Acceptance of Phase III, 30-Inch Force Main Relocation Project from 12th to 17th Streets Copyrighted May 20, 2019 City of Dubuque Consent Items # 20. ITEM TITLE: Acceptance of Phase I I I 30-Inch Force Main Relocation Project from 7th Street to 12th Street SUMMARY: City Manager recommending acceptance of the construction contract for Phase I I I of the 30-I nch Force Main Relocation Project from 7th Street to 9th Street, as completed byTop Grade Excavating, Inc. RESOLUTION Accepting the Phase I I I of the 3-Inch Force Main Relocation Project from 7th Street to 9th Street and authorizing the final payment to the contractor SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt Resolution(s) ATTACHMENTS: Description Type Phase I I I Force Main Relocation Project-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Cert Resolutions THE CITY OF Dubuque � AIFA�erlwGh UB E '�� III► Masterpiece on the Mississippi Z°°'�w'2 7A13 2017 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Phase III (7�h to 9�h) of the 30 Inch Force Main Relocation Project from 7�n Street to 12�h Street around the former Public Works Garage Site and the Alliant Energy Site DATE: May 14, 2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for Phase III of the 30-Inch Force Main Relocation Project from 7�h Street to 9�h Street, as completed by Top Grade Excavating, Inc., in the final contract amount of $625,997.44, which is a 7°k increase of the base bid amount of$584,117.80. The increase is due to by-pass pumping, removal and replacement of the existing water main, removal of a sanitary sewer manhole, sanitary sewer lateral repair and stored materials. I concur with the recommendation and respectfully request Mayor and City Council approval. ��JV'vr�"\ �Gtn.r //���{/L�t� Mic ael C. Van Milligen �� � MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF Dubuque � Aq���ns�+sit� U L � i�r.,-., '�! �� s � Masterpiece on the Mississippi 2°°''w12 2013•2017 TO: Michael C. Van Milligen, City Manag�,r--� ��• FROM: Gus Psihoyos, City Engineer , ; I �... ���������, DATE: May 13, 2019 RE: Phase III (7th to 9th) of the 30 Inch Force Main Relocation Project from 7t" Street to 12t" Street around the former Public Works Garage Site and the Alliant Energy Site INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for Phase III of the 30-inch Force Main Relocation Project from 7t" Street to 9th Street. BACKGROUND In 1969 the existing 30-inch force main was constructed from the Cedar Street lift station to the Terminal Street lift station. The route went through the former A.Y. McDonald site, the former City Public Works site, and the Alliant Energy site. During the early 1990's highway 151/61 was constructed through Dubuque. During the highway construction portions of the 30-inch force main were relocated and the portion running through the A.Y. McDonald site was abandoned. However, the portion running through the old Public Works Site and the Alliant Energy site remained in place. In October of 2011, the City experienced a significant failure in the existing force main. Two breaks occurred simultaneously, one at the former Public Works garage site and the other at the Alliant Energy site. After repairs were completed, a third break was experienced at the former Public Works garage site. The cost to repair the breaks, which occurred on the former Public works site, was significant as the site is a Super Fund Site. During the repair work corrosion of the pipe was noted and it was also found that when constructed the pipe was set on blocking prior to bedding, and the blocking was not removed. The areas of corrosion and the failed sections of pipe were near the old blocking that was found to be still in place. Soil and ground water contamination has been identified on or near the existing 30-inch force main route that may be a contributing factor to its deterioration. DISCUSSION The tota! 30-inch Force Main Relocation Project was constructed in three phases from 7tn to 12t" Street. This Phase III portion of the project was from 7t" Street to 9t" Street and is the focus of this memo. Phase III of the 30-inch Force Main Relocation Project from 7t" Street to 9t" Street project was completed by Top Grade Excavating, Inc. in the final contract amount of $625,997.44. This is a 7% increase of the base bid amount of $584,117.80. The increase is due to by-pass pumping, removal and replacement of the existing water main, removal of a sanitary sewer manhole, sanitary sewer lateral repair and stored materials. Phase III section of force main on Washington Street from 7t" Street to 9th Street, was planned and completed in conjunction with the reconstruction of Washington Street from 7t" to 9t" Streets. Phase III also included the final tie-in, at 12t" Street and 7t" Street to complete the final tie-in of the three phased force main reconstruction project. The completion of phase III finished the force main project, the new re-routed force main is now operational. The abandonment of the existing force main through the old Public Works Garage site (Jule Site) and the Alliant Energy Site will be budgeted for in the FY 2020 budget. BUDGETIMPACT The summary of project costs for the Phase III of the 30-inch Force Main Relocation Project from 7th Street to 9t" Street is as follows: Description Estimate Award Final Construction $ 597,400.00 $ 584,117.80 $625,997.4 Contin ency 59,740.00 59,740.00 0.00 Engineering Design & Inspection 98 571.00 96 379.4 22 416.39 Total Project Cost 755 711.00 7 0 2 7.2 648 413. The funding for this project will be distributed from the CIP identified below: CIP No. Fund Description Fund Amount Relocation of 30" Force Main Around Old Public Works 7102413 Garage $316,391 .3 3602552 Washington Street Reconstruction 7th to 9th Street $320,712.4 7101293 Sanitary Ext New Development $11,310.0 Total Project Fundin 648 41 . RECOMMENDATION 2 The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $625,997.44 to Top Grade Excavating, Inc. for Phase III of the 30-inch Force Main Relocation Project from 7t" Street to 9t" Street. cc: Jenny Larson, Budget Director William O'Brien, Water Pollution Control Manager John Klostermann, Public Works Director Todd Irwin, Engineering Technician 3 RESOLUTION NO. 180-19 ACCEPTING THE PHASE III OF THE 30 -INCH FORCE MAIN RELOCATION PROJECT FROM 7TH STREET TO 9TH STREET AND AUTHORIZING THE FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Phase III of the 30 -inch Force Main Relocation Project from 7th Street to 9th Street (the Project) has been completed by the Contractor, Top Grade Excavating, Inc. of Farley, IA (Contractor), and the City Engineer has examined the work and signed a certificate stating that the Project has been completed according to the terms of the Public Improvement Contract and that the City Engineer recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $625,997.44; WHEREAS, the Contractor has previously been paid $620,263.07, leaving a balance of $5,734.37; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor from the Relocation of 30" Force Main, Washington Street Reconstruction from 7th to 9th and the Sanitary Extension New Development CIP appropriations for the contract amount of $625,997.44 less any retained percentage provided for therein as provided in Iowa Code. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $5,734.37 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 20th day of May 2019. Attest: Kevyrs S. Firnstahl, C C City Clerk /),/f.,/ oy D. Buol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 30-INCH FORCE MAIN RELOCATION PROJECT FROM 7TH STREET TO 9TH STREET The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that he has inspected the Phase III of the 30-inch Force Main Relocation Project from 7r" Street to 9t" Street, and that the Project has been completed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $648,413.83. Dated this 14t" day of Mav 2019. ,�-��" �� '���'��"�. �.r Gus Psihoyos, City Engin�er Filed in the office of the City Clerk on the 14th day of Ma� 2019. � ° ���� �a. ,.• � , ,. evin Firnstahl, CMC, City Clerk