Acceptance 2022 Stump Sidewalks Project ThreeCopyrighted June 20, 2022 City of Dubuque Consent Items # 031. City Council Meeting ITEM TITLE: Acceptance 2022 Stump Sidewalks Project Three SUMMARY: City Manager recommending acceptance of the construction contract for the 2022 Stumps/Sidewalks Project Three. RESOLUTION Accepting the 2022 Stumps / Sidewalks Project Three and Authorizing the Payment to the Contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Acceptance 2022 Stump Sidewalks Project Three- City Manager Memo MVM Memo Staff Memo Resolution Staff Memo Resolutions Engineer's Certificate of Completion Supporting Documentation THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2022 Stumps / Sidewalks Project Three C I P 1022830, 3002849 DATE: June 15, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council acceptance of the construction contract for the 2022 Stumps/Sidewalks Project Three in the amount of $144,470.69. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2022 Stumps / Sidewalks Project Three CIP 1022830, 3002849 DATE: June 10, 2022 Dubuque All -America City 2007.2012.2013 2017*2019 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2022 Stumps / Sidewalks Project Three. BACKGROUND The project was coordinated between the Engineering and Parks departments for the purpose of removing stumps in the city parkway and replacing abutting sidewalk and curb where necessary throughout the city. As a result, 102 tree stumps ranging from 12 inches in diameter to more than 90 inches (includes large leader roots) in diameter were removed. There were 85 locations that had sidewalk replacement associated with them ranging from approximately 32 to 192 square feet, and 10 of those locations had curb repairs ranging from 2 to 25 feet associated with them. DISCUSSION The 2022 Stumps / Sidewalks Project Three was completed by Quality Concrete, of Dubuque, IA in the final contract amount of $144,470.69. This is an 0.21 % increase over the original contract amount of $144,172.19. The slight increase was due to the addition of a stump removal and sidewalk repair. BUDGETIMPACT The summary of project costs for the 2022 Stumps / Sidewalks Project Three is as follows: Description Estimate Award Final Construction Contract $ 159,732.40 $144,172.19 $ 144,470.69 Contingency $15,973.24 $14,417.22 0.00 Construction Administration & Inspection $17,570.56 $15,858.94 $14,447.07 Total Construction Cost $ 193,276.20 $174,448.35 1 $158,917.76 The project funding is summarized below: CIP No. Fund Description Fund Amount 1022830 Stump Removal $ 72,168.25 3002849 Pavement Rehabilitation Concrete $ 86,749.51 Street Total Project Funding $ 158,917.76 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $144,470.69 to Quality Concrete, for the 2022 Stumps / Sidewalks Project Three. cc: Jon Dienst, Civil Engineer II Luke Steger, Engineering Tech Stephen Fehsal, Park Division Manager Tom Kramer, Urban Forester Prepared by: Jon Dienst. City of Dubuque Engineering 50 W. 13" Street Dubuque IA 52001 (563)589-4270 Return to: Adrienne N. Breitfelder, City Clerk, 50 W 131" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 232-22 ACCEPTING THE 2022 STUMPS / SIDEWALKS PROJECT THREE AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2022 Stumps / Sidewalks Project THREE, (the Project) has been completed by the Contractor, Quality Concrete, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $144,470.69; and WHEREAS, the Contractor has previously been paid $137,247.15, leaving a balance of $7,223.54; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $7,223.54 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 20th day of June 2022. rad M. C—a nagh, Mayor Attest: Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2022 STUMPS / SIDEWALKS PROJECT THREE The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2022 Stumps / Sidewalks Project Three has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $158,917.76. Dated this 10th day of June 2022. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 10th day of June 2022. .<7/�?AViT n C� • / — a G j Adrienne N. Breitfelder, City Clerk