Iowa Department of Transportation Supplemental Agreements: Traffic Line and Symbol Pavement Markings - Annual Maintenance of Intersection Traffic Signals and CabinetsCity of Dubuque
City Council Meeting
Consent Items # 30.
Copyrighted
January 18, 2022
ITEM TITLE: Iowa Department of Transportation Supplemental Agreements: Traffic
Line and Symbol Pavement Markings - Annual Maintenance of
Intersection Traffic Signals and Cabinets
SUMMARY: City Manager recommending approval of two Iowa Department of
Transportation Supplemental Agreements for Traffic Line and Symbol
Pavement Markings, and Annual Maintenance of Intersection Traffic
Signals and Cabinets (collectively referred to as Supplemental
Agreements) between the Iowa DOT and the City of Dubuque.
SUGGESTED Suggested Disposition: Receive and File; Approve
DISPOSITION:
ATTACHMENTS:
Description Type
I DOT Supplemental Agreements-MVM Memo City Manager Memo
Staff Memo Staff Memo
Traffic Line Markings Agreement Supporting Documentation
Traffic Signal Agreement Supporting Documentation
THE CITY
DUOF
B TEE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Iowa Department of Transportation Supplemental Agreements
Traffic Line and Symbol Pavement Markings
Annual Maintenance of Intersection Traffic Signals and Cabinets
DATE: January 12, 2022
Dubuque
All -America City
IN
2007.2012.2013
2017*2019
Assistant City Engineer Bob Schiesl recommends City Council approval of two Iowa
Department of Transportation Supplemental Agreements for Traffic Line and Symbol
Pavement Markings, and Annual Maintenance of Intersection Traffic Signals and
Cabinets (collectively referred to as Supplemental Agreements) between the Iowa DOT
and the City of Dubuque.
Every five years a "master agreement" is prepared by the Iowa DOT and distributed to
all Iowa municipalities that have State primary highways within its corporate limits.
Acceptance of this master agreement is necessary to coordinate the maintenance of the
State roadways located within the municipality jurisdictions.
The City has executed the Five -Year Maintenance Agreement for Maintenance and
Repair of Primary Roads in Municipalities between the Iowa DOT and the City on
August 17, 2021 for the time period of July 1, 2021 to June 30, 2026.
The Supplemental Agreements are required for specific areas that are not included in
the Five -Year Maintenance Agreement.
I concur with the recommendation and respectfully request Mayor and City Council
approval.
Mic ael C. Van Milligen
MCVM:jh
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
John Klostermann, Public Works Director
Robert Schiesl, Assistant City Engineer
THE CF
UjB VE
Masterpiece on the Mississippi
TO: Michael C. Van Milligen, City Manager
Gus Psihoyos, City Engineer
John Klostermann, Public Works Director
FROM: Robert Schiesl, Assistant City Engineer
Dubuque
AFAmuici Ciq
rvtin(�m.iray:
2007.2012.2013
2017*2019
SUBJECT: Iowa Department of Transportation Supplemental Agreements
Traffic Line and Symbol Pavement Markings
Annual Maintenance of Intersection Traffic Signals and Cabinets
DATE: January 12, 2022
INTRODUCTION
The purpose of this memorandum is to request City Council approval of two (2) Iowa
Department of Transportation (Iowa DOT) Supplemental Agreements for Traffic Line
and Symbol Pavement Markings, and Annual Maintenance of Intersection Traffic
Signals and Cabinets (collectively referred to as Supplemental Agreements) between
the Iowa DOT and the City of Dubuque.
BACKGROUND
Every five years a "master agreement" is prepared by the Iowa DOT and distributed to
all Iowa municipalities that have State primary highways within its corporate limits.
Acceptance of this master agreement is necessary to coordinate the maintenance of the
State roadways located within the municipality jurisdictions.
The City has executed the Five -Year Maintenance Agreement for Maintenance and
Repair of Primary Roads in Municipalities between the Iowa DOT and the City on
August 17, 2021 for the time period of July 1, 2021 to June 30, 2026.
The Supplemental Agreements are required for specific areas that are not included in
the Five -Year Maintenance Agreement. Public Works Director John Klostermann,
Assistant City Engineer Robert Schiesl, and Traffic Engineer Dave Ness have reviewed
and approved the Supplemental Agreements.
