City-Wide Water Distribution System, Storage and Pumping Improvements Project 2021 - Award of Engineering ContractCity of Dubuque City Council Meeting Action Items # 7. Copyrighted November 1, 2021 ITEM TITLE: City -Wide Water Distribution System, Storage and Pumping Improvements Project 2021 -Award of Professional Engineering Contract SUMMARY: City Manager requesting authorization to enter a contract for professional engineering services with Origin Design of Dubuque, Iowa for the City - Wide Water Distribution System, Storage and Pumping Improvements Project 2021 in the amount of $793,800. SUGGESTED Suggested Disposition: Receive and File; Approve DISPOSITION: ATTACHMENTS: Description Type City -Wide Water Distribution System, Storage and City Manager Memo Pumping Improvements Project-MVM Memo CtyWide Improvements Award MVM Memo Staff Memo THE CITY OF Dubuque DUB TEE All -America City Masterpiece on the Mississippi � pp zoo�•*o 13 zoi720zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: City -Wide Water Distribution System, Storage and Pumping Improvements Project 2021 - Award of Professional Engineering Contract DATE: October 27, 2021 The City received two responses to a request for professional engineering proposals for the City -Wide Water Distribution System, Storage and Pumping Improvements. After review of the information provided by each firm and the innovation and initiative each firm would bring to the project, including an evaluation of the costs associated with the full scope of services, the selection committee recommends entering into a contract with Origin Design. Water Department Manager Christopher Lester requests City Council authorization to enter a contract for professional engineering services with Origin Design of Dubuque, Iowa for the City -Wide Water Distribution System, Storage and Pumping Improvements Project 2021 in the amount of $793,800. The City of Dubuque received notification from the Iowa Finance Authority on October 5, 2021, that its Planning and Design State Revolving Loan (Iowa SRF) Application was approved. The proposed engineering and design work will be funded in their entirety through the Iowa SRF Loan. I concur with the recommendation and respectfully request Mayor and City Council approval. Micliael C. Van Milligen MCVM:jh Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Christopher Lester, Water Department Manager THE CITYF DUiYB- E-E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Christopher Lester, Water Department Manager Dubuque AN -Americo CRY 2007-2012.2013 2017*2019 DATE: October 26, 2021 RE: City -Wide Water Distribution System, Storage, and Pumping Improvements Project 2021 Award of Professional Engineering Contract INTRODUCTION The purpose of this memorandum is to request authorization to enter a contract for professional engineering services with Origin Design of Dubuque, Iowa for the City -Wide Water Distribution System, Storage, and Pumping Improvements Project 2021. BACKGROUND The City of Dubuque is looking to address necessary improvements associated with its water distribution system. These improvements will address water resiliency, reduction of bottlenecks, improve water storage and pumping at key locations throughout the community to support the existing customer base, and prepare the city for increased demands associated with the existing customers. The project will also assist the City's need to reduce and better manage dead-end water mains and other areas where water age and water quality can suffer due to lack of circulation. The city will work with the successful engineering firm to identify the necessary improvements following a hydraulic assessment using the City's hydraulic distribution model currently residing with Origin Design, Dubuque, Iowa. The city will seek project financing and authorize construction as deemed appropriate. The work will be funded by a successful award of the City's application for an Iowa SRF loan for the proposed improvements, and the successful award of an Iowa SRF Planning and Design Loan. The planning and design application was submitted to the Iowa DNR on October 1, 2021, and the city was in receipt of a successful application on October 5t' DISCUSSION On October 13, 2021, the City initiated a request for professional engineering proposals for the City -Wide Water Distribution System, Storage, and Pumping Improvements. The successful engineering firm will be required to complete the following scope of services: Determine the requirements for land acquisition and easements, prepare plats and easement exhibits as necessary and assist the City with obtaining these requirements. • Assist the City in soliciting for professional geotechnical evaluation and reporting services as necessary for the design of the identified projects. • Prepare construction plans and specifications for all projects identified as Phase 1 improvements • North Cascade Road and Southwest Arterial Water Main Extensions, • Southwest Arterial Water Tower, and • Rockdale Road Water Main Extension. Phase 2 improvements • Central Avenue and Olympic Heights Water Main Extensions, • and Central Avenue Booster Station. • Each of these projects will be prepared for bid meeting the requirements of Iowa SRF. The plans and specifications shall be sealed by a professional engineer licensed in the State of Iowa. The firm shall also be required to prepare and obtain any and all federal, state, and local construction permits. Including but not limited to Iowa DNR Construction Permits, Joint Applications, Dubuque County Soil and Erosion Control permit(s), and City of Dubuque Soil and Erosion Control Permit(s) and Building Permit(s). Prepare bid opening documents, complete a bid review, and prepare a written bid analysis and contract award documents meeting the requirements of Iowa SRF including submittal of those documents