Fire Station No. 6 Improvements Project- External Stairwell Addition_Hearing Copyrighted September 3, 2019 City of Dubuque Public Hearings # 2. ITEM TITLE: Fire Station No. 6 Improvements Project- External Stairwell Addition SUMMARY: Proof of publication on notice of public hearing to consider approval of the plans, specifications, form of contract and estimated cost of the Fire Station No. 6 I mprovements Project, and the City Manager recommending approval. RESOLUTION Approval of plans, specifications, form of contract, and estimated cost for the Fire Station 6 External Stairwell Addition Project SUGGESTED DISPOSITION: Suggested Disposition: Receiveand File;Adopt Resolution(s) ATTACHMENTS: Description Type Fire Station 6 External Stairwell Addition Project-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Certificate for Notice to Bidders Supporting Documentation Dubuque THE CITY OF � uI�AaMca cih DuB E � � I � � I Maste iece on the Mississi i Zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Fire Station 6 External Stairwell Addition Project Request to Initiate Construction Bidding CIP: 350-2706 DATE: August 28, 2019 Project Manager Steve Sampson Brown recommends City Council approval of the plans, specifications, form of contract and estimated base bid amount of $203,900 for the Fire Station 6 External Stairwell Addition Project. I concur with the recommendation and respectfully request Mayor and City Council approval. � Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Teri Goodmann, Assistant City Manager Cori Burbach, Assistant City Manager Steve Sampson Brown, Project Manager Gus Psihoyos, City Engineer Rick Steines, Fire Chief Dubuque THE CTTY OF � AII�America Cip DuB E ;�� � �; Maste iece on the Mississi i zoo�.zo�Z=zo�3 � pp 2017*2019 TO: Michael C. Van Milligen - City Manager FROM: Steve Sampson Brown - Project Manager SUBJECT: Fire Station 6 External Stairwell Addition Project Request to Initiate Construction Bidding CI P: 350-2706 DATE: August 28, 2019 INTRODUCTION The enclosed resolution is in reference to the public hearing for the Fire Station 6 External Stairwell Addition Project. BACKGROUND Fire Station 6 is a three story structure that comprises of an apparatus truck bay and kitchen on the ground floor, living quarters and office space on the second floor, and a restricted height basement. The only access between the ground floor and the second floor is a wooden internal staircase that is original to the building which itself was built in 1906. The original staircase has begun to separate at the second floor level and is becoming structurally unstable. DISCUSSION In 2017 the Fire Department contracted with IIW Engineers, Architects, Surveyors P.C. of Dubuque, IA (IIW) to conduct a facility needs assessment for Fire Station 6. The results of that assessment were completed in 2018 which indicated the internal stairwell was in need of replacement. Based on the results of the assessment IIW was hired to design the replacement of the staircase. After consideration of several alternatives and the current and future needs of the fire station, a design option was selected to remove the internal staircase and replace it with an enclosed set of external stairs on northeast side of the station. This alternative has several benefits: • By removing the internal staircase, critically needed additional equipment storage space is created. • The current hose drying tower which can only be accessed via the kitchen area will be relocated to the new external stair tower. • Direct access to the basement from the exterior of the building will be created. Page 1 of 3 PROJECT SCHEDULE The schedule for the project will be as follows: Initiate Bidding August 19, 2019 Publish Notice to Bidders, Advertisement for Bids August 23, 2019 Notice of Hearing on Plans & Specifications August 23, 2019 Public Hearing September 3, 2019 Receipt of Bids September 10, 2019 Award of Contract September 16, 2019 Substantial Completion Date January 17, 2020 Final Completion Date January 31 , 2020 RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and estimated cost for the Fire Station 6 External Stairwell Addition Project. BUDGETIMPACT The estimate of robable cost for this ro�ect is summarized as follows: PROJECT COSTS ESTIMATE Construction Hard Costs Construction Contract — Base Bid $203,900.00 Contin enc 10°k $20,390.00 Total - Bid Project Cost $224,290.00 Optional Add/Deductive Alternates: #1 — Do not tuck point brick on portion of existing north wall & chimne Deductive Alternate #2 — Do not spray foam insulation on inside of new walls and roof framin of new stairwell Deductive Alternate #3 — Provide anodized