Purina Drive Flood Wall Replacement ProjectCopyrighted January 3, 2022 City of Dubuque Consent Items # 16. City Council Meeting ITEM TITLE: Purina Drive Flood Wall Replacement Project SUMMARY: City Manager recommending accepting the improvements for the Purina Drive Flood Wall Replacement Project and establishing the final construction cost. SUGGESTED DISPOSITION: ATTACHMENTS: Description RESOLUTION Accepting the Purina Drive Floodwall Replacement Project and authorizing payment to the contractor Suggested Disposition: Receive and File; Adopt Resolution(s) Purina Drive Floodwall Replacement-MVM Memo Project Acceptance Type City Manager Memo Staff Memo Resolution Purina Drive Floodwall Replacement Project Resolutions Acceptance Project Completion Letter Supporting Documentation THE CITY DUOF B TEE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Purina Drive Flood Wall Replacement Project CIP 1002480, 3502480 and 7202480 DATE: December 20, 2021 Dubuque All -America City IN 2007.2012.2013 2017*2019 Through the competitive quotation process for public improvements, the Purina Drive Flood Wall Replacement Project was awarded on May 25, 2021, to Tricon Construction, in the bid amount of $94,966. The final project construction cost was $110,383.09 or 16.2% above the project award due to additional concrete patching on the wall and the installation of two manhole sections and pipe to reconnect the toe drain system. Public Works Director John Klostermann recommends adoption of a resolution accepting the improvements for the Purina Drive Flood Wall Replacement Project and establishing the final construction cost. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:jh Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager John Klostermann, Public Works Director THE CITY OF DUiB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: John Klostermann, Public Works Director Dubuque All -America City I� 2007•2012.2013 2017*2019 SUBJECT: Purina Drive Flood Wall Replacement Project CIP 1002480, 3502480 and 7202480 DATE: December 20, 2021 INTRODUCTION The purpose of this memorandum is to officially record the acceptance of the Purina Drive F000dwall Replacement project. BACKGROUND The fiscal year 2021 Capital Improvement Budget provides for a total of $97,888 for the replacement of twenty-six feet (26 ft.) of floodwall near Purina Drive. DISCUSSION Bid documents and specifications for this project were prepared by IIW Engineers, now Origin Design. This project included the removal and replacement of twenty-six (26') feet of concrete floodwall. Through the competitive quotation process for public improvements, this project was awarded on May 25, 2021, to Tricon Construction of Dubuque, Iowa, in the bid amount of $94,966.00. Project engineer Lauren Ray, PE, SE from Origin Design has inspected the work and has certified the completion of the project. BUDGETIMPACT A summary of the project is as follows: Estimate Bid Construction Contract $120,300.00 $ 94,966.00 Contingency $ 18,045.00 $ Final $ 110,383.09 Total Project Cost $138,345.00 $ 94,966.00 $ 110,383.09 The final project construction cost is 16.2% above the project award. The change order costs were due to additional concrete patching on the wall and the installation of two manhole sections and pipe to reconnect the toe drain system. This project is funded with monies budgeted specifically for the Purina Drive Floodwall Replacement Project in the Public Works Department's FY 2021 Capital Improvement Budget: CIP's # 1002480, 3502480 and 7202480. ACTION REQUIRED The City Council is requested to adopt the attached resolution accepting the improvements and establishing the final construction cost. Attachment: Cc: Arielle Swift, Assistant Public Works Director Prepared by John Klostermann. City of Dubuque Public Works Dubuque IA 52001 (563) 589-4348 Retum to Adrienne N. Breitfelder, City Clerk, 50 W. 131h St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 5-22 ACCEPTING THE PURINA DRIVE FLOODWALL REPLACEMENT PROJECT AND AUTHORIZING PAYMENT TO THE CONTRACTOR Whereas, the public improvement contract for the Purina Drive Floodwall Replacement Project (the Project) has been completed by the Contractor, Tricon General Construction, Inc. of Dubuque, Iowa (Contractor), the Project Engineer has examined the work and recommends that the Project be accepted; and Whereas, the final contract amount for the Project is $110,383.09; and Whereas, the Contractor has previously been paid $104,863.94, leaving a balance of $5,519.15; and Whereas, the City Council finds that the recommendation of the Project Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA THAT: Section 1. The recommendation of the Project Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $5,519.15 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 3rd day of January 2022. B . Cavanagh, Mayor Attest: C�G2� Adrienne N. Breiffelder, City Clerk origindesi, December 9, 2021 John Klostermann City of Dubuque Public Works 925 Kerper Ct. Dubuque, IA 52001 RE: City of Dubuque Purina Drive Flood Wall Replacement Project Completion Letter Project No.17079 Dear John: A site visit of the Purina Drive Flood Wall Replacement project has been completed. Tricon General Construction, Inc. of Dubuque, Iowa, has completed construction of the above referenced Project in compliance with the drawings and specifications. The final project construction cost is $110,383.09. We recommend that the City of Dubuque approve and accept the Ice Harbor Flood Gate Abutment Repair project work. Retainage in the amount of $5,519.15 will be held for 30 days after acceptance and paid at that time provided no claims from others are filed. Approval and acceptance starts the two year warranty period. Sincerely, Origin Design Co. IA� Lauren Ray, PE, SE VP & Field Services Team Leader Copy: Tricon General Construction, Inc. DUBUQUE OFFICE 137 Main Street, Ste. 100 Dubuque, Iowa 52001 origindesign.corn 800 556-4491