Loading...
Acceptance of Twin Ridge Lift Station Abandonment Project Copyrighted May 20, 2019 City of Dubuque Consent Items # 19. ITEM TITLE: Acceptance of Twin Ridge LiftStationAbandonment Project SUMMARY: City Manager recommending acceptance of the construction contract for the Twin Ridge Lift Station Abandonment Project as completed by Gansen Excavating, Inc. RESOLUTION Accepting Twin Ridge Lift Station Abandonment Project SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt Resolution(s) ATTACHMENTS: Description Type Twin Ridge Lift Station Abandonment Project-MVM City Manager Memo Memo Staff Memo Staff Memo Acceptance Resolution Resolutions Engineer's Cert Supporting Documentation THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Twin Ridge Lift Station Abandonment Project DATE: May 15, 2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the Twin Ridge Lift Station Abandonment Project, as completed by Gansen Excavating, Inc., in the final contract amount of$106,851 .05. I concur with the recommendation and respectfully request Mayor and City Council approval. �� �� ��� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque � ��L L IU-Awer9aclry 1 I �s I �� Masterpiece on the Mississippi �°°'��12 zoia•zoa� TO: Michael C. Van Milligen, City Manager ,__—. FROM: Gus Psiho os, Cit En ineer ' � Y Y 9 .� ., DATE: May 10, 2019 RE: Twin Ridge Lift Station Abandonment Project INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Twin Ridge Lift Station Abandonment Project. BACKGROUND In 2015, the city purchased the sanitary sewer collection and water distribution systems, serving Twin Ridge subdivision, from Twin Ridge Water Corporation. The sanitary sewer collection system is comprised of the gravity collection system, a lift station and a lagoon treatment facility. Also, in 2015, the City constructed a new lift station on Lake Eleanor road. The Lake Eleanor road lift station was designed to serve the area between Key West Drive and U.S. highway 151/61, north of Lake Eleanor road, along with the ability to serve an additional 24 properties within Twin Ridge subdivision. DISCUSSION The Twin Ridge Lift Station Abandonment project was completed by Gansen Excavating, Inc. in the final contract amount of$106,851.05. The project provided for the abandonment of the existing lift station and connect it to a portion (24 properties) of the Twin Ridge subdivision to the City's sanitary sewer collection system. Connecting these properties has reduced the flow entering the existing lagoon treatment facility located within the subdivision. A future project, will include abandoning the lagoon treatment facility and connecting the remaining portion of the Twin Ridge subdivision to the City of Dubuque sanitary sewer collection system. This project is planned for FY2021. BUDGETIMPACT The summary of project costs for the Twin Ridge Lift Station Abandonment Project is as follows: Description Estimate Award Final Construction $ 111,136.00 $ 105,976.17 $106,851.05 Contingency 11,113.60 11,113.60 0.00 Engineering Design & Inspection 18 337.4 18 337.4 21 233.03 Total Pro'ect Cost 140 7. 135 427.21 128 084.08 The funding for this project will be distributed from the CIP identified below: Fund CIP No. + Fund Description Amount 7102754 Twin Ridge Lift Station Abandonment $128,084.0 Total Project Funding 1 8 4 RECOMMENDATION The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of$106,851.05 to Gansen Excavating, Inc. for the Twin Ridge Lift Station Abandonment Project. cc: Jenny Larson, Budget Director Denise Ihrig, PE, Water Department Manager Deron Muehring, Civil Engineer II i 2 RESOLUTION NO. 179-19 ACCEPTING THE TWIN RIDGE LIFT STATION ABANDONMENT PROJECT WHEREAS, the public improvement contract for the Twin Ridge Lift Station Abandonment Project, (the Project) has been completed by the contractor, Gansen Excavating, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $106,851.05; WHEREAS, the Contractor has previously been paid $105,008.49, leaving a balance of $1,842.55; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $1,842.55 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 20th day of May 2019. Attest: Kevirrr"S. Firnstahl, CMC City Clerk oy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE TWIN RIDGE LIFT STATION ABANDONMENT PROJECT 7hs undersigned City Engin�er of th�; City of Dubuqus, low�, herEby c�rtifies that he has inspectEd the Twin Ridgs Lift Stafiion Abandonment Projsct, ancJ th�t said Project has been perfc�rmed in compliance with the terms of th� Public ImprovE;ment Contract, and that the total cost of the completed work is $128,084.OB. �/�/1'-- / r" � , Dated this �7 d�y of i �C�(, 019. __._ _ _.....� L /\ I~/ �xx� �,�;� _ 15_t r Gus Psihoyos, City En ' eer � FiIPd in the office of the City CIPrk on fihe � day of���� , 2019. � �, . � w_, --- Ke n S. Firnstahl, CMC, City Clerk