Chavenelle Road Hike Bike Trail Phase 1 Iowa DOT Project No. EDP-2100(695)-7Y-31 Copyrig hted February 15, 2021 City of Dubuque Consent Items # 18. City Council Meeting ITEM TITLE: Chavenelle Road Hike Bike Trail Phase 1 lowa DOT Project No. EDP- 2100(695)--7Y 31 Acceptance of Public Improvement Project CIP 3602273 SUM MARY: City Manager recommending acceptance of the public improvement construction contract for the Chavenelle Road Hike-Bike Trail — Phase 1 Project, as completed by Midwest Concrete, Inc., in the final contract amount of$728,158.12, which is a 14% increase from the original contract amount of $638,840.15. RESOLUTION Accepting the Chavenelle Road Hike-Bike Trail — Phase 1 Project lowa DOT Project No. EDP-2100(695�7Y31 and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Chavenelle Road Hike-Bike Trail Phase 1-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY OF � ui-Aseria cih DuB E , . � . , � II � Maste iece on tj2e Mississi i zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Chavenelle Road Hike Bike Trail Phase 1 lowa DOT Project No. EDP-2100(695)--7Y-31 Acceptance of Public Improvement Project CIP 3602273 DATE: February 9, 2021 City Engineer Gus Psihoyos is recommending acceptance of the public improvement construction contract for the Chavenelle Road Hike-Bike Trail — Phase 1 Project, as completed by Midwest Concrete, Inc., in the final contract amount of$728,158.12, which is a 14% increase from the original contract amount of $638,840.15. Most of the overage is due to additional mulching and erosion control issues. These additional costs are IDOT participating where 80% of the costs are covered by the IDOT earmark grant for the project. I concur with the recommendation and respectfully request Mayor and City Council approval. Y Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF � All•Ameriea Ciq Du B E ���.�.,� .k . , � �����, I I Maste iece on the Mississi 2 zoa�•zoiz=zois � pp zoi�*zoi� TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: February 8, 2021 RE: Chavenelle Road Hike Bike Trail Phase 1 lowa DOT Project No. EDP-2100(695)-7Y-31 Acceptance of Public Improvement Project CIP 3602273 INTRODUCTION The enclosed resolution provides for the acceptance of the public improvement construction contract for the Chavenelle Road Hike-Bike Trail - Phase 1 Project, lowa DOT Project No. EDP-2100(695)-7Y-31. BACKGROUND In September 2015, city staff were notified that federal earmark funds from the USDOT SAFETEA-LU transportation bill were available for a trail project. The City was asked by East Central Intergovernmental Agency (ECIA) staff if a project could be identified that would connect to the Mississippi River Trail (MRT). In coordination with ECIA and the Planning Department, city staff identified Chavenelle Road between the NW Arterial and Seippel Road as a good candidate for a hike/bike trail. The corridor has gaps in the sidewalk and no bicycle facilities currently serve the industrial park. On September 10th, 2015 DMATS approved the alignment and approved to use the funds for a grade separated trail. In December of 2015, the Federal Highway Administration (FHWA) approved the movement of the earmark funds to this project in the amount of $906,139 for FY 2017. On April 14, 2016 DMATS approved Transportation Alternative Program funds in the amount of $242,863.00. The total project cost estimate for the for both phases of Chavenelle Road Hike/Bike Trail is estimated to be $1,436,262. Below is a table that shows the total planned funding for both phases of the total hike/bike trail: Total Funding Source Amount FHWA Trail Earmark $ 906,139.00 TAP Grant $ 242,863.00 REAP Grant $ 175,000.00 DICW TIF $ 112,260.00 TOTAL $ 1,436,262.00 DISCUSSION The Chavenelle Hike/Bike Trail Phase 1 was completed by Midwest Concrete, Inc. of Peosta, lowa in the final contract amount of $728,158.12 which is a 14% increase from the original contract amount of$638,840.15. The Chavenelle Trail project had an overage of $89,317.97. Most of this overage is due to additional mulching and erosion control issues that required the City to use 12" diameter perimeter and slope sediment control measures instead of silt fence that was originally specified. These additional costs are IDOT participating where 80% of the costs are covered by the IDOT earmark grant for the project. The Chavenelle Hike/Bike Trail project involved the construction of a 10-foot-wide concrete trail on the north side of Chavenelle Road from IA 32 (NW Arterial to Seippel Road). The final trail project will be constructed in two phases and will provide a multi- modal connection to the NW Arterial Hike/Bike Trail, the Bergfeld Pond Trail and Seippel Road. Ultimately the trail will provide a connection to the SW Arterial. This trail will connect users to the Mississippi River Trail. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the final payment of the contract amount of $728,158.12 to Midwest Concrete, Inc., of Peosta, lowa for the Chavenelle Road Hike-Bike Trail - Phase 1 Project, lowa DOT Project No. E D P-2100(695)-7Y-31. BUDGETIMPACT The project cost summary for the Chavenelle Road Hike-Bike Trail - Phase 1 Project is summarized below: Description Estimate Award Final Construction — Phase I $ 699,529.00 $ 638,840.15 $728,158.12 Contin ency (10% 69,952.90 69,952.90 0.00 Construction En ineerin & Ins ection 115,785.00 115,785.00 100,571.94 Pro ert Easements 25,160.37 25,160.37 25,160.37 Total Construction Cost Estimate $ 910,427.27 $ 849,738.42 $853,890.43 The proposed project funding is summarized as follows: CIP Fund Description City IDOT Total 3602273 Chavenelle Trail $ 170,778.09 $683,112.34 $ 853,890.43 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the public improvements and to authorize the payment of the final contract amount of $728,158.12 to Midwest Concrete, Inc., of Peosta, IA for the Chavenelle Road Hike-Bike Trail - Phase 1 Project (lowa DOT Project No. EDP-2100(695)-7Y-31. 2 cc: Jenny Larson, Finance and Budget Director John Klostermann, Public Works Director Marie Ware, Leisure Services Manager Wally Wernimont, Planning Services Manager Bob Schiesl, Assistant City Engineer 3 Prepared by: Jon Dienst, City of Dubuque, 50 W. 131h Street, Dubuque, IA 52001 (563)589-4270 Return to: Adreinne N. Breitbelder, City Clerk, 50W 13th Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 39-21 ACCEPTING THE CHAVENELLE ROAD HIKE -BIKE TRAIL — PHASE 1 PROJECT IOWA DOT PROJECT NO. EDP-2100(695)-7Y-31 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Chavenelle Road Hike -Bike Trail - Phase 1 Project, Iowa DOT Project No. EDP-2100(695)-7Y-31, (the Project) has been completed by the Contractor, Midwest Concrete, Inc. (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount fdr the�Pr�o.ect is $728,158.12; WHEREAS, the trto�h;�s pr vidusly been paid $706,313.38, leaving a balance of $21,844.75; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $21,844.75 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 15th day of February_2021. b Roy D. a ol, Mayor Attest: Adrienne N. Breitfelder, tity Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF CHAVENELLE ROAD HIKE-BIKE TRAIL — PHASE 1 PROJECT IOWA DOT PROJECT NO. EDP- 2100(695)-7Y-31 The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that he has inspected the Chavenelle Road Hike-Bike Trail - Phase 1 Project, lowa DOT Project No. EDP-2100(695)-7Y-31 has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $853,890.43. Dated this 9t" day of February 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 9t" day of February 2021. �� ,r .�}�� �-� r � ;,j , ,r.'� f ! . 7 a, r�fv .. �' , . . . . . . . . � - .. Adrienne N. Breitfelder, City Clerk