2022 John F. Kennedy Road Sidewalk Installation Project_InitiateCopyrighted September 19, 2022 City of Dubuque Items to be set for Public Hearing # City Council Meeting 01. ITEM TITLE: 2022 John F. Kennedy Road Sidewalk Installation Project SUMMARY: City Manager recommending City Council adopt the resolutions preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing the date of the public hearing as October 3, 2022; and authorizing the City Engineer to advertise for bids for the 2022 John F. Kennedy Road Sidewalk Installation Project between Asbury Road and the NW Arterial. RESOLUTION 2022 John F. Kennedy Road Sidewalk Installation Project: preliminary approval of plans, specifications, form of contract, and estimated cost; setting date of public hearing on plans, specifications, form of contract, and estimated cost SUGGESTED Receive and File; Adopt Resolution(s), Set Public Hearing for October DISPOSITION: 3, 2022Suggested Disposition: ATTACHMENTS: Description Type John F. Kennedy Road Sidewalk Installation Project- City Manager Memo MVM Memo Staff Memo Resolution Staff Memo Resolutions Notice of Public Hearing Supporting Documentation THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2022 John F. Kennedy Road Sidewalk Installation Project DATE: September 13, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt the resolutions preliminarily approving the proposed plans, specifications, form of contract, and construction estimate of $351,809.82; establishing the date of the public hearing as October 3, 2022; and authorizing the City Engineer to advertise for bids for the 2022 John F. Kennedy Road Sidewalk Installation Project between Asbury Road and the NW Arterial. I concur with the recommendation and respectfully request Mayor and City Council approval. k�4 Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II THE C DUUB--*--FE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: September 6, 2022 RE: 2022 John F. Kennedy Road Sidewalk Installation Project Dubuque AII•Ameriea M 1 I I I 2007-2012.2013 2017*2019 INTRODUCTION The attached resolutions authorize the initiation of the public bidding procedure and establish the date of the public hearing for the 2022 John F. Kennedy Road Sidewalk Installation Project between Asbury Road and the NW Arterial. BACKGROUND Since 1999 there have been discussions in the community concerning sidewalks along John F. Kennedy Road between Asbury Road and the NW Arterial. Numerous petitions were received both for and against the installation of sidewalks. In July 2021 the City of Dubuque was notified it will receive a $190,000 grant to be used toward a Safe Routes to School project on John F. Kennedy Road. On November 15, 2021 the City Council adopted the Resolution of Necessity and Preliminary Schedule of Assessments for the project on a 7-0 vote. The City Council also approved the funding agreement for the $190,000 in Safe Routes to School Funds with the Iowa Department of Transportation on May 16, 2022. DISCUSSION The John F. Kennedy Road Sidewalk Installation Project would provide installation of 4- foot-wide sidewalks along John F. Kennedy Road on both sides of the street from Asbury Road to the NW Arterial adjacent to abutting properties that do not currently have sidewalks and would include the following elements: — Excavation to allow for the installation of the sidewalk — Installation of base stone for the sidewalk — Installation of 4" thick public sidewalk in most areas — Installation of 6" thick sidewalk at driveway crossings — Installation of retaining walls where needed due to topography to accommodate the sidewalk. — Restoration of disturbed area with topsoil and seed. As a result of going through the federal aid process, engineering costs and construction costs are expected to increase. This increase in construction costs is due to federal auditing requirements, required paperwork and Davis -Bacon wages. The higher engineering costs are due to the increased workload to provide federal aid plans, administer the project and the auditing process afterwards. This project will have special assessments and the project construction documents will follow the Statewide Urban Design and Specifications (SUDAS). The $190,000 TAP grant is proposed to offset all costs on the project and thus reduce the special assessments applied to abutting property owners. The estimate for the costs includes the sidewalk costs, retaining wall costs, ADA ramps costs, engineering costs and contingency costs. These costs are estimated as follows: Items Total Costs TAP Grant Applied Net Costs Sidewalk (Assessed) $138,404.93 ($74,747.59) $63,657.34 Retaining Walls/ADA $139,705.60 ($75,450.04) $64,255.56 Ramps Cit Contingency $27,811.05 ($15,019.76) $12,791.29 Engineering $45,888.24 ($24,782.61) $21,105.63 Total $351,809.82 ($190,000.00) $161,809.82 PROJECT SCHEDULE The schedule for the Project is as follows: Initiate Public Bidding Process September 19, 2022 Publish Notice to Bidders September 23, 2022 Publish Public Hearing Notice on Plans & Specs September 23, 2022 Public Hearing on Plans & Specifications October 