finish for exterior door system $500.00 Project Soft Costs En ineerin /Architect Desi n & Construction Admin. Fees $31 ,750.00 Reimbursable Ex enses $2,000.00 Cit Staff Administration & Const. Ins ection Fees $1 ,500.00 Total — Project Soft Costs $35,250.00 TOTAL PROJECT COST (Without Bid Alternates) $259,540.00 Page 2 of 3 The funding summary for the Fire Station 6 External Stairwell Addition Project is as follows: CIP Funding Source Amount 350-2706 Structural Repairs at Stations 5 & 6 $240,579.00 350-2575 Implement Mechanical & Electrical System $20,000.00 Desi n Stud Recommendations Total Available Project Funding $260,579.00" " The base bid total project cost is $203,900.00 which fits within the available funding for this project. If the City benefits from a competitive bidding environment and bids for both the Base Bid and Add Alternate #3 are below $260,579.00 then the City will select Add Alternate #3 and included it as part of the award for this project. Otherwise only the base bid will be used as the basis of award for this project. ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the Fire Station 6 External Stairwell Addition Project through the adoption of the attached resolution. SSB\ssb Attachments cc: Gus Psihoyos — City Engineer Rick Steines — Fire Chief F:\PROJECTS\Fire Station No. 6 - Existing Building Evaluation - Stair Tower\City Council Documentation\1_Initiate\FS6 External Stainvell Addition-Initiate Bid Memo.docx Page 3 of 3 RESOLUTION NO. 325-19 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE FIRE STATION 6 EXTERNAL STAIRWELL ADDITION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA THAT: The proposed plans, specifications, form of contract and estimated cost for the Fire Station 6 External Stairwell Addition Project, in the estimated amount $275,000.00, are hereby approved. Passed, approved and adopted this 3rd day of September 2019. A Attest: Kevi S. Firnstahl, CMC, City Clerk Roy D. Buol, Mayor Ceftile@ TM1e untlerslgnetl, being firs[ tluly swom on oa[M1, 4a[es[M1a[TM1e Con4mc[lon Optla[e Plan Room Ne[woh�"W Ne[woh"� Isamryoatlontlulyorganlmtlantled4inguntler[M1elawsof[M1e5a[eof wttM1 ttsptlndpal plam oPousYnesln �esMolnes, Polk County, lowa. TM1e untlerslgnetl also 4a[aes[M1a[M1e Is now antl wasa[[M1e tlme M1erelnaRermentlonetl, [M1e tlul y quallfletl antl ac[Ing aresaa�e/ceo otma m m�wort, a�a maeas�m aresaa�e/ceo otma m m�worta�a ey mu au[M1ortty hom [M1e Exemtl ve BoaN, M1e ausetl a NOTCETOBIOOEIS FlreStatlon 6EMemalStalrvoell Atltlttlon P�JeRln �ubuque A ptln[etl mpy of wM1IM IsattaMetl antl matle part of[M1lscertlfia[e� [o be po4etl In Me Con4mc[lon Optla[e Ne[woh Plan Poom, a relevan[ mn[ac[orplan mom servlce wttM1 4a[ewltle ulatlon antl a relevan[mn[ac[orleatl geneatlngservlm wl[M1 4a[ewltle cl¢ulatlon, on [M1e (ollowing tla[e�s��. Aueu4]3 2019 mrtlfy untlerpenalty of pe Jury antl pursuan[[o[M1e lawsof[M1e 5a[e oFlowa[M1a[[M1e precetling Is [me antl mrtec[. Aueu4]3 2019 � ��� Oa@ P�esltlen[/CEO ofTM1e Con4mc[lon Optla[e Plan Room Ne[woh Kelsey Hutchison Ma9e�Bulltlers ol loxa� FtlmnlSUdl�re F5s9aM 8 Pm�etl I�Ro�mallon Spenallsl P21 PaM1 66eet�PO Bo.695 ��en ivbinss�loua �50306 �tl�515RIA81 ��0�5151B8B904 �e�Mu�ron�mtibutl ���wrvxmtibutl �Phn �om�FtloiMebtlebnreoo� badavtle mm4tlwaoB sAtldlc96w6IXtl61(OFVi &RCOL942 �Qwltlioz�LBoOBIvV%VNwHeNo �- W6 vatlmlFmeFuoO�YonHWIIM4811eZR XBMI&Pb PSIYJkOXa6FlN9e5wFFSPZF81v6�8 BWfx�oJNQ1NWH P5o906 Y9L6 � � M8 : eiog ' � ' • • , � � Qickhe_re ro report tliis emal as spam. RECEIVED NOTICE TO BIDDERS AUG 2 2 2019 SECTION 00120 CITY OF DUBUQUE PUBLIC IMPROVEMENT PROJECT FIRE STATION 6 EXTERNAL STAIRWELL ADDITION PROJECT 120.1 Time and Place for Filinq Sealed Proposals Sealed Bids for the work comprising each improvement as stated below must be filed before 2:30 p.m. on Se_ptember 10, 2019 in the Office of the City Clerk, City Hall — First Floor, 50 West 13th Street, Dubuque, lowa. 120.2 Time and Placed Sealed Proposals Will be O,pened and Considered Sealed proposals will be opened and Bids tabulated at 2:35 p.m. on September 10, 2019, at City Hall - Conference Room C, 50 West 13t" Street, Dubuque, lowa, for consideration by the City Council at its meeting on September 16, 2019. The City of Dubuque, lowa, reserves the right to reject any and all Bids. 120.3 Time for Commencement and Completion of Work Work on the Project must be commenced within ten (10) calendar days after the Notice to Proceed has been issued and shall be fully completed by January 31, . 