DISCUSSION
The Supplemental Agreements between the Iowa DOT and the City are as follows:
Maintenance of Intersection Traffic Signals and Cabinets
This agreement concerns the routine maintenance and monitor/adjust the signal timing
as needed for the traffic installations at two locations during the period of July 1, 2021
through June 30, 2022.
• US 52/61/151 at the intersection with Twin Valley Drive.
• Iowa 3 at the intersection with Northwest Arterial
Traffic Line and Symbol Pavement Markings
This agreement concerns the City managing the annual pavement marking program for
traffic line and symbol markings on US 61/151, US 52, US 20, & IA 946 during the
period of July 1, 2021 through June 30, 2022.
• US 52/61/151: Digital Drive to US 52
• US 61/151: US 52 to Wisconsin Bridge
• US 20: Old Highway Road to Illinois Bridge
• IA 946: Locust Street / Locust Connector
• US 52: US 52 to US 61/151 (SW Arterial)
ACTION TO BE TAKEN
I recommend that the City Council approve and authorize the City Manager to execute
the Supplemental Agreements for Traffic Line and Symbol Pavement Markings, and
Annual Maintenance of Intersection Traffic Signals and Cabinets between the Iowa DOT
and the City.
Prepared by Robert Schiesl, Assistant City Engineer
cc: John Klostermann, Public Works Director
Dave Ness, Traffic Engineer
Duane Richter, Traffic Engineer
Form 810035wd
4-01
~.._ Iowa Department of Transportation
..._., SUPPLEMENTAL AGREEMENT
For Maintenance of Primary Roads in Municipalities
This Supplemental Agreement made and entered into by and between the Municipality of City of Dubuque ,
Dubuque County, Iowa, hereinafter referred to as the Municipality, and the Iowa Department of
Transportation, Ames, Iowa, hereinafter referred to as the Department.
AGREEMENT:
I. This Agreement supplements the Agreement for Maintenance and Repair of Primary Roads in Municipalities entered
into by the parties on May 26 , 2021 , and in effect from July 1, 2021 , to June 30, ~2~0~2~6~--
11. The Municipality agrees to perform and accept all responsibility for those maintenance activities listed in Sections
1.8 .1, 1.8 .3, 1.8.4 and I.C .1 of the basic Agreement, with respect to the primary roads within the corporate limits of the
Municipality specifically described in this section.
In consideration thereof, the Department agrees to pay the Municipality at the rate of _N_/A ____ / lane mile for
acceptable work at the end of the fiscal year ending on June 30 th :
Route From To Lane Miles Total Cost
Pavement maintenance does not include full depth patching and bituminous resurfacing . I.C .1 does not include traffic
services and painting and structural repair to bridges.
Ill. The Municipality further agrees to perform additional maintenance for the Department on primary roads as specifically
described below:
Traffic Line Markings on US 61/151, US 52, US 20, & IA 946 -(See reverse side for details)
In consideration thereof, the Department agrees to pay the Municipality the following amounts after the work has been
completed: Payment determined by let contract prices by station & per symbols x 1 application= $19,750.00
(see reverse side for details). The City of Dubuque shall submit to the Iowa Department of Transportation an
annual breakdown of total quantites painted (station & symbols) applied to each route. Upon which
reimbursement will be made.
IV. This Supplemental Agreement may be terminated at any time by either party upon 30 days written notice.
V. This Supplemental Agreement shall be in effect from July 1, 2021 to June 30, 2022 unless re-negotiated or
terminated.
IN WITNESS WHEREOF, the parties hereto have set their hands, for the purposes herein expressed on the dates
indicated below.
City of Dubuque
MUNICIPALITY IOWA DEPARTMENT OF TRANSPORTATION
By~
Date Jo..n uo.ry 19: d0~2
BY
District Engineer
Date 01/21/2022
2021-2022 Dubuque Traffic Line Marking Agreement Breakdown 12/14/21
Traffic Line Markings
Payment based on a price, not to exceed let contract prices (by City of Dubuque), of actual markings for each of 1 application.
Necessary additional permanent or miscellaneous markings will require written approval prior to application.