3, 2022 Receipt of Bids (Bid Letting) October 18, 2022 Award Construction Contract November 5, 2022 Late Start Date April 15, 2023 Final Project Completion 55 Working Days The project as let by the Iowa DOT is constructed on a working day contract. The number of working days was defined by the Office of Contracts at the Iowa DOT in Ames, IA. RECOMMENDATION I recommend preliminary approval of the proposed plans, specifications, form of contract, and construction estimate for the 2022 John F. Kennedy Road Sidewalk Installation Project. I further recommend establishing the date of a public hearing and authorize the City Engineer to advertise for bids for the Project. BUDGETIMPACT E The estimate of probable cost for the 2022 John F. Kennedy Road Sidewalk Installation Project is as follows: Description Estimate Construction Contract $ 278,110.53 Contingency 27,811.05 Construction Engineering & Inspection 45,888.24 Total Project Cost $351,809.82 The project funding summary is as follows: CIP No. Fund Description Fund Amount 3001425 City Owned Sidewalk Program City Costs $ 81,283.28 TAP — Safe Routes to School Funding 190,000.00 Special Assessments 80,526.54 Total Project Funding $ 351,809.82 ACTION TO BE TAKEN I respectfully request adoption of the attached resolutions preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing the date of the public hearing; and authorizing the City Engineer to advertise for bids for the 2022 John F. Kennedy Road Sidewalk Installation Project. Prepared By: Jon Dienst, Civil Engineer II cc: Crenna Brumwell, City Attorney Bob Schiesl, Assistant City Engineer Adam Decker, Engineering Technician Phil Grommet, Engineering Technician 3 Prepared by Jon Dienst City of Dubuque 50 W 131h Street Dubuque IA 52001 (563) 589 4270 Return to Adrienne Breitfelder, City Clerk, City of Dubuque, 50 W. 13th Street, Dubuque, IA 52001 (563) 589-4100 RESOLUTION NO. 304-22 2022 JOHN F. KENNEDY ROAD SIDEWALK INSTALLATION PROJECT PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: The proposed plans, specifications, form of contract and estimated cost for the 2022 John F. Kennedy Road Sidewalk Installation Project in the estimated amount $351,809.82, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. A public hearing will be held on the 3rd day of October, 2022, at 6:30 p.m. in the Historic Federal Building Council Chambers (and/or by virtual means) 350 W. 61h Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. Passed, adopted, and approved this the 19th day of September 2022. Attest: rad Njo8avanagh, Mayor Adrienne N. Breitfelder, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2022 JOHN F. KENNEDY ROAD SIDEWALK INSTALLATION PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the 2022 John F. Kennedy Road Sidewalk Installation Project in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 3rd day of October 2022, in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Installation of sidewalks and retaining walls as necessary on both sides of John F. Kennedy Road from Asbury Road to the NW Arterial. This work includes: — Excavation to allow for the installation of the sidewalk — Installation of base stone for the sidewalk — Installation of 4" thick public sidewalk in most areas — Installation of 6" thick sidewalk at driveway crossings — Installation of retaining walls where needed due to topography to accommodate the sidewalk. — Restoration of disturbed area with topsoil and seed. The estimated quantity of 4" thick PCC sidewalk is 1690 SY. The estimated quantity of combined sidewalk and retaining wall is 53.9 CY. The estimated quantity of special retaining wall is 579 SF. Any visual or hearing -impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 23rd day of September 2022. Adrienne N. Breitfelder, City Clerk NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE 2022 JOHN F. KENNEDY ROAD SIDEWALK INSTALLATION PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the 2022 John F. Kennedy Road Sidewalk Installation Project in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 3rd day of October 2022, in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 6th Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Clerk. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Installation of sidewalks and retaining walls as necessary on both sides of John F. Kennedy Road from Asbury Road to the NW Arterial. This work includes: — Excavation to allow for the installation of the sidewalk — Installation of base stone for the sidewalk — Installation of 4" thick public sidewalk in most areas — Installation of 6" thick sidewalk at driveway crossings — Installation of retaining walls where needed due to topography to accommodate the sidewalk. — Restoration of disturbed area with topsoil and seed. The estimated quantity of 4" thick PCC sidewalk is 1690 SY. The estimated quantity of combined sidewalk and retaining wall is 53.9 CY. The estimated quantity of special retaining wall is 579 SF. Any visual or hearing -impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 23rd day of September 2022. Adrienne N. Breitfelder, City Clerk