Loading...
Stoneman Road Reconstruction Project_InitiateCopyrighted March 21, 2022 City of Dubuque Items to be set for Public Hearing # 3. City Council Meeting ITEM TITLE: Stoneman Road Reconstruction Project SUMMARY: City Manager recommending City Council approve the Resolution of Necessity, approve the Preliminary Schedule of Assessments, establish the date of the public hearing to April 18, 2022, and authorize the City Engineer to advertise for bid proposals through the adoption of resolutions for the Stoneman Road Reconstruction Project. RESOLUTION Stoneman Road Reconstruction Project: preliminary approval of plans, specifications, form of contract, and estimated cost; setting date of public hearing on plans, specifications, form of contract, and estimated cost; and ordering the advertisement for bids RESOLUTION Approving the preliminary plats, schedule of assessments and estimate of total cost for the Stoneman Road Reconstruction Project RESOLUTION of necessity for the Stoneman Road Reconstruction Project RESOLUTION Fixing date of public hearing on Resolution of Necessity SUGGESTED Receive and File; Adopt Resolution(s), Set Public Hearing for April 18, DISPOSITION: 2022Suggested Disposition: ATTACHMENTS: Description Type Stoneman Road Reconstruction Project-MVM Memo City Manager Memo Staff Memo Staff Memo Initiate Resolution Resolution of Assessments Resolution of Necessity Fixing Date PH Res of Necessity Schedule of Assessments —Updated 3.21.22 Schedule of Assesments Notice to Property Owners Notice of Hearing Resolutions Resolutions Resolutions Resolutions Supporting Documentation Supporting Documentation Supporting Documentation Supporting Documentation THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Stoneman Road Reconstruction Project CIP# 3001257, 7201117, 7401405 DATE: March 14, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council approve the Resolution of Necessity, approve the Preliminary Schedule of Assessments, establish the date of the public hearing to April 18, 2022, and authorize the City Engineer to advertise for bid proposals through the adoption of resolutions for the Stoneman Road Reconstruction Project. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen If•[yT/f•iW111111111111111 111111111 Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITYF DUiYB- E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer RE: Stoneman Road Reconstruction Project CIP# 3001257, 7201117, 7401405 DATE: March 14, 2022 Dubuque MI-Ameflu Mly 2007-2012.2013 2017*2019 INTRODUCTION The attached resolutions authorize the initiation of the public bidding procedure for the Stoneman Road Reconstruction Project. BACKGROUND Stoneman Road was originally constructed in 1974. The pavement is in very poor condition and the stormwater drainage has been an issue for years. The street serves Hills and Dales Child Development, the Kennedy Mall, a dentist office, Tandem Tire and the future Green State Credit Union facility. The street has a cul-de-sac that was platted at the end of the street, but the cul-de-sac was never constructed. Public Works have had issues with plowing the street. They currently turn around in the Hills and Dales parking lot. Since there is no cul-de-sac, it is difficult for Public Works to plow the street. DISCUSSION The Stoneman Road Reconstruction Project includes the reconstruction of pavement installation of a sidewalk on the north side of the street, reconstruction of storm sewer, reconstruction of some watermain and installation of new streetlights. The project will include electrical conduit to accommodate the streetlights. City staff have coordinated with local utilities on the project to see if they want to make changes or upgrades while construction occurs. The project is also proposed to be bid with paving alternatives. This allows both the asphalt and concrete industry to bid on the project. The pavements being considered equivalent in structural number: 9" of asphalt pavement and 8" of concrete pavement. Sidewalks will not be constructed on the south side of the street because of insufficient right of way available. If sidewalk is installed on the south side of the street later, property from Kennedy Mall would need to be acquired and forty-eight (48) parking spaces affected. It is recommended not to acquire this additional property at this time to expedite the reconstruction of Stoneman Road to improve access, safety and meet the future development timeline of Green State Credit Union. A five (5) foot wide sidewalk will be installed along the north side of the street and wrapped around the cul-de-sac to accommodate pedestrian access to the businesses. The construction project will be phased to accommodate access to all the businesses. Access may be restricted to accessing from John F. Kennedy Road at times or from Century Drive through the Kennedy Mall parking lot. It will depend on which phase is under construction. Wayfinding signage will be placed to direct traffic to businesses. Green State Credit Union Related Improvements As part of the Green State Credit Union (GSCU) site development at the intersection of John F. Kennedy Road and Stoneman Road, certain public improvements are required to be funded by the developer. Those improvements include: 1) Grading for sidewalk along Stoneman Road and along John F. Kennedy Road for a sidewalk. 