Bee Branch Watershed Flood Mitigation ProjectCity of Dubuque
Special Meeting
Copyrighted
August 8, 2022
Work Session - Bottom # 02.
ITEM TITLE: Bee Branch Watershed Flood Mitigation Project
SUMMARY: Civil Engineer I I Deron Muehring will present on the Bee Branch
Watershed Next Steps.
SUGGESTED
DISPOSITION:
ATTACHMENTS:
Description Type
Bee Branch Watershed-MVM Memo City Manager Memo
Presentation —Uploaded 8.8.22 Supporting Documentation
THE C
DUjIBQTE
Masterpiece on the Mississippi
TO: The Honorable Mayor and City Council Members
FROM: Michael C. Van Milligen, City Manager
SUBJECT: Bee Branch Watershed Next Steps - Work Session Request
DATE: July 27, 2022
Dubuque
WAWca 914
ii
2007-2012.2013
2017*2019
Civil Engineer II Deron Muehring is submitting the presentation for the work session on
Bee Branch Watershed Next Steps to be held on Monday, August 8, 2022.
Mic ael C. Van Milligen
MCVM:sv
Attachment
cc: Crenna Brumwell, City Attorney
Cori Burbach, Assistant City Manager
Gus Psihoyos, City Engineer
Deron Muehring, Civil Engineer II
8/8/2022
1
Bee Branch
Waterr,hpd Area:
6.5 square miles
2
50% Dubuque citizens
live or work within the
tree tsranch Watersnea
8/8/2022
Bee Branch Watershed Hydrology
St
IS
i,
r'm
WATERSHED
f
1 i ,I
5
1 Miles j
1.
i
3
Bee Branch Watershed Hydrology
�a is 5t
(" 016.�
- - WATERSHED
r --
I
1 � yQQ
-0 025~ 05 1 —
Miles
4
2
8/8/2022
Bee Branch Watershed Hydrology
Elood
Video
WATERSHED
WATERSHED
8/8/2022
Bee Branch Watershed Hydrology
July 20, 2016: 12:05 PM
22"d Street (west of Central Ave) 22"d Street (east of Central Ave)
4
1.7 inches of rain in 90 minutes (Between a 2 and 5-year event)
C
Bee Branch Watershed Hydrology
July 20, 2016: 12:05 PM
22"d Street (west of Central Ave)
22"d Street (east of Central Ave)
1.7 inches of rain in 90 minutes (Between a 2 and 5-year event)
I
M
8/8/2022
Bee Branch Watershed Hydrology
12:05 PM
E
July 20, 2016
22nd Street (west of Central Ave)
Bee Branch Watershed Hydrology
12:05 PM
10
July 20, 2016
12:22 PM
22"d Street (west of Central Ave)
672
8/8/2022
Bee Branch Watershed Flooding
Presidential Disasters
Presidential Disaster
Declaration: May 21, 1999
Disaster #
1277
0'
Declaration Reason
Flooding, severe storms, tornadoes
Disaster #
1763
Cause of Damage
3 inches of rain in 1.5 hours
Declaration Reason
Flooding, severe storms, tornadoes
Cause of Damage
15.7 inches of rain in 2 months
Presidential Disaster
.- ��
Disaster #
1420
Presidential Disaster
Declaration:
Declaration Reason
Flooding and storms
Disaster #
1930
Cause of Damage
4.9 inches of rain in 24 hours
Declaration Reason
Flooding, severe storms, tornadoes
Cause of Damage
4.8 inches of rain in 12 hours
Presidential Disaster
Declaration: June 2, 00
Disaster #
1518
Presidential Disaster
Declaration:
Declaration Reason
Flooding, severe storms, tornadoes
Disaster #
4018
Cause of Damage
3.9 inches of rain in 48 hours
Declaration Reason
Flooding, severe storms, tornadoes
Cause of Damage
10.2 inches of rain in 12 hours
11
12
8/8/2022
�• ••• •
High Water Line 4„J ,
From 2004 to 2009 the assessed value of commercial
property in the flood prone area decreased by 6% while it
increased by 39% elsewhere in the city.
