Water Department Fiscal Year 2023 Budget Presentation Copyrighted
March 23, 2022
City of Dubuque Public Hearings # 3.
Special Meeting
ITEM TITLE: Water Department Fiscal Year2023 Budget Presentation
SUMMARY:
SUGGESTED
DISPOSITION:
ATTACHMENTS:
Description Type
Water Department Policy Budget Book Supporting Documentation
Presentation_Uploaded 3.23.22 Supporting Documentation
Water Department
-21-
This page intentionally left blank.
-22-
WATER DEPARTMENT
FY 2021 FY 2022 FY 2023 %Change From
Budget Highlights Actual Budget Requested FY 2022 Budget
Expenses
Employee Expense 2,247,452 2,521,261 2,514,330 (0.3)%
Supplies and Services 2,558,634 2,649,327 2,702,358 2.0 %
Machinery and Equipment 714,163 564,750 960,568 70.1 %
Administrative Overhead Recharges 424,310 435,271 452,767 4.0 %
Finance Utility Billing 10,873 — — — %
Engineering Water Maintenance Charges 40,306 29,673 42,951 44.7 %
Payment in Lieu of Taxes 142,884 142,884 142,884 — %
Payment to Construction Fund 550,000 400,000 1,000,000 150.0 %
Debt Service 11,969,207 3,897,961 2,692,470 (30.9)%
Total Expenses 18,657,829 10,641,127 10,508,328 (1.2)%
Resources
Operating Revenue 19,777,274 10,553,217 11,630,469 10.2 %
General Fund - Rate Subsidy 21,315 96,126 25,000 (74.0)%
Total Resources 19,798,589 10,649,343 11,655,469 9.4 %
Net Operating Surplus (Deficit) 1,140,760 8,216 1,147,141 1,138,925
Personnel -Authorized FTE 26.07 26.07 26.07
Water User Fee Rate Increase — % 3 % 5 %
Revenue 1% Rate Increase Generates $ 85,475
Improvement Package Summar-X
1 of 6
This improvement request is for the purchase of one new GPS Unit. This GPS unit will work wirelessly with
the tablet for real time placement of water features in the field while infrastructure is being installed. City
Engineering has had much success with this exact same unit over the last couple of years. The water
department has eight staff members fully trained on how to operate the GPS unit and would allow us to send
multiple teams into the field to perForm data collection. The existing R2 GPS unit has proved to be
invaluable for on site data collection and it would be useful to have a second device when work is going on
at different ends of the the city. This is a proactive, sustainable approach of being as effective and efficient
with the operation in providing uninterrupted service to citizens, contractors, developers and engineering
firms that are served. This follows the City Council goal of having a Sustainable Environment: Become a
resilient city using sustainable and affordable technology for water, energy, transportation, health and
wellness, discard, community engagement- a model community for the world.
Related Cost: $880 Water User Fees Recurring Recommend -Yes
Related Cost: $6,600 Water User Fees Non-Recurring
Net Cost: $7,480
Water Rate Impact: 0.08 %
Activity: Distribution
-23-
2 of 6
This improvement request is for a Flexipro Video Camera to be used for inspection of the interior of existing
water mains for evaluation of water main replacement for future street and green alley projects. This also
provides means to see inside existing water mains through fire hydrants or cut outs of water main up to 400
feet in each direction. Public Works Department has a similar camera for sewer inspections, but are not
able to use for sanitary reasons. This follows the Council Goals and priorities of a Sustainable Environment:
Provide safe, dependable drinking water for all residents.
Related Cost: $ 9,500 Water User Fees Non-Recurring Recommend -Yes
Net Cost: $ 9,500
Water Rate Impact: 0.11 %
Activity: Distribution
3 of 6
This improvement request is for a set of four file cabinets with table top to match Public Works File Cabinets,
which will be placed in the open area of the Municipal Service Center. Per John Klostermann, Public Works
Director, our filing cabinets must match their filing cabinets so everything is uniform. File Cabinets will be
used to house Development Review Project Folders and Fire Sprinkler Plans that are older than five years.
This was planned to be housed in the Water Distribution File room on the mezzanine in the garage, due to
the amount of dust particles entering this room, it is not conducive to place file project folder records. This
follows the City Council Goals and Priorities of a Financially responsible, High performance City
Organization: Secure City information and data using "Best Practices".
Related Cost: $ 3,300 Water User Fees Non-Recurring Recommend -Yes
Net Cost: $ 3,300
Water Rate Impact: 0.04 %
Activity: Distribution
4of6
This improvement request is for a vehicle for the use of the maintenance and supervisory staff at the Eagle
Point Water Treatment Plant. Use and benefit of the vehicle would be used by maintenance at the pump
stations including, but not limited to, delivering bulk sodium hypochlorite liquid, changing reagents for
chlorine analyzers, well sampling and measurement, distribution system sampling, safety and security
inspections at the tanks, towers, and delivering parts as necessary to each of the nineteen(19) remote
facilities of the treatment and pumping operation. The vehicle will also be fitted with a plow for snow removal
to aid the Public Works Department, a utility box for onsite repairs and maintenance work, and will have a
spray in the bed liner for hauling materials and products to each site. This third vehicle will be used to
improve situations associated with the daily challenges of four maintenance and operations staff, two
operator special assignments and two maintenance staff, managing electrical and mechanical needs which
are often at odds with scheduling two vehicles and ensuring work is performed in a timely manner. A third
vehicle will reduce the wait and response time to perform their work and improve overall efficiency within the
group. This vehicle will also provide available transportation for staff to deliver customer notices and the
consumer confidence reports. It will also provide transportation for other City business, like conferences,
classes, etc., which are now being done with private vehicles. The vehicle is a 3/4 ton truck with utility box
and snowplow. This improvement package follows the City Council Goals and Priorities: Financially
Responsible, High PerFormance City Organization: Sustainable, Equitable, and effective Service Delivery.
Related Cost: $66,000 Water User Fees Non-Recurring Recommend -Yes
Net Cost: $66,000
Water Rate Impact: 0.78 %
Activity: Distribution
-24-
5 of 6
This improvement request is for a stand alone SureCall Cellular Distributed Antenna System (DAS) for the
Water Distribution Department Staff at the City of Dubuque Public Works building. This system would boost
the cellular signal for the area in the Public Works Building that is isolated from any windows (Water
Distribution Department) where cellular signal can be obtained. The SureCall DAS System consists of one
signal amplifier, one rooftop mounted antenna, and up to two (2) interior antennas that will be mounted in
the affected areas. Use and benefit of the SureCall DAS System would improve efficiency in daily operations
such as: making/receiving calls from Distribution crews, contractors, receiving notifications such as two-
factor identification, and effective use of the Panic Button app, in case of emergencies. This improvement
package follows the City Council Goals and Priorities: Financially Responsible, High-Performance City
Organization: Sustainable, Equitable, and Effective Service Delivery
Related Cost: $12,632 Water User Fees Non-Recurring Recommend -Yes
Net Cost: $12,632
Water Rate Impact: 0.15 %
Activity: Plant Operations
6 of 6
This improvement request would provide funding for Cartegraph's programming services, training and any
software add ons that are beyond the standard to help efficiently manage and report on daily operations
including generation of Work Orders, Preventative and Corrective Maintenance orders, inventory
management, Job Costing, Procurement Management(quotation and requisition processes) and Scheduling
and Service Requests. This follows the City Council Goal of financially responsible, high performance city
organization, sustainable, equitable and effective service delivery.
Related Cost: $65,000 Water User Fees Non-Recurring Recommend -Yes
Net Cost: $65,000
Water Rate Impact: 0.77 %
Activity:Administration
Significant Line Items
Employee Expense
1. FY 2023 employee expense reflects a 3.25°/o wage package increase.
2. The lowa Public Employee Retirement System (IPERS) City contribution of 9.44% is unchanged
from FY 2022 The employee contribution of 6.29% is unchanged from FY 2022.
3. The City portion of health insurance expense increased from $1,086 in FY 2022 to $1,119 in FY 2023
per month per contract which results in an annual cost increase of$3,452 or 3.00%.
4. Overtime is unchanged from $94,040 in FY 2022 to $94,040 in FY 2023 . FY 2021 actual was
$105,353.
5. Five-Year Retiree Sick leave payout is decreased from $31,850 in FY 2022 to $11,094 in FY 2023.
6. 50% Sick Leave Payout increased from $766 in FY 2022 to $1,841 in FY 2023 based on FY 2022
actual to-date. Effective July 1, 2019, employees over the sick leave cap can convert 50% of the sick
leave over the cap to vacation or be paid out.
7. An additional decrease in employee health insurance ($-3,452) reflects a corrected miscalculation
included in prior year expense.
-25-
Supplies & Services
8. Property Insurance increased from $72,702 in FY 2022 to $89,389 in FY 2023 based on FY 2022
actual plus 9.5°/o.
9. Electricity Utility Expense decreased from $770,628 in FY 2022 to $668,402 in FY 2023 based on FY
2019 actual of$730,336 less 8°/o.
10. Gas Utility Expense increased from $37,210 in FY 2022 to $39,992 in FY 2023. This is based on FY
2019 actual of$36,825 plus 8.6%.
11. Sales Tax expense increased from $454,532 in FY 2022 to $460,710 in FY 2023 based on FY 2021
actual plus an increase in water rates in FY 2023 of 5%. This expense is directly offset by sales tax
revenue.
12. Machinery and Equipment Maintenance decreased from $83,994 in FY 2022 to $63,457 in FY 2023
based on FY 2021 actual of$63,208. This line item represents wells, filters, pumps, generators,
chemical unloading and storage, chemical feed equipment, chlorinators, lime slackers, clarifiers, air
compressors and air system components, telemetry, HVAC, elevator, computer maintenance, sludge
plant, electrical controls, and sensors.
13. Costs for Fluoride, Phosphate, Chlorine, Carbon Dioxide, Lime, and Polymer expense (water
processing materials) decreased from $452,099 in FY 2022 to $335,000 in FY 2023. Chlorine
increased from $30,744 in FY 2022 to $40,675 in FY 2023. Lime decreased from $319,000 in FY
2022 to $319,650 in FY 2023. Carbon dioxide increased from $20,679 in FY 2022 to $29,275 in FY
2023.
14. Hauling Services unchanged from $165,000 in FY 2022 to $165,000 in FY 2023 based on FY 2022
actual price per ton unchanged.The amount of hauled tons of lime sludge is highly variable from year
to year and is based on hauling approximately 15,000 tons per year. FY 2021 actual expense was
$212,476.
15. Consultant Services increased from $29,000 in FY 2022 to $33,000 in FY 2023. This line item
includes a leak survey ($18,000) and water storage tank inspections ($15,000).
16. Software increased from $61,128 in FY 2022 to $94,610 in FY 2023. This increase is largely due to
($31,000) Hach Wims and Access Technologies expense previously charged to an equipment line
item. This line item includes the following breakout costs:
-26-
Software FY 2023
Water Administration
Laserfiche License 282
GoToMyPC (5) 720
Water Meters
Tokay Software 1,500
WaterSmart 31,568
Neptune360 (50%) 23,640
Water Plant Operations
Scada Tech Support For Rockwell Software 4,900
Hach Wims And Access Technologies 31,000
Water Distribution
AutoCAD 1,000
Total Software $94,610
17. Property Maintenance increased from $30,311 in FY 2022 to $45,170 in FY 2023 based on FY 2021
actual. This line item represents the contract for building and grounds maintenance for Eagle Point
Plant, sludge plant, storage tanks, reservoirs, booster stations, well houses.
18. Pipe Special Fittings is increased from $50,290 in FY 2022 to $75,472 in FY 2023 based on FY
2021 actual. This line item represents the purchase of water pipe, special fitting and tapping material
for the distribution system. There is associated revenue budgeted in taps ($35,121) and taps
services ($55,000) that covers these expenses.
19. Valves increased from $49,955 in FY 2022 to $64,000 in FY 2023 based on FY 2021 actual. This line
item represents the material cost only for valves in the distribution system (9 valves) and ongoing
valve replacement and maintenance internally in the plant.
20. Environment Testing/Monitoring unchanged from $35,600 in FY 2022 to $35,600 in FY 2023 based
on FY 2022 budget. FY 2021 actual was $38,048. This line item represents the cost of samples due
to boil advisories, chlorine monitoring, increased testing for expansion of system, and water quality
testing using the Heterotrophic Plate Count (HPC) test. The HPC test detects the growth of
pathogens beyond bacteria testing, that might be present, which is especially important after main
breaks, loss of pressure, and following new connections. HPC testing is conducted twice per month
or as needed following an emergency.
21. Engineering Water Maintenance Charges provides for in-house utility locates for various water
distribution operations through Engineering Department ($42,951). FY 2022 was budgeted at
$29,673 which is a 44.75°/o increase in FY 2023.
-27-
Machinery 8� Equipment
22. Equipment replacement items at the maintenance level include ($960,568):
Water Administration
Smart Phone (1) $ 350
Meters
Smart Phone (2) $ 700
Plant Operation & Maintenance
Smart Phone (2) $ 700
Water Distribution System
Shop Equipment $ 250
Hydrants $ 70,000
Electric Pump (2) $ 30,000
Cut Off Saw $ 3,200
Gas Generator _ $ 2,400
Barricades/Warn Safety Signals $ 1,000
Smartphones (3) $ 13,682
Portable Parallel Analyzer Test Equipment $ 5,000
Shop Vac $ 1,000
Annual Maintenance Projects �
Pump Replace Vacuum Filter $ 15,000
Generator Maintenance Program - $ 8,000
Valve Replacement $ 70,000
Water Main Replacements (Repair) $ 350,000
Large Water Meters Exchange $ 191,306
Water Valve Box Maintenance $ 25,000
Water Meter Testing $ 25,000
Recommended Improvement Packages $ 16,980
$ 960,568
Debt Service
23. Annual debt service reflects repayment to ($2,692,470):
Final Call
Amount Debt Series Source Purpose Payment Date
$ 58,740 SRF 2007A Water Fees Clear Wells 2028
$ 218,567 SRF Series 2009 Water Fees Meter Change-Out 2031
$ 423,300 Revenue 2021C Water Fees Water Improvements 2030 2028
$ 107,115 G.O. 2018A Water Fees Water Improvements 2031 2026
$ 40,245 G.O. 2021A Water Fees Water Improvements 2032 2028
$ 137,749 G.O. 2021A Water Fees Water Improvements 2033 2026
$ 659,200 G.O. 20121A Water Fees Water Improvements 2032 2028
$ 42,888 G.O. 2016C Water Fees Water Improvements 2033 2024
-28-
$ 674,200 SRF 2017 Water Fees CIWA Purchase/Imp 2036
$ 268,680 SRF 2019 Water Fees Roosevelt Water Tower 2038 �
$ 59,597 SRF 2021 Water Fees Water Improvements 2041
$ 2,189 SRF 2023 Water Fees Water Improvements 2043
$2,692,470 Total Water Annual Debt Service
Revenue
1. Water User Fees increased from $9,399,359 in FY 2022 to $10,195,050 in FY 2023 based on FY
2021 actual of$8,547,478 plus the FY 2023 projected rate increase of 5%.
