2022 Asphalt Overlay Access Ramp Project 1City of Dubuque City Council Meeting Consent Items # 08. Copyrighted July 5, 2022 ITEM TITLE: 2022 Asphalt Overlay Access Ramp Project 1 SUMMARY: City Manager recommending City Council approve a resolution accepting the improvements and authorize the final payment of the contract amount of $136,038.52 to Tschiggfrie Excavating, for the 2022 Asphalt Overlay Access Ramp Project 1. RESOLUTION Accepting the 2022 Asphalt Overlay Access Ramp Project 1 and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type 2022 Asphalt Overlay Access Ramp Project 1-MVM City Manager Memo Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Supporting Documentation THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2022 Asphalt Overlay Access Ramp Project 1 (CIP 3001227) DATE: June 29, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council approve a resolution accepting the improvements and authorize the final payment of the contract amount of $136,038.52 to Tschiggfrie Excavating, for the 2022 Asphalt Overlay Access Ramp Project 1. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE C DUj!B9kFE AII•Amarica City ; , Ij�l@ Masterpiece on the Mississippi 2017*2019 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2022 Asphalt Overlay Access Ramp Project 1 (CIP 3001227) DATE: June 24, 2022 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2022 Asphalt Overlay Access Ramp Project 1. BACKGROUND The project replaced thirty-two (32) non -compliant curb access ramps at eight (11) intersections in compliance with the Public Right of Way Accessibilities Guidelines (PROWAG) specifications, in coordination with the Public Works Departments Asphalt Overlay Program at the following locations: 1. Hillcrest Road at Grant Street, one single and one double ramps. 2. Hillcrest Road at Ellen Street, two single ramps. 3. Hillcrest Road at Woodrow Drive, two single ramps. 4. Keymeer Drive at Woodrow Drive, two single and one double ramps. 5. Keymeer Drive at Saint John Drive, two single ramps. 6. Hillcrest Road at Saint John Drive, one single and one double ramps. 7. Hillcrest Road at Key Largo Drive, two single ramps. 8. Keymeer Drive at Key Largo Drive, two single ramps. 9. Keymeer Drive at Keyway Drive, two single ramps. 10. Hillcrest Road at Keyway Drive, three double ramps. 11. Hillcrest Road at John F Kennedy Road, two double ramps. DISCUSSION The 2022 Asphalt Overlay Access Ramp Project 1 was completed by Tschiggfrie Excavating, of Dubuque, IA in the final contract amount of $136,038.52. This is a 0.39% increase over the original contract amount of $135,509.00. The minor increase was due to factors including the following: 0 Additional curb repairs at various locations needed for drainage purposes. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the final contract amount of $136,038.52 to Tschiggfrie Excavating for the 2022 Asphalt Overlay Access Ramp Project 1. BUDGETIMPACT The summary of project costs for the 2022 Asphalt Overlay Access Ramp Project 1 is as follows: Description Estimate Award Final Construction Contract $ 127,412.80 $135,509.00 $ 136,038.52 Contingency $12,741.28 $13,550.90 0.00 Construction Administration & Inspection $14,015.41 $14,905.99 $13,603.85 Total Construction Cost $ 154,169.49 $163,965.89 $149,642.37 The project funding is summarized below: CIP No. Fund Description Fund Amount 3001227 Curb Ramp Program $ 149,642.37 Total Project Funding $ 149,642.37 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $136,038.52 to Tschiggfrie Excavating, for the 2022 Asphalt Overlay Access Ramp Project 1. CC' John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Paul Davis, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II Prepared by: Jon Dienst. City of Dubuque Engineering 50 W. 13" Street Dubuque IA 52001 (563)589-4270 Return to: Adrienne N. Breitfelder, City Clerk, 50W 13" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 241-22 ACCEPTING THE 2022 ASPHALT OVERLAY ACCESS RAMP PROJECT 1 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2022 Asphalt Overlay Access Ramp Project 1 (the Project) has been completed by the Contractor, Tschiggfrie Excavating, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $136,038.52; and WHEREAS, the Contractor has previously been paid $129,236.59, leaving a balance of $6,801.93; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $6,801.93 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 5th day of July 2022. Brad M. Qg�Oagh, Mayor Attest: Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2022 ASPHALT OVERLAY RAMP PROJECT ONE The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2022 Asphalt Overlay Ramp Project One has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $149,642.37. Dated this 24th day of June 2022. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 24th day of June 2022. Adrienne N. Breitfelder, City Clerk