13
Bee Branch Watershed Flooding
"Residents irate over old storm
sewer.... A neighborhood
meeting to answer questions
about the May 16 flood turned
into a litany of accusations and
complaints."
Telegraph Herald — May 23, 1999
"We need something that will stop this thing
(from happening again)."
- Merlin Langkamp, W32nd Street resident
Telegraph Herald — May 23, 1999
14
VI
Drainage Basin
Master Plan Process
Master Plan
Input
• Selection
Criteria
• Rainfall
• Flooding
• Land Use
Damages
• Physical
Runoff
uno
• Roadway
Features
rate
Overtopping
• Geometry
Hydrology
• Runoff
• Water
Areas
• Violations
rate
surface
• Volume
elevations
Runoff
• Depths
• Flooding
Limits
Output
• Conveyance
• Storage
• Non-structural
--p.m
• Phasing/
Sequencing
• Capital
Improvements
Program
• Prioritization
• Funding
Drainage Basin Master Plan (2001)
8/8/2022
17
18
8/8/2022
Drainage Basin Master Plan (Amended 2013)
DUB E
h kgim M Ox ft—pp,
Ramie R�rannr—h—�Wntarshari
1 JU
.WPiea wl H. MiM'.?Rd
ation Project Plan
1L\ M �SJ��Iu�•
IIUR Inpi-in% Inf.
19
Bee Branch Watershed Flood Mitigation Project
The multi -phase project will:
❖Reduce the volume of stormwater, w •
...
❖Slow the rate and timing of stormwater flow through
the upper watershed, and
❖ Increase conveyance of stormwater through the flood -
prone area
20
10
8/8/2022
Bee Branch Watershed Flood Mitigation Project
Project Elements
The Bee Branch Watershed Flood - -
Mitigation Project will prevent an
estimated $582 million in damages
over the design life of the project.
21
BEE BRANCH WATERSHED FL0001 MITIGATION PROJECT
Improvement
Carter Road Detention Basin
West 32nd Street Detention Basin Q, � — ^ix — 0,43
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration watershed
Upper Bee Branch Creek Restoration L'FLOOD MITIGATION
Bee Branch Creek Railroad Culverts
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
22
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
11
8/8/2022
What's Next?
Carter Road Detention Basin
West 32nd Street Detention Basin
23
What's Next?
Carter Road Detention Basin
West 32nd Street Detention Basin
24
12
8/8/2022
What's Next?
Carter Road Detention Basin
West 32nd Street Detention Basin
r
�. S. t..
1yI �
25
1b
13
8/8/2022
BEE BRANCH WATERSHED FLOOD MITIGATION PROJECT
Improvement
Carter Road Detention Basin
West 32nd Street Detention Basin
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration -
Upper Bee Branch Creek Restoration oil 4
Bee Branch Creek Railroad Culverts
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
27
What's Next?
Upper Bee Branch Creek Restoration
pr
28
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
Lower Bee Branch Creek Restoration
14
8/8/2022
BEE BRANCH WATERSHED FLOO[1MITIGATION PROJECT
Improvement
Carter Road Detention Basin
West 32nd Street Detention Basin
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration watershed
Upper Bee Branch Creek Restoration
JEC
Bee Branch Creek Railroad Culverts
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
29
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
15
8/8/2022
Bee Branch Creek Railroad Culverts Proiect
31
Bee Branch Creek Railroad Culverts Pro'ect
a'
OO 1
watershed
L FLOOD MITIGATION
cc do
pY 1
32
16
8 8 2O22
Bee Branch Creek Railroad Culverts Proiect
1 2- _
-,'00 '00' ap_
, ®� ■ # �-� .'.0
■ . .0 . f
\:y.� \.
