Loading...
2021 Stumps / Sidewalks Project TwoCopyrighted January 3, 2022 City of Dubuque Consent Items # 18. City Council Meeting ITEM TITLE: 2021 Stumps / Sidewalks Project Two SUMMARY: City Manager recommending acceptance of the construction contract for the 2021 Stumps / Sidewalks Project Two, as completed by Burds Waterproofing. SUGGESTED DISPOSITION: ATTACHMENTS: Description RESOLUTION Accepting the 2021 Stumps / Sidewalks Project Two and authorizing the payment to the contractor Suggested Disposition: Receive and File; Adopt Resolution(s) 2021 Stumps -Sidewalk Project Two-MVM Memo Staff Memo Type City Manager Memo Staff Memo Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2021 Stumps / Sidewalks Project Two C I P 1022830, 3001425 DATE: December 22, 2021 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending acceptance of the construction contract for the 2021 Stumps / Sidewalks Project Two, as completed by Burds Waterproofing, in the final contract amount of $159,462.38, which is a 12.6% increase over the original contract amount of $141,579.46 due to larger stumps and root systems than originally bid and additional sidewalk needing to be removed. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:jh Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE COF DtUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2021 Stumps / Sidewalks Project Two CIP 1022830, 3001425 DATE: December 17, 2021 Dubuque *kmerlcm Ciq !�9N MTV 1 RN , I f:k AR. 2007*2012.2013 2017*2019 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2021 Stumps / Sidewalks Project Two. BACKGROUND The project was coordinated between the Engineering and Parks departments for the purpose of removing stumps in the city parkway and replacing abutting sidewalk and curb where necessary throughout the city. As a result, 93 tree stumps ranging from 22 inches in diameter to more than 100 inches (includes large leader roots) in diameter were removed. There was 72 locations that had sidewalk replacement associated with them ranging from approximately 18 to 162 square feet, and 30 of those locations had curb repairs ranging from 4 to 47 feet associated with them. DISCUSSION The 2021 Stumps / Sidewalks Project Two was completed by Burds Waterproofing, of Peosta, IA in the final contract amount of $159,462.38. This is an 12.6% increase over the original contract amount of $141,579.46. The increase was due to the following factors: • Addition of stump inch quantities due to larger stumps and root systems then originally bid. • Additional sidewalk needed to be removed because of stump root impact. BUDGET IMPACT The summary of project costs for the 2021 Stumps / Sidewalks Project Two is as follows: Description Estimate Award Final Construction Contract $ 130,590.80 $141,579.46 $ 159,462.38 Contingency $13,059.08 $14,157.95 0.00 Construction Administration & Inspection $14,364.99 1 $15,573.74 $15,946.24 Total Construction Cost $ 158,014.87 $171,311.15 $175,408.62 The project funding is summarized below: CIP No. Fund Description Fund Amount 1022830 Stump Removal $ 154,637.41 3001425 City Owned Sidewalk $ 20,771.21 Total Project Funding $ 175,408.62 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $159,462.38 to Burds Waterproofing, for the 2021 Stumps / Sidewalks Project Two. cc: Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech Stephen Fehsal, Park Division Manager Tom Kramer, Urban Forester Prepared by: Jon Dienst City of Dubuque Engineering 50 W. 131' Street Dubuque IA 52001 (563)589-4270 Return to: Adreinne N. Breitbelder, City Clerk, 50W 13'" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 6-22 ACCEPTING THE 2021 STUMPS / SIDEWALKS PROJECT TWO AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2021 Stumps / Sidewalks Project TWO, (the Project) has been completed by the Contractor, Burds Waterproofing, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $159,462.38; and WHEREAS, the Contractor has previously been paid $151,489.27, leaving a balance of $7,973.11; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $7,973.11 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 3rd day of January 2022. Brad M. Ca nagh, Mayor Attest: aj2j&"'� /-� &adz:, Adrienne N. Breitfelder, Clty Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2021 STUMPS / SIDEWALKS PROJECT TWO The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2021 Stumps / Sidewalks Project Two has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $175,408.62. Dated this 22nd day of December 2021. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 22" d day of December 2021. Adrienne N. Breitfelder, City Clerk