2. Flat Rates increased from $27,242 in FY 2022 to $52,897 in FY 2023. FY 2021 actual was $54,498.
This charge is for customers purchasing bulk water. Rates are set by City ordinance.
3. Fire Protection Rates increased from $181,778 in FY 2022 to $186,975 in FY 2023 based on FY
2021 actual of$186,975. This fee is the demand charge for fire sprinkler head connection. The rates
are set by City ordinance.
4. Taps increased from $41,000 in FY 2022 to $65,000 in FY 2023. FY 2021 actual was $23,302. This
fee is charged to customers for 3/4" to 1" taps and represents the cost of labor and materials. The
rates are set by City ordinance.
5. Tap Service decreased from $23,000 in FY 2022 to $20,000 in FY 2023. FY 2021 actual was $4,943.
This fee is charged to customers for 2" taps and represents the actual cost of labor and materials.
The rates are set by City ordinance.
6. Connection Charge Front Footage is increased from $75,000 in FY 2022 to $103,000 in FY 2023
based on a three-year average. FY 2021 actual was $92,811. This fee is charged to a new user
when a connection is made to the City water supply. This represents the user share of the cost of the
installation of the water main. Rates are set by City ordinance.
7. Backflow Prevention Administrative Fees increased from $75,675 in FY 2022 to $76,150 in FY 2023
based on actual number of accounts. FY 2021 actual was $74,406. This is the $25 annual fee
charged to all customers with a backflow device.
8. Penalties for late payments increased from $63,840 in FY 2022 to $95,748 in FY 2023 based on FY
2019 actual of$95,739.
9. Tower Monthly Rental increased from $127,732 in FY 2022 to $132,331 in FY 2023 based on water
lease contract amounts. FY 2021 actual was $134,615.
10. Sales Tax Collected increased from $454,532 in FY 2022 to $499,458 in FY 2023 based on the rate
increase for water fees. This line item off-sets the sales tax expense.
-29-
� � � � �
� �
��TI��V
�.ART
.
�
� '
�IS Se�asanal Intern [0.5]
1Nater Distributian ����r Depar[ment
Farepersan [1] Mana�er
Industrial Maintenance
Equipment �perator II [1] Mechanic[1]
Water Distribu�ian
� .
Maintenance 1�orker [6.5] 4Vater Plant �p��atar[&]
Meter Repair Worker II [1]
Industrial �ler�rical
Me�er Repair UJarker I [2] Technician [1]
-30-
WATER DEPARTMENT
The Water Department ensures our community has high quality, safe, reliable and affordable drinking
water.
SUCCESS IS ABOUT PLANNING, PARTNERSHIPS AND PEOPLE
LEADING TO OUTCOMES
PLANNIN�
The 1�Vater Department is engaged in
PE�PLE �����ientious, strategic planning which
allo�+vs for maintaining compliance with the
Emplo�rees of the �Ilater state and federal regulatory agencies in
Department are provided training order to pro�ide the highest qualit�r, safe
to ensure the maintenance of the and �ost eff�c#ive drin�Cing wat�r possible.
apprapriate licenses required b�
the lowa Department of Natural _ _ � _�' "�'�"� ,�,��
Resources. �ther job-related � = : �'
= , ._�_. . . �.
educativnal training is provided .,�µ �.� ; ,� : , •
�,.'t �.�. ��� -,
w�_.�����+� �::�:��-���� .
t❑ broaden emplo�ree s�Cills and �-. . , �.�
�--�=-.� -�- '" ����� �
increase praduct�vit�r. ����,��-. �,�: : �
�' - �
, .�;..� �-
e-�'
�� � � - - �
� } _.
�".
PAF�TNEF�SHIP�
The 1Nater Department is in�olved in �ommunit�r
�ctivitieslPartnershipsl �utreach pra�rams such as 1�Vater
Conservation Educational Program and the �marter �it�r Initiative.
The VlJater Department pro�ides tours of its Eagle Point Treatment
Plant to local schools and organi�ations.
-31-
WATER DEPARTMENT
FY 2021 FY 2022 FY 2023
Full-Time Equivalent 26.07 26.07 26.07
Resources Support
$30,000,000
$20,000,000 $19,777,274
$10,553,217 $11,630,469
$10,000,000
$0
Operating Revenue
� FY 2021 FY 2022 FY 2023
The Water Department is supported by 26.07 full-time equivalent employees, which accounts for
23.93% of the department expense as seen below. Overall, the department's expenses are expected to
decrease by -1.25% in FY 2023 compared to FY 2022.
Expenditures by Category by Fiscal Year
$15,000,000
$10,000,000
$5,000,000
� �
$0 — —
m cn m D c � C� p m
� � � Q � � p Cp �
� � � � � � � �
'-.
� � � � � � � � CD
CD � Cp � � C
(D CD
CD � � < �• h G �•
X Q � � � � CQ
n
� �
(D
TI
� � Q Q v
c�� N
(D cn
�
FY 2021 FY 2022 � FY 2023
-32-
WATER DEPARTMENT
Administration
Mission & Services
The City of Dubuque Water Department is dedicated to producing and delivering drinking water that is
in compliance with all state and federal drinking water standards. We continually strive to adopt new
and better methods of delivering the best quality drinking water to the citizens of Dubuque in the most
cost-effective manner. Water Department Administration is responsible for the preparation of operating
and capital budgets, interacting with the state and federal regulatory agencies, evaluation and
coordination of treatment facility operations and the water distribution system functions.
Water Administration Funding Summary
FY 2021 Actual FY 2022 Budget FY 2023 Requested
Expenditures $12,772,117 $4,958,327 $3,684,775
Resources $— $— $—
Water Administration Position Summary
FY 2023
Water Department Manager 1.00
Confidential Account Clerk 1.00
Water Engineering Assistant 1.00
GIS Specialist 1.00
GIS Intern 0.50
Total FT Equivalent Employees 4.50
Performance Measures
Performance Measure(KPI) Target FY 2020 FY 2021 FY 2022 Performance
Actual Actual Estimated Indicator
1 Activity Objective: Maintain a financially-viable water utility.
#of hours that staff are completing annual
training (hrs)to support CEUs and 20 35 35 35 �
professional development in emergency �
response
Reduction of Water Quality Issues per <20 21 22 24 �
100 miles of Pipe
% of IosUunaccounted for water <18% 16.5% 18% 18% C �
% of projects completed within the 100% 100% 100% 100% �
program budget
Operating cost coverage for water(Total r��
operational Revenue/Total Operating 1.0 1.04 1.0 1.0 L
Cost)
# New Commercial connections/ 1/yr 3/yr 3/yr 1/yr I�f
partnerships (per year)
-33-
WATER DEPARTMENT
Plant Operations and Maintenance
Overview '
Plant Operations and Maintenance ensures that water used
for domestic, commercial and industrial purposes is high
quality and is supplied to meet the needs our community. We
are responsible for the management of equipment and .
treatment process of the City's drinking water in compliance • � ' �
with all federal and state water quality standards. , ��> � �
. � ��_� -
Over 200 tests per day are performed by water treatment '' -
. . r .
plant operators. In addition to these tests, the Dubuque _
W&RRC Laboratory performs over 60 bacteriological analysis -- -
of the drinking water on a monthly basis. Other compliance- - _
related testing is performed by the University of lowa Hygienic
Laboratory. All of these analytical measures ensure the water - - '"
_,
reaching homes is of drinking-water quality. - -
• .• . . . .
FY 2021 Actual FY 2022 Budget FY 2023 Requested
Expenditures $2,493,525 $2,672,673 $2,646,640
Resources $1,400 $— $1,400
� .- . . • . .
FY 2023
Electronic Technician 1.00
Equipment Mechanic 1.00
Plant Operator I 1.00
Plant Operator II 1.00
Plant Operator III & IV 1.00
Plant Operator IV 3.00
Water Operations Supervisor 1.00
Total FT Equivalent Employees 9.00
Performance Measures
City Council Go�l: Sustainable�m
Performance Measure (KPI) Target FY 2020 FY 2021 FY 2022 Performance
Actual Actual Estimated Indicator
� Activity Objective: Provide water treatment and distribute high-quality, clean drinking water that
meets or exceeds drinking water regulations.
#of Regulatory Compliance as No 0 0 0 0 �
Violations
Water Plant Process Efficiency measured
as Water Treated vs Produced(MGD 1.1 .94 1.03 1.0 �
Treated/MGD Produced)
Cost Effectiveness of the Treatment <or- 1.0 0.94 1.07 1.0 C��
Process (O&M Cost/MG, thousands)
The 2019 Water Quality Report can be downloaded at: https://www.cityofdubuque.org/waterqualitX
-34-
WATER DEPARTMENT
�ate�" Iljc�rih� �finn
Mission & Services
The function of the Water Distribution Team is to safely transport potable water from the source to point
of use. Distribution is also responsible for the machinery, equipment, materials and personnel required
to repair main breaks; install water mains, control valves and fire hydrants and assist other sections of
the Water Department. It is our goal to operate and maintain a water distribution system consistent with
established procedures recognized by the American Water Works Association for efficient management
practices and to meet Federal, State and local rules and regulations.
� . . . .
FY 2021 Actual FY 2022 Budget FY 2023 Requested
Expenditures $2,396,882 $2,020,699 $2,968,919
Resources $19,628,845 $10,530,750 $11,483,981
� . . - . .
FY 2023
Equipment Operator II 1.00
Water Distribution Maintenance Worker 6.50
Water Distribution Foreman 1.00
Water Distribution Supervisor 1.00
Custodian I 0.07
Total FT Equivalent Employees 9.57
Performance Measures
Performance Measure(KPI) Target FY 2020 FY 2021 FY 2022 Performance
Actual Actual Estimated Indicator
1 Activity Objective: Ensure the integrity of the distribution system piping system.
#of breaks per 100 miles of pipe <15 27 25 23 �
Operation of 10% of system valves ��5 314 775 264 C �
annually
Hydrant effectiveness (out of service rate) <1% 0% <1% >1% C �
<1% or 25FH
O&M costs for water per 100 miles of pipe �343** 311 348 345 �
(thousands per 100 miles)
""Based on 3year running average
The Water Department's Distribution Crew is available 24/7/365 to repair water mains and
reduce service outages, minimizing the time customers are without water.
DID YOU KNOW? The water distribution system is composed of 330.14 miles of public water mains
ranging in diameter from 4" up to 30"; 8,008 control valves; and 2,606 fire hydrants.
-35-
WATER DEPARTMENT
Water Meters & Backflow Prevention
Mission & Services
The Water Meter Team provides dependable meter operations and maintenance. The work performed
includes installation, testing, cleaning, repairing and and reassembling meters as required. The Meter
Team also addresses pressure issues, performs water use investigations and manages the Backflow
Prevention Program. The work is conducted in compliance with local, state and federal requirements.
Water Meters Funding Summary
FY 2021 Actual FY 2022 Budget FY 2023 Requested
Expenditures $510,526 $372,755 $383,737
Resources $156,327 $112,658 $158,071
Water Meters Position Summary
FY 2023
Water Meter Repair Worker I 2.00
Water Meter Repair Worker II 1.00
Total Full-Time Equivalent Employee's 3.00
Performance Measures
Performance Measure(KPI) Target FY 2020 FY 2021 FY 2022 Performance
Actual Actual Estimated Indicator
� Activity Objective: Minimize the possibility of contamination in the distribution through the
installation of backflow prevention devices.
High and Low Hazard Containment r��
Services, by definition, to participate in the 100% gg% 99% gg% L
backflow prevention program
� Activity Objective: Respond to customer inquiries in a timely manner to maintain consumer
confidence in the water utility.
Respond to technical Meter Department 100% 100% 100% 100% �
service issues.
