2021 Asphalt Overlay Access Ramp Project 3Copyrighted November 1, 2021 City of Dubuque Consent Items # 12. City Council Meeting ITEM TITLE: 2021 Asphalt Overlay Access Ramp Project 3 SUMMARY: City Manager recommending acceptance of the construction contract for the 2021 Asphalt Overlay Access Ramp Project 3, as completed by Midwest Concrete, in the final contract amount of $154,728.90, which is a 4.53% increase over the original contract amount of $148,018.00 due to additional curb repairs and additional sidewalk. RESOLUTION Accepting the 2021 Asphalt Overlay Access Ramp Project 3 and Authorizing the Payment to the Contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type 2021 Asphalt Overlay Access Ramp Project 3-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2021 Asphalt Overlay Access Ramp Project 3 (CIP 3001227) DATE: October 25, 2021 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2021 Asphalt Overlay Access Ramp Project 3, as completed by Midwest Concrete, in the final contract amount of $154,728.90, which is a 4.53% increase over the original contract amount of $148,018.00 due to additional curb repairs and additional sidewalk. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE C DUj!B9kFE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2021 Asphalt Overlay Access Ramp Project 3 (CIP 3001227) DATE: October 22, 2021 Dubuque AII•Amarica City 2007-2012.2013 2017*2019 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2021 Asphalt Overlay Access Ramp Project 3. BACKGROUND The project replaced fifty-eight (58) non -compliant curb access ramps at fourteen (14) intersections in compliance with the Public Right of Way Accessibilities Guidelines (PROWAG) specifications. The curb access ramp work was completed in coordination with the Public Works Departments Asphalt Overlay Program at the following locations- 1 . Saint John Dr at Hillcrest Rd, one single and one double ramps. 2. Saint John Dr at Graham Cir. (South Intersection), four double ramps. 3. Saint John Dr at Westway Street, two single and one double ramps. 4. Graham Cir. At Westway Street, four double ramps. 5. Westway Street at Keyway Dr, one single and one double ramps. 6. Saint John Dr at Suzanne Dr, two single and one double ramps. 7. Saint John Dr at Graham Cir. (North Intersection), four double ramps. 8. Saint Celia Street at Graham Cir. (North Intersection), two single & one double ramps. 9. Saint Celia Street at Lisa Court, two single ramps. 10. Suzanne Dr at Westway Street, two single ramps. 11. Saint Celia Street at Westway Street, two single and two double ramps. 12. Saint Celia Street at Graham Cir. (South Intersection), two single ramps. 13. Saint Celia Street at Hillcrest Rd, two single ramps. 14. Graham Cir. at Graham Court, two single ramps. DISCUSSION The 2021 Asphalt Overlay Access Ramp Project 3 was completed by Midwest Concrete, of Peosta, IA in the final contract amount of $154,728.90. This is a 4.53% increase over the original contract amount of $148,018.00. The increase was due to factors including the following: • Additional curb repairs at 2200 block off St. John Dr. • Additional curb repairs were required at N. W. intersection of Graham Cir (North) and St John Dr. • Additional sidewalk added at S.W. corner of Graham Cir (South) and St. John Dr. to address an old City tree stump. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the final contract amount of $154,728.90 to Midwest Concrete, Inc. for the 2021 Asphalt Overlay Access Ramp Project 3. BUDGETIMPACT The summary of project costs for the 2021 as follows: Asphalt Overlay Access Ramp Project 3 is Description Estimate Award Final Construction Contract $ 173,757.00 $148,018.00 $ 154,728.90 Contingency $17,375.70 $14,801.80 0.00 Construction Administration & Inspection $19,113.27 $16,281.98 $15,472.89 Total Construction Cost $ 210,245.97 $179,101.78 $170,201.79 The project funding is summarized below: CIP No. Fund Description Fund Amount 3001227 Curb Ramp Program $ 170,201.79 Total Project Funding $ 170,201.79 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $154,728.90 to Midwest Concrete, for the 2021 Asphalt Overlay Access Ramp Project 3. cc: John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Paul Davis, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II 2 Prepared by: Jon Dienst. City of Dubuque Engineering 50 W. 13`^ Street Dubuque IA 52001 (563)589-4270 Return to: Adrienne N. Breitfelder, City Clerk, 50W 13'" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 374-21 ACCEPTING THE 2021 ASPHALT OVERLAY ACCESS RAMP PROJECT 3 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2021 Asphalt Overlay Access Ramp Project 3 (the Project) has been completed by the Contractor, Midwest Concrete, Inc., (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $154,728.90; and WHEREAS, the Contractor has previously been paid $146,992.46, leaving a balance of $7,736.45; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $7,736.45 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 1st day of November 2021. Attest: az�lio'g� '/7 f Adrienne N. Breitfelder, City Clerk P /-" Roy D. Fol, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF 2021 ASPHALT OVERLAY ACCESS RAMP PROJECT 3 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2021 Asphalt Overlay Access Ramp Project 3 has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $170,201.79. Dated this 22nd day of October 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 22nd day of October 2021. Adrienne N. Breitfelder, City Clerk