2022 John F. Kennedy Road Sidewalk Installation ProjectCity of Dubuque City Council Meeting Action Items # 02. Copyrighted November 7, 2022 ITEM TITLE: 2022 John F. Kennedy Road Sidewalk Installation Project SUMMARY: City Manager recommending City Council adopt a resolution to award the public improvement contract for the 2022 John F. Kennedy Road Sidewalk Installation Project, Iowa DOT Project TAP-U-2100-703-81-31 to Midwest Concrete, Inc., of Peosta, I A, in the amount of $538,457.12, subject to Iowa DOT concurrence and approval of award. RESOLUTION Awarding Public Improvement Contract for the 2022 John F. Kennedy Road Sidewalk Installation Project- Iowa DOT Project TAP-U-2100-703-81-31 SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Award John F. Kennedy Road Sidewalk Installation City Manager Memo Project-MVM Memo Staff Memo Staff Memo Resolution Resolutions THE CITY DUOF B TEE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: 2022 John F. Kennedy Road Sidewalk Installation Project Iowa DOT Project TAP-U-2100-703-81-31 (PROJECT 5521000010 and PROJECT 5524000003) DATE: November 1, 2022 Dubuque All -America City IN 2007.2012.2013 2017*2019 City Engineer Gus Psihoyos is recommending City Council adopt a resolution to award the public improvement contract for the 2022 John F. Kennedy Road Sidewalk Installation Project, Iowa DOT Project TAP-U-2100-703-81-31 to Midwest Concrete, Inc., of Peosta, IA, in the amount of $538,457.12, subject to Iowa DOT concurrence and approval of award. The low bid received for the project is $538,457.12, which is 27.87% above the revised engineering estimate of $421,097.20. During development of the construction documents and in consultation with IDOT staff, bid items related to pedestrian traffic signals and street patching were added to accommodate the federal aid funding for the project. Construction material prices have risen considerably since the original cost estimate was developed for this project. Local contractors have informed engineering staff that concrete materials alone have risen 30-40%. Material and labor shortages are impacting the construction industry negatively. It is not anticipated re -bidding this project will result in lower bids using the federal grant. City staff reviewed the bid tabulations and the area of significant increase in pricing are items related to the retaining walls to accommodate the sidewalk. Residents are not being assessed for the retaining walls. Because the preliminary schedule of special assessments has already been established, residents will NOT see any increase in their special assessments due to the bids received. To cover the additional project costs, staff is proposing using $262,699.04 of FY 22 funds allocated to the Villa Street Retaining Wall. City staff continue to monitor the Villa Street Retaining Wall and have not observed any further movement of the wall. Any additional funds required for the Villa Street Wall would be budgeted in a future year. I concur with the recommendation and respectfully request Mayor and City Council approval. Y Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Jon Dienst, Civil Engineer II THE C DUUB--*--FE Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: October 26, 2022 RE: 2022 John F. Kennedy Road Sidewalk Installation Project Iowa DOT Project TAP-U-2100-703-81-31 (PROJECT 5521000010 and PROJECT 5524000003) Dubuque AII•Ameriea M 1 I I I 2007-2012.2013 2017*2019 INTRODUCTION The purpose of this memorandum is to provide the City Council with information related to the recommended concurrence for the Iowa Department of Transportation to award the public improvement construction project for the 2022 John F. Kennedy Road Sidewalk Installation Project, Iowa DOT Project TAP-U-2100-703-81-31 between Asbury Road and the NW Arterial. BACKGROUND Since 1999 there have been discussions in the community concerning sidewalks along John F. Kennedy Road between Asbury Road and the NW Arterial. Numerous petitions were received both for and against the installation of sidewalks. In July 2021 the City of Dubuque was notified it received a $190,000 grant to be used toward a Safe Routes to School project on John F. Kennedy Road. On November 15, 2021 the City Council adopted the Resolution of Necessity and Preliminary Schedule of Assessments for the project on a 7-0 vote. The City Council also approved the funding agreement for the $190,000 in Safe Routes to School Funds with the Iowa Department of Transportation on May 16, 2022. DISCUSSION The John F. Kennedy Road Sidewalk Installation Project would provide installation of 4- foot-wide sidewalks along John F. Kennedy Road on both sides of the street from Asbury Road to the NW Arterial adjacent to abutting properties that do not currently have sidewalks and would include the following elements: — Excavation to allow for the installation of the sidewalk — Installation of base stone for the sidewalk — Installation of 4" thick public sidewalk in most areas — Installation of 6" thick sidewalk at driveway crossings — Installation of retaining walls where needed due to topography to accommodate the sidewalk. — Restoration of disturbed area with topsoil and seed. As a result of going through the federal aid process, engineering costs and construction costs were expected to increase. This increase in construction costs is due to federal auditing requirements, required paperwork and Davis -Bacon wages. The higher engineering costs