Signed Agreement with Interstate Power and Light Company Copyrighted
June 6, 2022
City of Dubuque Consent Items # 017.
City Council Meeting
ITEM TITLE: Signed Contract(s)
SUMMARY: Electric Service Agreement with Interstate Power and Light Company.
SUGGESTED Suggested Disposition: Receive and File
DISPOSITION:
ATTACHMENTS:
Description Type
Agreement with Interstate Power and Light Company Supporting Documentation
ELECTRIC SERVICE AGREEMENT
INTERSTATE POWER AND LIGHT
COMPANY
Account No.8509190000
This agreement made this 30th day of April, 2022 by and between Interstate Power and Light
Company (a wholly owned subsidiary of Alliant Energy Corporation), an Iowa corporation
headquartered at 200 First Street SE, Cedar Rapids, Iowa, (hereinafter referred to as the
"Company") and City of Dubuque, a corporation/partnership/proprietorship with principal offices
at 50 W 13th St, Dubuque, IA, 52001, (hereinafter referred to as the "Customer"):
That for and in consideration of the mutual covenants of the parties set forth, and the performance
thereof, it is agreed by and between the said parties as follows:
THE COMPANY HEREBY AGREES THAT:
1. It will furnish to the Customer at the Customer's premises located at 1902 Hawthorne St in
Dubuque, Iowa, through one point of delivery, alternating current electricity (hereinafter called
"electric service") for all electrical energy requirements of the Customer.
2. The electric service furnished hereunder will be approximately 13,800 volts, and 3 phase, 60
Hertz, and 7,970 volts, single phase, 60 Hertz, and metered at 13,800 volts.
THE CUSTOMER HEREBY AGREES THAT:
3. It will take from the Company, through one point of delivery, electric service for all electrical
energy requirements at the premises identified in Paragraph 1 hereof, and it will observe the
rules and regulations of the Company pertaining to electric service.
4. It will not create a demand for electric service in excess of 2,500 KVA without first notifying the
Company in writing of such increase in demand and giving the Company sufficient time in which
to provide additional line capacity and other electrical equipment if required.
5. It chooses / does not choose (circle one) Interruptible Service. If the Customer chooses
Interruptible Service, it will curtail its demand for electrical service pursuant to Attachment A to
this agreement.
IT IS MUTUALLY UNDERSTOOD AND AGREED BY AND BETWEEN THE PARTIES HERETO
AS FOLLOWS THAT:
6. The Company shall furnish electric service and the Customer shall use and pay for such service
in accordance with the terms and conditions of this Agreement and the rates set out in Rate
Schedule 487 attached hereto and made a part hereof, or such other applicable rate schedule
as hereafter at any time may be established for this class of service within the authority of the
Iowa Utilities Board or such other regulatory authority having jurisdiction. Notwithstanding any
other provision of this Agreement, all rates and charges contained in this Agreement may be
modified at any time by a subsequent filing made pursuant to the provisions of Chapter 476 of
the Code of Iowa. At the time of signing of this Agreement, the excess facilities is $0; in the
ECRM159301 Rev.4 05/20 Page 1
event the demand of the Customer set forth in Paragraph 4 above shall be increased, the
monthly excess facilities shall be increased appropriately.
7. It is understood by the Customer that, if at any future time it should elect to accept service under
some other available electric service rate that might prove more advantageous, any expense
brought about by necessary wiring changes on its premises shall be borne by the Customer.
8. The electric service furnished under this Agreement includes only that which is incidental to the
Customer and no part of the said electric service shall be sold by the Customer to any other
parties.
9. The Company will use due diligence in the operation and maintenance of its plants and system
pertinent to this Agreement so as to render efficient economic service, but the Company shall
not be liable to the Customer for any loss or damages suffered by the Customer through the
inability of the Company to furnish said electric service in accordance with this Agreement.
10. The Customer shall hold the Company harmless for any damage to persons or property arising
out of the use upon the Customer's premises of the electric service furnished to it by the
Company. Nothing herein contained shall be construed as relieving the Company from any
liability to its own employees while upon the property of the Customer in the performance of
their duty and by the direction of the Company, or as relieving the Company from any liability to
the Customer due to the Company's act of negligence.