Payment will be by station & per symbols x 1 application = $19,750.00; unless prior written approval is obtained from the Iowa Department of
Transportation District Operations Manager.
US 52/61/151: DIGITAL DRIVE (45.21) TO US 52 (43.91)
QUANTITIES
w/FACTOR FIGURED
UNIT LF
COST @
TOTAL
BLW4: Broken Lane Line (White)
0
STA
$12.19
$0.00
CHW8: Channelizing Line (White)
0
STA
$14.41
$0.00
CHY8: Channelizing Line (Yellow)
0
STA
$14.41
$0.00
CSLW: Combined Straight and Left Turn Arrow (White)
0
EA
$37.74
$0.00
CSRW: Combined Straight and Right Turn Arrow (White)
0
EA
$37.74
$0.00
DEW1: Dotted Entrance Line (White)
0
STA
$14.41
$0.00
DLW4: Dotted Line (White)
0
STA
$12.56
$0.00
DRW8: Dotted Roundabout Line (White)
0
STA
$14.41
$0.00
ELW4: Edge Line Right (White)
0
STA
$12.19
$0.00
ELY4: Edge Line Left (Yellow)
0
STA
$12.19
$0.00
LTAW: Left Turn Arrow (White)
11
EA
$37.74
$415.14
ONLW: Only Word Marking (White)
12
EA
$40.01
$480.12
RLRW: Right Lane Reduction Arrow
0
EA
$37.74
$0.00
RTAW: Right Turn Arrow (White)
14
EA
$37.74
$528.36
SLW2: Stop Line (White)
4.62
STA
$14.34
$66.25
SLW4: Solid Lane Line (White)
26.69
STA 77.04
$12.56
$335.23
SLW6: Standard Curb 6" (White)
1.03
STA 2669.08
$13.62
$14.03
SPY6: Sloped Curb 6" (Yellow)
0
STA 33.98
$13.62
$0.00
STAW: Straight Arrow (White)
0
EA
$41.82
$0.00
STW6: Standard Curb 6" (White)
0
STA
$13.62
$0.00
YLDW: YIELD Word Marking (Whtie) 0 EA $40.01 $0.00
$1,839.13
QUANTITIES
US 61/151: US 52 (186.55) TO WI BRIDGE (191.88) w/ FACTOR FIGURED UNIT LF COST @ TOTAL
BLW4: Broken Lane Line (White) 0 STA $12.19 $0.00
CHW8: Channelizino Line (White) 0 STA 514.41 50.00
CHY8: Channelizing Line (Yellow)
0
STA
$14.41
$0.00
CSLW: Combined Straight and Left Turn Arrow (White)
0
EA
$37.74
$0.00
CSRW: Combined Straight and Right Turn Arrow (White)
0
EA
$37.74
$0.00
DEW1: Dotted Entrance Line (White)
0
STA
$14.41
$0.00
DLW4: Dotted Line (White)
0
STA
$12.56
$0.00
DRW8: Dotted Roundabout Line (White)
0
STA
$14.41
$0.00
ELW4: Edge Line Right (White)
0
STA
$12.19
$0.00
ELY4: Edge Line Left (Yellow)
0
STA
$12.19
$0.00
LTAW: Left Turn Arrow (White)
10
EA
$37.74
$377.40
ONLW: Only Word Marking (White)
7
EA
$40.01
$280.07
RLRW: Right Lane Reduction Arrow
0
EA
$37.74
$0.00
RTAW: Right Turn Arrow (White)
8
EA
$37.74
$301.92
SLW2: Stop Line (White)
0
STA
$14.34
$0.00
SLW4: Solid Lane Line (White)
17.62
STA 1761.85
$12.56
$221.31
SLW6: Standard Curb 6" (White)
0
STA 2669.08
$13.62
$0.00
SPY6: Sloped Curb 6" (Yellow)
0
STA
$13.62
$0.00
STAW: Straight Arrow (White)
0
EA
$41.82
$0.00
STW6: Standard Curb 6" (White)
0
STA
$13.62
$0.00
.00
70 $1,180.70
Page 1 of 3
2021-2022 Dubuque Traffic Line Marking Agreement Breakdown 12/14/21
US 20: OLD HIGHWAY ROAD N. (315.38) TO IL BRIDGE (320.5)
BLW4: Broken Line (White)
QUANTITIES
w/FACTOR FIGURED
0
UNIT
STA
LF
COST @
$12.19
TOTAL
$0.00
