Loading...
Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project)_InitiateCity of Dubuque City Council Meeting Copyrighted November 7, 2022 Items to be set for Public Hearing # 01. ITEM TITLE: Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) SUMMARY: City Manager recommending City Council authorize the public bidding process for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) setting a public hearing for November 21, 2022 and preliminarily approving the proposed plans, specifications, form of contract, and construction estimate in the amount of $3,203,300 authorizing the City Engineer to advertise for bids for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project. RESOLUTION Preliminary approval of plans, specifications, form of contract, and estimated cost; setting date of public hearing on plans, specifications, form of contract, and estimated cost; and ordering the advertisement for bids for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project SUGGESTED Receive and File; Adopt Resolution(s), Set Public Hearing for November DISPOSITION: 21, 2022Suggested Disposition: ATTACHMENTS: Description Type Upper Bee Branch Creek Restoration Railroad City Manager Memo Sanitary Interceptor Crossing Project-MVM Memo Staff Memo Resolution Notice of Hearing Staff Memo Resolutions Supporting Documentation THE CITY OF Dubuque DUB TEE1. All -America City Masterpiece on the Mississippi � pp zoo�•*o 13 zoi720zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) Project #5581500003 DATE: October 31, 2022 City Engineer Gus Psihoyos is recommending City Council authorize the public bidding process for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) setting a public hearing for November 21, 2022 and preliminarily approving the proposed plans, specifications, form of contract, and construction estimate in the amount of $3,203,300 authorizing the City Engineer to advertise for bids for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project. The Project consists of the construction of trenchless installation of one 48-inch diameter steel casing across the railroad property that will house a 36-inch diameter sanitary sewer, a reinforced concrete transition structure, restoration of Garfield Avenue (concrete curb and gutter, asphalt pavement, and sidewalk), fiber optic lines, vegetative surface restoration, and other miscellaneous elements. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer Dubuque AII•Ameriea City N1lKML� ]4Y tv J,ii- I� 2007-2012.2013 2017*2019 SUBJECT: Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) Project #5581500003 DATE: INTRODUCTION October 26, 2022 The purpose of this memo is to seek authorization to initiate the public bidding process for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project). BACKGROUND In November of 2013, the City Council passed Resolution 335-13 adopting the 2013 Drainage Basin Master Plan Amendment that outlined several improvements throughout the Bee Branch watershed to mitigate the effects of future flooding and disasters. Collectively, the improvements form the basis of the multi -phase Bee Branch Watershed Flood Mitigation Project outlined below. Table 1. Twelve phases of the Bee Branch Watershed Flood Mitigation Project Phase Description Status 1 Carter Road Detention Basin Complete 2 West 32nd Street Detention Basin Complete 3 Historic Millwork District Complete 4 Lower Bee Branch Creek Restoration Complete 5 Flood Mitigation Gate Replacement Initiated' 6 Impervious Surface Reduction (Green Alleys) Initiatedz 7 Upper Bee Branch Creek Restoration Initiated3 8 22"d Street Storm Sewer Improvements Complete to N. Main St.4 9 Flood Mitigation Maintenance Facility Initiated 10 North End Storm Sewer Improvements 11 Water Plant Flood Protection 12 17t" Street Storm Sewer Improvements Complete to Heeb St.5 ' Bids for the project were rejected in June of 2022 with the low bid at more than 50% (almost $9 million) over the engineer's estimate and City budget. Currently exploring re-design/funding options 2 80 of the 240 alleys have been reconstructed as "green", pervious alleys. Several are currently under design. 3 The Upper Bee Branch Creek Restoration Project includes the improvements associated with the Upper Bee Branch Railroad Culverts Project, including the proposed sanitary sewer crossing through the railroad property. 4 Design complete to Kane Street. 5 Design is complete to Angela St., 60% design to Kirkwood St., 30% design to Rosedale. DISCUSSION The improvements associated with the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (Project) involves the installation of a 36-inch diameter sanitary sewer under the railroad tracks, providing a connection between the sewer system constructed as part of the Upper Bee Branch Creek Restoration Project with the sewer system installed with the Lower Bee Branch Creek Restoration Project. Until the sewer system through the railroad property could be installed, a temporary siphon was installed as part of the Upper Bee Branch Creek Restoration Project improvements included a temporary siphon to force wastewater flow under the restored creek, allowing the wastewater to flow west along Garfield Avenue, then south down Elm Street, and to the Cedar Street Lift Station. Siphons require significant maintenance challenges and as the flow characteristics necessarily back up wastewater flows which can lead to the accumulation of solids within the line upstream of the siphon. Installation of the proposed sewer through the railroad property will allow for the elimination of the siphon, providing a more hydraulically efficient system that will not be prone to the accumulation of solids or require frequent, intensive maintenance. The improvements associated with the Project were previously designed and bid as an alternate to the Upper Bee Branch Railroad Culverts Project. With the base bid coming in slightly over the engineering estimate, the City was not in a position to fund the sanitary sewer improvements at that time. Specifically, the Project consists of the construction of trenchless installation of one 48- inch diameter steel casing across the railroad property that will house a 36-inch diameter sanitary sewer, a reinforced concrete transition structure, restoration of Garfield Avenue (concrete curb and gutter, asphalt