Enhanced meter reading accuracy, larger ���
users: O&M on all large meters (>3") per 24/yr 10/yr* 0/yr* 24yr
AWWA standards (Ig meter/yr)
*Numbers affected by COVID
**Numbers to include partial year of 5 year MIU replacement 450 to 900
-36-
Recommended Operating Revenue Budget - Department Total
42-WATER
FY20 Actual FY21 Actual FY22 Adopted FY23 Recomm'd
Fund Account Account Title Revenue Revenue Budget Budget
640 43110 INVESTMENT EARNINGS 104,079 59,184 75,000 59,184
43 USE OF MONEY AND PROPERTY-Total 104,079 59,184 75,000 59,184
640 51105 METER RATES 8,407,944 8,547,478 9,399,359 10,195,050
640 51107 LTNAPPLIEDCREDITS 16,918 26,124 16,918 26,L24
640 51108 WATER RATE CREDIT 0 0 (96,126) 0
640 51110 FLAT RATES 42,570 54,498 27,242 52,897
640 S ll 11 FLAT RATE KEY WEST 2,053 2,061 1,095 2,061
640 Sll15 FIREPROTECTIONRATES 181,778 186,975 181,778 186,975
640 Sll25 TAPS-3/4&1 INCH 12,289 23,302 41,000 65,000
640 51130 CONNECT CHG LARGE SERVICE 7,454 4,943 23,000 20,000
640 51135 CONNECT CHG FRONT FOOTAGE 77,137 92,811 75,000 103,000
640 51140 METER SALES-REMOTES 15,414 16,304 13,500 16,304
640 51145 SALE OF METERS 29,466 54,239 12,500 54,239
640 51146 SALE OF UFR DEVICES 3,860 3,047 3,860 3,047
640 Sll65 MAINTENANCECHARGES 7,663 6,454 7,300 6,454
640 S ll 70 REPAIR OF METERS 6,314 8,257 6,314 8,257
640 Sll75 SHUTOFFPENALTIES 15,423 4,178 15,423 4,178
640 51176 METER TAMPERING FEE 400 394 400 394
640 51177 CALL OUT CHARGE 771 738 771 738
640 51180 CROSS CON.CNTL ADMIN FEE 73,771 74,406 75,675 76,150
640 51215 LATE PAYMENT PENALTY 63,853 2,798 63,840 95,748
640 51310 PERMIT 123,553 134,615 127,732 132,331
51 CHARGES FOR SERVICES -Total 9,088,631 9,243,621 9,996,581 11,048,947
640 53201 RF,FUNDS 18,875 0 0 0
640 53605 MISCELLANEOUS REVENUE 75 0 0 0
640 53615 DAMAGE CLAIMS 22,780 6,102 20,000 6,102
640 53620 REIMBURSEMENTS-GENERAL 6,055 14,662 5,935 14,663
640 53630 SALES TAX COLLECTION 428,804 461,820 454,532 499,458
53 MISCELLANEOUS -Total 476,589 482,585 480,467 520,223
640 54109 SALVAGE SALES 741 2,115 1,169 2,115
640 54210 GO BOND PROCEEDS 1,311,083 7,839,768 0 0
640 54220 BOND DISCOUNT 59,384 0 0 0
640 54230 SRF GO BOND PROCEEDS 1,120,000 2,150,000 0 0
54 OTHER FINANCING SOURCES -Total � 2,491,208 9,991,883 1,169 � 2,ll5
640 59100 FRGENERAL 0 21,315 96,126 25,000
59 TRANSFER IN AND INTERNAL -Total � 0 21,315 96,126 25,000
WATER -Total 12,160,508 19,798,589 10,649,343 11,655,469
-37-
Recommended Operating Expenditure Budget - Department Total
42-WATER
FY20 Actual FY21 Actual FY22 Adopted FY 23 Recomm'd
Fund Account Account Title Expense Expense Budget Budget
640 61010 FULL-TIME EMPLOYEES 1,413,995 1,379,223 1,624,004 1,645,097
640 61020 PART-TIME EMPLOYEES 8,610 9,568 29,060 29,685
640 61030 SEASONAL EMPLOYEES 10,967 6,710 15,545 16,046
640 61050 OVERTIME PAY 111,927 105,353 94,040 94,040
640 61071 HOLIDAY PAY-OVERTIME 21,370 24,662 17,000 18,600
640 61072 TANK CLiMBiNG PAY 0 165 1,200 1,200
640 61083 COVIDI9 EMP NON-WORK 4,687 0 0 0
640 61091 SICK LEAVE PAYOFF 31,715 31,872 31,850 11,094
640 61092 VACATION PAYOFF 1,065 12,190 0 0
640 61095 PARENTAL LEAVE 6,910 0 0 0
640 61096 50%SICK LEAVE PAYOUT 766 1,841 766 1,841
640 61310 IPERS 148,962 144,024 176,416 178,689
640 61320 SOCIAL SECURITY 116,676 114,118 138,358 138,925
640 61410 HEALTH INSURANCE 280,934 319,780 332,316 328,864
640 61415 WORKMENS'COMPENSATION 74,335 78,771 52,387 43,398
640 61416 LIFEINSURANCE 1,029 976 1,430 1,150
640 61640 SAFETY EQUIPMENT 2,801 17,248 4,750 4,750
640 61650 MEAL ALLOWANCE 664 809 664 809
640 61660 EMPLOYEE PHYSICALS 1,474 142 1,475 142
61-WAGES AND BENEFITS 2,238,888 2,247,452 2,521,261 2,514,330
640 62010 OFFICE SUPPLIES 2,838 4,460 2,838 7,760
640 6201 1 LTNIFORM PURCHASES 27,718 17,962 20,182 20,070
640 62030 POSTAGE AND SHIPPING 2,012 2,039 2,052 2,080
640 62033 HAND TOOLS/EQUIPMENT 3,752 8,579 4,317 8,751
640 62034 REPAIRPARTS/SUPPLIES 5,610 4,230 6,989 7,136
640 62036 CONSTRUCTION SUPPLIES 670 2,074 1,113 2,037
640 62050 OFFICE EQUIPMENT MAINT 258 0 263 0
640 62061 DP EQUIP.MAINT CONTRACTS 20,560 21,054 21,054 20,800
640 62062 JANITORIAL SUPPLIES 4,382 3,358 4,469 3,734
640 62063 SAFETY RELATED SUPPLIES 7,445 8,196 4,311 8,361
640 62064 ELECTRICAL SUPPLIES 15,863 4,734 16,180 4,829
640 62065 LAB SUPPLIES 10,229 13,216 10,434 13,480
640 62066 PLUMBING MATERIALS 537 697 2,082 1,235
640 62090 PRINTING&BINDING 676 376 1,710 1,055
640 62110 COPYING/REPRODUCTION 1,679 2,848 2,204 3,491
640 62130 LEGAL NOTICES&ADS 4,104 3,599 1,180 3,516
640 62170 SUBSCRIPTIONS-BOOKS-MAPS 519 158 806 540
640 62190 DUES&MEMBERSHIPS 1,280 2,869 3,423 4,423
640 62204 REFLTNDS 74 (6,ll9) 5,786 0
640 62206 PROPERTY INSURANCE 66,465 67,130 72,702 89,389
640 62207 BOILER INSURANCE 120 0 0 0
640 62208 GENERAL LIABILITY INSURAN 20,585 21,391 22,575 29,293
640 62210 SALES TAX 426,658 460,710 454,532 460,710
640 62310 TRAVEL-CONFERENCES 10,582 52 3,680 4,000
640 62320 TRAVEL-CITY BUSINESS 337 0 700 850
640 62340 MILEAGE/LOCALTRANSP 2,265 1,628 2,794 3,974
640 62360 EDUCATION&TRAINING 17,237 4,244 22,313 15,139
640 624ll UTILITY EXP-ELECTRICITY 733,932 730,336 770,628 668,402
640 62412 UTILITY EXP-GAS 37,210 33,216 37,210 39,992
640 62414 UTILITY EXP-FUEL OIL 13 0 1,500 1,500
-38-
Recommended Operating Expenditure Budget - Department Total
42-WATER
FY20 Actual FY21 Actual FY22 Adopted FY 23 Recomm'd
Fund Account Account Title Expense Expense Budget Budget
640 62415 UTILITY EXPENSE STORMWATR 221 418 236 453
640 62421 TELEPHONE 12,657 13,981 11,232 11,232
640 62424 RADIO/PAGERFEE 8,900 7,677 9,434 8,138
640 62431 PROPERTYMAINTENANCE 30,311 43,730 30,311 45,170
640 62433 CUSTODIAL SERVICES 0 0 700 0
640 62434 HVAC MAiNTENANCE 2,900 2,735 2,900 3,744
640 62435 ELEVATOR MAINTENANCE 2,875 2,410 2,584 2,410
640 62436 RENTAL OF SPACE 220 3,542 1,850 3,942
640 62437 BARRICADE RENTAL 3,790 8,622 7,250 8,622
640 62438 FIRE SUPPRESSION 982 435 982 435
640 62511 FUEL,MOTOR VEHICLE 24,049 24,014 19,700 22,435
640 62521 MOTOR VEHICLE MAINT. 32,288 31,457 34,133 32,576
640 62522 VEHICLE MAINT.,ACCIDENT 1,713 0 0 0
640 62528 MOTOR VEH.MAINT.OUTSOUR 8,624 5,914 948 4,335
640 62611 MACH/EQUII'MAINTENANCE 83,994 63,208 83,994 63,457
640 62613 METER MAINTENANCE 10,340 3,494 10,340 8,058
640 62614 EQUIP MA1NT CONTRACT 307 895 307 895
640 62615 MACH/EQUIP MAINT.OUTSOUR 1,444 1,068 2,044 1,068
640 62628 INSTRUMENTATION MAINT 10,467 13,520 10,467 13,520
640 62630 FLUORIDE 9,836 10,222 9,836 11,000
640 62631 LIME 270,596 297,001 319,000 335,000
640 62632 PHOSPHATE 60,862 59,900 65,000 64,150
640 62633 CHLORINE 30,744 27,529 30,744 40,675
640 62638 POLYMER 5,732 6,844 6,840 9,375
640 62639 LIQUID CO2/02 20,679 27,208 20,679 24,500
640 62663 SOFTWARELICENSEEXP 34,563 52,154 61,128 94,610
640 62664 LICENSE/PERMIT FEES 7,126 7,209 6,820 7,209
640 62667 DATA SERVICES 2,775 3,761 2,775 2,644
640 62669 PROGRAMMING 4,881 0 0 0
640 62675 VALVES 29,955 22,828 49,955 64,000
640 62676 PIPE-SPECIAL FITTINGS 50,290 75,472 50,290 75,472
640 62692 LANDFILL FEES 303 152 323 152
640 62696 OUTSIDE COLLECTOR EXPENSE 4,230 919 4,047 890
640 62710 CONTRACTOR SERVICES 0 0 0 6,000
640 62713 LEGAL SERVICES 5,196 1,916 0 0
640 62716 CONSULTANT SERVICES 38,146 1,307 29,000 33,000
640 62721 FINANCIAL CONSULTANT 0 14,139 0 14,139
640 62726 AUDIT SERVICES 3,500 3,600 0 3,708
640 62731 MISCELLANEOUS SERVICES 8,234 42,713 40,000 40,000
640 62732 TEMP HELPCONTRACT SERV. 1,316 0 0 0
640 62746 ONE CALL OPERATION 7,226 8,657 7,226 7,226
640 62765 GRANTS 5,365 3,452 15,000 10,000
640 62767 ENVIRON.TESTING/MON. 33,191 38,048 35,600 35,600
640 62780 HAULING SERVICES 174,196 212,476 165,000 165,000
62-SUPPLIES AND SERVICES 2,470,634 2,557,664 2,648,702 2,701,387
640 62724 BOND PAYiNG AGENT FEE 625 971 625 971
627-CONTRACTUAL SERVICES 625 971 625 971
640 7ll20 PERIPHERALS,COMPUTER 179 44 0 880
640 7ll23 SOFTWARE 0 0 0 65,000
640 71124 COMPUTER 0 25 0 0
-39-
Recommended Operating Expenditure Budget - Department Total
42-WATER
FY20 Actual FY21 Actual FY22 Adopted FY 23 Recomm'd
Fund Account Account Title Expense Expense Budget Budget
640 71215 STORAGE CABINETS 0 2,033 0 0
640 71312 VAN/PICKUP/WAG REPL 36,860 75,831 0 0
640 71314 TRUCK-REPLACEMENT 90,289 16,432 0 66,000
640 71318 HEAVY EQUIP-REPLACEMENT 0 141,426 0 0
640 71410 SHOP EQUIPMENT 1,730 138 250 250
640 71413 LABORATORY EQUIPMENT 1,837 2,436 5,800 0
640 71415 SAWS 2,500 4,200 4,200 3,200
640 71420 EARTH COMPACTOR 0 0 0 1,000
640 71510 HYDRANTS 10,460 32,351 15,000 70,000
640 71511 PUMPS 0 0 18,000 45,000
640 71515 WATER METER PRODUCT 0 54,243 0 0
640 71516 LARGEWATERMETERS 64,172 85,640 55,000 191,306
640 71550 MISCELLANEOUS EQUIPMENT 1,290 0 0 11,900
640 71619 OTHER MAINT.EQUIPMENT 0 0 50,000 6,600
640 72410 PAGER/RADIO EQUIPMENT 46,555 285 0 0
640 72418 TELEPHONE RELATED 117 81 3,500 15,432
640 72515 TEST EQUIPMENT,OTHER 0 0 0 5,000
71-EQUIPMENT 255,989 415,165 151,750 481,568
640 72115 BARRICADES/WARN SIGNALS 0 926 0 1,000
72-EQUIPMENT 0 926 0 1,000
640 73211 CONST.CONTR-NOT BLDG 308,852 298,071 395,000 470,000
640 73410 EQUiP ACQUISiTION 17,461 0 18,000 8,000
73-CIP EXPENDITURES 326,313 298,071 413,000 478,000
640 74111 PRINCIPALPAYMENT 4,131,164 ll,138,835 3,040,574 2,078,929
640 74112 1NTEREST PAYMENT 839,235 830,372 857,387 613,541
74-DEBT SERVICE 4,970,399 11,969,207 3,897,961 2,692,470
640 91100 TO GENERAL 597,380 567,194 578,155 595,651
640 91740 TO WATER CONSTRUCTION 400,000 550,000 400,000 1,000,000
91-TRANSFER TO 997,380 1,ll7,194 978,155 1,595,651
42-WATER TOTAL ll,260,227 18,606,650 10,611,454 10,465,377
-40-
Recommended Expenditure Budget Report by Activity & Funding
Source
42-WATER
UNDISTRIBUTED -10640
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
CONTRACTUAL SERVICES 971 971
SUPPLIES AND SERVICES 29,701 9,833 15,029
TRANSFER TO 1,]17,194 978,155 1,595,651
UNDISTRIBUTED 1,147,866 987,988 1,611,651
WATER ADMINSTRATION -42100