CHW8: Channelizing Line (White)
CHY8: Channelizing Line (Yellow)
18.42
0
STA
STA
921.13
$14.41
$14.41
$265.43
$0.00
CSLW: Combined Straight and Left Turn Arrow (White)
CSRW: Combined Straight and Right Turn Arrow (White)
0
0
EA
EA
$37.74
$37.74
$0.00
$0.00
DEW1: Dotted Entrance Line (White)
DLW4: Dotted Line (White)
0
0.48
STA
STA
144.9
$14.41
$12.56
$0.00
$6.03
DRW8: Dotted Roundabout Line (White)
ELW4: Edge Line Right (White)
0
0
STA
STA
$14.41
$12.19
$0.00
$0.00
ELY4: Edge Line Left (Yellow)
LTAW: Left Turn Arrow (White)
0
62
STA
EA
$12.19
$37.74
$0.00
$2,339.88
ONLW: Only Word Marking (White)
RLRW: Right Lane Reduction Arrow
59
5
EA
EA
$40.01
$37.74
$2,360.59
$188.70
RTAW: Right Turn Arrow (White)
SLW2: Stop Line (White)
59
0
EA
STA
$37.74
$14.34
$2,226.66
$0.00
SLW4: Solid Lane Line (White)
SLW6: Standard Curb 6" (White)
102.11
0
STA
STA
10494.7
2669.08
$12.56
$13.62
$1,282.50
$0.00
SPY6: Sloped Curb 6" (Yellow)
STAW: Straight Arrow (White)
0
0
STA
EA
$13.62
$41.82
$0.00
$0.00
STW6: Standard Curb 6" (White)
0
STA
$13.62
$0.00
YLDW: YIELD Word Marking (Whtie)
0
EA
$40.01
$0.00
TOTAL
IA 946: LOCUST STREET (0.0 - 0.96)
BLW4: Broken Line (White)
QUANTITIES
w/ FACTOR FIGURED
0
UNIT
STA
14230
LF
COST @
$12.19
$8,669.79 $8,669.79
TOTAL
$0.00
CHW8: Channelizing Line (White)
23.89
STA
1194.36
$14.41
$344.25
CHY8: Channelizing Line (Yellow)
0
STA
$14.41
$0.00
CSLW: Combined Straight and Left Turn Arrow (White)
0
EA
$37.74
$0.00
CSRW: Combined Straight and Right Turn Arrow (White)
2
EA
$37.74
$75.48
DEW1: Dotted Entrance Line (White)
0
STA
$14.41
$0.00
DLW4: Dotted Line (White)
1.71
STA
139.12
$12.56
$21.48
DRW8: Dotted Roundabout Line (White)
0
STA
$14.41
$0.00
ELW4: Edge Line Right (White)
0
STA
$12.19
$0.00
ELY4: Edge Line Left (Yellow)
0
STA
$12.19
$0.00
LTAW: Left Turn Arrow (White)
20
EA
$37.74
$754.80
ONLW: Only Word Marking (White)
15
EA
$40.01
$600.15
RLRW: Right Lane Reduction Arrow
0
EA
$37.74
$0.00
RTAW: Right Turn Arrow (White)
10
EA
$37.74
$377.40
SLW2: Stop Line (White)
0
STA
$14.34
$0.00
SLW4: Solid Lane Line (White)
15.11
STA
1509.25
$12.56
$189.78
SLW6: Standard Curb 6" (White)
0
STA
2669.08
$13.62
$0.00
SPY6: Sloped Curb 6" (Yellow)
0
STA
$13.62
$0.00
STAW: Straight Arrow (White)
0
EA
$41.82
$0.00
STW6: Standard Curb 6" (White)
0
STA
$13.62
$0.00
YLDW: YIELD Word Marking (Whtie)
TOTAL
0
EA
5511.8
$40.01
$0.00
$2,363.34 $2,363.34
Page 2 of 3
2021-2022 Dubuque Traffic Line Marking Agreement Breakdown 12/14/21
US 52: US 52 to US 61/151 (SW ARTERIAL)
QUANTITIES
(INCLUDES ROUNDABOUT INTERCHANGES)
w/FACTOR FIGURED
UNIT LF
COST@
TOTAL
BLW4: Broken Line (White)
0.43
STA
$12.19
$5.24
CHW8: Channelizing Line (White)
36.62
STA
$14.41
$527.69
CHY8: Channelizing Line (Yellow)
69.43
STA
$14.41
$1,000.49
CSLW: Combined Straight and Left Turn Arrow (White)
12
EA
$37.74
$452.88