2) Grading along John F. Kennedy Road for a dedicated southbound right turn lane from John F. Kennedy Road to Stoneman Road. 3) Construction of a dedicated left turn lane on Stoneman Road at John F. Kennedy Road. GSCU assumes all costs for this portion of work. 4) The City will fund the paving for the right turn lane on John F. Kennedy Road. The GSCU study that was conducted concluded a right turn lane was necessary at some time in the future. The cost and benefit to construct the right turn lane with this project, versus sometime in the future is much more cost effective. PUBLIC ENGAGEMENT City staff have sent letters to the abutting property owners in this corridor and held individual meetings with all the property owners. Business owners will also receive a copy of the Road Construction Toolkit that was developed by staff in recent years. Easements will be required from the property owners to accommodate improvements. Those easements will be secured prior to awarding the contract. PROJECT SCHEDULE The schedule for the Project is as follows: Initiate Public Bidding Process Publish Notice to Bidders, Advertise for Bids Mail Notice to Affected Property Owners Publish Public Hearing Notice on Plans & Specs Publish First Public Hearing Notice to Property Owners Publish Second Public Hearing Notice to Property Owners Public Hearing on Plans & Specifications Receipt of Bids (Bid Letting) Award Construction Contract Final Project Completion March 21, 2022 March 25, 2022 March 25, 2022 April 1, 2022 April 1, 2022 April 8, 2022 April 18, 2022 April 21, 2022 May 2, 2022 September 17, 2022 RECOMMENDATION I recommend preliminary approval of the proposed plans, specifications, form of contract, and construction estimate for the Stoneman Road Reconstruction Project. I further recommend establishing the date of a public hearing and authorize the City Engineer to advertise for bids for the Project. BUDGETIMPACT The estimate of probable cost for the Stoneman Road Reconstruction Project is as follows: Description Cost Estimate Construction $ 1,126,387.20 Contingency 112,638.72 Construction Engineering and Inspection 123,902.59 Total Construction Cost Estimate $ 1,362,928.51 The project funding summary is as follows: CIP Fund Description Fund Amount 3001257 Stoneman Road Reconstruction $ 984,523.96 7201117 Stoneman Road Storm Sewer 85,000.00 7401405 Watermain Construction 50,000.00 Special Assessment — Street Improvement, Commercial 146,464.02 Special Assessment — Commercial Deficiency 0.00 Sidewalk Assessment — 100% Assessable 19,039.52 Green State Credit Union Development 77,901.01 Total Project Funding $1,362,928.51 PROPERTY ASSESSMENTS The assessed properties in this project are all commercial use and therefore not eligible for the normal owner -occupied residential financial assistance. Abutting properties can pay assessment balances in excess over $500 over a 15-year period with 3% interest. Abutting property owners can pay their assessment balances to the City Treasurer within the first 30 days after receiving the final notice of special assessment to avoid interest charges. ACTION TO BE TAKEN The City Council is requested to give preliminary approval to the Resolution of Necessity, approve the Preliminary Schedule of Assessments, establish the date of the public 3 hearing, and authorize the City Engineer to advertise for bid proposals through the adoption of the enclosed resolutions for the Stoneman Road Reconstruction Project. Attach. Prepared by Jon Dienst, P.E. cc: Crenna Brumwell, City Attorney Jenny Larson, Budget Director John Klostermann, Public Works Director Deron Muehring, Civil Engineer 12 Prepared by Jon Dienst, Civil Engineer, 50 W 13°i St Dubuque IA 52001 (563) 589-4276 Return to Adrienne N. Breiffelder, City Clerk, 50 W. 13t" St., Dubuque, IA 52001, (563) 589-4100 RESOLUTION NO. 92-22 STONEMAN ROAD RECONSTRUCTION PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the Stoneman Road Reconstruction Project in the estimated amount $1,126,387.20, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 18th day of April, 2022, at 6:30 p.m. in the Historic Federal Building Council Chambers (second floor) 350 W. 6th Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. The Stoneman Road Reconstruction Project is hereby ordered to be advertised for bids for construction. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. The City Engineer is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the Notice to Bidders to be published on the City of Dubuque website and a contractor plan room service with statewide circulation, which notice shall be published not less than thirteen but not more than forty- five days before the date for filing bids before 2:00 p.m. on the 215t day of April 2022. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 2nd day of May 2022, in the Historic Federal Building Council Chambers (second floor), 350 West 6th Street, Dubuque, Iowa. Passed, approved, and adopted this 21 st day of March, 2022. Brad M. avanagh, Mayor Attest: / Adrienne N. Breitfelder, City Clerk Prepared by Jon Dienst. City of Dubuque, 50 W. 13t' Street, Dubuque IA 52001 (563) 589-4270 Return to Adrienne Breitfelder, City Clerk, City of Dubuque, 50 W. 13th Street, Dubuque, IA 52001 (563) 589-4100 RESOLUTION NO. 93-22 APPROVING THE PRELIMINARY PLATS, SCHEDULE OF ASSESSMENTS AND ESTIMATE OF TOTAL COST FOR THE STONEMAN ROAD RECONSTRUCTION PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the attached preliminary plats, schedule of assessments, and estimate of total cost for the Stoneman Road Reconstruction Project are hereby approved. Passed, approved, and adopted this 21st day of March, 2022. .• 9—CKanagh,• Attest: Adrienne N. Breitfelder, City Clerk Prepared by Jon Dienst. City of Dubuque 50 W. 1311 Street Dubuque IA 52001 (563) 589-4270 Retum to Adrienne Breitfelder, City Clerk, City of Dubuque, 50 W. 13th Street, Dubuque, IA 52001 (563) 589-4100 RESOLUTION NO. 94-22 RESOLUTION OF NECESSITY FOR THE STONEMAN ROAD RECONSTRUCTION PROJECT Whereas, the plat, preliminary schedule of assessments, and estimate of total cost for the Stoneman Road Reconstruction Project have been duly prepared and approved by the City Council of the City of Dubuque and ordered placed on file in the office of City Clerk. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The Stoneman Road Reconstruction Project will provide: Reconstruction of Stoneman Road — Removal of the existing pavement and curb and gutter — Excavation of the subgrade to allow the placement of granular sub -base — Installation of storm sewer — Reconstruction of a portion of the watermain — Spot repairs of the sanitary sewer — Installation of sub -drains — Installation of 8-inch PCC pavement — Installation of curb and gutter — Installation of sidewalk along the north side of the street — Installation of new streetlights — Installation of conduit to streetlight needs There is on file in the office of the City Clerk an estimated total cost of the work, and a preliminary plat and schedule showing the amount proposed to be assessed to each lot for the improvement. The date, time, and place the council will hear property owners subject to the assessment and interested parties for or against the improvement, its cost, the assessment, or the boundaries of the district. That the City Council deems it advisable and necessary for the public welfare to make the herein mentioned improvements. Unless a property owner files objections with the City Clerk at the time of hearing on the resolution of necessity, the property owner is deemed to have waived all objections pertaining to the regularity of the proceeding and the legality of using the special assessment procedure. Said improvements shall be constructed in accordance with the plans and specifications which have been approved by the City Council and are now on file in the Office of the City Clerk. The cost of making such improvement will be assessed against property lying with the assessment limits. The above resolution was introduced, approved, and ordered placed on file with the City Clerk this 21s' day of March, 2022. Attest: Adrienne N. Breitfelder, City Clerk Prepared by Jon Dienst, City of Dubuque. 50 W. 13'^ Street, Dubuque IA 52001 (563) 589-4270 Return to Adrienne Breitfelder, City Clerk, City of Dubuque, 50 W. 13th Street, Dubuque, IA 52001 (563) 589-4100 RESOLUTION NO. 95-22 FIXING DATE OF PUBLIC HEARING ON RESOLUTION OF NECESSITY Whereas, the City Council of the City of Dubuque, Iowa, has given its preliminary approval to the plat, preliminary schedule of assessments, and estimated total cost for the Stoneman Road Reconstruction Project and ordered the plat, schedule of assessments, and estimate of total cost placed on file in the Office of the City Clerk; and Whereas, the proposed Resolution of Necessity for Project has been introduced and is now on file in the Office of the City Clerk. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The City Council will meet on the 18th day of April 2022, at 6:30 p.m. in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 6th Street, Dubuque, Iowa. At which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, the boundaries of the district, the cost, the assessment against any lot, or the final adoption of a resolution of necessity. A property owner will be deemed to have waived all objections unless at the time of hearing the property owner has filed objections with the City Clerk. The City Clerk be and is hereby authorized and directed to cause a notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published once each week for two consecutive weeks, the first publication of which shall be not less than ten days prior to the day fixed for its consideration. Passed, adopted and approved this 215t day of March, 2022. Brad M. avanagh, Mayor Attest: 6°y� Adrienne N. Breitfelder, City Clerk CITY OF DUBUQUE, IOWA Stoneman Road PRELIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS DATE: 3-21-2022 The following schedule is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the amount proposed to be assessed against each lot and the valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the City Council of the City of Dubuque. public pvmt and private water & sewer total PARCEL NUMBER PROPERTY OWNER NAME LOT DESCRIPTION STREET ADDRESS NET ASSESSED VALUATION VALUATION WITH IMPROVEMENT NET PAVING IMPROVEMENT COST TOTAL PUBLIC IMPROVEMENT COST SIDEWALK WATER SERVICE SANITARY SERVICE STORM SEWER STUB GSCU COSTS TOTAL PUBLIC ASSESSMENT 1028230013 HILLS AND DALES CHILD DEVELOPMENT CENTER LOT 2-2-1-2-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N-R2E 3505 Stoneman Road $1,476,400 $1,493,783.88 $11,305.23 $11,305.23 $6,078.65 $17,383.88 1028230015 FINAL GRAVITY LLC LOT 1-2-1-2-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N-R2E UND 1/4 INT 3455 Stoneman Road $239,300 $244,012.56 $3,092.45 $3,092.45 $1,620.11 $4,712.56 1028230016 PECKOSH, VALERIE B DMD & THOMAS F JR LOT 1-2-1-2-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N-R2E (LIND 1/4 INT 3455 Stoneman Road $239,300 $244,012.56 $3,092.45 $3,092.45 $1,620.11 $4,712.56 1028230018 PECKOSH, THOMAS F JR & VALERIE B LOT 1-2-1-2-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N R2E (LIND 1/8 INT 3455 Stoneman Road $116,210 $118,566.27 $1,546.22 $1,546.22 $810.05 $2,356.27 1028230017 MB REAL ESTATE OF DUBUQUE LLC LOT 1-2-1-2-1-2-2-2-2-2 NE 1/4 NE1/4 SEC 28 T89N-R2E (LIND 1/8 INT 3455 Stoneman Road $116,210 $118,566.27 $1,546.22 $1,546.22 $810.05 $2,356.27 1028230014 BIERIE DENTAL BUILDING LLC LOT 1-2-1-2-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N-R2E (LIND 1/4 INT 3455 Stoneman Road $239,300 $244,012.56 $3,092.44 $3,092.44 $1,620.12 $4,712.56 1028230019 M&D Real Estate 1 LLC LOT 1-1-2-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N-R2E 3435 Stoneman Road $798,350 $817,200.21 $12,369.78 $12,369.78 $6,480.44 $18,850.21 1028230020 GREENSTATE CREDIT UNION LOT 1 GREENSTATE PLACE 3425 STONEMAN ROAD $268,300 $304,892.72 $17,789.32 $17,789.32 $7,792.40 $8,923.75 $2,087.25 $36,592.72 1028230021 GREENSTATE CREDIT UNION LOT 2 GREENSTATE PLACE 1475 John F. Kennedy R $1,685,780 $1,759,699.72 $14,822.11 $14,822.11 $2,420.00 $56,677.61 $73,919.72 1028276002 KENNEDY MALL INC BAL LOT 1-1-1-1-1 HAWKEYE STOCK FARM 555 John F. Kennedy Ro $4,050,000 $4,124,031.45 $74,031.45 $74,031.45 $74,031.45 $142,687.67 $19,039.52 $239,628.20 CITY OF DUBUQUE, IOWA Stoneman Road PRELIMINARY SCHEDULE OF VALUATION AND PROPOSED ASSESSMENTS DATE: 2-17-2022 The following schedule is hereby determined to show each lot proposed to be assessed for the improvement shown in the title together with the amount proposed to be assessed against each lot and the valuations shown opposite each lot are hereby fixed as the true valuations of such lots by the City Council of the City of Dubuque. public pvmt and private water & sewer total PARCEL NUMBER PROPERTY OWNER NAME LOT DESCRIPTION STREET ADDRESS NET ASSESSED VALUATION VALUATION WITH IMPROVEMENT NET PAVING IMPROVEMENT COST TOTAL PUBLIC IMPROVEMENT COST SIDEWALK WATER SERVICE SANITARY SERVICE STORM SEWER STUB GSCU COSTS TOTAL PUBLIC ASSESSMENT 1028230013 HILLS AND DALES CHILD DEVELOPMENT CENTER LOT 2-2-1-2-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N-R2E 3505 Stoneman Road $1,476,400 $1,493,783.88 $11,305.23 $11,305.23 $6,078.65 $17,383.88 1028230015 FINAL GRAVITY LLC LOT 1-2-1-2-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N-R2E UND 1/4 INT 3455 Stoneman Road $215,370 $234,220.21 $12,369.78 $12,369.78 $6,480.44 $18,850.21 1028230019 M&D Real Estate 1 LLC LOT 1-1-2-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N-R2E 3435 Stoneman Road $798,350 $817,200.21 $12,369.78 $12,369.78 $6,480.44 $18,850.21 1028230020 GREENSTATE CREDIT UNION LOT 2-1-1-2-2-2-2-2 NE 1/4 NE 1/4 SEC 28 T89N-R2E LANDS INSIDE 3425 STONEMAN ROAD $268,300 $295,949.26 $8,845.. 