2021 Asphalt Overlay Access Ramp Project 4 Copyrighted June 6, 2022 City of Dubuque Consent Items # 014. City Council Meeting ITEM TITLE: 2021 Asphalt Overlay Access Ramp Project 4 SUMMARY: City Manager recommending City Council adopt a resolution accepting the improvements and authorize the final payment of the contract amount of $168,958.94 to Tschiggfrie Excavating, for the 2021 Asphalt Overlay Access Ramp Project 4. RESOLUTION Accepting the 2021 Asphalt Overlay Access Ramp Project 4 and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Acceptance 2021 Asphalt Overlay Access Ramp City Manager Memo Project 4-MVM Memo Staff Memo Staff Memo Resolution Resolutions Dubuque THE CITY OF Marin;fly DUB E , IIII. 3 Masterpiece on the Mississippi 2017*20 9 YP pp zai�*�oi� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2021 Asphalt Overlay Access Ramp Project 4 (CIP 3001227) DATE: June 1 , 2022 City Engineer Gus Psihoyos is recommending City Council adopt a resolution accepting the improvements and authorize the final payment of the contract amount of $168,958.94 to Tschiggfrie Excavating, for the 2021 Asphalt Overlay Access Ramp Project 4. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF Wand AIE•America City DUB E ' I I®► 2007*2012.2013 Masterpiece on the Mississippi 2017*2019 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2021 Asphalt Overlay Access Ramp Project 4 (CIP 3001227) DATE: May 31, 2022 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2021 Asphalt Overlay Access Ramp Project 4. BACKGROUND The project replaced thirty-three (33) non-compliant curb access ramps and seven (7) storm water intakes at eight (8) intersections in compliance with the Public Right of Way Accessibilities Guidelines (PROWAG) specifications. This project was extended into Spring of 2022 because it got too late in Fall of 2021 to get proper cure time for concrete and the asphalt plant closing for season. The curb access ramp work was completed in coordination with the Public Works Departments Asphalt Overlay Program at the following locations: 1. Jackson Street at E 12th Street, two radius ramps. 2. Jackson Street at E 14th Street, four radius ramps. 3. Jackson Street at E 15th Street, three radius ramps and two storm intakes. 4. Jackson Street at E 16th Street, three double ramps. 5. Jackson Street at E 18th Street, four radius ramps and two storm intakes. 6. Jackson Street at E 19th Street, four radius ramps and two storm intakes. 7. Jackson Street at E 20th Street, one single and three radius ramps. 8. Jackson Street at E 21st Street, two single, two double ramps and one storm intake. DISCUSSION The 2021 Asphalt Overlay Access Ramp Project 4 was completed by Tschiggfrie Excavating, of Dubuque, IA in the final contract amount of $168,958.94. This is a 5.96% increase over the original contract amount of $159,452.10. The increase was due to factors including the following: • Additional curb repairs at various locations because poor existing rock curb. • Additional work added at North intersections of 20th St and Jackson to clean up unnecessary tall curb and concrete islands reducing future maintenance. • Street and curb repairs due to a Hydrant replacement from the water department at SW corner Jackson and E 20th St. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the final contract amount of $168,958.94 to Tschiggfrie Excavating for the 2021 Asphalt Overlay Access Ramp Project 4. BUDGET IMPACT The summary of project costs for the 2021 Asphalt Overlay Access Ramp Project 4 is as follows: Description Estimate Award Final Construction Contract $ 162,561.40 $159,452.10 $ 168,958.94 Contingency $16,256.14 $15,945.21 0.00 Construction Administration & Inspection $17,881.75 $17,539.73 $16,895.89 Total Construction Cost $ 196,969.29 $192,937.04 $185,854.83 The project funding is summarized below: CIP No. Fund Description Fund Amount 3001227 Curb Ramp Program $ 185,854.83 Total Project Funding $ 185,854.83 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $168,958.94 to Tschiggfrie Excavating, for the 2021 Asphalt Overlay Access Ramp Project 4. cc: John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Paul Davis, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II 2 Prepared by:Jon Dienst,City of Dubuque Engineering,50 W. 13th Street, Dubuque, IA 52001 (563)589-4270 Return to:Adreinne N.Breitbelder,City Clerk,50W 13th Street,Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 213-22 ACCEPTING THE 2021 ASPHALT OVERLAY ACCESS RAMP PROJECT 4 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2021 Asphalt Overlay Access Ramp Project 4 (the Project) has been completed by the Contractor, Tschiggfrie Excavating, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $168,958.94; and WHEREAS, the Contractor has previously been paid $160,510.99, leaving a balance of$8,447.95; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of$8,447.95 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 6th day of June 2022. . ,,,,,,..,\,,Q (---?_„.„,,,y, David T. Resnick, Mayor Pro Tern Attest: Trish L. Gleason, Assistant City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF 2021 ASPHALT OVERLAY ACCESS RAMP PROJECT 4 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2021 Asphalt Overlay Access Ramp Project 4 has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $185,854.83. Dated this 31st day of May 2022. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 31st day of May 2022. Adrienne N. Breitfelder, City Clerk