Loading...
Stumps / Sidewalks Project Three_InitiateCopyrighted February 21, 2022 City of Dubuque Items to be set for Public Hearing # 2. City Council Meeting ITEM TITLE: Stumps / Sidewalks Project Three SUMMARY: City Manager recommending City Council adopt the resolution preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing the date of the public hearing for March 7, 2022; and authorizing the City Engineer to advertise for bids for the Stumps / Sidewalk Project Three. RESOLUTION Stumps / Sidewalks Project Three: preliminary approval of plans, specifications, form of contract, and estimated cost; setting date of public hearing on plans, specifications, form of contract, and estimated cost SUGGESTED Receive and File; Adopt Resolution(s), Set Public Hearing for March 7, DISPOSITION: 2022Suggested Disposition: FIN ik[91:ILyil21ZIII &] Description Type Stumps / Sidewalks Project 3-MVM Memo City Manager Memo Staff Memo Staff Memo Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Stumps / Sidewalks Project Three DATE: February 16, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the resolutions preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing the date of the public hearing for March 7, 2022; and authorizing the City Engineer to advertise for bids for the Stumps / Sidewalk Project Three. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE C DUUB--*--FE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: February 15, 2022 RE: Stumps / Sidewalks Project Three Dubuque AII•Ameriea M 1 I I I 2007-2012.2013 2017*2019 INTRODUCTION The attached resolutions authorize the initiation of the public bidding procedure for the Stumps / Sidewalk Project Three. BACKGROUND Iowa Code and Dubuque's City ordinance states that the abutting property owner is responsible for all maintenance in the area between the property line and the back of curb. City policy is property owners are required to replace sidewalks that are defective no matter what has caused the defect. When the City is notified of a sidewalk defect a notice is sent to the abutting property owner. The property owner is provided a time frame to correct the defect(s). If a property owner fails to correct a defect the City intervenes, corrects the defect, and assesses the property owner for the project. There is an exception regarding sidewalks disturbed by street trees a second time. If the sidewalk has been replaced by the abutting property owner once due to a tree heaving or affecting the sidewalk, the City warrants any future sidewalk replacement caused by the tree. Upon a repeat instance, the City repairs the sidewalk. A change in policy adopted May 17, 2021, allows for Engineering Department to have a combined stump/sidewalk replacement project with the City paying for the sidewalk repairs instead of the abutting property owner the first time and all subsequent times it may occur. In 2021 the City was able to contract out and remove approximately 200 diseased or dead ash tree stumps and replaced necessary defective sidewalk and curb. DISCUSSION The Stumps / Sidewalk Project Three will provide for the removal of 101 tree stumps and replacement of abutting sidewalks and curb in defective locations. Stumps sizes range from 12 to 90 inches in diameter. The sidewalk replacement behind the trees is approximately 40 to 100 square feet depending on the location. PROJECT SCHEDULE The schedule for the Project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Publish Public Hearing Notice on Plans & Specs Public Hearing on Plans & Specifications Receipt of Bids (Bid Letting) Award Construction Contract Final Project Completion February 21, 2022 February 24, 2022 February 24, 2022 March 7, 2022 March 10, 2022 March 21, 2022 July 29, 2022 RECOMMENDATION I recommend preliminary approval of the proposed plans, specifications, form of contract, and construction estimate for the Stumps / Sidewalk Project Three. I further recommend establishing the date of a public hearing and authorize the City Engineer to advertise for bids for the Project. BUDGETIMPACT The preliminary estimate of probable costs for the Stumps / Sidewalk Project Three is as follows: Description Cost Estimate Construction $ 159,732.40 Contingency 15,973.24 Engineering Design and Administration 17,570.56 Total Construction Cost Estimate $ 193,276.20 The funding summary is as follows: CIP Fund Description Fund Amount 1022830 Tree Removal & Replacement $ 100,255.76 3002849 Pavement Rehab Concrete Streets $ 93,020.44 Total Project Funding $ 193,276.20 The Pavement Rehab Concrete Streets CIP is recommended for funding the sidewalk and curb and gutter portion of the project. The remainder of the Pavement Rehab Concrete Streets CIP will be used on N. Grandview Ave. between Loras Blvd. and Rosedale Ave. to address defective pavement. ACTION TO BE TAKEN I respectfully request adoption of the attached resolutions preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing the date of the public hearing; and authorizing the City Engineer to advertise for bids for the Stumps / Sidewalk Project Three. E cc: John Klostermann, Public Works Director Stephen Fehsal, Park Division Manager Jon Dienst, Civil Engineer II Prepared by Jon Dienst City of Dubuque 50 W 1311 Street Dubuque IA 52001 (563) 589 4270 Return to Adrienne Breitfelder, City Clerk, City of Dubuque, 50 W. 13th Street, Dubuque, IA 52001 (563) 589-4100 RESOLUTION NO. 63-22 STUMPS / SIDEWALKS PROJECT THREE PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Stumps / Sidewalk Project Three in the estimated amount $159,732.40, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 7th day of March, 2022, at 6:30 p.m. in the Historic Federal Building Council Chambers (and/or by virtual means) 350 W. 61h Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. Passed, adopted and approved this the 215t day of February 2022. Attest: Brad M. Cavofiigli, Mayor Adrienne N. Breiffelder, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE STUMP / SIDEWALKS PROJECT THREE NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Stumps / Sidewalks Project Three in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 71" day of March 2022, in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 6tn Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Removal of one -hundred -one (101) tree stumps and replacement of sidewalk at most of these locations. Stumps range in size from 12 to 90 inches in diameter. Sidewalk replacement behind the trees is roughly 40 to 100 SF in replacement, depending on location. Any visual or hearing -impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 21st day of February 2022. Adrienne N. Breitfelder, City Clerk