Loading...
2022 Asphalt Overlay Ramp Project 2_HearingCopyrighted April 4, 2022 City of Dubuque Public Hearings # 1. City Council Meeting ITEM TITLE: 2022 Asphalt Overlay Ramp Project 2 SUMMARY: Proof of publication on notice of public hearing to consider City Council approval of the plans, specifications, form of contract and estimated cost for the 2022 Asphalt Overlay Ramp Project 2 through the adoption of a resolution, and City Manager recommending approval. SUGGESTED DISPOSITION: ATTACHMENTS: Description RESOLUTION Approval of plans, specifications, form of contract, and estimated cost for the 2022 Asphalt Overlay Ramp Project 2 Suggested Disposition: Receive and File; Adopt Resolution(s) 2022 Asphalt Overlay Ramp Project 2-MVM Memo Staff Memo Type City Manager Memo Staff Memo Resolution Resolutions THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2022 Asphalt Overlay Ramp Project 2 DATE: March 30, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council approve the plans, specifications, form of contract and estimated cost for the 2022 Asphalt Overlay Ramp Project 2 through the adoption of a resolution. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE C DUUB--*--FE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: March 28, 2022 RE: 2022 Asphalt Overlay Ramp Project 2 INTRODUCTION Dubuque AII•Ameriea M 1 I I I 2007-2012.2013 2017*2019 The purpose of this memorandum is to provide the City Council with information related to the public hearing for the 2022 Asphalt Overlay Ramp Project 2. BACKGROUND Since 1990, the City of Dubuque has installed pedestrian access ramps around the City of Dubuque to conform with the American with Disabilities Act (ADA). The pedestrian access ramps allow people with mobility difficulties to access the City's sidewalk system. The design standards for these ramps have evolved over time as more ramps have been installed and standards have changed. Since 2011, The City of Dubuque has followed the "Proposed Accessibility Guidelines for Pedestrian Facilities in the Public Right -of -Way." These are updated standards to use for facilities in the public right-of-way and addressed issues brought up since the original ADA standards were developed. The Iowa Department of Transportation has adopted the PROWAG standards. The Federal Highway Administration (FHWA) has also adopted the standards and requires all cities that receive federal funding to follow these standards. DISCUSSION This project includes the replacement of twenty-eight (28) access ramps, two (2) intake replacements and curb and sidewalk repairs at 12 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Auburn Street at University Ave, one single ramp. 2. Auburn Street alley between University Ave and Grace Street, two single ramps. 3. Grace Street at Griggs Street, two single ramps. 4. Grace Street at Ida Street, two single ramps. 5. Grace Street at alley East of 1819 Grace Street, two single ramps. 6. Bennett Street at alley East of 1755 Bennett Street, two single ramps. 7. Bennett Street at alley East of 1854 Bennett Street, two single ramps. 8. Bennett Street at Griggs Street, two single ramps. 9. Bennett Street at McCormick Street, one single ramp. 10. Bennet Street at N. Algona Street, curb, and sidewalk replacement. 11. Chaney Street at St. Anne Drive, two single and 2 double ramps. 12. Chaney Street at Hillcrest Road, two single and two double ramps. PUBLIC ENGAGEMENT The Public Works Department will mail letters to property owners and the Engineering Department has developed door hangers for residents notifying residents of the overlay and ramp project. PROJECT SCHEDULE The schedule for the Project is as follows: Initiate Public Bidding Process March 21, 2022 Publish Notice to Bidders, Advertise for Bids March 22, 2022 Publish Public Hearing Notice on Plans & Specs March 22, 2022 Public Hearing on Plans & Specifications April 4, 2022 Receipt of Bids (Bid Letting) April 7, 2022 Award Construction Contract April 18, 2022 Final Project Completion July 1, 2022 RECOMMENDATION I recommend that the City Council approve the plans, specifications, form of contract and estimated cost for the 2022 Asphalt Overlay Ramp Project 2. BUDGETIMPACT The preliminary estimate of probable costs for the 2022 Asphalt Overlay Ramp Project 2 is as follows: Description Cost Estimate Construction $ 177,750.40 Contingency $ 17,775.40 Engineering Design and Administration $ 19,552.54 Total Construction Cost Estimate $ 215,077.98 