CSRW: Combined Straight and Right Turn Arrow (White)
12
EA
$37.74
$452.88
DEW1: Dotted Entrance Line (White)
7.81
STA
$14.41
$112.54
DLW4: Dotted Line (White)
1.4
STA
$12.56
$17.58
DRW8: Dotted Roundabout Line (White)
6.9
STA
$14.41
$99.43
ELW4: Edge Line Right (White)
34.71
STA
$12.19
$423.11
ELY4: Edge Line Left (Yellow)
7.31
STA
$12.19
$89.11
LTAW: Left Turn Arrow (White)
12
EA
$37.74
$452.88
ONLW: Only Word Marking (White)
10
EA
$40.01
$400.10
RLRW: Right Lane Reduction Arrow
0
EA
$37.74
$0.00
RTAW: Right Turn Arrow (White)
4
EA
$37.74
$150.96
SLW2: Stop Line (White)
16.61
STA
$14.34
$238.19
SLW4: Solid Lane Line (White)
13.3
STA
$12.56
$167.05
SLW6: Standard Curb 6" (White)
0
STA 2669.08
$13.62
$0.00
SPY6: Sloped Curb 6" (Yellow)
15.58
STA
$13.62
$212.20
STAW: Straight Arrow (White)
8
EA
$41.82
$334.56
STW6: Standard Curb 6" (White)
0
STA
$13.62
$0.00
YLDW: YIELD Word Marking (Whtie)
14
EA
$40.01
$560.14
TOTAL
2669.1
$5,697.04 $5,697.04
GRAND TOTAL
$19,750.00
TOTALS BY TYPE
QUANTITIES
w/ FACTOR FIGURED
UNIT
LF
COST @
TOTAL
BLW4: Broken Lane Line (White)
0.43
STA
0
$12.19
$5.24
CHW8: Channelizing Line (White)
78.93
STA
2115.49
$14.41
$1,137.38
CHY8: Channelizing Line (Yellow)
69.43
STA
0
$14.41
$1,000.49
CSLW: Combined Straight and Left Turn Arrow (White)
12
EA
0
$37.74
$452.88
CSRW: Combined Straight and Right Turn Arrow (White)
14
EA
0
$37.74
$528.36
DEW1: Dotted Entrance Line (White)
7.81
STA
0
$14.41
$112.54
DLW4: Dotted Line (White)
3.59
STA
284.02
$12.56
$45.09
DRW8: Dotted Roundabout Line (White)
6.9
STA
0
$14.41
$99.43
ELW4: Edge Line Right (White)
34.71
STA
0
$12.19
$423.11
ELY4: Edge Line Left (Yellow)
7.31
STA
0
$12.19
$89.11
LTAW: Left Turn Arrow (White)
115
EA
0
$37.74
$4,340.10
ONLW: Only Word Marking (White)
103
EA
0
$40.01
$4,121.03
RLRW: Right Lane Reduction Arrow
5
EA
0
$37.74
$188.70
RTAW: Right Turn Arrow (White)
95
EA
0
$37.74
$3,585.30
SLW2: Stop Line (White)
21.23
STA
0
$14.34
$304.44
SLW4: Solid Lane Line (White)
174.83
STA
13842.8
$12.56
$2,195.86
SLW6: Standard Curb 6" (White)
1.03
STA
2669.08
$13.62
$14.03
SPY6: Sloped Curb 6" (Yellow)
15.58
STA
33.98
$13.62
$212.20
STAW: Straight Arrow (White)
8
EA
0
$41.82
$334.56
STW6: Standard Curb 6" (White)
0
STA
0
S13.62
S0.00
TOTAL
TOTALS WITH FACTORS APPLIED FOR PLAN QUANTITY FACTOR
CHW8: Channelizing Line (White) 2
DLW4: Dotted Line (White) 0.33
SLW4: Solid Lane Line (White) 1
0 $40.01 $560.14
18945 $19,750.00 $19,750.00
Page 3 of 3
Form 810035wd
4-01
~t.. Iowa Department of Transportation
._,, SUPPLEMENTAL AGREEMENT
For Maintenance of Primary Roads in Municipalities
This Supplemental Agreement made and entered into by and between the Municipality of City of Dubuque ,
Dubuque County, Iowa, hereinafter referred to as the Municipality, and the Iowa Department of
Transportation, Ames, Iowa, hereinafter referred to as the Department.