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
CONTRACTUAL SERVICES - 625 0
DEBT SERVICE 11,969,207 3,897,961 2,692,470
EQUIPMENT 20 1,050 65,350
SUPPLIES AND SERViCES 482,060 478,381 496,440
WAGES AND BENEFITS 320,831 580,310 430,515
WATER ADMINSTRATION 12,772,ll7 4,958,327 3,684,775
METERS -42300
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
EQUIPMENT 24,838 700
SUPPLIES AND SERVICES 58,045 92,416 97,128
WAGES AND BENEFITS 427,643 280,339 285,909
METERS 510,526 372,755 383,737
PLANT OPER.&MAINT -42400
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
EQUIPMENT 4,553 56,500 66,700
SUPPLIES AND SERVICES 1,682,278 1,707,367 1,678,077
WAGES AND BENEFITS 806,695 908,806 901,863
PLANT OPER.&MAINT 2,493,525 2,672,673 2,646,640
WATER DISTR. SYSTEM -42700
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
CIP EXPENDITURES 5,720 0
EQUIPMENT 271,326 24,200 143,512
SUPPLIES AND S6RVIC6S 280,123 256,705 317,713
WAGES AND BENEFITS 691,847 751,806 896,043
WATER DISTR.SYSTEM 1,249,O16 1,032,711 1,357,268
-41-
Recommended Expenditure Budget Report by Activity & Funding
Source
42-WATER
STORAGE TANK INSPECT/MON-42705
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
SUPPLIES AND SERVICES 15,000
STORAGE TANK 1NSPECT/MON 15,000
PUMP REPLC VACUUM FILTER-42713
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
EQUIPMENT 15,000 15,000
PUMP REPLC VACUUM FILTER — 15,000 15,000
FIRE HYDRANT PAINTING -42720
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
SUPPLIES AND SERViCES 5,000 5,000
FIRE HYDRANT PAINTING — 5,000 5,000
GENERATOR MAIN PROGRAM -42725
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
GP EXPENDITURES 18,000 8,000
GENERATOR MAIN PROGRAM — 18,000 8,000
SERVICE LINE ASSIST -42735
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
SUPPLIES AND S6RVIC6S 22,004 35,000 35,000
SERVICE LINE ASSIST 22,004 35,000 35,000
VALVE REPLACEMENT -42745
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
C1P EXPENDITURES 70,000
SUPPLIES AND SERVICES — 20,000 14,000
VALVE REPLACEMENT — 20,000 84,000
WATER MAIN REPLACEMENTS -42755
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
-42-
Recommended Expenditure Budget Report by Activity & Funding
Source
42-WATER
CIP EXPENDITURES 273,966 350,000 350,000
WAGES AND BENEFiTS 437
WATER MAIN REPLACEMENTS 274,403 350,000 350,000
WATER METER EXCHANGE -42760
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
EQUIPMENT 115,355 55,000 191,306
WATER METER EXCHANGE 115,355 55,000 191,306
WATER LEAK REPAIR GRANT -42765
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
SUPPLiES AND SERViCES 2,242 5,000 5,000
WATER LEAK REPAIR GRANT 2,242 5,000 5,000
COUNTY WATER ASSISTANCE -42766
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
SUPPLIES AND SERVICES 1,210 10,000 5,000
COUNTY WATER ASSISTANCE 1,210 10,000 5,000
WATER VALVE BOX MAINT -42770
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adoptcd Budget FY23 Recomm'd Budget
CIP EXPENDITURES 18,085 20,000 25,000
WATER VALVE BOX MAINT 18,085 20,000 25,000
COMPUTERIZED LEAK SURVEY-42785
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
SUPPLIES AND SERVICES - 29,000 18,000
COMPUTERIZED LEAK SURVEY - 29,000 18,000
WATER METER TESTING -42790
FUNDING SOURCE:WATER UTILITY OPERATION
Account FY21 Actual Expense FY22 Adopted Budget FY23 Recomm'd Budget
CIP EXPENDITURES 300 25,000 25,000
WATER METER TESTING $ 300.00 $ 25,000.00 25,000
WATER TOTAL $18,606,650 $10,611,454 $10,465,377
-43-
CITY OF DUBUQUE, IOWA
DEPARTMENT DETAIL-PERSONNEL COMPLEMENT
42 WATER DEPARTMENT
FY 2021 FY 2022 FY 2023
FD JC WP-GR JOB CLASS FTE BUDGET FTE BUDGET FTE BUDGET
61010 Full Time Employee Expense
640 3275 GE-40 WATER DEPARTMENT MANAGER 1.00 $ 110,505 1.00 $ 112,150 1.00 $ 100,347
640 3200 GE-36 WATER DISTRIBUTION SUPERVISOR 1.00 $ 91,659 1.00 $ 93,267 1.00 $ 96,307
640 - GE-36 WATER OPERATIONS SUPERVISOR - $ - 1.00 $ 72,370 1.00 $ 74,730
640 2950 GE-33 WATER ENGINEERINGASSISTANT 1.00 $ 75,252 1.00 $ 77,143 1.00 $ 79,653
640 2650 GE-31 FOREMAN -WATER DISTR. 1.00 $ 68,265 1.00 $ 69,277 1.00 $ 71,870
640 2610 GE-30 GIS SPECIALIST 1.00 $ 64,679 1.00 $ 66,299 1.00 $ 68,450
640 GE-25 CONFIDENTIALACCOUNT CLERK 1.00 $ 49,429 1.00 $ 50,255 1.00 $ 51,879
640 2400 0E-16 ELECTRONIC TECHNICIAN 1.00 $ 65,319 1.00 $ 66,645 1.00 $ 69,105
640 2800 0E-14 EQUIPMENT MECHANIC 1.00 $ 62,691 1.00 $ 63,616 1.00 $ 63,768
640 2550 0E-16 WATER PLANT OPR CERT GR III/IV - $ - 1.00 $ 60,812 1.00 $ 65,814
640 0E-11 WATER PLANT OPERATOR CRT GR I - $ - - $ - 1.00 $ 56,355
640 2475 0E-12 WATER PLANT OPERATOR CRT GR II 1.00 $ 58,395 1.00 $ 59,260 1.00 $ 61,179
640 2475 0E-16 WATER PLANT OPERATOR CRT GR IV 6.00 $ 384,585 4.00 $ 261,999 3.00 $ 202,706
640 2305 0E-10 EQUIPMENT OPERATOR II 2.00 $ 116,147 1.00 $ 58,074 1.00 $ 60,167
640 1775 0E-09 WATER METER REPAIR WORKER I 2.00 $ 110,462 2.00 $ 113,210 2.00 $ 118,098
640 0E-14 WATER METER REPAIR WORKER II 1.00 $ 61,474 1.00 $ 62,381 1.00 $ 64,537
WATER DISTR MAINTENANCE
640 1476 0E-09 WORKER 5.00 $ 266,434 6.00 $ 322,400 6.00 $ 340,132
TOTAL FULL TIME EMPLOYEES 25.00 $ 1,585,296 25.00 $ 1,609,158 25.00 $ 1,645,097
61020 Part-Time Employee Expense
WATER DISTR MAINTENANCE
640 1476 0E-09 WORKER 0.50 $ 25,233 0.50 $ 25,599 0.50 $ 26,434
640 2050 0E-03 CUSTODIAN I 0.07 $ 3,401 0.07 $ 3,461 0.07 $ 3,251
TOTAL PART TIME EMPLOYEES 0.57 $ 28,634 0.57 $ 29,060 0.57 $ 29,685
61030 Seasonal Employee Expense
640 NA-37 GIS INTERN 0.50 $ 15,326 0.50 $ 15,545 0.50 $ 16,046
TOTAL SEASONAL EMPLOYEES 0.50 $ 15,326 0.50 $ 15,545 0.50 $ 16,046
TOTAL WATER DEPARTMENT 26.07 $ 1,629,256 26.07 $ 1,653,763 26.07 $ 1,690,828
-44-
CITY OF DUBUQUE,IOWA
ACTIVITY PERSONNEL COMPLEMENT SUMMARY
FY 2021 FY 2022 FY 2023
ACCT FD JC WP-GR POSITION CLASS FTE BUDGET FTE BUDGET FTE BUDGET
Water Administration-FT
64042100 61010 640 2610 GE-30 GIS SPECIALIST 1.00 $ 64,679 1.00 $ 66,299 1.00 $ 68,450
64042100 61010 640 3275 GE-40 WATER DEPARTMENT MANAGER 1.00 $ 110,505 1.00 $ 112,150 1.00 $ 100,347
64042100 61010 640 GE-25 CONFIDENTIALACCOUNTCLERK 1.00 $ 49,429 1.00 $ 50,255 1.00 $ 51,879
64042100 61010 640 2950 GE-33 WATER ENGINEERING ASSISTANT 1.00 $ 75,252 1.00 $ 77,143 1.00 $ 79,653
WATER DISTRIBUTION
64042100 61010 640 3200 GE-37 SUPERVISOR 1.00 $ 91,659 1.00 $ 93,267 - $ -
Total 5.00 $ 391,524 5.00 $ 399,114 4.00 $ 300,329
Water Administration-SEASONAL
64042100 61030 640 NA-37 GIS INTERN 0.50 $ 15,326 0.50 $ 15,545 0.50 $ 16,046
Total 0.50 $ 15,326 0.50 $ 15,545 0.50 $ 16,046
Water Meters-FT
64042300 61010 640 1775 0E-09 WATER METER REPAIR WORKER I 2.00 $ 110,462 2.00 $ 113,210 2.00 $ 118,098
VV/11 CR IVIC I CR RCrF11R VVVRf�CR
64042300 61010 640 0E-14 II 1.00 $ 61,474 1.00 $ 62,381 1.00 $ 64,537
WATER DISTR MAINTENANCE
64042300 61010 640 1476 0E-09 WORKER 1.00 $ 54,178 - $ - -
Total 4.00 $ 226,114 3.00 $ 175,591 3.00 $ 182,635
Water Plant Operation-FT
WATER PLANT OPERATOR CRT
64042400 61010 640 0E-11 GR I - $ - - $ - 1.00 $ 56,355
WATER PLANT OPERATOR CRT
64042400 61010 640 2475 0E-12 GR II 1.00 $ 58,395 1.00 $ 59,260 1.00 $ 61,179
64042400 61010 640 2550 0E-16 WATER PLANT OPR CERT GR III/IV - $ - 1.00 $ 60,812 1.00 $ 65,814
WATER PLANT OPERATOR CRT
64042400 61010 640 0E-16 GRIV 6.00 $ 384,585 4.00 $ 261,999 3.00 $ 202,706
WATER OPERATIONS
64042400 61010 640 GE-36 SUPERVISOR - $ - 1.00 $ 72,370 1.00 $ 74,730
64042400 61010 640 2800 0E-16 ELECTRONIC TECHNICIAN 1.00 $ 65,319 1.00 $ 66,645 1.00 $ 69,105
64042400 61010 640 3015 0E-14 EQUIPMENT MECHANIC 1.00 $ 62,691 1.00 $ 63,616 1.00 $ 63,768
Total 9.00 $ 570,990 9.00 $ 584,702 9.00 $ 593,657
Water Distribution-FT
WATER DISTR MAINTENANCE
64042700 61010 640 1476 0E-09 WORKER 4.00 $ 212,256 6.00 $ 322,400 6.00 $ 340,132
WATER DISTRIBUTION
64042700 61010 640 3200 GE-36 SUPERVISOR - $ - - $ - 1.00 $ 96,307
64042700 61010 640 2305 0E-10 EQUIPMENT OPERATOR II 2.00 $ 116,147 1.00 $ 58,074 1.00 $ 60,167
64042700 61010 640 2650 GE-31 FOREMAN-WATER DISTR. 1.00 $ 68,265 1.00 $ 69,277 1.00 $ 71,870
Total 7.00 $ 396,668 8.00 $ 449,751 9.00 $ 568,476
Water Distribution-PT
WATER DISTR MAINTENANCE
64042700 61020 640 1476 0E-09 WORKER 0.50 $ 25,233 0.50 $ 25,599 0.50 $ 26,434
64042700 61020 640 2050 GD-03 CUSTODIAN I 0.07 $ 3,401 0.07 $ 3,461 0.07 $ 3,251
Total 0.57 $ 28,634 0.57 $ 29,060 0.57 $ 29,685
TOTAL WATER DEPARTMENT 26.07 $ 1,629,256 26.07 $1,653,763 26.07 $ 1,690,828
-45-
Capital Improvement Projects by Department/Division
WATER
FY 20 Actual FY 21 Actual FY 22 Adopted FY 23 Recomm'd
CIP Number Capital Improvement Project Title Expense Expense Budget Budget
7401339 SCADA SYSTEM UPGRADE 38,746 23,027 250,000 150,000
7401393 EXHAUST FAN/DUCT SLAKER 67,500
7401396 CHLORINE FEED ROOM EXPL 46,500
7401397 EP OFFICE/LAB PUMP ROOM W 30,000
7401405 WATER MAIN REPLACEMENTS 260,651 146,786 97,000
7401415 SHALLOW WELL REHAB 53,491 120,000 90,000
7401418 REPLACE VACUUM PUMP-SLDG 25,000
7401422 BiJNKER HILL PUMP STATION 15,000
7401423 FOURTH PRESSURE ZONE ll5,000
7401672 ROOSEVELT RD MAIN EXT. 2,467,954 1,814,720
7401826 PAINT PUMP ROOM PIPES ll 5,000
7401827 SEAL WALLS SOUTH PLNT CO2 970,245
7401828 CLEAR WELL RESERVR-REHAB 13,000
7401829 SECURITY UPGRADES 22,800
7402030 VACUUM FILTER BACK-UP 4,916 ll,049
7402044 GREEN ALLEY PILOT PROJECT 108,000
7402052 WATER METER REPL PROGRAM 3,223 44,816 461,015 529,018
7402234 SOUTHGATE WATER 1,136
7402349 MANSON ROAD WATER MAIN 853,750
7402525 N CASCADE WATER MAIN 13,011 479,715
7402527 GENERATOR 79,214 4,121 90,000
7402594 SW ARTERiAL MAIN EXT 94,322 331,290
7402595 CREEK CROSSING RESTORE 35,550
7402596 MAIN RELOC SEWER MANHOLE 25,000 20,000
7402653 L1ME SLAKER REPLACE STUDY
7402654 FIRE HYDRNT ASSMBLY SW PG 20,000
7402655 MAINT WTR MN-RETAIN WAL 20,000
7402656 WATER STORAGE TANK COATIN - 4,800 25,000 150,000
7402657 WTR MN UPGRADES-STREET 20,000 20,000
7402658 WTR MN REPLACE-SWR CONS 10,468 8,799 310,250
7402703 WEST RURAL WATER PURCHASE 191,082 36,899 165,000
