Loading...
Work Session Request - Five FlagsCopyrighted November 21, 2022 City of Dubuque Action Items # 04. City Council Meeting ITEM TITLE: Work Session Request - Five Flags SUMMARY: City Manager requesting City Council schedule a work session for Monday, December 5, 2022 at 5:30 p.m. to discuss how to move forward with the Five Flags Project. SUGGESTED Suggested Disposition: Receive and File; Council DISPOSITION: ATTACHMENTS: Description Type Request to schedule a Five Flags Work Session for City Manager Memo Monday, December 5, 2022 at 5:30 p.m.-MVM Memo Staff Memo Supporting Documentation THE CITY OF Dubuque DUB TEE1. All -America City Masterpiece on the Mississippi � pp zoo�•*o 13 zoi720zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Request to schedule a Five Flags Work Session for Monday, December 5, 2022 at 5:30 p.m. DATE: November 16, 2022 Assuming the Mayor and City Council have approved the amendment to the Roshek Building Development Agreement the significant delay in building a new downtown parking ramp that is created by that amendment frees up approximately $18 million in downtown urban renewal debt capacity. Combining this with over $6 million in downtown urban renewal debt capacity that has already been reserved for Five Flags creates an opportunity to invest in excess of $24 million into Five Flags in the next few years. While not adding additional seating capacity and retaining the existing building this level of investment could turn Five Flags into a premier entertainment facility greatly improving the customer and entertainer experiences. Leisure Services Manager Marie Ware has provided a description of option 2 that was described in the 2018 consultant's report as costing $18.6 million ($24 million is 29% more than their 2018 number) with additional investments to be made in the facility over the next 15 years. Since this $24 million in downtown urban renewal debt is not general fund debt put on the property tax levy a referendum is not required to issue the debt, unless a citizens petition is submitted requiring a referendum. I respectfully recommend that the Mayor and City Council schedule a Work Session for Monday, December 5, 2022, at 5.30 p.m. to discuss how to move forward with the Five Flags Project. AAA-44 Michael C. Van Milligen MCVM-sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Marie Ware, Leisure Services Manager THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Marie L. Ware, Leisure Services Manager SUBJECT: Five Flags Civic Center Scenario 2 Information DATE: November 16, 2022 I' k I:to] Big-[" I f] Ll Dubuque MI -America City 2007*2012-2013 2017*2019 Per your request, the purpose of this memo to share information related to Scenario 2 from Assessment and Study Regarding the Future of Five Flags Civic Center dated June 19, 2018. DISCUSSION Overview The Assessment and Study Regarding the Future of Five Flags Civic Center that was received and filed by the City Council provided four scenarios. The Assessment and Study Regarding the Future of Five Flags Civic Center document can be accessed by clicking here and the Appendices are ocated here. A full documentation of all studies and project history can be found on the city website at www.cityofdubugue.org/fiveflagsstudV. The landing page is an overview page with active links. Click on the Project History tab for additional information. All studies and information can be found on these pages. Scenario 2 Scenario 2 involves a limited renovation of Five Flags Civic Center (FFCC) which includes the arena and historic theater. This scenario has no expansion of the current footprint. The current seating capacity of 4000 in the arena would remain the same. Page 7-8 of this memo shows the current footprint and layout of FFCC and that same footprint remains in Scenario 2. The Assessment and Study states, "The renovation items are planned to address life safety and code compliance, to improve building security, to enhance event marketability and patron amenities, and to make building operations more efficient. It includes better ADA access, improved fall protection, elevator access to all levels, a new security and surveillance system, updated