as
34
17
Qi,e Brahc6
Rendering
:r
watershed
FLOOD MITIGATION
i\ PROJECT
�
f »NU
• i!`
II
��il
fee Bra#.,
vskeRendering
v
watershed-------------
FLOOD MITIGATION
-
--'-
4
i■
_ „>F:.,>
;� 2021 Photo
8/8/2022
37
981
19
8/8/2022
BEE BRANCH WATERSHED FLOO[1MITIGATION PROJECT
Improvement
Carter Road Detention Basin
West 32nd Street Detention Basin
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration I
Upper Bee Branch Creek Restoration oil 4
Bee Branch Creek Railroad Culverts
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
39
all
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
/9M
U)
Phase I: Complete in 2018
i SSO, Phase II: Complete in 2020co
'
Ry
..; Phase I: Complete in 2018
Phase II: Complete in 2020
f
Phase III: Complete in 2020
�a
k St Nr� aS
I► a ace f���� %, � `° �► �2? � �.
OMM
8/8/2022
22nd St/Kaufmann Storm Sewer Capacity Improvements
Improvements Realized
July 20, 2016
1�� d
5
A1
�g
77
} IP ■l
1.7 inches of rain in 90 minutes
[Looking west up 22nd St/Kaufmann Ave from Central Ave]
43
22nd St/Kaufmann Storm Sewer Capacity Improvements
Improvements Realized
July 20, 2016 July 15, 2022
30
-144
r
1.7 inches of rain in 90 minutes
2.0 inches of rain in 90 minutes
(3.9 inches in 3 %2 hours)
[Looking west up 22nd St/Kaufmann Ave from Central Ave]
44
22
8/8/2022
PRIOR ACCOMPLISHMENTS
22nd St./Kaufmann Ave. Storm Sewer Improvements
$17.8 million in shovel ready
infrastructure improvements
45
BEE BRANCH WATERSHED FLOO11MITIGATION PROJECT
Improvement
Carter Road Detention Basin
West 32nd Street Detention Basin
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration watershed
Upper Bee Branch Creek Restoration
Bee Branch Creek Railroad Culverts
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
46
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
23
Phase I: Complete in 2018 Phase III: Complete in 2020
Phase II: Complete in 2020 Future Phases: Depends on Additional Funding
Clarke pr,
W. L ocus t
5t.
foc(nz)
k `R �G watershed
Q , tdN co •-----------• r
FLOOO MITIGATION
PROJECT
Phase I: Complete in 2018 Phase III: Complete in 2020
Phase II: Complete in 2020 Future Phases: Depends on Additional Funding
tiTrr�Yri']I,rW` 1 1 y Y •i fILrp�C;U:SfrStruarref�Iy ♦�
a d
1W
watershed
FLOOO MITIGATfON
PROJECT
Phase I: Complete in 2018 Phase III: Complete in 2020
Phase II: Complete in 2020 Future Phases: Depends on Additional Funding
Cj arkit j1 Fr j _
e Dr 4, y y ��
r
W. Locust 5t
a, 0 ,} `
�o ¢ 4,� :. k� � Cam+•-' '� h �,,
;0% n` N .
N 4 watershed-------------
r
E _ FLOOO MITIGATION
PROJECT
Phase I: Complete in 2018 Phase III: Complete in 2020
Phase II: Complete in 2020 Future Phases: Depends on Additional Funding
STIP:
.' "0 - ti
•• , ,(p# ••,` y,.qe.�.,� �'�i'
T
` Y
yi f�LrOCUS`fr5�truarr+ifsIy p�
a ,od,Sti Brags j
�,
co
:.
watershed
FLOOO MITIGATfON
PROJECT
8/8/2022
51
17th/W. Locust Street Storm Sewer Capacity Improvements
Improvements Not Yet Fully Realized
July 15, 2022
2.0 inches of rain in 90 minutes
(3.9 inches in 3 %2 hours)
52
26
8/8/2022
BEE BRANCH WATERSHED FLOO[1MITIGATION PROJECT
Improvement
Carter Road Detention Basin
West 32nd Street Detention Basin
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration watershed
-------------
Upper Bee Branch Creek Restoration FLOOD MITIGATIO
PROJECT
Bee Branch Creek Railroad Culverts L.
