Chaplain Schmitt Veterans Memorial Project - Acceptance of the Construction ContractCity of Dubuque City Council Meeting Consent Items # 19. Copyrighted September 7, 2021 ITEM TITLE: Chaplain Schmitt Veterans Memorial Project —Acceptance of the Construction Contract SUMMARY: City Manager recommending acceptance of the construction contract for the Chaplain Schmitt Veterans Memorial Project, as completed by Conlon Construction, in the final contract amount of $2,579,595.77. RESOLUTION Accepting the Chaplain Schmitt Veterans Memorial Project, and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Chaplain Schmitt Veterans Memorial Project-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque DUB TEE All -America City Masterpiece on the Mississippi � pp zoo�•*o 13 zoi720zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Chaplain Schmitt Veterans Memorial Project — Acceptance of the Construction Contract C I P# 100-2781 DATE: September 2, 2021 Project Manager Steve Sampson Brown is recommending acceptance of the construction contract for the Chaplain Schmitt Veterans Memorial Project, as completed by Conlon Construction, in the final contract amount of $2,579,595.77. This is a 0.8% increase over the original contract amount of $2,560,000.00 due to several factors including the following: parking lot modifications, landscape & irrigation enhancements, and architectural changes to the elevated boardwalk. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Steve Sampson Brown, Project Manager THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen - City Manager FROM: Steve Sampson Brown — Project Manager Dubuque MI-Amldla Cily 2007-2012.2013 2017*2019 SUBJECT: Chaplain Schmitt Veterans Memorial Project —Acceptance of the Construction Contract CIP# 100-2781 DATE: September 1, 2021 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the Chaplain Schmitt Veterans Memorial Project. BACKGROUND In November 2018 The Dubuque City Council approved the Chaplain Schmitt Island Improvement Agreement between the City of Dubuque and the Dubuque Racing Association, LTD (DRA) for the development of the Chaplain Schmitt Veteran's Memorial Project. The Improvement Agreement required that all design, bids, change orders over $5,000.00, and design changes must be approved by a majority of the Chaplain Schmitt Project Advisory Committee. The members of the Advisory Committee are: For City: Mike Van Milligen — City Manager* Gus Psihoyos — City Engineer Marie Ware — Leisure Services Manager For DRA: Rick Dickinson Gary Dolphin Kevin Lynch On June 14, 2019 the Chaplain Schmitt Project Advisory Committee met and affirmed the final project scope, budget, and to initiate bidding on the project. The Chaplain Schmitt Veterans Memorial Project included several amenities to honor Veterans, Chaplain Schmitt himself, and improved the overall experience and enhanced the existing monuments. The improvements also included enhancing the Veterans Memorial Plaza by improving the edge of the pond with seating, plaza expansion space for additional memorials and Veterans' tributes, and clean-up of the pond edge to enhance viewsheds. The Chaplain Schmitt Island Memorial itself was composed of a decorative swirling concrete Page 1 of 3 path that transforms into an elevated boardwalk that extends from the Veteran's Plaza over the pond. Located at the end of the boardwalk is a circular landing that contains a sculpture titled "Skyward". The sculpture is a 52' long stainless -steel sheet with vertical cut slits that is 24' high on one end and tapers down to 15' on the other end. The sheet was then loosely rolled to a diameter of 11'. An opening allows pedestrians to enter the sculpture to where they are able to read a poem that is etched onto the metal. The design also included colorful nighttime lighting used in a subtle way to honor our Veterans and add prominence to the memorial. The Memorial Plaza is intended to facilitate formal and informal gatherings, ceremonies, and contemplation. The Plaza as designed will become part of the overall public space system on the island. Lastly, the Tri-State Vietnam Veteran's Memorial has been relocated from Miller Riverview Park to the new Memorial Plaza. DISCUSSION The Chaplain Schmitt Veterans Memorial Project was completed by Conlon Construction, of Dubuque, IA in the final contract amount of $2,579,595.77. This is a 0.8% increase over the original contract amount of $2,560,000.00. The increase was due to several factors including the following: parking lot modifications, landscape & irrigation enhancements, and architectural changes to the elevated boardwalk. The project was formally dedicated and opened to the public on May 30, 2021. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the contract amount of $2,579,595.77 to Conlon Construction Company of Dubuque, IA for the Chaplain Schmitt Veterans Memorial Project. BUDGETIMPACT The summary of project costs for the Chaplain Schmitt Veterans Memorial Project is as follows: PROJECT COSTS ESTIMATE AWARD FINAL Construction Hard Costs Construction Contract — Base Bid $2,404,000.00 $2,560,000.00 $2,560,000.00 Contingency (change orders) $180,300.00 $44,550.00 $19,595.77 Total Construction Project Cost $2,653,050.00 $2,739,550.00 $2,579,595.77 All of the $3,200,000 in project funding was provided by the Dubuque Racing Association, LTD. The additional construction change order costs in the amount of $19,595.77 will be covered by the Dubuque Racing Association. Page 2of3 The funding summary for the Chaplain Schmitt Veteran's Memorial Project is as follows: CIP Funding Source Amount 100-2781 Chaplain Schmitt Veteran's Memorial Project $3,200,000.00 ACTION TO BE TAKEN The City Council is requested to adopt the attached resolution to accept the improvements and to authorize the payment of the contract amount of $2,579,595.77 to Conlon Construction for the Chaplain Schmitt Veterans Memorial Project. SSB\kb cc: Jenny Larson - Director of Finance & Budget Gus Psihoyos — City Engineer Marie Ware — Leisure Services Manager Page 3 of 3 Prepared by: Steve Sampson Brown City of Dubuque Engineering 50 W 13" Street Dubuque IA 52001 (563)589 4270 Return to: Adreinne N. Breitbelder, City Clerk, 50W 13" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 300-21 ACCEPTING THE CHAPLAIN SCHMITT VETERANS MEMORIAL PROJECT, AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Chaplain Schmitt Veterans Memorial Project (the Project) has been completed by the Contractor, Conlon Construction, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $2,579,595.77; and WHEREAS, the Contractor has previously been paid $2,450,615.98, leaving a balance of $128,979.79; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Director of Finance & Budget is hereby directed to pay to the Contractor the balance of the retainage of $128,979.79 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 711 day of September 2021. Attest: (�� ✓niL i `. &lliye2 Adrienne N. Breitfelder, City Clerk Roy 4Duo(l—Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE CHAPLAIN SCHMITT VETERANS MEMORIAL PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Chaplain Schmitt Veterans Memorial Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $2,579,595.77. Dated this 1st day of September 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 1st day of September 2021. Adrienne N. Breitfelder, City Clerk