box office, air conditioning and heating in the locker rooms, new operable walls, new telescopic seating, new theatre dressing rooms in the basement, black box theatre upgrades, existing toilet renovation, replacement of concourse finishes, updated wi-fi system, concession stand renovation, fixed arena seating replacement, theatre seating replacement, arena and theatre sound system replacement, increased electrical system capacity, and replacement of the theatre steam HVAC system." (Page 65) Scenario 2 does not include an increase in the seating capacity of the arena. Scenario 2 Cost Estimate A summary of preliminary order -of -magnitude capital cost for each scenario was presented in terms of 2018 dollars, a summary by major cost type is shown in terms of upfront costs (i.e. construction costs and immediate deferred maintenance costs), as well as costs through Year 15 of the projection period (i.e., construction costs, deferred maintenance, and upcoming assumed capital repair/replacement costs). (Page 74) 5oenario Cost By Type 2 ExpansionfConstrucdon $0 Deferred Maintenance $4.070,400 Life Safety f Code Compliance $484,000 Security 3435,000 Event Marketability $3,815.500 Patron Amenities $5,297.500 Operations $2,102.500 Hard Construction Costs $16,204,500 Soft construction Casts $2.430,575 Total construction Coats $18,635175 Upfront Plus Capital Costs Years 1-15 ExpansionXonstruction $0 Deferred Maintenance $7,590,400 Life Safety 1 Code Compliance $583,000 Security 5580,400 Event Marketability $4,440.500 Patron Amenities $6,800,400 Operations $2.487,500 Hard Comm ction Costs $22.461,400 Soft construction Casts $3.359,150 Total Construction Coats $25,830150 The upfront construction cost was outlined in 2018 dollars as $18,635,175. With a year 1-15 total cost of $25,830,150. Scenario 2 is a limited renovation thus it will address specific items related to deferred maintenance, life safety/code compliance, security, event marketability, patron amenities and operations with a larger infusion of funding upfront and would need continued support in the capital budget in the coming years to keep up with the ongoing costs in these categories. 2 Page 9-11 of this memo are Exhibit E pages 4-6. Reviewing this list provides more detail on specific items related to deferred maintenance, life safety/code compliance, security, event marketability, patron amenities and operations that are included in the $18.6 million initial costs and total $25.8 million over 15 years. This list was completed in 2018 and it is now nearly 5 years later. There are now additional capital items and replacements that would need to be included from 2018 to present. Current Capital Improvement Funding The current FFCC capital improvement projects in FY 23-27 are the following. Any FY projects beyond FY23 is based upon funding availability in each of the fiscal years. CIVIC CENTER DIVISION Cuturt antl R&ctmttien CUTIF G-O- OEIDL G*SWE FNe Flags Bulking Impfuements lkwontown TIF 5 5D3.D30 5 2.KO.00a 52.5W.00a $ — S — S 6.D00-000 sa Areas-Ramal Oakcbw Flo[+ 6RAGaminig $ — S — S — $ 21%500 $ — j 26SOO SB Arena -Paint Exterla Sleet Sldng 6RAGaming 5 — S — 5 — S 1030M $ — S 103AOO 70 Arena - Maskmg Equpnent DRACwskibulion $ — S — S — S 41AO13 $ — S 41=11 71 Arena --o4erMln A*r Fad hies DRACwskibulion $ — 5 — 5 — 5 16,300 $ — 3 16X0 72 Puma - Stage Siege ReMneraenl DRAO■slrlbullw $ — 5 — S — 5 256Aa0 $ — S 255imil 73 Arena -Air Cd ilillaRer Replsbuffient Grader ❑nwnhnr.n TIF — 5 — 5 — 5 — $ 525J000 # 52AM11 74 Arena - Rlnt CeIF ig Sales Tah FUntl (20%) — 5 — 5 — 5 — 87.700 3 87.7110 75 Arena - Dressing R68m3 Remodel Sales Tax Furd (20%) — 5 — 5 — 5 — $ 35J000 # 35J000 76 Arens - Sooreboertl Sales Tax Furd (20%) 5 — 5 — 5 — 5 — $ 73XII ; 73„Mll 77 Tltealer - Dfessing Rows RefnMel DRAGaming 54.050 $ — # 54J050 78 Theater - holler Replacem*,it 6RADiatrlbulloo 5 — S 10Oim 5 — 5 — $ — $ 1O xll 79 City ar 6uhuqur ReCOn M'hr.Md Capithl il5pntl4lMM1Entsummaryt FY 2a23 - FY 2a2T PROGRAM? PROJECT DESCRIPTION SOURCE OF FUNDS DEPT FY 2023 FY 2924 FY 2025 FY 2D25 FY 2p27 TOTAL PAGE LEISURE SERVICES CIVIC CENTER DIVISION Culluntr antl R&crlefien Theater -Chair ResloralWn Sales Tax FUrd (20%) 