Central Avenue (9th - 21st) HMA Pavement ResurfacingCity of Dubuque City Council Meeting Consent Items # 12. Copyrighted March 21, 2022 ITEM TITLE: Central Avenue (9th - 21 st) HMA Pavement Resurfacing Project: Acceptance of Public Improvement Project SUMMARY: City Manager recommending City Council adopt a resolution to accept the public improvements and to authorize the payment of the contract amount of $1,192,149.96 to River City Paving for the Central Avenue (9th - 21 st) HMA Pavement Resurfacing Project. RESOLUTION Accepting the HMA Pavement Milling and Resurfacing Project on Central Avenue (Formerly US52) from 9th to 21 st Street and authorizing final payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Acceptance Central Avenue (9th - 21 st) HMA City Manager Memo Pavement Resurfacing Project-MVM Memo Staff Memo Staff Memo Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Central Avenue (9th - 21 st) HMA Pavement Resurfacing Project Acceptance of Public Improvement Project Iowa DOT Project No. NHSN-052-2 (157)--2R-31 DATE: March 14, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 Assistant City Engineer Robert Schiesl is recommending City Council adopt a resolution to accept the public improvements and to authorize the payment of the contract amount of $1,192,149.96 to River City Paving for the Central Avenue (9th - 21st) HMA Pavement Resurfacing Project. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer THE COF DtUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer DATE: March 10, 2022 SUBJECT: Central Avenue (9th -21st) HMA Pavement Resurfacing Project Acceptance of Public Improvement Project Iowa DOT Project No. NHSN-052-2 (157)--2R-31 INTRODUCTION Dubuque All -America City Il 2007•2012.2013 2017*2019 The enclosed resolution provides for the acceptance of the public improvement construction contract for the Central Avenue (9th - 21st) HMA Pavement Resurfacing Project. BACKGROUND The HMA Milling and Resurfacing Project on Central Avenue (formerly US52) from 9th to 21 st Street was the 4th and final phase of a joint partnership project between the City and the Iowa Department of Transportation (Iowa DOT) as part of the Southwest Arterial local roadway transfer of jurisdiction (TOJ) and the associated roadway state of good repair work. The scope of the multi -year joint pavement rehabilitation project includes the following: • Phase 1 - Central Ave (21st to 32nd) Pavement Rehab Project (completed in 2011) • Phase 2 - White Street (11th to 21st) Pavement Rehab Project (completed in 2014) • Phase 3 - White (9th to 11th), 11th (White to Elm) Pavement Rehab (completed in 2019) • Phase 4 - Central Ave (9th to 21 st) Pavement Rehab Project (completed in 2020) • Northwest Arterial (US20 - JFK) Rehabilitation / Reconstruction (complete in 2022/23) DISCUSSION The Phase 4 - Central Avenue (9th - 21st) HMA Pavement Resurfacing Project provided for the following improvements: • Pavement milling on Central Avenue, from 9th to 21 st Street. • Transverse and longitudinal joint repair as needed. • Pavement sub -base repair and patching as needed. • HMA resurfacing of both thru driving lanes and parking areas on Central Ave, from 9th to 21 st Street • Spot curb, driveway, and sidewalk replacement. • Storm sewer improvements. • Water main replacement. • Installation of ADA pedestrian access curb ramps (30 total). Through the cooperative agreement, the Iowa DOT is responsible for the eligible construction costs associated with pavement rehabilitation for the center 24 feet (12 feet in each direction from roadway centerline) and 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants along the project corridor. The City is responsible for the costs associated with pavement rehabilitation of the parking lanes and the costs for curb and sidewalk replacement, underground utility work, 50% of the costs associated with the pedestrian access curb ramps at all the intersection quadrants along the project corridor and landscape restoration. All other associated costs, such as engineering design, contract administration, construction engineering and inspection will be funded solely with City funding. The HMA Pavement Milling and Resurfacing Project on White Street from 9th to 11th Street and on 11th Street from White to Elm Street was completed by River City Paving of Kieler, Wisconsin, in the final contract amount of $1,192,149.96 which is a 10.8% decrease from the original contract amount of $1,335,856.96. RECOMMENDATION I recommend that the City Council accept the public improvements and authorize the payment of the final contract amount of $1,192,149.96 to River City Paving for the HMA Milling and Resurfacing Project on Central Avenue from 9th to 21st Street. BUDGETIMPACT The project cost summary for the HMA Milling and Resurfacing Project on Central Avenue from 9th to 21st Street is summarized below: Description Estimate Award Award Construction Contract $1,575,920.00 $1,335,856.96 $1,192,149.96 Contingency 157,600.00 133,585.70 Engineering Design, Admin, Inspection 294,700.00 249,808.25 176,030.76 Consultant Services 41,533.75 Parking Division Fees 5,026.38 Total Construction Cost $2,028,220.00 $1,719,247.91 $1,414,740.85 The project funding summary is as follows: CIP Funding Source Amount 3602760 Iowa DOT Funding $ 530,711.60 3602760 Central Ave (9th - 21st) HMA Pavement Resurfacing 760,395.18 7202756 Central Ave Storm Sewer Improvements 44,839.50 7401405 Water Main Replacement 78,794.57 Total Project Funding $1,414,740.85 REQUESTED ACTION The City Council is requested to adopt the attached resolution to accept the public improvements and to authorize the payment of the contract amount of $1,192,149.96 to River City Paving for the Central Avenue (9th - 21 st) HMA Pavement Resurfacing Project. cc: Jenny Larson, Director of Finance and Budget Nathan Steffen, Civil Engineer Deron Muehring, Civil Engineer Chris Lester, Brant Schueller, Water Department F:\PROJECTS\Central HMA Resurfacing (9th - 21st) - 2019\Council & Staff Documents\Acceptance 3 Prepared by Robert Schiesl City of Dubuque Engineering 50 W. 13" St Dubuque IA 52001 (563)589 4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 1311 St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 85-22 ACCEPTING THE HMA PAVEMENT MILLING AND RESURFACING PROJECT ON CENTRAL AVENUE (FORMERLY US52) FROM 9TH TO 21ST STREET AND AUTHORIZING FINAL PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the HMA Pavement Milling and Resurfacing Project on Central Avenue (formerly US52) from 9th to 21st Street, (the Project) has been completed by the Contractor, River City Paving of Kieler, Wisconsin (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $1,192,149.96; and WHEREAS, the Contractor has previously been paid $1,229,884.27, leaving a credit refund balance of $37,734.31; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to receive and deposit the refund payment from the Contractor for the credit balance of $37,734.31 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 21 st day of March 2022. Attest: ln�� /� &-2& �-7 Adrienne N. Breitfelder, City Clerk Brad M. C �'hagh, Mayor Prepared by Robert Schiesl City of Dubuque Engineering 50 W. 131h St. Dubuque, IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 131h St. Dubuque, IA 52001 (563)589-4100 CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF HMA PAVEMENT MILLING AND RESURFACING PROJECT ON CENTRAL AVENUE (FORMERLY US52) FROM 9TH TO 21 ST STREET The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the HMA Pavement Milling and Resurfacing Project on Central Avenue from 9th to 21st Street has been performed in compliance with the terms of the Public Improvement Contract, and that the total project cost of the completed work is $1,414,740.85. Dated this 10th day of March 2022. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 10th day of March 2022. Adrienne N. Breitfelder, City Clerk F:\PROJECTS\Central HMA Resurfacing (9th - 21st) - 2019\Council & Staff Documents\Acceptance