11. This Agreement shall continue for a period of (a) one (1) year, commencing NA, 20NA, and
ending NA, 20NA, and thereafter, or(b)three (3)years in the case in which Customer chooses
Interruptible Service under paragraph 5, commencing April 30th, 2022, and ending May 1st,
2025, and may be terminated by either party giving to the other written notice at least ninety
(90) days prior to the date upon which it desires to terminate the same; whereupon this
Agreement shall terminate on said date.All contracts, agreements and understandings between
the parties hereto, whether oral or written, pertaining to the subject matter hereof, heretofore
made and entered into, shall hereby become null and void and of no further force and effect
whatsoever.
12. This Agreement shall be binding upon and inure to the benefits of the parties hereto, their
successors and assigns; but the assignment of this Agreement by either party shall not relieve
such party, without the written consent of the other, from any of the obligations hereof.
IN WITNESS WHEREOF, the parties hereto have caused these presents to be executed as of the
day and year first above written.
City of Dubuque Interstate Power and Light Company
(Custom (Company)
By: Aim` 7144te%.., By:
Title: City Manager Title:
(Officer-Partner-Owner)
Attest: Attest:
ATTACHMENT A:
ECRM159301 Rev.4 05/20 Page 2
CONTRACT FIRM DEMAND LEVEL
This Attachment is made this 30th day of April 2022 by and between City of Dubuque
(hereinafter"Customer") and INTERSTATE POWER AND LIGHT COMPANY (an Alliant
Energy company), an Iowa corporation, having its principal offices at 200 First St. SE,
Cedar Rapids, Iowa 52401 (hereinafter "Company"),
WHEREAS Company and Customer have entered into Electric Service Agreement
Number 56169 dated the 30th day of April , 2022 under which Customer takes electric
Interruptible Service Option, Rider INTSERV tariff;
WHEREAS the parties have reached an understanding based upon Company's
Interruptible Service Option tariff;
NOW THEREFORE, in consideration of the mutual covenants, terms and conditions
set forth, the parties hereto mutually covenant and agree to the followings:
The Firm Contract demand level to which the Customer will curtail its electrical service
in the 36 consecutive revenue months beginning
the 1st day of May 2022 is 50 kW for:
Premise address 1902 Hawthorne St, Dubuque, IA 52001,
Account number 8509190000.
In all other respects the Electric Service Agreement shall remain unchanged.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be
executed as of the day and year first above written.
Customer: Interstate Power and Light Company:
By .CR/'J i wH/ � By
Title City Manager Title
(Officer-Partner-Owner)
Attest: Attest:
ECRM159301 Rev.4 05/20 Page 3
Alliant INTERSTATE POWER AND LIGHT BILLING AUTHORIZATION
Energy.
Page 1ot2
N. Aaa,ea
City of Dubuque Eagle Point Water Plant 1902 Hawthorne St
c s, to
Dubuque Iowa 52001
E, Da A.,aaa,No
04/30/22 8509190000
Rata Caaa
487 090878281 & 09878279
e 13,800 �sla,i. Pha,. 73Ph...
ESTIMATE PROVISIONS FINAL INSTALLED COST
P.aaa.aa D..a,a a
Me a,Ea p actta laataiia (.a, team .,,a a a,) M.,a,Eaaipc.a,laateli.a
Ta1.i Ea�m.t, at leatailetia, A,„ai Caat at la.�ailet�aa
1.60% E.a..a Faailiti.,Cna,,. 1.60%
Eat.Maas 1,E.aa.a Faa,i,a�.a Cpa,,. Maarti,E.a..a Faa�in�..Cpa,,.
Not.: Fine) ,material Inv..story and electric service(mmelima)diadraam(s) must be attached.
Eaceat,: Ca.tam.,Siaa,ta,a Tl,la D.i.
la, el.a Ca at. Caatam a,Saaat,,. T Data
ADJUSTMENTS TO EXISTING PRIMARY SERVICE INSTALLATION
Dana of O,la�aat I,,taila��,a IO.,o�aat E.,.., Faa�i���e, Cha,aa
D.1, , Ratr,am act at O,a as Ea,ipm (t aao„aap,.) R.aa,tiaaa
Ea,pa,atR.m,,,a Ca., TaaiCa. . R.ma..a
E.a..a Faaiini., 1.60%
R.aa,t as to Cpae,.