7402705 GRANDVIEW/LORAS INTER IMP
7402713 RPR/MAINT WATER LINE ISLA 5,042
7402714 BULK CO2 TANK REPLACEMENT
7402744 PUBLIC LEAD LINE WATER RE 84,500
7402745 TAMARAK FRONTAGE WATER MN 35,242
7402746 COTTINGHAM RD WATER MAIN 7,361 54,647
7402747 CHESTERFiELD DR WATER MAI
7402748 EPWP TRANSFORMER SAFETY 11,890
7402786 DAVENPORT RD EXT/PMP STAT 1,465
7402814 BRIARWOOD SUB MAIN EXT
7402821 LANDFILL WATER MAIN EXT 80,000
7402836 MAIN EXT TO NEW DEV - (19,566) 775,000 -
7402837 WATER PLANT ASSESS PLAN - 6,441 20,000 20,000
7402838 ALTHAUSER&EAGLE WTR MN 145,000
7402839 WATER PLANT iMPROVEMENTS 824
7402873 PUBLIC SAFETY WAY
7402894 WTP&PUMP STATION REHAB 20,000 200,000
7402895 MCFADDEN WATER MAIN 1MP 385,000
7402896 SUPER 20 WATER CONNECTION - - 142,000 -
7402897 BURLINGTON WATER MAIN - - 350,000 -
-46-
Capital Improvement Projects by Department/Division
WATER
FY 20 Actual FY 21 Actual FY 22 Adopted FY 23 Recomm'd
CIP Number Capital Improvement Project Title Expense Expense Budget Budget
7402898 C1WA SYSTEM AGREEMENTS 125,000 65,000
7402899 OLYMPMIC HTS AUTO FLUSHER — — 37,075 —
7402902 E 16TH HYDRANT RELOCATION — — 24,000 —
7402933 E 16TH WATER MAIN REPLACE — 7 L,500 —
7402934 WTP ROOF REPAIR 200,000
WATER TOTAL 3,225,723 3,024,660 3,158,590 4,542,313
-47-
PRGRM/
DEPT PROJECT DESCRIPTION FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 TOTAL PAGE
WATER DEPARTMENT
Business Type
8th Street Concrete Panel
Replacement(Jackson to Central)
Water Main Connections 20" $ - $ 166,000 $ - $ - $ - $ 166,000 127
Water Meter Replacement
Program $ 529,018 $ 567,500 $ 567,500 $ 567,500 $ 130,950 $ 2,362,468 128
Westside Water System Service
Line Installation/Fire Hydrant
Install/Purchase $ 165,000 $ - $ - $ - $ - $ 165,000 129
Water Main Relocation for
Sanitary Sewer Manhole Project $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 100,000 130
Water Main Upgrades during
Street General Repairs $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 100,000 131
Maintenance of Public Water
Mains during Stone Retaining
Wall Repair $ 20,000 $ 20,000 $ - $ - $ 20,000 $ 60,000 132
Fire Hydrant Assembly
Relocation/Replacement for the
Sidewalk Program $ 20,000 $ 20,000 $ 20,000 $ - $ 20,000 $ 80,000 133
Water Main Replacement
Consent $ 310,250 $ 132,000 $ - $ 99,000 $ - $ 541,250 134
Public Lead Line Water Main
Replacement $ 84,500 $ 85,000 $ - $ - $ - $ 169,500 135
Wells,Well Field, &Well
Transmission Piping Repair and
Rehabilitation Program $ 90,000 $ 180,000 $ 110,500 $ - $ 110,000 $ 490,500 136
Water Treatment Plant Condition
Assessment and Master Plan $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 20,000 $ 100,000 138
Water Storage Maintenance
Program $ 150,000 $1,350,000 $ 100,000 $ 900,000 $ 50,000 $ 2,550,000 139
Creek Crossing Restoration $ 35,550 $ 35,080 $ 48,400 $ 33,120 $ 29,900 $ 182,050 140
Southwest Arterial Water Main
Extension $ - $ - $ - $ - $ 1,083,826 $ 1,083,826 141
HWY 20/Dodge St Water Main
Relocation $ - $ - $ - $ - $ 996,000 $ 996,000 142
Althauser St. and Eagle St.Water
Main Improvements $ 145,000 $ - $ - $ - $ - $ 145,000 143
Water Treatment Plant and Pump
Station Pipe Rehabilitation $ 200,000 $ - $ - $ - $ - $ 200,000 144
Pump Station Site Drainage
Improvements $ 15,000 $ - $ - $ - $ - $ 15,000 145
McFadden Farm Water Main
Improvement(S. Heacock Rd
from Chavenelle to Pennsylvania) $ - $ - $ 305,800 $ - $ - $ 305,800 146
SCADA&Comms Improvements $ 150,000 $ 450,000 $ - $ - $ - $ 600,000 147
Green Alley Water Main and
Fittings Replacement $ - $ - $ 306,000 $ - $ 475,000 $ 781,000 149
CIWA Water System Agreements
for Water Service Line
Installations $ 65,000 $ 9,000 $ 25,000 $ - $ - $ 99,000 150
Generators-Park Hill &Mt. Carmel $ 90,000 $ - $ - $ 125,000 $ - $ 215,000 141
Chesterfield Drive Water Main
Extension $ - $ - $ - $ - $ 497,500 $ 497,500 152
West End Annexation Study and
Implementation Phase I $ - $ - $ - $ - $ 165,000 $ 165,000 153
West End Annexation Phase II $ - $ - $ - $ - $ 300,250 $ 300,250 154
-48-
PRGRM/
DEPT PROJECT DESCRIPTION FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 TOTAL PAGE
WATER DEPARTMENT
Business Type
Tamarack Park Drive/Wood Gate
Drive Frontage Road Water Main
Extension $ - $ - $ - $ - $ 126,000 $ 126,000 155
Old Davenport Road Water Main
Extension/Pump Station $ - $ - $ - $ - $ 251,500 $ 251,500 156
Airborne Road Water Main
Extension (Landfill Frontage
Road) $ 80,000 $ - $ - $ - $ - $ 80,000 157
IDOT Hwy 20/Dodge St.
Improvements(Old Hwy Rd to
Crescent Ridge) $ - $ - $ - $ - $ 156,500 $ 156,500 158
Swiss Valley/Highway 20
Interchange Multiple Phases $ - $ - $ - $ 360,310 $ 1,003,138 $ 1,363,448 159
Old Highway Road Water Main
Extension-Sieppel and Radford
Road Loop $ 853,750 $ - $ - $ - $ - $ 853,750 160
Water System Improvements
2022 $ - $ - $277,829 $2,613,454 $16,276,115 $ 19,167,398 161
Water Main Replacements-
Streets $ 97,000 $544,500 $1,070,000 $540,000 $ - $ 2,251,500 162
Kennedy Road to Tanzanite Drive
Connection (Zone 3 to 4)with
Pump Station $ - $ - $340,987 $2,268,945 $ - $ 2,609,932 164
4940 Backhoe/Loader
Replacement $ 67,500 $ - $ - $ - $ - $ 224,000 131
Ground Penetrating Radar $ 30,000 $ - $ - $ - $ - $ 2,049,000 132
Sludge Pump Replacement $ 25,000 $ - $ - $ - $ - $ 37,075 133
Tapping Machine Replacement $ 46,500 $ - $ - $ - $ - $ 200,000 134
Vehicle 4912 Replacement $ 115,000 $ - $ - $ - $ - $ 100,000 135
Vehicle 4913 Replacement $ 115,000 $ - $ - $ - $ - $ 71,500 136
Webber Property Phase 1 &2-
Water $ 970,245 $ - $ - $ - $ - $ 24,000 137
Whacker Compactor
Replacement-4919 $ 13,000 $ - $ - $ - $ - $ 215,000 138
TOTAL $ 4,542,313 $3,619,080 $3,232,016 $7,567,329 $21,751,679 $42,250,747
-49-
This page left intentionally blank.
-50-
� r, •_Y•.•.; • � u
' '�,
.�-
.���
-�����-- ��,;.� . � _- -- - �
. -- �����I � ' �
��� -�
�, , � �
,�,�x��l}��� ! � ���
� rt �
"�' �.�'���' F���'� �1
• � • � � �� � �- � � ��� ;���
, . � -
��� � } � �� � � .
- � . . . � _���� -
' �_.�:��s
��� ; � �
��''��� -
�r� � �- ~ " -- . .
. _. F
f� =-i
. �� .� �� ya'
�
�"' 1 -y'�'�� - r ' * .
��, __ i :�- �� ,� �
�� l �• - t� � .�
�. �.. � . �i �y�� .� � , �
{ � �` ry{ �
F �,)�� .'�•- �� �� � '��
,� ' � �r . '"�' Yr _
_r �� �: ��'•''�c ,`��'� �+-
.', ��_`~ �i�,�- . �� ` �
� �_ : ' yti� ��f• ��.•- �• ..�� 6 �F
� � �
� � �!,�]'� ,�t�'�'..`.� i.� -^ .�.�} ti
� - ��. �
�.� _ � .
� �} r ��
� � � � ~�
� � �� � �� •.�'�~��
.� � �}� � ��� �-
���^���� r�� �i i:. I' { +• ' �
� �
�•� �� � �� �
Water Department
The City of Dubuque Water Department is passionate
about delivering high quality drinking water with excellent
customer service, while meeting our customers' changing
needs with equitable and sustainable rates.
New Faces and Retirements of FY2022 !
Welcome! Welcome! Thank you!
� � � -�: �
�"��"� - .
r�` � � 4
-� +��r: a
` . � �
� �•g� � ��
` � �
_ ���.�
� � �
, , ���
� ,
� � �;;
. �� „ - `�� � .
�.
, � � .
� �
r�.� . . . ,. ,.-.� �
{ ��_ '�� ����� f �,��� �' �
iv�arYy r�ass Benjamin Pancratz Bret Stierman
Water Distribution Water Distribution Industrial Electronics Technician
Maintenance Worker Maintenance Worker Water Plant - Retiring April 2022
Water Department FY23 (26.07 Full -Time Equivalents)
- r : : - - : � :
����� ��,��r��r��r�� �r�� �:��r�� ��'���.� ���. �� ����
4'�a[�r D�partment
f'.+la�ag�r
�1-� ��
��nfident;a',�rrt
��ea�C ._
��.o �}
Water� V�at�r En�neering �at�.r O�-ativr�
Supervisor f�ss is#a nt �15 Spet�asist SUpe rw�is�r
��.a F-rF� �1_a �� [��o �E� .��-� ��
�� � —i l.�r:, � ����
. - � �
���� �'I ete r Repair Wfl rk�r I I C'i IS 5eason a� Intems :'faC�r�o-ant�pera4vrs
Forema n .
;�.0 F'�E� �i_4�TEI �0.5 �EI t6.0 FTE�
� I
�n d ustr�at El�rtrica I
Equ i�m ent�pe�ator I I M�ter Fkep�air ti14'�rker�
T�rhnician
�i.a FTEJ {? FTEJ .
��-� ��
�:'ater Dis�-i�ut ion I n�ustria4 Ma'sntenarx�
Maintenan{e:'.'ark�r �lle�hanit
��.5 FTE� ��.� FTE�
Recognition of Staff for lowa DNR Certifications Obtained
Andrew Fonck - Water Distribution Grade 1
Mike Patzner - Water ��eatment Grade 1
Danny Petersen - Water Distribution Grade 2
I�WA DEPARTIIAENT O�F
Marty Kearney - Water Distribution Grade 2 NATURAL RES4URCES
Chad Sharkey - Water Treatment Grade 2 & Water Distribution Grade 2
Carl Plumley - Water Distribution Grade 3
Nick Connolly - Water Treatment Grade 4 & Water Distribution Grade 4
Christopher Lester - Water Treatment Grade 4 & Water Distribution Grade 4
� F�E�TIIV � ��1 � Hi h-P�r��r�n�n�� �r ar���a�i�n �a�nd �o�r�r�urri � �h�� i�
� � �Y
E�l� I T�� LE D�t�-Dri�r�n ��r� �u�t��r��-F�cu���d bu��t �n �h� ��ur pif��rs ��:
��IIII �I lJ 11l IT1� �
� F � �I �I� E
.
. . � + • . t •
� �
. w -
A � �
1'I� r � . -
� � �
. a.�
_ _ �.
— w, � .� y,� �-{ �
.� �. . �
� _
� - #
.�
- ��
�
F' �`r "�'
s � +
� #*� , �,"
■ ► � �
�.ltili�� 6illir�g
Feb 2��2 Feb ��22 Feb ��2'� Feb 202�
Custamers Enralled In: # Customers °l� Cust�rx�ers # �ustomers °Io Customers
Paperless Billing 3,7�5 15 °l0 3,�8� '� 3 °I�
, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,, ,,,,,,,,,,,,,,,,,,, ,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
Auta Pay 5,�81 33 °/o �,805 3� �I�
--- ---- --- --- --- --- --- -- ---- ---- -- -- -- --- --- ---- --- --- ---- - -- --- -- ---- ------------ --- -------- --- --- --- -- ------- ---- --- --- -- --- --- --- --- ----- --- --- -- --- -- -- --- --- -- - ---- --- ---- ---- --- --- ---- -
Phone & Qnline Payments G,535 �� °l0 5,fi�2 �3 �1�
,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,, ,,,,, ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,
1Nate��mart Registered Users 'I 1 ,0�4 45 °I� 8, ��9 �4 �I�
. ..... .... .... ..... .�---.......---. ..... ..... ..... .---.. ..................--- .---- .---. ..---. ...................---. ..... ---- .---�--�---�--�--..--�--��---�-�---- ----. .---.. ---.. .....--�-----. ---- ----...-----�---.......---. .----. .--- .----- .---......................---. .---- .---. .---...........--�---.. .---. ----. -----�---. .............