The funding summary is as follows: CIP Fund Description Fund Amount 3001227 Curb Ramp Program $ 215,077.98 ACTION TO BE TAKEN The City Council is requested to approve the plans, specifications, form of contract and estimated cost for the 2022 Asphalt Overlay Ramp Project 2 through the adoption of the attached resolution. E GNP/kb cc: John Klostermann, Public Works Director Jon Dienst, Civil Engineer II Prepared by Kerry Bradley City of Dubuque 50 W. 1311 Street Dubuque IA 52001 (563) 589 4270 Return to Adrienne Breitfelder, City Clerk, City of Dubuque, 50 W. 13th Street, Dubuque, IA 52001 (563) 589-4100 RESOLUTION NO. 123-22 APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2022 ASPHALT OVERLAY RAMP PROJECT 2 NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the proposed plans, specifications, form of contract and estimated cost for the 2022 Asphalt Overlay Ramp Project 2, in the estimated amount $177,750.40, are hereby approved. Passed, adopted, and approved this this 4th day of April 2022. Attest: Adrienne N. Breitfelder, City Clerk STATE OF IOWA SS: DUBUQUE COUNTY CERTIFICATE OF PUBLICATION I, Kathy Goetzinger, a Billing Clerk for Woodward Communications, Inc., an Iowa corporation, publisher of the Telegraph Herald, a newspaper of general circulation published in the City of Dubuque, County of Dubuque and State of Iowa; hereby certify that the attached notice was published in said newspaper on the following dates: 03/25/2022 and for which the charge is 52.60 Subscribed to before me, a Notary Pu 'c in and for Dubuque County, Iowa, this 25th day of March, 2022 Notary Public in and for Dubuque County, Iowa. e SRARON WYELBORN Cam gii:ssion W mimmber $27408 My Gmmmma. Exp. NOV I01 2023 Ad text : CITY OF DUBUQUE, IOWA OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2022 ASPHALT OVERLAY RAMP PROJECT 2 NOTICE IS HEREBY GIVEN: The Dubuque City Council will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the 2022 Asphalt Overlay Ramp Project 2 in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 4th day of April 2022, in the Historic Federal Building, 350 West 6th Street, 2nd Floor, Dubuque, Iowa. The scope of the Project is as follows: This project includes the replacement of twenty-eight (28) access ramps, two (2) intake replacements and curb and sidewalk repairs at 12 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: 1."Auburn Street at University Ave, one single ramp. 2. "Auburn Street alley between University Ave and Grace Street, two single ramps. 3."Grace Street at Griggs Street, two single ramps. 4."Grace Street at Ida Street, two single ramps. 5. "Grace Street at alley East of 1819 Grace Street, two single ramps. 6."Bennett Street at alley East of 1755 Bennett Street, two single ramps. 7. "Bennett Street at alley East of 1854 Bennett Street, two single ramps. 8."Bennett Street at Griggs Street, two single ramps. 9. "Bennett Street at McCormick Street, one single ramp. 10."Bennet Street at N. Algona Street, curb, and sidewalk replacement. 11. "Chaney Street at St. Anne Drive, two single and 2 double ramps. 12."Chaney Street at Hillcrest Road, two single and two double ramps. At the meeting, the City Council will receive oral and written comments from any resident or property owner of said City to the above action. The official agenda will be posted the Friday before the meeting and will contain public input options. The City Council agenda can be accessed at https://cityofdubuque.novusagenda.com/AgendaPublic/ or by contacting the City Clerk's Office at 563-589-4100, ctyclerk@cityofdubuque.org. Written comments regarding the above public hearings may be submitted to the City Clerk's Office via email at ctyclerk@cityofdubuque.org or by mail to City Clerk's Office, City Hall, 50 W. 13th St., Dubuque, IA 52001, before said time of public hearing. At said time and place of public hearings the City Council will receive any written comments. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk and may be viewed Monday through Friday between 8:00 a.m. and 5:00 P.M. Individuals with limited English proficiency, vision, hearing, or speech impairments requiring special assistance should contact the City Clerks Office at (563) 589-4100, ctyclerk@cityofdubuque.org as soon as feasible. Deaf or hard -of -hearing individuals can use Relay Iowa by dialing 711 or (800) 735-2942. Published by order of the City Council given on the 21st day of March 2022. Adrienne N. Breitfelder, City Clerk It 3/25