2020 120.4 Bid Securitv Each Bidder must accompany its Bid with a Bid security as security that the successful Bidder will enter into a contract for the work Bid upon and will furnish after the award of contract a corporate surety Bond, acceptable to the governmental entity, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The Bid security must be in the amount of ten percent (10%) of the amount of the contract and must be in the form of a cashier's check or certified check drawn on a state- chartered or federally chartered bank, or a certified share draft drawn on a state- chartered or federally chartered credit union, or the Bidder may provide a Bid Bond with corporate surety satisfactory to the governmental entity. The Bid Bond must contain no conditions except as provided in this section. 120.5 Contract Documents Copies of the Contract Documents may be obtained at the Engineering Department, City Hall —Second Floor, 50 West 13th Street, Dubuque, lowa 52001. The Contract Documents will also be available on the City's website at www.citvofdubucxue.orq/bids.asi�x. No plan deposit is required. 120.6 Preference for lowa Products and Labor By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of lowa, and to lowa domestic labor, to the extent lawfully required under lowa statutes. 120.7 Sales Tax The Bidder should not include State of lowa sales tax in its Bid. A sales tax exemption certificate will be available for all material purchased in lowa for incorporation into the Project. 120.8 General Nature of Public Im rovement Pro'ect Fire Station 6 External Stairwell Addition Project CIP# 350-2706 This Project involves the removal of the internal stairwell and installation of an exterior brick clad stairwell, along with miscellaneous tuck pointing, interior wall and mechanical system modifications. Base Bid Estimated Total Cost = $203,900.00 Alternate No. 1 Estimated Total Cost = $ �deductive alternate} Alternate No. 2 Estimated Total Cost = $ �deductive alternate} Alternate No. 3 Estimated Total Cost = $ 500 120.9 Pre-Bid Construction Conference Each prospective bidder is encouraged to attend the Pre-Bid Construction Conference to be held at 8:30 AM on Auqust 29, 2019 at Fire Station 6a 1500 Rhomberq Avenue in Dubuque, lowa. Attendance by all prospective bidders is not mandatory but highly recommended. 120.10 Title VI — Non-Discrimination Clause The City of Dubuque in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d-2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of tt�e Secretary, Part 21, Nondiscrimination in Federally assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, sex, age, or disability in consideration for an award. 120.11 Notice to Bidders Distribution On the following date, Seqtember 3, 2019 this Notice was posted at the following locations: 1. The City of Dubuque Website. 2. Master Builders of lowa plan room service. 3. Master Builders of lowa construction lead generating service. ___= END OF SECTION 00120 =___ STATE OF IOWA {SS: DUBUQUE COUNTY CERTIFICATION OF PUBLICATION I, Suzanne Pike, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald, a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: August 23, 2019, and for which the charge is $21.70 Subscribed to before me, a Notary Public in and for Dubuque County, Iowa, this 3'44 day of ,20/9. Notary Pu or Dubuque County owa. MARY K WESTERMEYER Cornet sSiOf Number 154885 My Commission Exp. Feb. 1, 2020 CITY OF DUBUQUE, , IOWA NOTICE OF PUBLIC HEARING ON PLANS, r , SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR FIRE STA- TION 6 EXTERNAL STAIRWELL ADDI- TION PROJECT NOTICE IS HEREBY GIVEN; The City Coun- cil of the City of Dubuque, Iowa - will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Fire Station 6 External Stairwell Ad- dition Project, in accor- dance with the pro- visions of Chapter 26, Code of Iowa, at 6:00 p.m., on the 3rd day of September 2019, in the Historic Federal Build- ing Council Chambers (second i floor), ``'350' West 6th Street, Dubuque, Iowa. Said proposed plans, speci- fications, form of con- tract and estimated I cost are now on file in the office of the City Clerk. Ansaid hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: • This Project involves the removal of the in- ternal stairwell and in- stallation of n-stallationof an exterior brick clad stairwell, along with miscella- neous tuck iscellaneous'tuck pointing, in- terior wall and mech- anical system modifi- cations. odifications.; Individuals with limit- ed English proficiency, vision, ' hearing or speech..':` impairments requiring special assis- tance should ssis-tanceshould contact the City ;Clerk's Office at (563) 589-4100 or, TDD (563) 690-6678 as soon as feasible. Published by, order of the City Council given on the 19th day ,of Au- gust 2019, Kevin S. Firnstahl,'. CMC, City Clerk It 8/23