on behalf of the City. Engineering Firm Review and Short List Process The City received two engineering proposals on October 22, 2021. Each proposal was reviewed and scored by an approved committee. Proposals were submitted by: Origin Design of Dubuque, Iowa and Fehr Graham of Manchester, Iowa. The selection committee comprised of staff from the Water, Engineering, and the W&RRC. The committee reviewed each proposal to ensure that the minimum requirements of the proposal format were met. They were tasked with reviewing each proposal using a scoring system to place qualifying proposals on a consultant short-list for interview. The following criteria was used to initially evaluate the submitted proposals: 1. The firm must have a high level of professional competence and a proven track record in the preparation of similar projects: a. Qualifications and experience of the Consultant and any subconsultants. b. Demonstration of the project team's professional expertise and technical abilities. c. If a joint venture with subconsultants, the track records of the Firms experience working together. d. Experience of the Consultant working on municipal projects. e. Experience of the Consultant working on municipal projects in Iowa. 2. Review of the quality and completeness of the written proposal. The proposal should clearly demonstrate understanding of the City's overall objectives for the project. 3. Review of the design approach/methodology in completing scope of services such as: 2 a. Grasp of project requirements and level of interest in the project. b. Creativity and problem -solving ability. c. Ability of Consultant team to demonstrate initiative, motivation and knowledge as an indication of their desire to work with the City of Dubuque. 4. Confirm inclusion of a proposed schedule required to complete the project. The selection committee unanimously recommended a single firm be selected for the project; therefore, no further questions were asked of the design firms. Engineering Firm Selection and Recommendation The selection committee evaluated the innovation and initiative each firm would bring to the project and identified Origin Design as the firm that would be able to perform the necessary work efficiently and economically in the time frame allotted by the city. Origin Design demonstrated a clear grasp of the project scope and requirements. Origin Design recently completed the application for the City of Dubuque's planning and design loan application and the SRF Intended Use Plan along the preliminary engineering report, submitted in support of this project under a previous agreement. Since preparation of the Planning and Design Loan application for this project, Origin Design has successfully been able to assist the city in obtaining the $1,570,000 loan as requested. They were able to demonstrate their problem -solving abilities and keen attention to detail regarding the complexity of the project. They are familiar with many of the improvements that will be necessary to support continued growth and development in the community and are prepared to start work immediately. Origin Design has prepared similar work for the city including the final design, bid, and construction management of the recently completed the 1.25 million- gallon Roosevelt Street Water Tower project and associated water main improvements. Both firms provided a schedule capable of meeting the submittal deadlines in 2023. The responses from each firm enabled the committee to focus on reviewing each firm side by side. The committee is recommending the team from Origin Design be selected for this project due to their comprehensive and detailed understanding of the project, ability to work and complete the work under time of the essence conditions. The following is a cost summary of each firm following clarification of the cost proposals. The Fehr Graham proposal contained costs associated with construction administration, which for the purposes of the request was removed for a true comparison of expenses. Origin Design Fehr Graham Proposed Project Cost — $793,000 $950,000 Design Engineering Only 3 RECOMMENDATION The selection committee upon review of the information provided from each firm including an evaluation of the costs associated with the full scope of services recommends the City enter into a contract with Origin Design. BUDGETIMPACT The City of Dubuque received notification from the Iowa Finance Authority on October 5, 2021, that its Planning and Design State Revolving Loan (Iowa SRF) Application was approved. The proposed engineering and design work will be funded in their entirety through the Iowa SRF. The planning and design application was submitted to the Iowa DNR's SRF program on October 1, 2021, in the amount of $1,570,000, of which $1,355,000 was identified as available via method of reimbursement for work associated with the preliminary and final design engineering. The remaining loan balance of $215,000 was identified for costs associated with archeological, environmental, and geotechnical evaluations, land acquisition, administration, finance, and legal fees. The project will be administered through740-2836 Water Line Extensions to New Developments with reimbursement from the Iowa SRF loan. Description Iowa SRF Loan Funds for Preliminary and Final Design $1,570,000 Origin Design Proposed Fee for Preliminary and Final Design $793,800 Available Loan Balance $776,200 REQUESTED ACTION I respectfully request consideration and authorization for the City Manager to enter a contract for professional engineering services with Origin Design of Dubuque, Iowa for the City -Wide Water Distribution System, Storage, and Pumping Improvements Project 2021 in the amount of $793,800, funded via the Iowa State Revolving Loan fund. cc: Jennifer Larson, Director of Finance & Budget Kerry Leppert, Water Engineering Assistant 12