� attached notice was published in said newspaper on the lIATED WATER-TOyV- tions. and, pump ,re- ER PROJECT COW- • � f0110w111 C�at85: TRACTS A AND B p�acement at the,Eagle' � g NOTICE-]S HEREBY Point;,Pumping_Facility I � GIVEN: The City Coun• #or pumps #6"and #7,' ; Februar 22 2�19 ' cil of the City ;of Whicli involves controls! i y > > � and electrical improve-i � D'ubuque, Jowa will ments � hold a public hearing i 211C1 fOr W111C11 t110 CI722'g0 1S �41.95 �^ on Che proposed plans, �nY visual-.or.hear-��, � j specificatians, fo'rm oi ing-impaired ,:persorls' � contract and estimatetl needing special assis- r cost�fior the Water Dis- tance or persons with' �� L tributian System Pres- special accessibility', �I sure Zone;;'2 ImproJe- needs should -contact i r the Cify Clerk's office; mentsi Roosevelt Str,eet at (563) 589-4100 or � �Y 1:25 MG Elevated Wa- Subscribed to before me, a Notary Public in and for � ter Tower?ProJect, �n TDD at.(563) 690-6678 � at least 48 hours prior, Dubuque County Iowa accordance' with tne , � , , � provisions of Chapter to the meeting. I � Published by order of, , 26, Code of'lowa, at the City Council given' ° 6`.00 p m ron the 4th on the lSth,<day of, ' t111S�day of 20�, day of March 2019, ,in February zo�e. ' ' the Historic Federal ; I Kevin S.Firnstahi, i �Building CQuncil.Cham-I �� CMC,�City"Clerk�� � bers(second floor),�501 lt 2/22 ' � 1Nest 6th,Street, Dubu-, � ,� que, lowar Said pro-� � , posed plans, specifica=, tions,form'of contract, � NOt2Ty ubI1C lri aT1C� fOP DubuC�u COurity, IOWa. ' and estimated cost are, ,� now on file in the office' of the City Clerk,50 W.. 13th Street'Dubuque. { � Written comments°'re-' �.��• garding the above pub- � IaJ4��t`(K�ftfE�T���E``(F�t ' �ic hearings may be; � ���.���{r„ r submitted to the City il � �°,'�� "'` �;06"Y?9`tlBlS�I���{9C�b0�f 1��r��a Clerk's Office, 50 W, ! y`"B � �S ���1,1,2020 ' 13th St., Dubuque, 4A' � q,y, �y{;��n11S�1pn,�CK��� 52001, om or before � ��,r,,,,,�„�,„,.,�� said time ,of public hearing. At said hear- ing,any°in#erested peF= son may :appear'"a"nd I file objections thereto. �"The scope of 'fhe Project is as follows: � Contract A: Roo- sevelt Street Water ' Tower and; W,ater_' Distribution 'Im-` ;; prove�nents The eztent of the work consists of the construction of a 1.25 MG�water tower ';and associaEed water main''. ` installation.-.The 'pro-i� , ;;ject also inciudes vari-,a ous work associated`I 'with the site improve-; ments including:earth- work, storm se.wer, sanitary sewer service, clearing and grubbing,' PCC pavement, seed-I � ing, and'erosion con-� � �trol Trafific control, is � included in the project to maintain a safe work'', site for both the Con- ' � ��#ractvrand�fhepG611e. �'� j ' F"Conlract`B: Eagle''. € Point 1Natier Treaf- ', � ment plant and 1Na- !