Loading...
Stumps / Sidewalks Project ThreeCopyrighted March 21, 2022 City of Dubuque Consent Items # 8. City Council Meeting ITEM TITLE: Stumps / Sidewalks Project Three SUMMARY: City Manager recommending City Council award the construction contract for the Stumps / Sidewalk Project Three through the adoption of a resolution to Quality Concrete in the amount of $144,172.19, which is 9.66% below the engineer's estimate. RESOLUTION Awarding Public Improvement Contract for the Stumps / Sidewalks Project Three SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Award 2022 Stump Sidewalks Project Three-MVM City Manager Memo Memo Staff Memo Resolution Staff Memo Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Stumps / Sidewalks Project Three DATE: March 14, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council award the construction contract for the Stumps / Sidewalk Project Three through the adoption of a resolution to Quality Concrete in the amount of $144,172.19, which is 9.66% below the engineer's estimate. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE C DUUB--*--FE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: March 10, 2022 RE: Stumps / Sidewalks Project Three Dubuque AII•Ameriea M 1 I I I 2007-2012.2013 2017*2019 INTRODUCTION The attached resolution authorizes the award of the public improvement construction contract for the Stumps / Sidewalks Project Three. BACKGROUND Iowa Code and Dubuque's City ordinance states that the abutting property owner is responsible for all maintenance in the area between the property line and the back of curb. City policy is property owners are required to replace sidewalks that are defective no matter what has caused the defect. When the City is notified of a sidewalk defect a notice is sent to the abutting property owner. The property owner is provided a time frame to correct the defect(s). If a property owner fails to correct a defect the City intervenes, corrects the defect, and assesses the property owner for the project. There is an exception regarding sidewalks disturbed by street trees a second time. If the sidewalk has been replaced by the abutting property owner once due to a tree heaving or affecting the sidewalk, the City warrants any future sidewalk replacement caused by the tree. Upon a repeat instance, the City repairs the sidewalk. A change in policy adopted May 17, 2021, allows for Engineering Department to have a combined stump/sidewalk replacement project with the City paying for the sidewalk repairs instead of the abutting property owner the first time and all subsequent times it may occur. In 2021 the City was able to contract out and removed 204 diseased or dead ash tree stumps and replaced necessary defective sidewalk and curb. DISCUSSION The Stumps / Sidewalk Project Three will provide for the removal of 101 tree stumps and replacement of abutting sidewalks and curb in defective locations. Stumps sizes range from 12 to 90 inches in diameter. The sidewalk replacement behind the trees is approximately 40 to 100 square feet depending on the location. BID RESULTS The City received four bids on March 10, 2022, for the Stumps / Sidewalks Project Three. Quality Concrete of Dubuque, IA, submitted the low bid in the amount of $144,172.19 which is 9.66% below the engineer's estimate. A summary of the bid proposals received is as follows: Contractor Name Total Bid Quality Concrete $144,172.19 G & R Tree Service, Inc. $144,304.30 McDermott Enterprises, LLC $154,181.40 Burds Waterproofing, Inc. $158,103.50 RECOMMENDATION I recommend awarding the contract for the Stumps / Sidewalk Project Three to Quality Concrete in the amount of $144,172.19. BUDGETIMPACT The estimate of probable costs for the Stumps / Sidewalk Project Three is as follows: Description Cost Estimate Award Construction $ 159,732.40 $ 144,172.19 Contingency 15,973.24 15,973.24 Engineering Design and Administration 17,570.56 17,570.56 Total Construction Cost Estimate $ 193,276.20 $ 177,715.99 The funding summary is as follows: CIP Fund Description Fund Amount 1022830 Tree Removal & Replacement $ 70,431.90 3002849 Pavement Rehab Concrete Streets $ 107,284.09 Total Project Funding $ 177,715.99 The Pavement Rehab Concrete Streets CIP is recommended for funding the sidewalk and curb and gutter portion of the project. The remainder of the Pavement Rehab Concrete Streets CIP will be used on N. Grandview Ave. between Loras Blvd. and Rosedale Ave. to address defective pavement. ACTION TO BE TAKEN The City Council is requested to award the construction contract for the Stumps / Sidewalk Project Three through the adoption of the attached resolution to Quality Concrete in the amount of $144,172.19. Prepared by: Kerry Bradley, Engineering Dept. cc: John Klostermann, Public Works Director E Stephen Fehsal, Park Division Manager Jon Dienst, Civil Engineer II Prepared by Kerry Bradley. City of Dubuque Engineering 50 W. 13th St. Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 84-22 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE STUMPS / SIDEWALKS PROJECT THREE Whereas, sealed proposals have been submitted by contractors for the Stumps / Sidewalks Project Three, (the Project) pursuant to Resolution No. 63-22 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 24th day of February 2022; and Whereas, said sealed proposals were opened and read on the loth day of March 2022 and it has been determined that Quality Concrete of Dubuque, IA submitted the low bid in the amount of $144,172.19, and is the lowest responsive, responsible bidderforthe Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That a Public Improvement Contract for the Project is hereby awarded to Quality Concrete and the City Manager is hereby directed to execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 215t day of March 2022. M'Or . ..Mavretm Attest: 6-7�- Adrienne N. Breitfelder, City Clerk