2022 Asphalt Overlay Curb Ramp Project 4 Copyrighted
June 6, 2022
City of Dubuque Consent Items # 013.
City Council Meeting
ITEM TITLE: 2022 Asphalt Overlay Curb Ramp Project 4
SUMMARY: City Manager recommending the award for the 2022 Asphalt Overlay
Curb Ramp Project 4 be officially recorded in the minutes of the City
Council.
SUGGESTED Suggested Disposition: Receive and File; Make Matter of Record
DISPOSITION:
ATTACHMENTS:
Description Type
Award Recording Memo 2022 Asphalt Overlay Ramp City Manager Memo
Project Four-MVM Memo
Staff Memo Staff Memo
Dubuque
THE CITY OF htbd
All-America City
DUB E ' IV
3
Masterpiece on the Mississippi 201•7*20 9
� pp zoi7*zoig
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: 2022 Asphalt Overlay Curb Ramp Project 4
DATE: June 1 , 2022
City Engineer Gus Psihoyos is submitting information for the 2022 Asphalt Overlay Curb
Ramp Project 4 and the award be officially recorded in the minutes of the City Council.
The 2022 Asphalt Overlay Curb Ramp Project 4 will provide for the replacement of sixteen
(16) access ramps and two storm drain intakes and curb repairs at six intersections in
conjunction with the Public Works Asphalt Overlay program at the following locations:
Locust Street at W 4th Street, four radius ramps and two storm drain intakes
Locust Street at W 5th Street, four radius ramps
Bluff Street at W 4th Street, four radius ramps
Bluff Street at W 3rd Street, one double directional ramp
Bluff Street at Pedestrian Crossing near 208 Bluff Street, one single directional
ramp
Bluff Street at Emmett Street, one single directional ramp
The engineer's estimate for the project is $127,638.05, this is 1.10% under the Engineer's
estimate. Through the competitive quotation process for public improvements, this project
was awarded on May 12, 2022, to D&D Concrete, Inc. of Dubuque, Iowa, in the low bid
amount of $126,234.14.
��' 4Prfrzt/t1/4"-,,
Micha I C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Dubuque
THE CITY OF brittgl
All mrI a Mly
DUB E ,I,ONALC711,-r:�
' 111I►
3
Masterpiece on the Mississippi 2017*20 9
p pp zoi�*zoi�
TO: Michael C. Van Milligen, City Manager
FROM: Gus Psihoyos, City Engineer
DATE: May 23, 2022
RE: 2022 Asphalt Overlay Curb Ramp Project 4
The 2022 Asphalt Overlay Curb Ramp Project 4 will provide for the replacement of sixteen
(16) access ramps and two storm drain intakes and curb repairs at six intersections in
conjunction with the Public Works Asphalt Overlay program at the following locations:
Locust Street at W 4th Street, four radius ramps and two storm drain intakes
Locust Street at W 5th Street, four radius ramps
Bluff Street at W 4th Street, four radius ramps
Bluff Street at W 3rd Street, one double directional ramp
Bluff Street at Pedestrian Crossing near 208 Bluff Street, one single directional ramp
Bluff Street at Emmett Street, one single directional ramp
The following is a summary of bids received for the 2022 Asphalt Overlay Curb Ramp
Project 4:
Contractor Base Bid
D&D Concrete, Inc. $126,234.14
Midwest Concrete $138,986.42
BCD Contractors, LLC $152,544.05
The engineer's estimate for the project is $127,638.05, this is 1.10% under the Engineer's
estimate. Through the competitive quotation process for public improvements, this project
was awarded on May 12, 2022, to D&D Concrete, Inc. of Dubuque, Iowa, in the low bid
amount of $126,234.14.
The funding is as follows:
CIP No. Fund Description Fund
Amount
3001227 Curb Ramp Program $ 126,234.14
In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it
is necessary that the award for the 2022 Asphalt Overlay Curb Ramp Project 4 be officially
recorded in the minutes of the City Council.
Prepared By: Kerry Bradley, Eng. Dept.
cc: Jon Dienst, Civil Engineer II
Luke Steger, Engineering Tech
2