Aaanaa.
Data at Ea , eat Aaa t aaa(at eafl N,ala, a pp a,,.) Tarar Ca.t. at Eaarpn aet A,,., _
C. E.a..aFaait.a 1.60%
A,,dlaa Ch.a,.
O,,raai— ,.a,at,aa is ahe,,.+adartraa to anae,.
C,ata a.,Sie T la Data
ATTACH: DETAIL ITEMIZATION TO SUPPORT EXCESS FACILITY CHARGE(INCLUDE NUBIES REPORTS).
All accounts with percentage adjustments must have a completed electric service(amelise)diaeranm(s).
Meter
T,anatatmet iv iv
Pala, of Deirvear POD 10
If palmearn,tarea;snow ali,aita,a ,enata,nar nai,anst,,na, pvne,,flip (attach ,editlanaianeatsitnaaaaa).
IPLC,a aaa.Rea,eaeatetl,e Saae ,,. IPLCaa aea,Raa,eaeatetl,e N,m. (a„,teal D:, ,.
Jacob Semann 04/30/22
ROUTING: Bdart,,, Raaa,aaa Canta,,Caaa, Rapiaa GOBtfl F1,a,,p,ainaaa,antar@,manta,,„r.aae,866—ALLIANT
ECRM159957 REV.5 01/17
Page 2or2
Nam Aaaraaa
City of Dubuque Eagle Point Water Plant 1902 Hawthorne St
cre stet. za ca
Dubuque Iowa 52001
Erred a Da Aeseaai No
04/30/22 8509190000
EXCESS FACILITIES BILLING ADJUSTMENTS -
BIIIim� Sa en en a rya Add/ Rere eve
Charge Charge IA& MN B.II Priet Acts zl
Type Descriptiom Pros/is/cam Desc Qr. Ca.s.. Dere Q.__,. Cc sr-.
2 E. F. -
0.016 Transrorm er
Traasrorm er (TRFM)
3 Ex Fa c -Pole a 0.016 Po (POLE)
4 Ex Fa 0.016 Conaactor
Co e e oto r (CONDTR)
Ex Fa c -
5 0.016 Meter (METR)
Metering
6 Ex Fao —P p e 0.016 P,p a (PIPE)
Ex Fa
7 45 each 3Ph
3Ph a a e a s a (3PH)
8 EgoF,ment 0.016 E,cip (EQUIP)
Mont/sly Excess Facility, Biiuim, TOTAL $
BILLING PROVISIONS
IAAmaaames Omly MN A4aaames Omly
❑-2%Meter eat st Poirt or Deueerr (prim art m alorieg/seaoraorr Collage aar0arv) nPrtm rr m otoring alsaoaec
17+2%Mazer eat at Point or Delaery (s e ea eaary m eterleSprint cry voltage delivery) nTr.aamiaaioa service eieaoant
1-14.42%Prim are via s a a.oart(4,160 to 15V) Pr m err care as a decant
1-77.5%Primary oereiae discount(34.5and above)
*nlnrerrapubie eaaoanr 50 nCartemer Owned Sr eta e
*nTotai Moethir axaaaa raa�ruas abarge $ 9.39 nAmant Erorgv Ow lied System
*FIT.— dem and is 1000KW or greater Avvras to agn�v•beyond m eter�ng vo�nt.
*nPrim err m er.r.a Cocoonr
* Service Agaaam meeaaea iF LGS Cwm0etrn .
Cvstam.rS�aas��ro Tel. D��-City Manager 04/27/2022
IPLCam asaC Rao,.s.e�e���.S,a�s�are IPLCam a .Raa,asa�„���. Nem a (ar�eraal Dare
Jacob Semann Jacob Semann 04/30/22
ROUTING: B.ainoaa Roaearca Cantor,Cadar Rapid G08th Floor,be sin aaaaentor@airaetaeargr.eam,866-ALLIANT
ECRM159957 REV.5 01/17