Loading...
2022 Asphalt Overlay Access Ramp Project 2 Copyrighted August 1, 2022 City of Dubuque Consent Items # 016. City Council Meeting ITEM TITLE: 2022 Asphalt OverlayAccess Ramp Project 2 SUM MARY: City Manager recommending City Council adoption of the resolution accepting the improvements and authorize the final payment of the contract amount of$180,169.65 to BCD Contractors LLC, for the 2022 Asphalt Overlay Access Ramp Project 2. RESOLUTION Accepting the 2022 Asphalt OverlayAccess Ramp Project 2 and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File;Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Acceptance 2022 Asphalt Overlay Ramp Project Two- City Manager Memo MVM Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Supporting Documentation Dubuque THE CITY QF � All-Meriea Ciry DLT B E ; . � . � �� � � MaSt� Z�C� aYd t�Q Mt55ZSSZ Z zoa�•zoiz•�ai3 YP pp za��*zai� TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2022 Asphalt Overlay Access Ramp Project 2 (CIP 3001227-2) DATE: July 27, 2022 City Engineer Gus Psihoyos is recommending City Council adopt the resolution accepting the improvements and authorize the final payment of the contract amount of $180,169.65 to BCD Contractors LLC, for the 2022 Asphalt Overlay Access Ramp Project 2. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Dubuque THE CITY OF � All•America Cip� D B E � , �,:..�. U '�I I ► � � Masterpiece on the Mississippi 2oi�*2oi� TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2022 Asphalt Overlay Access Ramp Project 2 (CIP 3001227-2) DATE: July 26, 2022 INTRODUCTION The enclosed resolution provides for the acceptance of the construction contract for the 2022 Asphalt Overlay Access Ramp Project 2. BACKGROUND Replacement of twenty-eight (28) access ramps, two (2) intake replacements and curb / sidewalk repairs at 11 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Auburn Street at University Ave, one single ramp. 2. Auburn Street alley between University Ave and Grace Street, two single ramps. 3. Grace Street at Griggs Street, two single ramps. 4. Grace Street at Ida Street, two single ramps. 5. Grace Street at alley East of 1819 Grace Street, two single ramps. 6. Bennett Street at alley East of 1755 Bennett Street, two single ramps. 7. Bennett Street at alley East of 1854 Bennett Street, two single ramps. 8. Bennett Street at Griggs Street, two single ramps. 9. Bennett Street at McCormick Street, one single ramp. 10. Bennet Street at N. Algona Street, curb, and sidewalk replacement. 11. Chaney Street at St. Anne Drive, two single and 2 double ramps. 12. Chaney Street at Hillcrest Road, two single and two double ramps. DISCUSSION The 2022 Asphalt Overlay Access Ramp Project 2 was completed by BCD Contractors LLC, of Dubuque, IA in the final contract amount of $180,169.65. This is a 4.64% increase over the original contract amount of $172,172.35. The increase was due to factors including the following: • Additional curb repairs on Auburn Street to replace rock curb in deteriorating condition. • Installation of beam curb retaining walls to hold back yards and landscaping because of lowered sidewalk grades RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the final contract amount of $180,169.65 to BCD Contractors LLC for the 2022 Asphalt Overlay Access Ramp Project 2. BUDGET IMPACT The summary of project costs for the 2022 Asphalt Overlay Access Ramp Project 2 is as follows: Description Estimate Award Final Construction Contract $ 177,750.40 $172,172.35 $ 180,169.65 Contingency $17,775.04 $17,217.24 0.00 Construction Administration & Inspection $19,552.54 $18,938.96 $18,016.97 Total Construction Cost $ 215,077.98 $208,328.55 $198,186.62 The project funding is summarized below: CIP No. Fund Description Fund Amount 3001227 Curb Ramp Program $ 198,186.62 Total Project Funding $ 198,186.62 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $180,169.65 to BCD Contractors LLC, for the 2022 Asphalt Overlay Access Ramp Project 2. cc: John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Paul Davis, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II 2 Prepared by: Jon Dienst,City of Dubuque Engineering, 50 W. 13th Street, Dubuque, IA 52001 (563)589-4270 Return to:Adrienne N. Breitfelder,City Clerk, 50W 13th Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 262-22 ACCEPTING THE 2022 ASPHALT OVERLAY ACCESS RAMP PROJECT 2 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2022 Asphalt Overlay Access Ramp Project 2 (the Project) has been completed by the Contractor, BCD Contractors LLC, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $180,169.65; and WHEREAS, the Contractor has previously been paid $171,161.17, leaving a balance of$9,008.48; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $9,008.48 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 1st day of August 2022. Brad M avanagh, Mayor Attest: ----___ _2aGt> Trish L. Gleason, Assistant City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE 2022 ASPHALT OVERLAY RAMP PROJECT TWO The undersigned City Engineer of the City of Dubuque, lowa, hereby certifies that he has inspected the 2022 Asphalt Overlay Ramp Project Two has been perFormed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $198,186.62. Dated this 27th day of July 2022. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 27t" day of July 2022. r� � � � �.7 . > , ./ �. . . '.�, , •,' . �. Adrienne N. Breitfelder, City Clerk