2022 Asphalt Overlay Access Ramp Project 3City of Dubuque City Council Meeting Consent Items # 014. Copyrighted September 19, 2022 ITEM TITLE: 2022 Asphalt Overlay Access Ramp Project 3 SUMMARY: City Manager recommending City Council adopt a resolution accepting the improvements and authorize the final payment of the contract amount of $161,110.30 to BCD Contractors LLC, for the 2022 Asphalt Overlay Access Ramp Project 3. RESOLUTION Accepting the 2022 Asphalt Overlay Access Ramp Project 3 and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Acceptance 2022 Asphalt Overlay Ramp Project Three- City Manager Memo MVM Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Supporting Documentation THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2022 Asphalt Overlay Access Ramp Project 3 (CIP 3001227-3) DATE: September 13, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt a resolution accepting the improvements and authorize the final payment of the contract amount of $161,110.30 to BCD Contractors LLC, for the 2022 Asphalt Overlay Access Ramp Project 3. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE C DUj!B9kFE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: 2022 Asphalt Overlay Access Ramp Project 3 (CIP 3001227-3) DATE: September 12, 2022 INTRODUCTION Dubuque AII•Amarica City 2007-2012.2013 2017*2019 The enclosed resolution provides for the acceptance of the construction contract for the 2022 Asphalt Overlay Access Ramp Project 3. BACKGROUND The 2022 Asphalt Overlay Curb Ramp Project 3 provided the replacement of twenty-six (34) access ramps at 9 intersections in conjunction with the Public Works Asphalt Overlay program at the following locations: 1. Olde Country Ln at Castle Woods Ln, two single and one double ramps. 2. Olde Country Ln at Country Cove Ct, two single ramps. 3. Olde Country Ln at Arbor Hills Dr, two single and one double ramps. 4. Kane Street at N. Grandview Avenue, four double directional ramps. 5. Kane Street at Lobo Lane, two single directional ramps. 6. Kane Street at Primrose Street, two single and two double directional ramps. 7. Arbor Oaks Drive at Spring Valley Road, two single directional ramps. 8. Arbor Oaks Drive at Oakview Court, two single and one double directional ramp. 9. Arbor Oaks Drive at Arbor Oaks Court, two single non -directional ramps. DISCUSSION The 2022 Asphalt Overlay Access Ramp Project 3 was completed by BCD Contractors LLC, of Dubuque, IA in the final contract amount of $161,110.30. This is a 19.17% increase over the original contract amount of $135,196.05. The increase was due to factors including the following: • The addition of six (6) single ramp openings and two (2) double ramp openings on Olde Country Ln. Olde Country Ln was added to the paving program and the ADA ramps on said Ln needed to be brought up to current PROWAG standards per federal government guidelines. Olde Country Ln was not included into original bid plans. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the final contract amount of $161,110.30 to BCD Contractors LLC for the 2022 Asphalt Overlay Access Ramp Project 3. BUDGETIMPACT The summary of project costs for the 2022 Asphalt Overlay Access Ramp Project 3 is as follows: Description Estimate Award Final Construction Contract $ 126,406.05 $135,196.05 $ 161,110.30 Contingency $ 12,640.61 $13,519.61 0.00 Construction Administration & Inspection $13,904.67 $14,868.87 $16,111.03 Total Construction Cost $ 152,951.32 $163,584.53 $177,221.33 The project funding is summarized below: CIP No. Fund Description Fund Amount 3001227 Curb Ramp Program $ 177,221.33 Total Project Funding $ 177,221.33 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the improvements and authorize the final payment of the contract amount of $161,110.30 to BCD Contractors LLC, for the 2022 Asphalt Overlay Access Ramp Project 3. cc: John Klostermann, Public Works Director Arielle Swift, Assistant Public Works Director Paul Davis, Public Works Supervisor Jenny Larson, Budget Director Jon Dienst, Civil Engineer II Prepared by' Jon Dienst City of Dubuque Engineering 50 W. 13'" Street Dubuque IA 52001 (563)589 4270 Return to: Adrienne N. Breitfelder, City Clerk, 50W 13"' Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 301-22 ACCEPTING THE 2022 ASPHALT OVERLAY ACCESS RAMP PROJECT 3 AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the 2022 Asphalt Overlay Access Ramp Project 3 (the Project) has been completed by the Contractor, BCD Contractors LLC, (Contractor), the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $161,110.30; and WHEREAS, the Contractor has previously been paid $153,054.79 leaving a balance of $8,055.52; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. Section 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $8,055.52 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved and adopted this 19th day of September 2022. Attest: Adrienne N. Breitfelder, City Clerk Brad- M,4,-:Cava'nagh, Mayor CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF 2022 ASPHALT OVERLAY ACCESS RAMP PROJECT 3 The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the 2022 Asphalt Overlay Access Ramp Project 3 has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $177,221.33. Dated this 12th day of September 2022. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 12th day of September 2022. ryl , Adrienne N. Breitfelder, City Clerk