Fire Station 6 External Stairwell Addition Project Request to Initiate Construction Bidding_Hearing Copyrighted J une 7, 2021 City of Dubuque Public Hearings # 2. City Council Meeting ITEM TITLE: Fire Station 6 External Stairwell Addition Project Request to Initiate Construction Bidding SUM MARY: Proof of publication on notice of public hearing to consider City Council approval of the plans, specifications, form of contract and the estimated cost of$395,100 for the Fire Station 6 E�ernal Stairwell Addition Project, and City Manager recommending approval. RESOLUTION Approval of plans, specifications, form of contract, and estimated cost for the Fire Station 6 External Stairwell Addition Project SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Fire Station 6 External Stairwell Project-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY OF � ui-Aseria cih DuB E , . � . , � II � Maste iece on tj2e Mississi i zoo�•zoiz•zois YP pp zoi�*zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Fire Station 6 External Stairwell Addition Project Request to Initiate Construction Bidding CIP: 350-2706 DATE: June 3, 2021 City Engineer Gus Psihoyos recommends City Council approval of the plans, specifications, form of contract and the estimated cost of $395,100 for the Fire Station 6 External Stairwell Addition Project. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Steve Sampson Brown, Project Manager Dubuque THE CITY OF � All•p�eedoa Ci� Du B � ;�� �; � � � �� MRste iece on the MisSiSsi i zoo�•zoiz=zois � pp zoi�*zot9 TO: Michael C. Van Milligen, City Manager FROM: Steve Sampson Brown, Project Manager SUBJECT: Fire Station 6 External Stairwell Addition Project Request to Initiate Construction Bidding CIP: 350-2706 DATE: May 26, 2021 INTRODUCTION The attached resolution is in reference to the public hearing for the Fire Station 6 External Stairwell Addition Project. BACKGROUND Fire Station 6 is a three-story structure that comprises of an apparatus truck bay and kitchen on the ground floor, living quarters and office space on the second floor, and a restricted height basement. The only access between the ground floor and the second floor is a wooden internal staircase that is original to the building which was built in 1906. The original staircase has begun to separate at the second-floor level and is becoming structurally unstable. DISCUSSION In 2017 the Fire Department contracted with IIW Engineers, Architects, Surveyors P.C. of Dubuque, IA (I IW)to conduct a facility needs assessment for Fire Station 6. The results of that assessment were completed in 2018 which indicated the internal stairwell was in need of replacement. Based on the results of the assessment, IIW was hired to design the replacement of the staircase. After consideration of several alternatives and the current and future needs of the fire station, a design option was selected to remove the internal staircase and replace it with an enclosed set of external stairs on northeast side of the station. This alternative has several benefits: • By removing the internal staircase, critically needed additional equipment storage space is created on the first floor. • The current hose drying tower which can only be accessed via the kitchen area will be relocated to the new external stair tower. • Direct access to the basement from the exterior of the building will be created. Page 1 of 3 PROJECT SCHEDULE The schedule for the project will be as follows: Initiate Bidding May 17, 2021 Publish Notice to Bidders, Advertisement for Bids May 21, 2021 Notice of Hearing on Plans & Specifications May 21, 2021 Public Hearing June 7, 2021 Receipt of Bids June 9, 2021 Award of Contract June 21, 2021 Substantial Completion Date December 17, 2021 Final Completion Date December 31, 2021 RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and estimated cost for the Fire Station 6 External Stairwell Addition Project. BUDGETIMPACT The estimate of probable cost for this project is summarized as follows: PROJECT COSTS ESTIMATE Construction Hard Costs Construction Contract— Base Bid $346,000.00 Contin enc 10% $34,600.00 Total - Bid Project Cost $380,600.00 Project Soft Costs En ineerin /Architect Desi n & Construction Admin. Fees $10,000.00 Reimbursable Ex enses $2,000.00 City Staff Administration & Const. Ins ection Fees $2,500.00 Total — Project Soft Costs $14,500.00 TOTAL PROJECT COST $395,100.00 The funding summary for the Fire Station 6 External Stairwell Addition Project is as follows: CIP Funding Source Amount 102/350-2706 Structural Repairs at Stations 5 & 6 $462,662.00 Total Available Project Funding $462,662.00 Page 2 of 3 ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the Fire Station 6 External Stairwell Addition Project through the adoption of the attached resolution. SSB\ssb cc: Gus Psihoyos, City Engineer Rick Steines, Fire Chief F:\PROJECTS\Fire Station No. 6 - Existing Building Evaluation - Stair Tower\City Council Documentation\1_Initiate\FS6 External Stairwell Addition-Initiate Bid Memo2021.docx Page 3 of 3 Prepared by Kerry Bradley City of Dubuque Engineering 50 W 13th St Dubuque Iowa 52001 (563)589-4270 Return to Adrienne N. Breitfelder City of Dubuque City Clerk 50 W 13th St Dubuque, Iowa 52001 (563)589-4100 RESOLUTION NO. 196-21 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE FIRE STATION 6 EXTERNAL STAIRWELL ADDITION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for Fire Station 6 External Stairwell Addition Project, in the estimated amount $346,000.00, are hereby approved. Passed, adopted and approved this 7th day of June 2021. r /Li Roy D. Buol, Mayor Attest: Aiuiol/r Adrienne N. Breitfelder, City Clerk