5 — 5 — 5 — 5 — $ 184AD0 $ 164AUll 00 Theater-OnYtesks Pit Uft 6RAINSUIblA6on 5 — 5 — 5 — $ 256p00 S — $ 25WO 31 Theater - Ederl&AAhYlg AddiUpr Sates Tan Fund PD%) 5 — 5 — 5 — 5 — S 27MO $ 27A(311 32 Theater -Scene Shop Ramp Reni.5,al Sales Tax Fund (20%) $ — S — S — S — $ 35A130 $ 35=11 33 Theater - Stage Curta:r Repdcernent Sales Tax Furd (20%) $ — S — 5 — 5 — $ 35.SOO ; 36Wll B4 Theater - stage Ughling Replacement Sales Tax Furd (20%) $ — 5 — S — S — $ 125AD0 3 125ADO 55 Theater - Plaster Reslorallon and Pant Sales Tax Furl (20%) $ 212.D30 S — S — S — $ — $ 212AOO 36 Theater -FIfe ES03pe GMD1slflbu1IW Ii 127.230 5 — 5 — 5 — $ — 3 127200 67 Theater - East Exterior and Interlor F.Ed7of km Grealer Dbwnluan TIF 5 — 5 — 5 — 5 — $ 30AO0 30MI] 30 Rminanatle-Rernotlal Omeeasloo gales Tax Furl (20%j Stand 187AO13 S 187AOO 59 In FY 20 $6,000,000 was included into the capital improvement budget for improvements to the building. This was done so that if a bond vote did happen and it was not approved that improvements to the building could begin to address the deferred maintenance costs and deferred equipment purchases. The outline below shows the types of improvements proposed. 3 The pricing of these items below was established in the early winter of 2018 with the thought that the work would be done in 2020 and/or 2021. The costs of construction and equipment has risen significantly however the total of $6 million has remained unchanged. DEPARTMENT: STATE PROGRAM: PROJECT TITLE: YEAR FIRST 32 - Laisura Services f Civic dC - Culture 8 Recreation Five Flags Building Improvements SUBMITTED; FY 2020 TOTAL PROJECT Canter Division ACTIVITY NO: 360-1044 COST s 6,000,WO 2021 2022 EXPENSE BUDGET PROJECT BUDGET 2023 2024 2025 2026 2027 2028 A. EXPENDITURE ITEMS Engineering S 600,000 $ — 5 — $ — $ — $ — Construction 5 — $ 2900,000 5 2,500,000 $ — $ — S — 5 — $ — 5 — $ Is — $ 5 — S — TOTAL S 600,000 $ 2,900,000 5 2.500,W0 $ — $ — $ — B. PROJECT FINANCING G.O_ Debt (GDTIF) S 600.W0 $ 1,709.322 5 2.500,000 $ — $ — $ — GreatorDowntown TlF S — $ 1,190.678 5 — $ 5 - $ 1 TOTAL S 600A00 $ 2,900,000 S 2,500,600 $ — $ —IS — PROJECT DESCRIPTIONIJUSTIFICAnON This project provides for improvaments to the building (arena, theater, lobby areas, exteror) and its equipment should a bond referendum for another scenario not pass. This would be used on the current facility at its current footprint in its currant state_ The building is in need of wood window repairs, painting of the steel exterior, resaaling the ballroom floor, remodaliaglupgrading concession stands, carpet and file replacement, locker shower upgrades, stage dimmer light replacement, dressing room upgrades, orchestra pit electronic lift, placement, refurbishing the stage floor, restoration of theater seats, painting walls and csilirys, satellite ticket booth, theater counter weight and grid system, roof repairs, lighting upgrades and retrofits and other building needs. Equipment replacement needs include the sound system, floor scrubber, tables and portable chairs, water fountains, popcorn popper, concert lighting, pipe and drapa, follow spots, lighting consoles, masking equipment, scoreboard and other equipment replacements. New equipment necessary for a venue doing the level of business of Five Flags include wireless internet, and more. Al projects listed have been submitted previously as individual projects with the oldest continuously submited in the budget process since 2O03 and the majority have been submitted and cut from the budget for 11.12 years_ Civic Canter opened its doors in 1979, alongside the restored Theater with 53.7 million bond_ Additional upgrades and renovations wsra completed in P665 for just over $2.0 million_ Conclusions Associated with Market Analysis Key conclusions associated with the detailed market analysis from the Assessment and Study Regarding the Future of Five Flags Civic Center (p. ES-4 & 5) included the following. These conclusions were not specific to Scenario 2. 1. Market support exists for both Arena and Theater components. Market research and analysis conducted for this study indicates that demand exists for both the arena and performing arts theater functions in Dubuque that the FFCC provides. These types of facilities would be expected to continue to have important roles in the Dubuque marketplace into the foreseeable future. 