are due to the increased workload to provide federal aid plans, administer the project and the auditing process afterwards. This project will have special assessments and the project construction documents will follow the Iowa DOT Standard Specifications. The $190,000 TAP grant will offset all costs on the project and thus reduce the special assessments applied to abutting property owners. PROJECT SCHEDULE The schedule for the Project is as follows: Initiate Public Bidding Process September 19, 2022 Publish Notice to Bidders September 23, 2022 Publish Public Hearing Notice on Plans & Specs September 23, 2022 Public Hearing on Plans & Specifications October 3, 2022 Receipt of Bids (IA DOT Bid Letting) October 18, 2022 Award Construction Contract November 7, 2022 Late Start Date April 15, 2023 Final Project Completion 55 Working Days The project as let by the Iowa DOT is constructed on a working day contract. The number of working days was defined by the Office of Contracts at the Iowa DOT in Ames, IA. BID RESULTS Bids were received on the project by the Iowa Department of Transportation on October 18, 2022 in Ames. Midwest Concrete, Inc., of Peosta, IA submitted the low bid in the amount of $538,457.12. A summary of the bid proposals received is as follows: Contractor Name Total Bid Midwest Concrete, Inc. $ 538,457.12 Eastern Iowa Excavating and Concrete LLC $ 559,781.85 Pirc-Tobin Construction, Inc. $ 570,731.20 Tschiggfrie Excavating Co. $ 690,766.60 The low bid received for the project is $538,457.12, which is 27.87% above the revised engineering estimate of $421,097.20. During development of the construction documents and in consultation with IDOT staff, bid items related to pedestrian traffic signals and E street patching were added to accommodate the federal aid funding for the project. Construction material prices have risen considerably since the original cost estimate was developed for this project. Local contractors have informed engineering staff that concrete materials alone have risen 30-40%. Material and labor shortages are impacting the construction industry negatively. It is not anticipated re -bidding this project will result in lower bids using the federal grant. City staff reviewed the bid tabulations and the area of significant increase in pricing are items related to the retaining walls to accommodate the sidewalk. Residents are not being assessed for the retaining walls. Because the preliminary schedule of special assessments has already been established, residents will NOT see any increase in their special assessments due to the bids received. RECOMMENDATION I recommend the City Council concur on the award of the public improvement construction project to Midwest Concrete, Inc. of Peosta, IA in the amount of $538,457.12, subject to Iowa DOT concurrence and approval of award for the 2022 John F. Kennedy Road Sidewalk Installation Project, Iowa DOT Project TAP-U-2100-703-81-31. BUDGETIMPACT The estimate of probable cost for the 2022 John F. Kennedy Road Sidewalk Installation Project is as follows: Description Estimate Construction Contract $ 538,457.12 Contingency 26,922.86 Construction Engineering & Inspection 67,845.60 Total Project Cost $633,225.58 The project funding summary is as follows: CIP No. Fund Description Fund Amount 5521000010 City Owned Sidewalk Program City Costs $ 100,000.00 5529900006 Villa Street Retaining Wall 262,699.04 TAP — Safe Routes to School Funding 190,000.00 Special Assessments 80,526.54 Total Project Funding $ 633,225.58 To cover the additional project costs, staff is proposing using $262,699.04 of FY 22 funds allocated to the Villa Street Retaining Wall. City staff continue to monitor the Villa 3 Street Retaining Wall and have not observed any further movement of the wall. Any additional funds required for the Villa Street Wall would be budgeted in a future year. ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution to award the public improvement contract for the 2022 John F. Kennedy Road Sidewalk Installation Project, Iowa DOT Project TAP-U-2100-703-81-31 to Midwest Concrete, Inc., of Peosta, IA, in the amount of $538,457.12, subject to Iowa DOT concurrence and approval of award. Prepared By: Jon Dienst, Civil Engineer II cc: Crenna Brumwell, City Attorney Bob Schiesl, Assistant City Engineer Adam Decker, Engineering Technician Phil Grommet, Engineering Technician n Prepared by Kerry Bradley City of Dubuque Engineering 50 W 13'^ St Dubuque Iowa 52001 (563)5894270 Return to Adrienne N. Breitfelder City of Dubuque City Clerk 50 W 13'h St Dubuque, Iowa 52001 (563)589-4100 RESOLUTION NO. 356-22 AWARDING PUBLIC IMPROVEMENT CONTRACT FOR THE 2022 JOHN F. KENNEDY ROAD SIDEWALK INSTALLATION PROJECT - IOWA DOT PROJECT TAP-U-2100-703-81-31 Whereas, sealed proposals were opened and read by the Iowa Department of Transportation on the 18th day of October, 2022 and it has been determined that Midwest Concrete, Inc. of Peosta, IA with a bid amount of $538,457.10 is the lowest responsive, responsible bidder for the project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: That the City concurs with awarding a Public Improvement Contract for the Project subject to Iowa Department of Transportation concurrence and approval of award to Midwest Concrete, Inc. and execute a Public Improvement Construction Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 7th day of November 2022. Attest: a4�'� /'�' &b" Adrienne N. Breitfelder, City Clerk