2021 Asphalt Overlay Access Ramp Project 2Copyrighted September 7, 2021 City of Dubuque Consent Items # 18. City Council Meeting ITEM TITLE: 2021 Asphalt Overlay Access Ramp Project 2 SUMMARY: City Manager recommending acceptance of the construction contract for the 2021 Asphalt Overlay Access Ramp Project 2, as completed by S & S Builders, in the final contract amount of $93,349.29. SUGGESTED DISPOSITION: ATTACHMENTS: Description RESOLUTION Accepting the 2021 Asphalt Overlay Access Ramp Project 2 and authorizing the payment to the contractor Suggested Disposition: Receive and File; Adopt Resolution(s) 2021 Asphalt Overlay Ramp Project 2-MVM Memo Staff Memo Type City Manager Memo Staff Memo Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2021 Asphalt Overlay Access Ramp Project 2 (CIP 3001227) DATE: August 31, 2021 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2021 Asphalt Overlay Access Ramp Project 2, as completed by S & S Builders, in the final contract amount of $93,349.29. This is a 12.12% increase over the original contact amount of $83,257 due to additional access ramps being installed, additional curb repairs that were required, and additional curb and sidewalk added that was added. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE C DUj!B9kFE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2021 Asphalt Overlay Access Ramp Project 2 (CIP 3001227) DATE: August 31, 2021 INTRODUCTION Dubuque AII•Amarica City 2007-2012.2013 2017*2019 The enclosed resolution provides for the acceptance of the construction contract for the 2021 Asphalt Overlay Access Ramp Project 2. BACKGROUND The project replaced twenty-six (26) non -compliant curb access ramps at ten (10) intersections in compliance with the Public Right of Way Accessibilities Guidelines (PROWAG) specifications. The curb access ramp work was completed in coordination with the Public Works Departments Asphalt Overlay Program at the following locations: 1. Lombard Street at Jenni Street, two single ramps. 2. Lombard Street at Stetmore Street, two single and one double ramps. 3. Lombard Street at Meadow Lane, two single ramps. 4. Ungs Street at Clarke Drive, two single ramps. 5. Ungs Street at Hoyt Street, two single ramps. 6. Ungs Street at North Grandview Avenue, two single ramps. 7. Lincoln Avenue at Rhomberg Avenue, two single ramps. 8. Lincoln Avenue at Sumner Street, two single ramps. 9. Lincoln Avenue at Hawthorne Street, two single ramps. 10. Roosevelt Street at Rhomberg Avenue, two single and two double ramps. DISCUSSION The 2021 Asphalt Overlay Access Ramp Project 2 was completed by S & S Builders, of Dubuque, IA in the final contract amount of $93,349.29. This is a 12.12% increase over the original contract amount of $83,257.00. The increase was due to several factors including the following: • Additional access ramps were installed at the NE and SE corners of Roosevelt St. and Rhomberg Ave. This is directly related to additional miles of asphalt overlay work added to the 2021 PW Asphalt overlay program. • Additional curb repairs were required on Hoyt St. as existing curb was in of poorer quality condition than originally thought and failed during the project. • Additional curb and sidewalk added near Lombard St. and Meadow Ln. to address an old City tree stump. BUDGETIMPACT The summary of project costs for the 2021 Asphalt Overlay Access Ramp Project 2 is as follows: Description Estimate Award Final Construction Contract $ 93,081.00 $83,257.00 $ 93,349.29 Contingency $9,308.10 $8,325.70 0.00 Construction Administration & Inspection 1 $10,238.91 $9,158.27 $14,002.39 Total Construction Cost $ 112,628.01 $100,740.97 $107,351.68 The project funding is summarized below: CIP No. Fund Description Fund Amount 3001227 Curb Ramp Program $ 107,351.68 Total Project Funding $ 107,351.68 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $93,349.29 to S & S Builders, for the 2021 Asphalt Overlay Access Ramp Project 2. cc: John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Paul Davis, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II 2 Prepared by: Jon Dienst City of Dubuque Engineering 50 W. 13" Street Dubuque IA 52001 (563)589 4270 Return to: Adreinne N. Breitbelder, City Clerk, 50W 13" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 299-21 ACCEPTING THE 2021 ASPHALT OVERLAY ACCESS RAMP PROJECT 2 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for 2021 Asphalt Overlay Access Ramp Project 2, (the Project) has been completed by the Contractor, S & S Builders, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $93,349.29.00; and WHEREAS, the Contractor has previously been paid $88,681.83, leaving a balance of $4,667.46; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $4,667.46 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 7th day of September 2021, v Roy . uol, Mayor Attest: Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2021 ASPHALT OVERLAY ACCESS RAMP PROJECT 2 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2021 Asphalt Overlay Access Ramp Project 2 has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $107,351.68. Dated this 31 st day of August 2021. Gus Psihoyos, Ci y ngineer Filed in the office of the City Clerk on the 31 st day of August 2021. Adrienne N. Breitfelder, City Clerk