Loading...
2022 Asphalt Overlay Curb Ramp Project 3Copyrighted May 2, 2022 City of Dubuque Consent Items # 013. City Council Meeting ITEM TITLE: 2022 Asphalt Overlay Curb Ramp Project 3 SUMMARY: City Manager requesting that the award for the 2022 Asphalt Overlay Curb Ramp Project 3 be officially recorded in the minutes of the City Council. SUGGESTED Suggested Disposition: Receive and File; Make Matter of Record DISPOSITION: FIN ik[91:ILy,121zk ] Description Type Award Recording Memo 2022 Asphalt Overlay Ramp City Manager Memo Project Three-MVM Memo Staff Memo Staff Memo THE CITY DUOF B TEE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2022 Asphalt Overlay Curb Ramp Project 3 DATE: April 27, 2022 Dubuque All -America City IN 2007.2012.2013 2017*2019 City Engineer Gus Psihoyos is submitting the 2022 Asphalt Overlay Curb Ramp Project 3 which will provide for the replacement of twenty-six (26) access ramps at 7 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: Kane Street at N. Grandview Avenue, four double directional ramps. Kane Street at Andrew Court, two single directional ramps. Kane Street at Lobo Lane, two single directional ramps. Kane Street at Primrose Street, two single and two double directional ramps. Arbor Oaks Drive at Spring Valley Road, two single directional ramps. Arbor Oaks Drive at Oakview Court, two single and one double directional ramp. Arbor Oaks Drive at Arbor Oaks Court, two single non -directional ramps. Through the competitive quotation process for public improvements, this project was awarded on April 21, 2022, to BCD Contractors, LLC of Dubuque, Iowa, in the low bid amount of $135,196.05. In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the 2022 Asphalt Overlay Curb Ramp Project 3 be officially recorded in the minutes of the City Council. k�4 Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: April 22, 2022 RE: 2022 Asphalt Overlay Curb Ramp Project 3 Dubuque All•Merin City 2007-2012.2013 2017*2019 The 2022 Asphalt Overlay Curb Ramp Project 3 will provide for the replacement of twenty- six (26) access ramps at 7 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: Kane Street at N. Grandview Avenue, four double directional ramps. Kane Street at Andrew Court, two single directional ramps. Kane Street at Lobo Lane, two single directional ramps. Kane Street at Primrose Street, two single and two double directional ramps. Arbor Oaks Drive at Spring Valley Road, two single directional ramps. Arbor Oaks Drive at Oakview Court, two single and one double directional ramp. Arbor Oaks Drive at Arbor Oaks Court, two single non -directional ramps. The following is a summary of bids received for the 2022 Asphalt Overlay Curb Ramp Project 3: Contractor Base Bid BCD Contractors, LLC $135,196.05 Midwest Concrete $139,166.38 Tschiggfrie Excavating $150,408.60 S&S Builders $156,595.15 The engineer's estimate for the project is $126,406.05, this is 6.95% over the Engineer's estimate. Through the competitive quotation process for public improvements, this project was awarded on April 21, 2022, to BCD Contractors, LLC of Dubuque, Iowa, in the low bid amount of $135,196.05. The funding is as follows: CIP No. Fund Description Fund Amount 3001227 Curb Ramp Program $ 135,196.05 In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the 2022 Asphalt Overlay Curb Ramp Project 3 be officially recorded in the minutes of the City Council. Prepared By: Kerry Bradley, Eng. Dept. cc: Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech 2