AGREEMENT :
I. This Agreement supplements the Agreement for Maintenance and Repair of Primary Roads in Municipalities entered
into by the parties on May 26 , 2021 , and in effect from July 1, 2021 , to June 30, _2=-0=2=6"------
11. The Municipality agrees to perform and accept all responsibility for those maintenance activities listed in Sections
I.B.1, I.B.3, I.B.4 and I.C.1 of the basic Agreement, with respect to the primary roads within the corporate limits of the
Municipality specifically described in this section.
In consideration thereof, the Department agrees to pay the Municipality at the rate of -'-'N'"'"/A-'-----/ lane mile for
acceptable work at the end of the fiscal year ending on June 30 th :
Route From To Lane Miles Total Cost
Pavement maintenance does not include full depth patching and bituminous resurfacing. I.C.1 does not include
traffic services and painting and structural repair to bridges .
Ill. The Municipality further agrees to perform additional maintenance for the Department on primary roads as
specifically described below:
The City of Dubuque will provide routine maintenance and monitor/adjust the signal timing as needed for
traffic installations at the locations listed below. Maintenance will be in accordance with the City's
guidelines for the "Annual Maintenance of Traffic Signals and Cabinets", attached as Exhibit "A".
Locations:
1. U.S. 52/61/151 at the intersection with Twin Valley Drive.
2. Iowa 3 at the intersection with Northwest Arterial (NE quadrant only).
In consideration thereof, the Department agrees to pay the Municipality the following amounts after the work has
been completed :
The cost of labor will be billed back to the State based on the wages of the personnel involved. The cost of
parts will be billed back to the State on an actual cost basis. The City of Dubuque shall submit to the State
of Iowa an annual accounting of costs upon which reimbursement will be made.
IV. This Supplemental Agreement may be terminated at any time by either party upon 30 days written notice .
V. This Supplemental Agreement shall be in effect from July 1, 2021 to June 30, 2022 unless re-negotiated or
terminated.
IN WITNESS WHEREOF, the parties hereto have set their hands, for the purposes herein expressed on the dates
indicated below.
City of Dubuque
MUNICIPALITY IOWA DEPARTMENT OF TRANSPORTATION
By ~~~~-"j"""=-----
BY
District Engineer
Jo..n\J.o.ry I~, ~OJ~ Date Date -------------------01/31/2022
EXHIBIT "A"
Annual Maintenance of Traffic Signals and Cabinets
Yearly maintenance shall consist of. -
Signals
• Exterior cleaning of signal heads if needed.
• Check angle of alignment of each head (try to align all heads)
• Observe for broken or extremely faded back plates
• Check operability of pedestrian buttons
• Observe Walk / Don't Walk status, lenses etc
• Inspect exterior equipment, note in log if painting, replacement, etc is
necessary
• Wash camera lenses
• Replace any burned out incandescent or LED signal lamps
• Observe signal timings — note any needed adjustments to Engineering
• Confirm correct operation of microwave vehicle detection
Cabinet
• Vacuum
• Replace Filter
• Check/Clean exhaust fan
• Log Make, Model and Serial numbers of the following:
- Cabinet
- Controller
- Conflict Monitor
- Video detection equipment and monitors
- Pre-emption systems
- Battery Backup Devices
• Perform Test of Conflict monitor and attach printout to log, Note any failures
immediately to Engineering
• Oil Locks and Hinges
• Tighten electrical connections
• Note any changes to timings or Video detection. Notify Engineering of
changes so data can be backed up electronically
• Check if accurate phase diagram is present in cabinet
• Update database sheet printout and return to Engineering once maintenance
is complete.