2. Local quality of life and economic activity would be negatively impacted without a venue serving these roles. The FFCC has long -served an important role in Dubuque and the region, accommodating a significant portion of local sports, entertainment and performing arts event demand, including certain activity that other local event facilities could not, or would not, accommodate. Important events, entertainment opportunities, attendance, and community exposure would be lost and negatively impacted without either of these types of facilities. Should the FFCC be decommissioned and no other replacements are developed, other local venues would not be able to sufficiently accommodate the FFCC's displaced activity. 3. The FFCC Theater is an historic asset that should be protected. The FFCC Theater continues to serve an important market niche for a small fixed -seating venue space in Dubuque. It has been and continues to serve as an important asset to the local 19 performing arts. Improvements to the FFCC Theater are not expected to significantly increase market share or attendance; however, impactful enhancements could be made to support spaces associated with the Theater to improve its efficiency, financial performance, and marketability. 4. The FFCC's current location is ideal for an entertainment/sports/arts complex. The existing location maximizes synergy from an attendee and an economic perspective, leveraging a pedestrian -friendly environment with a density of nearby visitor amenities, attractions and transportation/parking infrastructure. It serves to draw people into the downtown core, enhancing the downtown's overall health. In most cases, cities who are planning new arena and/or theater facilities first look to their downtown central business districts for available development parcels, given the high density of amenities and a walkable environment. 5. Significant upgrades to the FFCC Arena product are needed to better compete for and serve spectator and entertainment event segments. While the FFCC Arena was originally designed to accommodate a wide variety of event types and uses, modern industry expectations nationwide have led toward the development and gravitation to more specialized -purpose facilities. In recent years, Dubuque has partially responded to these trends, through the development of the Grand River Center (conventions/meetings/exhibitions) and the Mystique Community Ice Center (ice sports and rec). The result is that spectator/entertainment events remain as the key current and potential future target event segment for the FFCC Arena. 6. The FFCC Arena has exceeded its practical life. At a minimum, significant investment is required to shift the facility closer to state -of -the -industry standards to address deferred capital repair/replacement items, improve operating efficiency and functionality, and allow it to continue accommodating existing event activity and grow future market share. Failure to do so will likely result in continued erosion of market share and diminishing event, performance and attendance levels at the FFCC Arena. Further, a minimum capital repair/replacement expenditure will be necessary in the near -term just to address life safety issues and maintain minimum operational functionality. 7. The FFCC Arena physical product and functionality is industry substandard. There are many aspects of the existing FFCC Arena that do not conform, or are substandard, relative to state -of the -industry arenas (in the competitive environment and nationwide). In many respects, the FFCC Arena possess attributes that are more consistent with a multipurpose flat floor exhibition facility than with a modern spectator/entertainment arena. As will be discussed further in the subsequent chapter, given the existing FFCC's footprint and structural elements, it likely would be significantly challenging —if not impossible —to renovate the existing FFCC Arena structure into a state -of -the industry sports/entertainment arena. An expanded site area and a major redevelopment likely would be necessary to meet minimum requirements for a long-term sports/entertainment venue solution. 