Sfarm�rvater Reduced Base Fee" 558 � °lo �0'i � °I�
- --- --- --- --- --- ---- - .
Refuse Reduced Base Fee" 5�'� 2 °lo �9� 2 °I�
. .....................................................................................................................................................................................................................................................................................................................................................................................................................................................
V1later Reduced Base Fee" �97 2 °I� 5�8 � °/o
--- --- -- --- -- -- -- -- -- -- -- -- -- -- -- -- --- -- ---- - -- --- -- ---- --- ------------------------------ ,-..--...,,......,.---. --- --- --- --- --- ---- --- --- -- -- --- --- --- --- -- - ---- --- ---- -------- --- --- .
Sanitary �e�nrer Reduced E�ase Fee" 499 � °/0 5�� � �I�
*�otal �ustomers 24,��2 "FY2'i Ger�eral Fund Re�luced Fees $1'I �,39�
FISCAL YEAR 2022
HIGHLIGHTS
, � 4;� Kf'n721'L�1' �fI ��t�at�c��Mc�rsi Erc�zsfon a�zc� � SPe�.a,R�^:a�em=��,���5
❑i_T P[_i[][.`� � xo,a nw��a w���E�
— � -- EXHIBlT A ,. � .
11rlr�fl���c�z=r �.rr�;c� SirI� llrtf��r•:ti1r7i�r C.��tcrt5rs��r
',5:.,.a:.s:.� '� . i,. �Y , . •Y 9 . � . � � �.� �- � •�'-sv:e� .,, '� �� _
frs, �� •f . . .�-�$. .,�,'._ .�.�`�^4�� �.._ "- :r=... + � f�..
• Kennedy Rd Water Main r ` ' 4 - F , � '
� � f� ` • ��wner To Tie Inta Existinc � �
�''� r - Private Water Main � r � �i
;• � '� • � ��.: j,��+�j�., � •• k a�. ``$_ _ '+'�,i I � -
N � , �. �� �` �.��,- `� . . _�., �1 � ��
Extension to Wildflower Ridge .� q4 ���..���� ���y �. �;�,�e� :� ��.ST�.�4cn�, ���.���_ � .�F � �� :�� �--
�! k f" .: X . .....�,+►' .'-�: �.. K 7 � ' I
r ����� � .,, Water P.1a�n Exten�in To Propased �. •� �r ��;}• i t i � ,
��' � :i��'S`� dY �� �y�, � '-��C
■ ■ ■ � '�dater P:1�m�n Kenne Rd. • i O ��
S� - _:.. - F"D+' .rk 5�. r.'�,It!T�, �,-..:i�t�,4. F4,�'_ !� .�r^�•!� • '/ � y�
'J i`I'.. J" _
u b d i v i s i o n f-.����- ;:� ::,�:�,, ti � �� - � _
r�L !+ - - • ���i���Yt '-� �7II 5 r ..
�� q �X.3��' j ��W,.�: i I�.
.r ;��,��} , y,����,,:� . Owner7oTielntaPropased T,,,, � ` �.
�'�� Fu61ic Water Main Installed By City ~��f'�' ;x �• �i
� �' Citytal��stall � :"��t. 'e+='
� � 12"Public Water Main ��}' �"�},::`�� ��t��• � '-I "'•'.:� '
. , ,p�a �,•�iw. A� w.� �� r ��'. . � . R �-.I .•i'�7L.�r .
y .� -y} Extension an Kennedy Rd. �..__ ;��'e: _ . ,'_:,..•��_w�_:-• •_ _ - . _
• Coordination with City Engineering - . - ��� �d� y�� -- "- ` A � '_�-a �: ,`_ - � �� tr
_L . ,»� � ��-s,• �'�, �"�.a �, � :{ ;♦ ..
�I � • T��` j �,...�, . k,�/ �` � ��r1,r E��
I �iT�7o Tie Into Existi{�g �� .±� :.�, r-�- ,� �
iPu6licVJaterh�lain � 1'. _ ' ,e;�+�.. , � r �� �.: __
• , � ,. � :"� � �' ,� �� ���' End Of City Installed Public
Forest Glen Ct. to Daisy Trail II :p'� �;,�` `� . . ��%rF'',�I� �j---- - '+"daterFAainAtPropertyLine
i � 1 �r:!l:.��-'� ' � � !r-'� � `+�'r � r'.�,�"ww�"-"�Ir �� . - — �-� ,- --�"��'.
I� •',;.
' f_ i"'�, �il* 71� r �-� r -al�- RR' #'` ;i/ >..^'•I� -R � i}� � i
• 12-inch diameter• 3 800LF �- ��. ��, �� �a .. �, .�,,,� „�-,• _ �,� � � "�--- . - . ... �° �� .
-,,.-; �:- ��
� �� � eF'... ��' I�
7 7 ' �• � -- Y.". � .�_�..: . ''�.= ,?.�=
r.�.�R a. ■-J� .'} �J_LA�a r ^.'lY r'r_.'1L..lL.� W.�r w a-Tr'+I r'1�`.'�1�:. -� .. � �.�...... jl�7f� _ yn � �,r1.r
_.. . -a. . l] w } V• �+�'""Y.`e`I ,�S5 *�.� I � �v�
�'1�� r.i�-.. ��. �'�W ��1 - I�. �r � MI �N'�9I'LA .`•� � .r } �4 �y. .I i �1 .i�r's .�' �.
• ContractAmount: $827,687 +i��� � ��_ � °: �,:}�• � �,T �; -�,� ��r�,: ti ,�� - �:.=.:=�' � ;:3�- �� ?: ,�;_� _ _-�����,�
� +,� �2� ,�. , �� ; }, �II ��:��� . . _- .
�� ,`� LFr� ��� '�J = �� �►,�.�� t�"` '°-F;��'�. '- �, 4:_y -� f -� -y_1�^ �" 'q
� Drew Cook Excavatin /Tem erle -:-� . _— ��-.�x;;. �;- . ���,- i � `�`�� � - �` - �.. :...
J p Y .�� �-- � .� . _� .,,P -�. � r , � �. �� �L . - --- �---�.
p � Y �II i,_51 �� ,� 'ti- i � �r�'"��'..,������r S"-i}.r -� . .�� �� fr.� 1 " r� .�.:
:4��� ��"' �•�j'' --.,.--� ' ,. , i _ , ��,,� �; :3�`� ,- �„ � .�_ '� �����'�:Y
Excavati n g . . - ; ��, '� �,�` 5�;� ���:�, � :�,�,j rF,_ __ f;�.
a+'+�,n�r �. •K� ��.,� . . � 5: � ' �: � •" "��`�- ---,- �- ,�-�� 5r''-
N fv1_3;� ,re��ared by:
� McDermott Excavating __ - - - � �50 5Qa � ,��� G1yafC�u,�����,e
Feet W`�'E W�terDeparlment
It�02 Haevihorne St
.
Estimated Completion Date: May 2022 - � �� � S ���-s��-��G�
FISCAL YEAR 2022
HIGHLIGHTS
�- - ::� . � .
, � � .,� � �,�
,
� � .. �+���. r,:.
► .
' , h ' ' ..�;. • t��: ' ����`;� '`i' +
��f •1`*'+- ,. �?-" '� +-�,,�' �" t �^�f�. ' i� �
� r_ . ,.• . ," h � � -���
• O rc h a rd D r Wate r S ste m �� ` �� .. �.; �. k , -k,� - A �� y � s�,��:: �
v � .� , �. ��,_
i `�, . � � ' , �.,�.,�.. .
I m p rove m e n ts ��= � �rt�_ �, . .,n;. ��t� =_—
t� �• �; ,�_ �:�e :�: -
- • ' _ . t �`.`4 � ���` � � � ,
• Collaborations: Water De artment and - � . '' - � . . - -��""�' �' '
p .;= , t ,� �;: �_F ; �_ �,__ ��r-
.. �m, _ ``' i . ..j.,'� -1,� � ..
Public Works � . . � �� . '° �# - • �•
. " " '��. - . � t'�Y'�.,\ , - �:A= . y _ y. � ' �� �- — .
' 1 ' 1 ? Y x�'� , �".F:;�- ;
� '� ,��
.��'R. Jqk � � �� .✓ � � . -�=..' i•-+. •s �_
• 6-inch diameter; 1 ,350 LF �� � � ��,,-- ���� � �
Y," ,f .,ti 7� �
. '1� � � ._ !`��'�,� .
• 680' Curb and gutter :� ' `} � �F ` �'� �� � y � - �.�'�"�'``�
d � _ _. � � rti
'l .S
1 �n,-i� ..1..-.
� ,�.^ !� � .. � �,'-� "
w� / Y ��5 � _y' .
• 360' sidewalk with ADA Ram � � y �`�' - �� �" �� : ��r� - �v - { � . .
p � -:�. � . ,� �` ��, �" ����y} , f- • _
�;�:�� � '� . _ ��� -��
• HMA Overlay - Spring 2022 :�: "�` r - � } � � � '► � �'�
��. � �` } � t .�``:.
�_ � •� ,w� ,.�^ �°` �
� Total: $432,316 v � �� ���� ,� ��^ ��� :. T � , �' � � .K. . _� ��flOC���0�1� �� �4� .��
�. .. .�. •� ..:�. ;..�-�. • , -
�+ � .�� . . � � .�; ,- .
�, � i^"4';� "` � ` ` ��r `k 3.' , �. . �t+.�
�4r � "0•M ` , 1`"�:r'p�" '.,��te�:T , •.Y��-x, . y � �� . ,
�r ., ��r:i. ..� �- .,, . . . a:'r.l . �.� � , . • �_ , , . '
F I SCAL YEAR 2022
HIGHLIGHTS
l����- SoLrt�ligerte Da� er�id Siaiz�soz� St� SpzG"���1e��,".���_
�.nii:� iur �1 zo.�h�„�4:,,�.,
,��.� �� ��,�_ �� Ll'atrr:l9aiuGn���echi��rrC]P-.9fl-a'3.�
—— � I
�aso I�
II 2375 SiMP5D3J
286
• Southgate Dr. to Simpson ' � '� � � � � r �.. � ��-
� ,...
_ ,-.�. �#. �
� � 2865011iHGAFE DR 290 SOl1THGA7E UR �
St. Water Main Connection � � -� ,
. �
2445 53MP50N
� �{, R�p�el�a6� sMpS°�,si �eae"tlsro.�,se�e�o.am:
.y5 .... cRn erMa!n
__i . �� . _ .-. �.y S�rveyP�o^t
� �.� Descrip
`� ( � _J ti' 43 �JhD13�YP.00�
• Project coordinated with City .� `�l � _ ' -��` �'�� "�h � j _ �°�
. 7 �, . ��fJ Cl �'- GF E [E 'n
r�� * + �
1 _.��r, ,�Eas�M_��
/ 1C�F E�sarrer�t bowm
Engineering --- s'�BoxS�`°=
-- ._ , �:�..e
� � SO�fxGAfEOR � f H{ran�z
6"ClWaterMa��:n � _ - � � VaJvez
. . y� '.�—_�� ~ _ —y_ _ '�' � � Fin�n
• Contractor: : - i - - -�� e=
� �s-Rc.Pet7.so-% i rr�
_ . — �i� i = F'��g
� anua:tl?=e
McDermott Excavating ' . H��d=vPe
F�o�E
I Warer Main
24�0 SIMPSON ST —E.�=t�np
]
��F�w�.c5ed
YService Connecfions
Total Cost: $58,449 2a95nUTHGATEDR S�a=
� 296 5UUTHGATE�R ���
Sanrtary ManM1ole
� I �
Sani[a ry Tap Fimng
�
• 6% below awarded contract. �� s.rtaryG�a��TyMa�°
..„�,.. .� _
' h' Map Prepared by:
Ciry of Dupuque
- - �inch=27 feet �.��E �nacer oepanmenc
_ � �_ 'aFEE� 1B02Hawthame5t
- ,�^.a:,..�:�.,,.,... S 563-SBQ-0291
FISCAL YEAR 2022 North Cascade - Cottingham Rd
Water Mai n Relocation
HIGHLIGHTS � �
(lowa DOT Swiss Valley Interchange Pro�ect)
� � � 'f" f 1' r �� ? ,� py�`, %� *' s:
l p r • t� J� .
ti �RY7 ''' 9 P� � .� r '���w •! ' jw..,� ,.,f. . .
g
� � � r i ��r��i i �
• Collaboration with lowa DOT Cit T� � � - ��� � � f
, y t .{ � � :s; f �.�:G:� :.
� { e -, ,�•,�;`�.,
'� ' �',. .,x�-..,�
Engineering, Water Department � � s � , ;�
.#• ��. CE�ARCREST r:'s �=�'����. :-;�..= � • .�'' � �� wA�Rniair�i c�t:
. SUBflIVI510N •9 �.i..'':�;�' � y� '� .
� s " 'q,,, ' �, y�' i:e�';: REtDCAT14N::'�
r � £ �. ''�*; �;�z;��' ,'�' i,, r , r.,.'
• Benefits: �� {. :: ,. . - �,� , '� :: ....,�.
x y .., �� , •q ' NEW � . f ' k� r M '' a�
� r � rf INTEftCHANG�,f: � `-�r .r
� New Services/Customers � . �� ,, � , i � ��.�>� � :-.
r � Y , ' ,, ,/ � _.�. • �
� More resilient and . � : � _ �-�� �
NEW G�TTWGHAM RQA� �,,,,�,�,�„ti _ _
Qm �;war�s r�ain�:. ^•r.�
—'�'�"'�p8DND6h Eo �r � � `
sustainable water �. �•••••�������' �� � � �
� �.
�' ',. � ,�t
distribution system. ' � - � �
� �,�. ��
�— �............... �%
�'` i WAT£R MAIN� �q
= � �RELOCA7IDN� . �:I
�.�..■■.a�qr.a.