pavement, and sidewalk), fiber optic lines, vegetative surface restoration, and other miscellaneous elements. PROJECT SCHEDULE The schedule for the Project is as follows: Initiate Public Bidding Process November 7, 2022 Publish Notice to Bidders, Advertise for Bids November 8, 2022 Publish Public Hearing Notice on Plans & Specs November 11, 2022 Public Hearing on Plans & Specifications November 21, 2022 Receipt of Bids (Bid Letting) December 8, 2022 Award Construction Contract December 19, 2022 Final Completion November 15, 2023 RECOMMENDATION I recommend preliminary approval of the proposed plans, specifications, form of contract, and construction estimate for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project. I further recommend establishing the date of a public hearing and authorization to advertise for bids for the Project. BUDGET IMPACT The estimate of probable costs for the Project is as follows: Construction Contract $3,203,300 Contingency 320,000 Engineering 198,000 Total Project Cost $3,721,300 The Project is to be funded through a FY22/23 appropriation in the amount of $386,300 for engineering and design (CIP#3402769) and an FY23 appropriation in the amount of $3,335,000 for construction (CIP#7101298/Project#5581500003). The funding summary is as follows: ARPA $3,335,000 State Sales Tax Increment Proceeds 386,300 TOTAL $3,721,300 ACTION TO BE TAKEN I respectfully request adoption of the attached resolutions preliminarily approving the proposed plans, specifications, form of contract, and construction estimate; establishing the date of the public hearing; and authorizing the City Engineer to advertise for bids for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project. F-IVM 111 Prepared by Deron Muehring cc: Crenna Brumwell, City Attorney Jenny Larson, Director of Finance & Budget Deron Muehring, Civil Engineer Prepared by Deron Muehrino City of Dubuque Enaineerina 50 W 13th St Dubuque IA 52001 (563)589-4270 Return to Adrienne N. Breitfelder City Clerk City of Dubuque, 50 W. 13th St. Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 352-22 PRELIMINARY APPROVAL OF PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; SETTING DATE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST; AND ORDERING THE ADVERTISEMENT FOR BIDS FOR THE UPPER BEE BRANCH CREEK RESTORATION RAILROAD SANITARY INTERCEPTOR CROSSING PROJECT NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. The proposed plans, specifications, form of contract and estimated cost for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project in the estimated amount $3,203,300.00, are hereby preliminarily approved and ordered filed in the office of the City Clerk for public inspection. Section 2. A public hearing will be held on the 21 st day of November, 2022, at 6:30 p.m. in the Historic Federal Building Council Chambers, 350 W. 6th Street, Dubuque, Iowa, at which time interested persons may appear and be heard for or against the proposed plans and specifications, form of contract and estimated cost of said Project, and the City Clerk be and is hereby directed to cause the attached notice of the time and place of such hearing to be published in a newspaper having general circulation in the City of Dubuque, Iowa, which notice shall be published not less than four days nor more than twenty days prior to the date of such hearing. At the hearing, any interested person may appear and file objections to the proposed plans, specifications, form of contract, or estimated cost of the Project. Section 3. The Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project is hereby ordered to be advertised for bids for construction. Section 4. The amount of the security to accompany each bid shall be in an amount which shall conform to the provisions of the Notice to Bidders hereby approved. Section 5. The City Engineer is hereby directed to advertise for bids for the construction of the improvements herein provided, by publishing the Notice to Bidders to be published on the City of Dubuque website and a contractor plan room service with statewide circulation, which notice shall be published not less than thirteen but not more than forty-five days before the date for filing bids before 2:00 p.m. on the 8th day of December 2022. Bids shall be opened and read by the City Clerk at said time and will be submitted to the City Council for final action at 6:30 p.m. on the 19th day of December 2022, in the Historic Federal Building Council Chambers (and/or by virtual means) 350 West 6th Street, Dubuque, Iowa. Passed, approved, and adopted this 7th day of November 2022. Attest: / Q a"'I /r• A,C " Adrienne N. Breitfelder, City Clerk CITY OF DUBUQUE, IOWA OFFICIAL NOTICE NOTICE OF PUBLIC HEARING ON PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND ESTIMATED COST FOR THE UPPER BEE BRANCH CREEK RESTORATION RAILROAD SANITARY INTERCEPTOR CROSSING PROJECT NOTICE IS HEREBY GIVEN: The City Council of the City of Dubuque, Iowa will hold a public hearing on the proposed plans, specifications, form of contract and estimated cost for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project, in accordance with the provisions of Chapter 26, Code of Iowa, at 6:30 p.m., on the 21St day of November 2022, in the Historic Federal Building Council Chambers (and/or by virtual means), 350 West 61" Street, Dubuque, Iowa. Said proposed plans, specifications, form of contract and estimated cost are now on file in the office of the City Engineer. At said hearing any interested person may appear and file objections thereto. The scope of the Project is as follows: Project consists of the construction of trenchless installation of one 48-inch diameter steel casing across the railroad property that will house a 36-inch diameter sanitary sewer, a reinforced concrete transition structure, restoration of Garfield Avenue (concrete curb and gutter, asphalt pavement, and sidewalk), fiber optic lines, vegetative surface restoration, and other miscellaneous elements. Any visual or hearing -impaired persons needing special assistance or persons with special accessibility needs should contact the City Clerk's office at (563) 589-4120 or TDD at (563) 690-6678 at least 48 hours prior to the meeting. Published by order of the City Council given on the 11t" day of November 2022. Adrienne N. Breitfelder, City Clerk