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
53
54
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
BEE BRANCH HEALTHY HOMES PROGRAM
• Healthy Homes $8,900,165
October 2016 —June 2022
307 Housing Units — Final Number Assisted
114 single-family units
23 duplexes (46 family units)
4 Quad-plex (16 family units)
3 Six-plex (18 family units)
3 Seven-plex (21 family units)
2 12-unit apartment complex (24 family units)
2 19-unit apartment complex (38 family units)
1 30-unit apartment complex (30 family units)
27
-,�gr 11
AFTER
BEE B 10 RANCH
ZV.
HEALTHY 0 S
H ME
BEE BRANCH
HOMES
New eletated water
heater & furnace
BRANCH
HEALTHY HOMES
New Electrical Service Panels
lug
Bra
watershed
------------
LOOD MITIGATION
PROIECr
8/8/2022
BEE BRANCH HEALTHY HOMES PROGRAM
❑ Healthy Homes $8,900,165
❑ October 2016 — June 2022
❑ 307 Housing Units — Final Number Assisted
(—$29,000 per unit)
• 657 applications requested (stopped advertising in September of 2021)
• 392 applications received
• 357 applications reviewed
• 315 applications approved (42 ineligible due to location or income)
• 35 applications have not been reviewed for eligibility
At least 8 families qualified but were unable to receive
assistance. Another 35 families could qualify for assistance.
57
Bee Branch Healthy Homes Resiliency Program
NJNk.
Advocacy Model
Home Visitation by the Advocate to each participant's home
■ On average advocates spent (23.2) hours per single family
unit and (18.5) hours per multi -family unit, on completed
projects to date
■ Identify Resident Needs and Challenges
■ Top (5) Referrals by volume: Weatherization, Carbon
Monoxide Detector, Education, Home Maintenance, Dental
■ Provide Resources and assistance
■ Aim to remove barriers to achieve goals, follow up with
providers, meet with partners, personal resilience plan
58
29
8/8/2022
BEE BRANCH HEALTHY HOMES PROGRAM
231 Needs
HEALTH
Health insurance
Dental insurance
Dental Home
Dental Need Gap
Smoking
Medical Equipment
Food
Pests
Mental Illness
Blood lead levels
Nutrition
Medical Home
59
.o
119 Needs
ECONOMIC
Underemployed
Unemployed
Financial
Utility Bill
Childcare $$
48 Needs
EDUCATION
Skills Gap
NICC Cert
Parent Education
Absenteeism
IEP-Child
School Supplies
K-12
Intake Challenge Buckets
159 Needs 306 Needs
SOCIAL
Childcare
Youth Activity
Parent Education
Food
Legal
Transportation
Clothing
Pests
Housing
Counseling
Social Support
(lack of)
BUILT
ENVIRONMENT
Home Maintenance
Weatherization
CO2/Smoke alarm
Lead Hazards
Pest Control
307 families have received some level of advocacy support through the program
BEE BRANCH HEALTHY HOMES PROGRAM
What's Next? ❑Healthy Homes $8,900,165
0-d- ��, ❑ October 2016 - June 2022
❑ 307 Housing Units - Final Number Assisted
1 (-$29,000 per unit)
• At least 8 families qualified but were unable to receive
assistance. Another 35 families could qualify for
assistance.
• Continuation of the home advocacy program?
30
8/8/2022
BEE BRANCH WATERSHED FLOO[1MITIGATION PROJECT
Infrastructure Improvement *4
Carter Road Detention Basin
West 32nd Street Detention Basin
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration watershed
-------------
Upper Bee Branch Creek Restoration FLOOD MITIGATIO
PROJECT
Bee Branch Creek Railroad Culverts L.
