Bennett Street Storm Sewer ExtCITY OF DUBUQUE, IOWA MEMORANDUM April 30, 2001 TO: FROM: SUBJECT: The Honorable Mayor and City Council Members Michael C. Van Milligen, City Manager Bennett Street Storm Sewer Extension Project Public Works Director Mike Koch is recommending acceptance of the construction contract for the Bennett Street Storm Sewer Extension Project in the final contract amount of $39,302.06. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic a~el C~. Van I~lilligeri MCVM/jh Attachment cc: Barry Lindahl, Corporation Counsel Michael A. Koch, Public Works Director TO: FROM: SUBJECT: CITY OF DUBUQUE, IOWA MEMORANDUM April 30, 2001 Michael C. Van Milligen, City Manager Michael A. Koch, Public Works Director Bennett Street Storm Sewer Extension Project INTRODUCTION The enclosed resolutions provide for the acceptance of the construction contract for the Bennett Street Storm Sewer Extension Project. DISCUSSION The work has been completed on the project by Royal Oaks Excavating in the amount of $39,203.06. The final cost of the project exceeded the original construction contract due to the poor shape of the existing street. RECOMMENDATION I would recommend that the City Council accept the improvement and recommend that the final contract amount be established at $39,203.06. BUDGET IMPACT The project cost for the Bennett Street Storm Sewer Extension Project is as follows: Bid Final Construction Contract Contingency Engineering Total Project Cost $26,557.65 $39,203.06 2,762.2O 0 4,557.63 4,557.63 $33,677.48 $43,760.69 The project will be funded with the General Storm Sewer Construction Fund from a Fiscal Year 2001 appropriation in the amount of $36,000. The remaining balance will also be funded from the General Storm Sewer Construction Fund. ACTION TO BE TAKEN The City Council is requested to adopt the attached resolutions accepting the improvement and establishing the final contract amount. MAK/vjd Prepared by Deron L. Muehdng, Civil Engineer cc: Gus Psihoyos, Assistant City Engineer Prepared by: Gus Psihoyos, Assistant City Enqineer Address: 50 W. 13,h Street, Dubuque, IA 52001-4864 RESOLUTION NO.165-O1 ACCEPTING IMPROVEMENT Whereas, the contract for the Bennett Street Storm Sewer Extension Project has been completed and the City Manager has examined the work and filed his certificate stating that the same has been completed according Lo the terms of the contract, plans and specifications and recommends its acceptance. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the recommendation of the City Manager be approved and that said improvement be and the same is hereby accepted. BE IT FURTHER RESOLVED that the City Treasurer be and he is hereby directed to pay to the contractor from the General Storm Sewer Construction Fund in amount equal to the amount of this contract, less any retained percentage provided for therein. Passed, approved and adopted this 7th day May, 2001. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk Prepared by: Gus Psihoyos, Assistant City EnRineer Address: 50 W. 13m Street, Dubuque, IA 52001-4864 RESOLUTION NO. 166-O1 FINAL ESTIMATE Whereas, the contract for the Bennett Street Storm Sewer Extension Project has been completed and the City Engineer has submitted his final estimate showing the cost thereof including the cost of estimates, notices and inspection and all miscellaneous costs; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That the cost of said improvement is hereby determined to be $43,760.69 and the said amount shall be paid from the General Storm Sewer Construction Fund of the City of Dubuque, Iowa. Passed, approved and adopted this 7th day of May, 2001. Terrance M. Duggan, Mayor Attest: Jeanne F. Schneider, City Clerk City of Dubuque ENGINEERING DIVISION FINAL ESTIMATE FOR: Bennett Street Storm Sewer Extension Project DATE: April 26, 200'1 ITEM QTY. UNIT UNIT COST TOTAL COST 15" RCP, Special 240.00 Lin. Ft. 18" RCP 9.00 Lin. Ft. Intake 101-B, Complete 1.00 No. of intake, Modified 101-B, Complete 1.00 No. of MH#1, Complete 1.00 No. of Junction Box#l, Complete 1.00 No. of Bedding Stone, 1" Clean 107.69 Ton Limestone Backfill Ton 3/4" Rolled Stone Base 235.03 Ton AC Street/Drive Removal/Replacement 26.00 Ton 4" PC Sidewalk 508.50 Sq. Ft. PC Curb & Gutter (Remove & Replace) 187.00 Lin. Ft. Type "A" Residential Drive Approach w/6" walk No. of Sodding 294.33 Sq.Yd. Traffic Control 1.00 Lump Extra Work: 6" PC Sidewalk 139150 Sq. Ft. AC Street Patch 72.24 Ton $24.25 $5,820.00 $30.00 $270.00 $1,300.00 $1,300.00 $2,458.00 $2,458.00 $1,222.00 $1,222.00 $2,990.00 $2,990.00 $12.00 $1,292.28 $4.50 $15.00 $3,525.45 $176.00 $4,576.00 $4.35 $2,211.98 $13.50 $2,524.50 $380.00 $I0.00 $2,943.30 $300.00 $300.00 $6.50 $906.75 $95.00 $6,862.80 TOTAL DUE CONTRACTOR ENGINEERING TOTAL CONSTRUCTION COST I hereby certify that the above statement shows in detail the correct amount of all wo,~ r,~j/q~'~,~ to com~//~he above imprevement. Michael Van Milligen, City Manager ~- City of Dubuque, Iowa The undersigned, ~,~// (7~/--~- ,~¢,~/~,, contractor for the above improvement, does here/b~/accept the above ":Fotal Due Contractor", as full settlement for all claims for said improvement. $39,203.06 $39,203.06 Michael A. Koch Public Works Director