Loading...
2022 Asphalt Overlay Ramp Project 2_InitiateCopyrighted March 21, 2022 City of Dubuque Items to be set for Public Hearing # 1. City Council Meeting ITEM TITLE: 2022 Asphalt Overlay Ramp Project 2 SUMMARY: City Manager recommending City Council authorize the initiation of the public bidding procedure for the 2022 Asphalt Overlay Ramp Project 2 by adoption of a resolution preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing the date of the public hearing for April 4, 2022; and authorizing the City Engineer to advertise for bids for the 2022 Asphalt Overlay Ramp Project 2. RESOLUTION 2022 Asphalt Overlay Ramp Project 2: Preliminary approval of plans, specifications, form of contract, and estimated cost; setting date of public hearing on plans, specifications, form of contract, and estimated cost; and ordering the advertisement for bids SUGGESTED Receive and File; Adopt Resolution(s), Set Public Hearing for April 4, DISPOSITION: 2022Suggested Disposition: ATTACHMENTS: Description 2022 Asphalt Overlay Ramp Project 2-MVM Memo Staff Memo Resolution Type City Manager Memo Staff Memo Resolutions Notice of Hearing Supporting Documentation THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2022 Asphalt Overlay Ramp Project 2 DATE: March 11, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council authorize the initiation of the public bidding procedure for the 2022 Asphalt Overlay Ramp Project 2 by adoption of a resolution preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing the date of the public hearing for April 4, 2022; and authorizing the City Engineer to advertise for bids for the 2022 Asphalt Overlay Ramp Project 2. I concur with the recommendation and respectfully request Mayor and City Council approval. k�4 Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE C DUUB--*--FE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: March 9, 2022 RE: 2022 Asphalt Overlay Ramp Project 2 Dubuque AII•Ameriea M 1 I I I 2007-2012.2013 2017*2019 INTRODUCTION The attached resolutions authorize the initiation of the public bidding procedure for the 2022 Asphalt Overlay Ramp Project 2. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque has followed the "Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way." These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The Iowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. DISCUSSION This project includes the replacement of twenty-eight (28) access ramps, two (2) intake replacements and curb and sidewalk repairs at 12 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Auburn Street at University Ave, one single ramp. 2. Auburn Street alley between University Ave and Grace Street, two single ramps. 3. Grace Street at Griggs Street, two single ramps. 4. Grace Street at Ida Street, two single ramps. 5. Grace Street at alley East of 1819 Grace Street, two single ramps. 6. Bennett Street at alley East of 1755 Bennett Street, two single ramps. 7. Bennett Street at alley East of 1854 Bennett Street, two single ramps. 8. Bennett Street at Griggs Street, two single ramps. 9. Bennett Street at McCormick Street, one single ramp. 10. Bennet Street at N. Algona Street, curb, and sidewalk replacement. 11. Chaney Street at St. Anne Drive, two single and 2 double ramps. 12. Chaney Street at Hillcrest Road, two single and two double ramps. PUBLIC ENGAGEMENT The Public Works Department will mail letters to property owners and the Engineering Department has developed door hangers for residents notifying residents of the overlay and ramp project. PROJECT SCHEDULE The schedule for the Project is as follows: Initiate Public Bidding Process March 21, 2022 Publish Notice to Bidders, Advertise for Bids March 22, 2022 Publish Public Hearing Notice on Plans & Specs March 22, 2022 Public Hearing on Plans & Specifications April 4, 2022 Receipt of Bids (Bid Letting) April 7, 2022 Award Construction Contract April 18, 2022 Final Project Completion July 1, 2022 RECOMMENDATION I recommend preliminary approval of the proposed plans, specifications, form of contract, and construction estimate for the 2022 Asphalt Overlay Ramp Project 2. 1 further recommend establishing the date of a public hearing and authorize the City Engineer to advertise for bids for the Project. BUDGETIMPACT The preliminary estimate of probable costs for the 2022 Asphalt Overlay Ramp Project 2 is as follows: Description Cost Estimate Construction $ 177,750.40 Contingency $ 17,775.40 Engineering Design and Administration $ 19,552.54 Total Construction Cost Estimate $ 215,077.98 The funding summary is as follows: CIP Fund Description Fund Amount 3001227 Curb Ramp Program $ 215,077.98 ACTION TO BE TAKEN I respectfully request adoption of the attached resolutions preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing E the date of the public hearing; and authorizing the City Engineer to advertise for bids for the 2022 Asphalt Overlay Ramp Project 2. GNP/kb cc: John Klostermann, Public Works Director Jon Dienst, Civil Engineer II 3 Prepared by: Kerry Bradley City of Dubuque Engineering 50 W 13'h Street Dubuque IA 52001 (563)589-4270 Return to: Adrienne N. Breitfelder, City Clerk 50 W 13'" Street Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 90-22 2022 ASPHALT OVERLAY RAMP PROJECT 2 PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the 2022 Asphalt Overlay Ramp Project 2 in the estimated amount of $177,750.40 are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 4th day of April 2022, at 6:30 p.m. in the Historic Federal Building Council Chambers (and/or by virtual means), 350 W. 6th Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. 2022 Asphalt Overlay Ramp Project 2 is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Engineer is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the Notice to Bidders to be on the City of Dubuque website and a contractor plan room service with statewide circulation, and which notice shall be published not less than thirteen but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 7th day of April 2022. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 18th day of April 2022, in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 6th Street, Dubuque, Iowa. Passed, adopted, and approved this 215t day of March 2022. BradM—Zi6anagh, A,,,,ttllest: A n ' Adrienne N. Breitfelder, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2022 ASPHALT OVERLAY RAMP PROJECT 2 NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the 2022 Asphalt Overlay Ramp Project 2 in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 41" day of April 2022, in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 6'" Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: This project includes the replacement of twenty-eight (28) access ramps, two (2) intake replacements and curb and sidewalk repairs at 12 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Auburn Street at University Ave, one single ramp. 2. Auburn Street alley between University Ave and Grace Street, two single ramps. 3. Grace Street at Griggs Street, two single ramps. 4. Grace Street at Ida Street, two single ramps. 5. Grace Street at alley East of 1819 Grace Street, two single ramps. 6. Bennett Street at alley East of 1755 Bennett Street, two single ramps. 7. Bennett Street at alley East of 1854 Bennett Street, two single ramps. 8. Bennett Street at Griggs Street, two single ramps. 9. Bennett Street at McCormick Street, one single ramp. 10. Bennet Street at N. Algona Street, curb, and sidewalk replacement. 11. Chaney Street at St. Anne Drive, two single and 2 double ramps. 12. Chaney Street at Hillcrest Road, two single and two double ramps. Any visual or hearing -impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 22nd day of March 2022. Adrienne N. Breitfelder, City Clerk