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
61
62
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2025
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
MAJOR STORMWATER MANAGEMENT DRAINAGE
SYSTEM IMPROVEMENTS
Bee Branch Gate & Pump Replacement Project
Peosta
Channel `
- n" -] Ker er Boulevard
16th k
Street
Pondin.
!i
Area
31
8/8/2022
BEE BRANCH GATE & PUMP REPLACEMENT
watershed
63
BEE BRANCH GATE & PUMP REPLACEMENT
er er Boulevard _
-- 40 `
"Kerperard_
64
32
8/8/2022
BEE BRANCH GATE & PUMP REPLACEMENT
Increase Resiliency by:
— Handling the floodwaters from the Bee Branch Creek
which provides 500-year protection;
— Doubling the pumping capacity;
— Providing flexible gate operation to drain the basin
under extreme flooding conditions;
— Providing easy access to remove debris from the
trash racks; and
— Providing backup generators to ensure operations
during storm events.
65
BEE BRANCH GATE &PUMP REPLACEMENT
FUNDING
SOURCE
AMOUNT'
State Flood Mitigation Program Sales Tax Increment
$9,631,000
Stormwater Utility Fee Revenue
$2,796,000
SRF Loan
$2,600,000
EDA Disaster Recovery Grant
$2,500,000
DRA Distribution
$1,400,000
TOTAL
$18,927,000
State and Federal Funding: $12,131,000
1101
33
8/8/2022
67
BEE BRANCH GATE & PUMP REPLACEMENT
Bids
-- ---
RAI
i
/ I ��}1�ii ���i`�Ii•ii il' 4`�4111�1i d1�1��i � li�liifi�1111„t ` � � �
BEE BRANCH GATE & PUMP REPLACEMENT
What's Next?
34
8/8/2022
BEE BRANCH WATERSHED FLOO[1MITIGATION PROJECT
Infrastructure Improvement Aj
Carter Road Detention Basin
West 32nd Street Detention Basin
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration watershed
-------------
Upper Bee Branch Creek Restoration FLOOD MITIGATIO
Bee Branch Creek Railroad Culverts L.PROJECT
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
.•
70
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
BEE BRANCH FLOOD MITIGATION MAINTENANCE FACILITY
■ Maintenance Facility
■ Public Parking
■ Public Restrooms
■ Green Space
■ Overlook
�Jry`ST
ST
'r
..r ysr
7 1 MI,
35
8/8/2022
BEE BRANCH FLOOD MITIGATION MAINTENANCE FACILITY
■ Maintenance Facility
■ Public Parking
■ Public Restrooms
■ Green Space t
■ Overlook
F rs.
T
Ack
I-J
watershed
L, FLOOD MITIGATION
ST �_
71
BEE BRANCH FLOOD MITIGATION MAINTENANCE FACILITY
EAST BLUM SITE - EPA CLEANUP GRANT
NN
72
36
NN
72
36
8/8/2022
BEE BRANCH FLOOD MITIGATION MAINTENANCE FACILITY
■ Maintenance Facility -
■ Public Parking ' �r
■ Public Restrooms
■ Green Space-
■ Overlook x -
f r _
73
BEE BRANCH FLOOD MITIGATION MAINTENANCE FACILITY
WEST BLUM SITE - EPA CLEANUP GRANT
71..-Iill
E9 Sr4rlip
w
74
37
8/8/2022
BEE BRANCH FLOOD MITIGATION MAINTENANCE FACILITY
What's Next?
■ Environmental cleanup this summer/fall
■ Preliminary design of restroom/storm shelter, possible FEMA (BRIC) funding
■ Park Master Plan
• Maintenance Facility
• Public Parking
• Public Restrooms
Flood Mitigation Maintenance Facility
75
fee Brap4
watershed
-------------
FLOOD MITIGATION
PROJECT
$5,550,000
BEE BRANCH WATERSHED FLOOD MITIGATION PROJECT
Infrastructure Improvement
Carter Road Detention Basin
West 32nd Street Detention Basin :'
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration watershed
Upper Bee Branch Creek Restoration FLOOD MITIGATION
Bee Branch Creek Railroad Culverts
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
76
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
8/8/2022
NORTH END STORM SEWER CAPACITY IMPROVEMENTS
What's Next?