• c�ty cost: �752,soo � ,,.�� �'�f -- �;�
' r'�� �,
•f S r.'.1 �
• lowa DOT Cost: $498,100 WATER i ��-��" - � �
r4WfR � �' ' - �
;
�� � .� '
� Total Project Cost: $1 ,250,700 ',� t�,' , � �"`.' � .�
.4'JATER MAIN r
�'
, � �RELOLATION � :R; ,,,^1�
� ,� ■u�,n■.nrsrs y6, '• j ��,-�.
i' �� µ'.
. t. � h• '�
�� _�.�, � � �..'� "
z
� ��._..�,. --- � .:�,: . _ _,�� - - - ;
- • Reduce Service Outages:
.
� Althauser Street and Eagle Street Water Main
Replacement & Lead Service Line Replacement
■ ■ ti � r � - �� �
_���___� �� _ ;� . � Althauser 5t
�
�--�'—�.— � ---- - �----� and
� �` � _. � .--�-� �---�-y__ +:� i
��:7 _ - —.�— - � �`-- cV
' ' ; --�__�—_-�-- _ --_��� --�- �� - , - -- � � Eagle St
— • i � �a �",-�,,------ -
- I� � � -- - - -._ ' � p 1
- , i
-I � �4
� - 4- - '�.. { Re�onstrud�on Project
I ---- � � YW.
, , , '4� �--- �, � ,
. � ' __ . ` .
'�� � CITYaF�UBUqUE
�� � � ❑178LqlJE C�UNTY,IOWA
� . I� � ��� I �- - � ,�\
� . ` � I � k,� :� I� II . � � ry .�. `' �E L@GEAJD
—�, Water Distrihutipn
4 _ _ -�._� � �L�:� �f,�_� ±� -- ---�� + �Hydrants
J + � + � �Valves
f..l�_ � � ��
��' � ' Water Maln Sreaks
� �.-,� ' i ,
i
- �` ; ��i f � -Water Main
I � - _, �� ' ' j ? � 5Yorrn Water
� . $ , �� _ i + 0 Storm Inlet
�� ' �Storm Manhole
` �/j __._------ _ �+ � ,. , Storm WaYerGra�ity Main
--J � � SanitarySewer
_ � J� . �� . r �
_ � �Sanitary Manhnle
� ----� J� f f
f � • Cleanouts
; ■Cleanout Line
-� � f ��' ►Sanitary Sewer Gravity Main
F� Other
�I I' �+ f Water Main To 8e Repka[ed
� �iTax Parcels
. [ + __��-4�"� � I
' �s } •� I ��` � -_�{�,�
. ; •J� �„ � -- __ — _ - . -� � . c�^Yaow,w.swrm����wn,�,�r�sawl�n�ni�;,,�m��
� ma
• � f _ , r.inolaw�ryi.e�Gri.�Gisdam!nipwnilr�2o2�
' � I 'f w�ww-rou,ryes
— . i, . -_. •�4 Y.� A _ _ I . I = .
: � ` s -� � . � � J ,.,,<..,;,,,,.,�,���,,,��,,;,,a„w��,�,�w,P�,.�r::��
y�� � �� i f ,.� , + - -._ + � • ,,.,�,,.rar:�„���,,•�', ��
_ _ �'` `" ' � ��ti�t � ' °-. _ f �' , MSA� Yx ��,�.��.:,
_ .. � �_ 1 � �'� �J<«-.�
� • Emergency Response
.
� Park Hill Standpipe Emergency Generator
Installation Project
■ ■
.
------ � _
� -
�
_ � �
� � `�
� , .
� Y, "���i. �`,�{� �
-� " � � '. ' �` .*..
___'� �y' 4�� �rr�yy� . ?g .
`,�-! y ' 3�t��,', ..:.�:.: .. �
� \ _ , y �=-
ry A ���:.
�� � �_----� ' ^"a'ti��y_.._�_ ei I �:.��,,�c;,,�".s L:� : ���^yi,r�
//� - �.. �ti. _ .. _' � �� �Y�' �w;,�•'`�L.� f�
, FILER ,-;" -``'s_ , ,:.
0 - • -���r-�r
_��,�.� � _� � : .x .�,.. .
r-. • .�.� -.�pj'���:- ��{,�:„
h �,`o nu�n m. ��l _ .. � - .��,itT, �r
� ��n.�iu ri"'�..�,.-"�. . ' -_ -y-�- � ��. � �_'�.g'�
M1�^ e��a��:n":ii:n::. i ! -^ . � • r •�-$
1 , � . , �.li�it� -•-•__�,�•ti, ,�_--��. . .._ , . - - . . _ _ .Oa
�--� �p .��� �� .� 'F - - _ �,,,,,_ �. :...:_ -�
.�
wl'��n'�.��.� �' `� �- � -
��IWI: ���wrom�n ' "_ . ' ' _" .
. ,.mn��amu� ..iewnrmn � r.. r-.` . . _ " . '____ "` _" •
_ _'__' �� '• ' ' � -
_.
.. _.__"���..�. • ' — — ,
^
�_�... ., . . �•_ • _ _ _
._....� _.s..,"+�`'""' �... c:-�,r
�r • •+.r - _ _ -__ � �`�� -__ - - - ;�����
.
„ - -
J
;.;_,. - - - - .. - - - -
� ~ • _- - - --- - - -- �- �. ' ..��.;.____ _ _ -- �� .
:i`,+:�!s: _ - - - - � . .'. -=- _... - -- .,
��Lw��a = _-_ _.-_... --.: _----�� '�_ �.-� _..- - . .- t �"''..
���:+5,y�.�LLiY, �► .1 F` �
}.- .- . • — .._. . ,►�- ,+��A` ''�
. : - �"'... ��'��/ ;�
��,•��" r �
�1 { �i�, �� �r , . ...... .... _. ,-•x
� _. _ •-�vyr4�i . . � - ••-....~ �_,_-_....-••�n' '...
� , � __ � ..-.•�.r+�^•� E�r-r .... . . . *+• . ..
J�� �� i}"".- ... . `._,.��. .Fjr�-.-� � , ..._ . r � . �
' Y��� _....
�� .. �� , .1��� .
.... . . . � � . . _�'I� . � . . '..��� . . . .M . .. . .
. Support Economic Growth and Development:
� Crossroads Industrial Park: Phase 1 & 2 - Water Main
� Extension
■ ■
,�� ,
;,, H��
� . •
:, `�, �.�r,,�.��.�, a'�9!��
�.,'. �`�+ �d .....e..�....
_ _ _ �II 1 .�r�M��:��rH�KNEIv?�n.iCE�
� - , . , �-_= _ '',l �
w • Project Design Coordinated with
` � � � w� � Economic Development, City
_ � .� .-- .-- • � ��,
� on `,r
',� 7 _Ea _� , ' r -1- -- - -- , t�. � '', � Engineering. Engineer of Record
� , �� �
� FlLL � i '� II � :�� � � --- __ Origin Design.
ET . � FlLL ,
� � I
� , \ �� 1 _ ;
� � _ __
'�� I ��� �a�¢
I 1. i ■ -
\ �:. r �
�� ��� � �- �� �_E _ � ��� ° � f�___ _ :. • Phase 1 : 4,555 LF 16" Water Main
� '/:.. .��� ' � � 'i/ � k
\ c.ra� M I � � 7C
� �' ` � � ~ � Phase 2: 450 LF 12" Water Main
� � > ; .
� E E1 LE T E f1 LE � II ii � 1
T � '
I g �d�>
1 v � .� Ef LL i FlLL � . ' .. -T E.EL -LE � _ 'I .EiLL i FlLL , , ��I�I �—J .,E�1.�a_
I I I
T . i �.� m Q 'y��
i _-`___.____._.. �� FlLL . I � :�C�
` ' '� . .Ef � � i FlLL �� � II �IY � X a '�o G� �
� Project Cost Estimate Including
�, , o � W� ��
I ----'-.-__H-E___��."_ --�; r . �.. }f��I ' I' II -.-�.:'.
�".-I'.: \.� . ❑ �
:/•:� ..;"y._..-_'....'.
:.� ,:. " _ _ _ E•�.!�::�:f!�:':
i '��, ��� • ' H_E '��� , -�-_ - i; __ �� U � Engineering Services: $970,245
� - , _------ -— - — �,� e �
{ T E EL -�LE ���. ' ' " .. . _ - �
� ' . .'f, ... . _ .___- __ -�-- ._.._- �\' . �
T __ -
FlLL , \'t� .- �.}� -:
.Ei FILL � .�. ::/.�'.• �1' � ..
_ --------�- �� � ��` .��� g • Construction Schedule:
�-- �. s� �� -__ �
� � f I '�.� R
r ,_ � :� �;� � ; .� �� Completion December 2023
II .n_E' I1C.. Ii r1 N 3� .
. r � ,� �o� 8�_..II+ _� . � -
�LL i ' - :
ET T o�' ,-=�r�J I ,� S
� I s t
I � F� I�
I r �_E •I I' J 1 � v
I FlLL i /
Ef T Il tl°..�.. �� _-'.:- L -ll / � e�
r :��ir, , _u�: / f
II r H-E' - - I /n� • rl_ r;� . �I•- { -
f I - /
RLL � I e� f n�E X �
I rr nLL �J o ° .
�Ilr l _ fy
. Support Economic Growth and Development:
� City-Wide Distribution System and Storage
� Improvements
■ ■ }.T� - _ _
�- '�''� �'�-�-�_.
.�` -. _ # ��
� ._ ���` :,: , . w
},�. . -� . .
4• � i'
� w� �,a���P5 ���E[D�hLE f?�Aa � y�i.-
�� ,� '.�AT�R hl AIN E��EfvSI�N ��
,� � � • f
, , .
F�G46��4"T45K9f '• "�' �.1� .'.
�JT
CEIviRALr1'�ENUC � �:,�����S�
Y�n r�ri�s
6•�05TEF��fATf��I I 1 � �
. _�_u.�—�� � �~ Yr 7w:h`crr.rvc•r _
��� �
�r � M1i5 �
� PorK Nd t� �
�,�r,T�kA� �1+'�N1�E �•or�.Nil Tark� �
k`ti'ATER MAlhl ��T��Sl�hl • O'7�r�ti F�_i�h:s��L C��Ir.rp-'�try�� Aupar, � ��
f'�—P"'
fi�.r�e•k�i�-��, ��ip�iY��:c��i
�
'`��- } .� � ���Tr�,��_�- a����r���
�w- �L: �.���a i tr� i s�urtr�
. �} _ �
-,- .. . ;-,�i
aLYMRIC NEI�NTS �
w:AT=R �dAiN =K—EM3�O�J � .. _ _
..��Uar�P�
r�,�Tx��� � • �UL"H'�t't�:T AM I�i�IAL
' ',�'�=f� �!AI�I E`�'�N�i4N I
� �}�
�K�nk � hi�I�TI-I CAS^AD� R�OAD x�
_,. �
1�+ATER MpJ N E�TEIr�SI�N {
f�e. i�3
Pe��Tsnk � . _ — _
�Cr�fsh k1iF�3
� • Lead Service Lines
.
� Bipartisan Infrastructure Bill
� Lead & Copper Rule Revisions December 2021
� � • Lead Service Line Inventory - October 16, 2024
�
�.
��,�
_ .}. s.
:-,�,�s, �.y� ^ _ . . - '
. ,.`� . �'; .
+ ,..� .. -. .
« r
. .. _ _ - .. ._ f�•.ti:. �
� ``��
. . ��`�..\.. � �. ��
�� ..` ����``�-� `'",4
. ����`��\ -
�. ��. �
��. ��`.\�� =
. �\� ;
\�� ����:
�
��_
� �.t . > �
� } a ;,
� ��� i�� �}����"" ;i�!`fl � ji` .
r ;
f t � ' Y r r���� �� � � "
`.
r : � -
� =� _;��� ^- � —
.'4 l�y;�^'i �e
�l ` r
+ !. ti;�., r . �
r—�.s '� - - ' -
Security, Communications, and Energy Savings
' � SCADA & Fiber Optic Communications
. Upgrade Project Est: $1 ,200,000
John F Kennedy Rd to Soccer �`ank SPe�,a�A�h,e�emeR<����5
■ ■ T!iFCfIYOF ;..
DuB F � �o,o Awa�W,�ne�
,Lf�i�;�r,ur������u flie,l1 i�N==i��,,�
Ll�z��lnrrrred Uist�arice: T SbT Fecf
�TO � [� � �
� �
�
� � �
`,, � � �r��r �; O "
U` � � �
- �( � � s . ,
��- � �S
JOH�F kP,y �ay0
�I � � -' _ hEdYRD� `t��
� n �r �l�'.ylW _ �q !7� 5�.'�
� �� I
�� L „k,.
��
�. �_�
I�
j`L�L�� �.e ge nd
V � �Proposed Wa[er Fiher
r_ -VJater Facilities
1'
�(/�..- City Fiber Network
i`' '���' �<all oiher values>
.. � � Stahas
�Ac[ive
• � Inac5lve
y �LlnderCons[ruc[ionl�esign ���PJ. ,�
�—�Proposed �P,(;� �
� ��� � � �� m,� �Abandoned in Place �
. . .� ����}::xa�/ .
eY_.
�' L�:�G�'p��� " " : nf Map Prepared by:
1 inch= 189 feet C�ty oi Dubuque
� ioo so o �o0 2ooFees 1/U E Wa1er Dapartmeni
��� 1902 Hawthorne 51
S 563-589-4291
- Water Meter Product Replacement Program
, . - --
:::.:. _-- ,__ - � __� ._ _ . �
- - -=- --_-�=�� --_-- -- - _ _ . - - ___-- ---_ - -- -- _
_ . --- -- _- - -_ . .
■ ■ __ ._-_.---_ -___ _- _- . _- ___ _ -_ . _-- __ - .:-- -- -_ - --
_ -__ _,.-�_r ,_ . _ . - - : . . -. .
:- :-_ :�:���_�-r� _
. , : . : -�- _ -
• Water Meter Product � =�-�---��
- _ _- -__-_ -_ -__ --_ _ . : .- .. �_____��
Replacement of Meter .� : - - - �� � ����: �
� r �� .