8. Investment in FFCC enhancements or redevelopment would be expected to drive new activity and positive impacts. A distinct opportunity exists for Dubuque to capture new sports, entertainment and performing arts events with a new/improved 0 event facility product —specifically, through a modern arena venue that is more consistent with state -of -the -industry standards, allowing it to protect existing business and compete for new business. 9. The highest -and -best -use of the FFCC asset (building and land) is a multipurpose civic/entertainment/arts complex. Based on the entirety of the research, community outreach, and analysis conducted for this study, there are not any compelling reasons to demolish the FFCC Arena and redevelop the site for an alternate use. There is not believed to be any apparent compelling alternate use or more attractive economic opportunity for the City and its citizens to consider permanent retirement or relocation of a long-standing, productive community asset in the heart of Dubuque's downtown. These findings are also consistent with the Arts and Culture Master Plan that was previously adopted by the City Council. ACTION REQUESTED This information is provided per your request. 3 fcUMF4416 , Tow6R 1 F I F tN ST FE ET rxalopw 4coft WWI,I� r3�r��tn�sa�+l f�eN 11 12I 0-510 w 10 UL—� FIVE FLAGS CIVIC CENTER ASSESSMENT AND STUDY �'�' Appendix D: Architectural Concept and Layout Renderings Page D-1 yy FEH ULSIc:i\ � 8etschFssociate� �UM�IChL'CONI� 1-T�F� iN =�= QL 1�j7— lA V r-1Frla STKEET FIVE FLAGS CIVIC CENTER ASSESSMENT AND STUDY Appendix D: Architectural Concept and Layout Renderings Page D-2 w N z K 1�(IS o Pl od FvR 9o-9M I 1211 0-51020 6b 11—� F E H UL 51 G 8etschAsscc a le._ U APPENDIX E: Capital Cost Estimates Comparison of Estimated Capital Construction, Repair & Replacement Costs over 15-Yr Projection Period (All figures are shown in current 2018 dollars) A Expansion/Construction 1 Site Acquisition Site Purchase of convenience store $0 $0 - 2 Site Construction Site Store demolition $0 $0 3 Site Construction Site Sitework/ utility relocation $0 $0 4 Construction Arena FFC Demolition $0 $0 5 Construction Arena FFC Interior Renovation $0 $0 6 Construction Arena Roof Replacement $0 $0 7 Construction Arena Construction of 6000 seat arena and support areas $0 $0 8 Construction Theatre General interior renovation $0 $0 A - Subtotal - $0 B Deferred Maintenance 1 Improve building signage Arena Replace existing marquee- Project has been funded $100,000 $200,000 2 Improve building efficiency Arena Replace rooftop package HVAC unit and upgrade system $800,000 $1,600,000 3 Improve building efficiency Arena Replace arena lighting with dimmable LED fixtures $300,000 $600,000 4 Improve building efficiency Arena Replace hard wired dimming system $48,000 $48,000 5 Improve building envelope Arena Replace arena roof $300,000 $600,000 6 Improve building efficiency Arena Replace emergency generatorw/ natural gas equipm't in 10 years $125,000 $125,000 7 Improve building efficiency Arena Remove existing fuel oil tank in 10 years $200,000 $200,000 8 Improve building envelope Arena Tuck point brick on arena $400,000 $700,000 9 Improve building envelope Arena Insulate walls and roof $400,000 $400,000 10 Improve building envelope Arena Add gutter and drains at entry $30,000 $60,000 11 Improve building circulation Arena Replace elevatorto bring up to code and to increase load capacity $150,000 $200,000 12 Improve finishes Arena Paint interior of arena $300,000 $600,000 13 Improve finishes Arena Repair concrete on arena floor $60,000 $120,000 14 Improve finishes Arena Replace stage curtains $30,000 $30,000 15 Improve building signage Theatre Install marquee/ awning at exterior entance $60,000 $60,000 16 Improve building efficiency Theatre Replace original flyrail $300,000 $450,000 17 Improve building efficiency Theatre Prepare structural grid study $7,000 $7,000 18 Improve building envelope Theatre Repair basement stone on theatre $50,000 $50,000 19 Improve building envelope Theatre Tuck point brick on theatre