6 $8,845.. 6 $7,792.40 $8,923.75 $2,087.25 $27,649.26 1028230021 GREENSTATE CREDIT UNION LOT 1-1-1-2-2-2-2-2 OF NE 1/4 NE 1/4 OF SEC 28 T89N-R2E LANDS INSIDE 1475 John F. Kenned R $1,685,780 $1,772,419.53 $27,541.92 $27,541.92 $2,420.00 $56,677.61 $86,639.53 1028276002 1 KENNEDY MALL INC IBAL LOT 1-1-1-1-1 HAWKEYE STOCK FARM 1555 John F. Kennedy Ro $4,050,0001 $4,124,031.45 $74,031.45 $74,031.45 1 $74,031.45 $146,464.02 $19,039.52 $243,404.54 NOTICE TO PROPERTY OWNERS STONEMAN ROAD RECONSTRUCTION PROJECT Notice is given that there is now on file for public inspection in the office of the clerk of the City of Dubuque, Iowa, a proposed resolution of necessity, an estimate of cost and schedule showing the amounts proposed to be assessed against each lot and the valuation of each lot within a district approved by the City Council of the City of Dubuque, Iowa, for a public improvement of the type(s) and in the location(s) as follows: Reconstruction of the following Street: • Stoneman Road — Removal of the existing pavement and curb and gutter — Excavation of the subgrade to allow the placement of granular sub -base — Installation of storm sewer — Reconstruction of a portion of the watermain — Spot repairs of the sanitary sewer — Installation of sub -drains — Installation of 8-inch PCC pavement — Installation of curb and gutter — Installation of sidewalk along the north side of the street — Installation of new streetlights — Installation of conduit to streetlight needs The proposed district to be benefited and subject to assessment for the cost of such improvements is described as follows: All properties abutting or served by utilities in the following street: • Stoneman Road CITY OF DUBUQUE OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE STONEMAN ROAD RECONSTRUCTION PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Stoneman Road Reconstruction Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 18t" day of April 2022, in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 6th Street, Dubuque, Iowa. At which time the owners of property subject to assessment for the proposed improvement or any other person having an interest in the matter may appear and be heard for or against the making of the improvement, said proposed plans, specifications, form of contract, estimated cost, the boundaries of the district, the assessment against any lot, or the final adoption of a resolution of necessity. A property owner will be deemed to have waived all objections unless at the time of hearing the property owner has filed objections with the clerk. The scope of the Project is as follows: Reconstruction of Stoneman Road — Removal of the existing pavement and curb and gutter — Excavation of the subgrade to allow the placement of granular sub -base — Installation of storm sewer — Reconstruction of a portion of the watermain — Spot repairs of the sanitary sewer — Installation of sub -drains — Installation of 8-inch PCC pavement — Installation of curb and gutter — Installation of sidewalk along the north side of the street — Installation of new streetlights — Installation of conduit to streetlight needs Copies of supporting documents for the public hearing are on file in the City Clerk's Office, City Hall, 50 W. 13t" St., Dubuque, Iowa. To comply with social distancing mandates, documents can be viewed at ittps://www.citVofdubugue.org/Agendas or by contacting the City Clerk's Office at 563-589-4100. Written comments regarding the above public hearing should be submitted to the City Clerk's Office, 50 W. 13t" St., Dubuque, IA 52001, ctyclerk(a-)_cityofdubug ue.org, on or before said time of public hearing. At said time of public hearing all interested citizens and parties will be given an opportunity to submit online written comments for or against said proposal. Individuals with limited English proficiency, vision, hearing or speech impairments or requiring special assistance should contact the City Clerk's Office at (563) 589-4100, TDD/TTY (563) 690-6678, ctyclerkC@-cityofdubuque.org as soon as feasible. Deaf or hard - of -hearing individuals can use Relay Iowa by dialing 711 or (800) 735-2942. In the event that a meeting at the Historic Federal Building location is not possible as a result of the COVID-19 pandemic, instructions for a virtual meeting, and listening, viewing and public input options will be posted on the meeting agenda on Friday, September 17, 2021 at https://www.cityofdubugue.org/agendas. Published by order of the City Council given on the 21st day of March 2022. Adrienne N. Breitfelder, City Clerk