North End Storm Sewer Capacity Improvements
77
wee Bra4.
watershed
FL00lt MITIGATION
PPOIECT
$1,400,000
BEE BRANCH WATERSHED FLOO11 MITIGATION PROJECT
Infrastructure Improvement
Carter Road Detention Basin
West 32nd Street Detention Basin
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration watershed
Upper Bee Branch Creek Restoration
Bee Branch Creek Railroad Culverts
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
W
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
39
8/8/2022
WATER PLANT FLOOD PROTECTION
What's Next?
watershed
Water Plant Flood Protection $4,400,000
79
BEE BRANCH WATERSHED FLOO11 MITIGATION PROJECT
Infrastructure Improvement
Carter Road Detention Basin
West 32nd Street Detention Basin
Historic Millwork District Complete Streets
Lower Bee Branch Creek Restoration watershed
Upper Bee Branch Creek Restoration
Bee Branch Creek Railroad Culverts
22nd St/Kaufmann Storm Sewer Capacity Improvements
17th St/W. Locust Storm Sewer Capacity Improvements
Bee Branch Healthy Homes
Flood Mitigation Gate & Pump Replacement
Flood Mitigation Maintenance Facility
North End Storm Sewer Capacity Improvements
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
:8
Schedule
Complete (2003)
Complete (2009)
Complete (2012)
Complete (2011)
Complete (2017)
Functional (2021)
Complete to N. Main (2021)
Complete to Heeb St (2021)
320 Complete (2021)
Est. Completion — 2023
Est. Completion — 2028
Est. Completion — 2030
Est. Completion — 2030
Est. Completion — 2040
Ulm
8/8/2022
81
IMPERVIOUS SURFACE REDUCTION (GREEN ALLEYS)
What's Next?
Impervious Surface Reduction (Green Alleys)
Funded Flood Mitigation Improvements
Carter Road Detention Basin
West 32nd Street Detention Basin
Lower Bee Branch Creek Restoration
Historic Millwork District Complete Streets
Flood Mitigation Gate & Pump Replacement
Upper Bee Branch Creek Restoration
22nd Street/Kaufmann Storm Sewer Capacity Improvements
Bee Branch Creek Railroad Culverts
17th Street/W. Locust Storm Sewer Capacity Improvements
North End Storm Sewer Capacity Improvements
Flood Mitigation Maintenance Facility
Water Plant Flood Protection
Impervious Surface Reduction (Green Alleys)
Bee Branch Healthy Homes
*Rounded **Estimated
82
Total Cost:
Total Grant Funding:
Total City Share
fee Bra4v$
watershed
FL00lt MITIGATION
PPOIECT
$57,420,000
Cost
$1,080,000 *
$4,160,000 *
$29,400,000 *
$7,980,000 *
$18,930,000 **
$64,230,000
$8,570,000
$32,300,000 **
$7,500,000
$1,400,000 **
$5,550,000 **
$4,400,000 **
$57,420,000 **
$8,430,000
$250,270,000 **
$165,803,311
$85,541,354
41
8/8/2022
Bee Branch Watershed Flood Mitigation Project Update
VISION
IOWA
Project Partners
r
SRF
U.S. Department of Transportation
�Federal Highway
� Administration
CqcB.-Iowa Department
of Transportation
WA
lent
83
84
OMf,LAND S
F
. PV�
�CFMCY MPS
Dubuque
�-Community
Schools
Lmming Leading Living
:C30BS
OWASINFRASTRUCILREIWVE ENIIMiN
TREES FOREVER
Together We Grow
TIGER
LouNrj.
�VBUQJ1,
ECIA
Pe,.�MENT pF
y�� IIIIIIII co
a��3n3a Nd`Da
LEO
®upaeo
®bank.
WAHLERT PREMIER BANK
FOUNDATION ■■■
42