_ �� � 5� r .��� .. _ _ '
' _ ___ - _ __ -y� -
Interface Units and ---__-= ----=--- - _-----_- - :- - :=r--4����-� . . _________ _ __
_ r_�;-. _-
. - -. . -- : ---_= -- -- - --=-- - - :�� - � �� . - _ -_-
Registers . . -._- -_ , . - : � ___ - _-
_ - �� �_.` � 4 � �
_ ' ' �
' � � -. �� ���
. ���' � ��� .0
� , .: :� -��'' ._ - -'�
� 5-Year Program. - : � : . - ��= _ � ���
• � ; � - � � �
. . . ; -t� , r .
I n itiated i n FY2022. - -
. �: � .
,�� — r. �a;�� ' ��
:, � _.`�`�� � :,,�'�•y y54 '�
����
Q 1 ' �r -.�aK
• Work Performed by , - �° �� . � ��y��:'�i F��
h �.. �._ .t¢
� . • f 'hy�����Yr� � �r7� ;'�},'9��
,�•�� r��sti'i�_�r Y{ �."...
�1 �4 ..� ..T• � ,•��.'�s�s. .�.. ?" f'
Water Department ����=��,-.���� h : -:� .l:�7�: , - �������{'u
��4.ir:... 1` x,± : _�S'r'ati. �"f`�J � �'.� ti.YS
��.� R3:._"�R_�T.y�µi'}\�+'r�:V��'i�n_.' .�r. 4
" ., _.. _ � . f�.�:.:•��r;:��'�?' � � - .* �
��`F:=. �„����{-f'.=;;��*':.#�l,r�• �-. . ��-. v.���.`7.�
Meter Crew. ����;� ��,{ ���� =-,., . _ � �� .r�-.��.
.'' r I�i�c�-�.��':., " ., �
. *_ �} 4�ti_.`"., 'f' 's.�l'' Y r s".:x
y fy !� :. .;�.4 . � M �}.,� *k ..��
.l y.� .�'+.r'..Si1.�l" .'d:s� �i-."�.`i-"',� � � _
; �� ,l�`N. . , • 's�,.� 4.�'' F, s. f..F,. .
->�,: r -:.� '.�,;.. Wu, ::ia'�'� � � :�. k::�;4�:
. . .,, .- �:.. u,+t� ,,� _ . -
�. ��,j.,... .�;::�'} •�.; - ;.;��.�.,_ a h• „',L�+, 4�' r' �;
q. ^' ��
� l�� '�Ct�.�ti':,i ka��i+'-r;PRKS��� ��,��°- � � � r'�7yk, �``l.�!'ti�'
�}rf".'�t►{+i���5:��k��T�-�€. ,�,s'r.'i' �:a►►i;,�.:�r�:'r. ,:�r'�."�'�� "ti �r�. . . .
Danny Pefersen installing new MIU
*Average Household = 6, 000 Gallons/Month
0
0 �
Proposed Rate Monthly Bill Impact for
Increase over FY 22 Average Household*
RATE COMPARISON
Rate Comparison, Lime Softened Facilities Only
$50.00
$4I .67
$40.00 �3�•76 $3�•�� $3 5.93 $3 5.0 I
$34.42 $33. 18
$30.00 $29.67
$20.00
$ I 0.00
$—
West Des Des Cedar Ave.W/O lowa City Ames Dubuque Council
Moines Moines Rapids Dubuque Bluffs
� FY23 Water Only forAverage Household (6,000 gallons)
Based Average Household = 6, 000 Gallons/Month
2 n d Lowest Rates : T h e H i g h est Wate r
� Rate West Des Moines is 26% Hi her
� g
� , than Dubuque's Rate ; and the Average
Rate is 7% Hi her than Dubuque .
g
��OWJy Home Staiistics— Resources— ManageAcco��nt—
WAT E R A D M I N I S T RAT I O N T�a����g E�e�t deta��s
�
.
Employee Training and Development Date ;C310'2021-03;,4,Zo2,
Location
� Professional Development
City&State GNLINE
� On Boarding of New Employees -
Contacts IDINARURALWATER 0RG
� Continuing Education Programs -
More Inio IDWARURALWATER DRG
�escription RISK+'RESlLIENCE 8 Eh1ERGENCY RESPDNSE PLANS-Iv1ARCH
• Re g u I ato ry C o m p I i a n ce MaxAllowable Hours S
� Reporting, monitoring, and working with
lowa DNR and EPA on compliance.
• Capital Improvement Planning
� Project development including
budgeting, initiation, and award through
construction completion.
WATER TREATMENT PLANT OPERATIONS
�����
■ ■ 1��11�
�
- �e ��t
• Water Production and Treatment �
�r.� .� -
� Regulatory Compliance � �`�
- 1 _ '"���
� Water Qualit - Consumer Confidence ��� +` - - - l _ _ _
Y
• Source Water Protection -
. ��J� �.
� Wells and the Well field -
� Treatment Plant � ��f�
+�I.j.,
•F
�
• Water Storage and Pumping Facility ;� -��,�J�; �+
. . �`
Operation and Maintenance - � � ���y�� -�
��.
� ., � � � .� � . : . � _ w �
• Reliable Data Access and Reporting
� SCADA Communications �„ � ���� ����
��
WATER PLANT OPERATIONS
■ � Eagle Point Water Treatment Plant
��
� • Plant Capacity: 11 — 13* MGD
. ���� _. • Well Capacity: 16* MGD
. = I �
. : ���.
;���� • Peak Day Demand : 10.7* MGD
� � � � ���
�'� - ' � �� (November 2016)
- - ' N � . r - . . �� ���
' 1 _ +� " ' } � � . +
. � � - ��4 � � K� � ` � ■
'� i -
�� �' - � � ��� � . � .�� � � • Average Day Demand . 7.0* MGD
� � � ���
_ - f �_�
_-- - ,� . ��, � �
�
� �
- �--�.� i
1
v �
.1
.*� �yy ���a - _
#��^'� + � � - � -
��r��r�� 4 �.� - ��
_��' _ - - = r�i�+ - - �� .
' ' ~ - . ��
WATER PLANT OPERATIONS
■ ■
Water: Treated and Metered Non Revenue Water
2,500 2�2�4 2�2�3 (Percentage�
25.00%
= 2,000 1 ,898 1 ,914
I 9.8 I %
° 20.00% ' �•'�°�
0 1 ,500
o I 5.00%
0
w
`� I �000
_ � �.���
O
�
� 500 5.00%
Treated M etered �
FY'20 FY'2 I
� FY'20 � FY'2 I NRW Percentage
WATE R D I STRI B U TI O N -___-_ _ -~�~ - --�_�_______ _
■ R - �. _ _
�,
� - _ __
� - ��- � �Y - ; �..�
' �� � _-- � s. r
, - .� � � �
• r i n n M i n n n � ._ �.. �� - ���� ��� n� _�:
Opeato ad a teace �. � ,.t ;�v � ,�
__ � , �� : �
• Emergency Response _ _ _ _ - _ � _ -- _
�� _ � - -�
_ - �_ -.
• Inspection �-�-.� _.�� � -
�..
• General Construction �-- � - � ���-���� x����=�� � �� �T�� �� ��
, _.�: �.� - .,� ���`m�
e�- +,� , + "' � � -'
� Service Li ne Mai n Taps � ' -� �=��������� Y
�=� 4
T.-. �Y
.i�.RCClf.�'S�a...:r43{%.�L�i
• Water Main Installation � � , ,,�
. �� .
� Meter Management ��-�� - � _ `�
, , � .s��� ..; i
�
• Backflow Prevention - ��� : � � � ��� ��. � ��� '
� ,
f �Y �
■ ,�� �' • 1 ,,.`��V'�7.
• Development Rev�ew . __ - , `'� - '�- �
.-�..�.. '� _ .,�.� r �"`�
- - - -- - .
_ - � ; , ..�..,�..-: ,� . . ��,. �.,, . .
Pf''F!��! �Nrx �; ..,�..���Y.:T� ._'�i� ���-.;'�{�,�b���W�.7� �y '
� i _
WATER DISTRIBUTION
■ ■
Water Main Break Response
125
105
100
85 83
74 ��
75
58 60
50
25
0
FY' I 6 FY' I 7 FY' I 8 FY' I 9 FY'20 FY'2 I FY'22*
� Water Main Break Response
WATE R
DISTRIBUTION - ' '
„
,
*FY 2022 to date:
128 Service Taps � �
New Connections '
.
result from
� �
community growth � � '
such as new housing,
businesses, and �
industry.
�
• • �
WATE R
DISTRIBUTION � '
. , , ,
, , , .
. . -
Starting in FY20, the Water
Distribution Meter Crew - � � �
assumed all responsibility
for:
� � �
• meter repairs,
• testing,
• change outs, and ' ' '
• service calls, which were
originally handled by , , �
Utility Billing.
�
Backflow Prevention Program
� _ - _
■ ■ ` "%d ' ~ �, � \, �
I� r, �
1 � _ ,� � , ,
. ' .�w
_ �, �
• Administered internally. � �= �� �
r :I � � ��
f�"' �"� ,� �.�..�.
'_ '���� � �"'�'i►,
=�_ r �' ��� � J � .J�r ,'1�
■ ■ ■ ■ � 7�, ' � � � . . Y'A� �'�`�' -
• Administrative fee $25/device. .�,� �� _ � � � � � �� _.�� � � .�
��= ��r� � � � -
�:,.� � �- :�_ �j,,,�`�. � �, �;� - ,�"'
• FY2023 Revenue Forecast: � ��, � - �� �- '���,, ����,� � �_''�
�, �( � ,� �.� ,��. _
� $76,150 , .,. :� _- ,., � �;--- �
, � �
. i. � _ �Y �C � � .
� Based on pro�ected 3,046 �°_� Y ` . � ��9� �
. r--�___ ;: �
devices. � ��l _�� �
k , "�� ,�`./1- �k
. �, �
. ' .. • ,,I� j.-._�,.��
. �:�;� _- � 9/��
�► �! ' _
. \ �
. �-.
a
��,F,.=�- �.�
._. � � - �
.� ,,
,
_ ,: j - ��� � 7
,� �. ,
: ;� --�
..�:_���: .�`�` -_� � 1 �
Jeff Mills performs backflow recertification testing
/
.
1 .New GPS Unit for Water Distribution Staff
� � Estimated Purchase Price: $6,600 (Non-Recurring)
' ' •
2.Flexipro Video Camera
� � Estimated Purchase Price : $9,500 (Non-Recurring)
3. Four File Cabinets with Table Top at MSC Building
Estimated Purchase Price : $3,300 (Non-Recurring)
4. Maintenance Vehicle at Eagle Point Water Treatment Plant
Estimated Purchase Price : $66,000 (Non-Recurring)
5. SureCall Cellular Distributed Antenna System (DAS) at MSC
Estimated Purchase Price : $12,632 (Non-Recurring)
6. Cartegraph Services
Estimated Purchase Price : $65,000 (Non-Recurring)
FY 23 CAPITAL IMPROVEMENT PROJECTS
- . - - _ . . - . - • .
Water Meter Replacement Program $ 529,018 $ 2,692,533
Manhole Replacement Rehab $ 20,000 $ 75,000
Water Main Upgrades during Street General Repairs $ 20,000 $ 70,000
Wells, Well Field, and Raw Transmission Piping Repair $ 90,000 $ 500,500
Water Treatment Plant Condition Assessment and � 20,000 $ 100,000
Master Plan
Water Storage Tank Coating Program $ 150,000 $ 2,525,000
WTP and Pump Station Pipe Rehabilitation $ 200,000 $ 220,000
Water Main Replacements - Sanitary Sewer Program -
Custer & Auburn Streets $ 310,250 $ 927,949
SCADA & Comms Improvements $ 150,000 $ 850,000
Althauser St. & Eagle St. Water Main Improvements $ 145,000 $ 296,065
FY 23 CAPITAL IMPROVEMENT PROJECTS (Continued)
. � - - - . . . • .
Water Main Replacements - Streets $ 97,000 $ 2,516,787
Webber Property Phase 1 & 2 - Water Main Extension $ 970,245 $ 970,245
Old Highway Road Water Main Extension - Seippel and � 853,750 $ 853,750
Radford Rd Loop
CIWA Water System Agreements for Water Service
Line Installations $ 65,000 $ 224,000
Park Hill Pump Station Emergency Backup Generator $ 90,000 $ 90,000
Creek Crossing Restoration - NW Arterial East & West $ 35,550 $ 35,550
Fire Hydrant Assembly Relocation/Replacement for � 20,000 $ 100,000
Sidewalk Program
Maintenance of Public Water Mains During Stone � 20,000 $ 24,000
Retaining Wall Repair
Westside Water System Service Line Installation/Fire � 165,000 $ 245,983
Hydrant Install/Purchase
FY 23 CAPITAL IMPROVEMENT PROJECTS (Continued)
- . - . .
Public Lead Line Water Main Replacement $ 84,500 $ 276,333
Airborne Road Water Main Extension - Landfill $ 80,000 $ 109,679
4940 Backhoe/Loader Replacement $ 67,500 $ 67,500
Tapping Machine Replacement $ 46,500 $ 46,500
Ground Penetrating Radar $ 30,000 $ 30,000
Sludge Pump Replacement - Lime Softening Plant $ 25,000 $ 25,000
Pump Station Drainage Improvements $ 15,000 $ 15,000
Vehicle 4912 Replacement $ 115,000 $ 115,000
Vehicle 4913 Replacement $ 115,000 $ 115,000
4919 Whacker Plate Compactor Replacement $ 13,000 $ 13,000
PERFORMANCE MEASURES
Goals that need work: Goals Improving: Goals that are on track:
# of Breaks per 100 miles of Operation of 10% of # of Regulatory Compliance
Pipe Distribution System Valves Violations, Target Zero (0)
Annually
O&M Costs for Water # of Completed Annual Training
Distribution per 100 miles of Hydrant effectiveness (Out hours to support CEUs, reported
p�pe of Service Rate) <1% in staff hours
Technical Meter Service /ssues % of Projects Completed within
per 1,000 accounts the Program Budget
www.cityofd u buq ue.org/water