within 10 years $300,000 $75,000 20 Improve building envelope Theatre Replace theatre roof $75,000 $375,000 21 Improve building efficiency Theatre Replace stage lighting and provide LED fixtures in theatre lobby $400,000 $550,000 22 Improve building efficiency Theatre Replace rooftop package HVAC unit and upgrade system $100,000 $100,000 23 Improve building efficiency Theatre Replace stage lighting dimmers $100,000 $140,000 24 Improve finishes Theatre Replace window woodwork and wood structure $50,000 $75,000 25 Improve finishes Theatre Replace stage curtains $50,000 $80,000 26 Improve finishes Theatre Replace stage wood floor $25,000 $25,000 27 Improve finishes Theatre Paint interior of theatre and repair plaster $60,000 $120,000 B - Subtotal $7,590,000 C Life Safetv / Code Compliance 1 Increase space on sidewalk Arena Remove entry vestibule and rework entrance $110,000 $110,000 2 Provide added safety devices Arena Add defribulators and oxygen recharging stations $15,000 $15,000 3 Increase access to seating Arena Move dressing rooms to open up eastern entrance - No solution $0 $0 4 Increase entrance/ exit capacity Arena Add doors to exterior walls $24,000 $48,000 5 Increase entrance/ exit capacity Arena Provide added exits in north wall - No solution $0 $0 6 Improve fall protection in theatre Theater Provide fall protection and roof rails $85,000 $125,000 7 Need EMS access to balconies Theater Provide new elevator with access to all levels with new platforms $250,000 $285,000 C - Subtotal $583,000 D Security 1 Increase limited visual surveillance Arena Provide video camera system and security office for arena/theatre $250,000 $350,000 2 Need protective barriers at exterior Arena Add precast concrete bollards at entrances (24) $50,000 $50,000 3 Need detention area Arena Provide security office $35,000 $35,000 4 Improve poor box office security Arena Relocate box office with up to date systems $85,000 $130,000 5 Improve poor box office security Theater Provide safe alarm for box offices $15,000 $15,000 D - Subtotal $580,000 E Event Marketabil Appendix E: Capital Cost Estimates Page E-4 APPENDIX E: Capital Cost Estimates Comparison of Estimated Capital Construction, Repair & Replacement Costs over 15-Yr Projection Period (All figures are shown in current 2018 dollars) 1 Improve building access Arena Adjust mailing address to agree with main entrance $0 $0 2 Improve building access Arena Replace ADA ramps to reduce slope $17,500 $17,500 3 Reduce pull weight of entrance doors Arena Replace exterior door closers (22) $5,500 $5,500 4 Premium seating Arena Provide club seating $150,000 $150,000 5 Premium seating Arena Provide private and party suites - No solution $0 $0 6 Cannot use dressing rooms in summer Arena Provide air conditioning and heat in locker/ dressing rooms $300,000 $400,000 7 Increase dressing room capacity Arena Provide 6 large and 2 small dressing rooms - No solution $0 $0 8 Improve sound seal at Blue wall Arena Replace operable wall and add east/west walls $505,000 $505,000 9 Need increased arena seating capacity Arena No solution $0 $0 10 Need increased arena seating capacity Arena Add seating sections to to the north and east $0 $0 11 Improve inadequate exhaust system Arena Provide smoke exhaust system $250,000 $250,000 12 Cannot create ice in warm weather Arena No solution $0 $0 13 Cannot create ice in warm weather Arena Provide new ice floor $0 $0 13 Provide flexible seating arrangements Arena Replace telescopic seating with seating in separate sections $1,300,000 $1,300,000 14 Increase rigging capacity and capability Arena Provide expanded rigging grid and provide 150,000 pound capacity $80,000 $80,000 15 Increase height to bottom of structure Arena No solution $0 $0 16 Provide better identification of entrances Arena Provide enhanced exterior entrance design $250,000 $350,000 17 Need increased catering capacity Arena Provide catering kitchen - No solution $0 $0 18 Improve event capability Arena Provide portable staging and risers $85,000 $85,000 19 Improve event capability Arena Provide folding tables $25,000 $25,000 20 Need adequate wing space for stage Theater No solution $0 $0 21 Need adequate dressing rooms Theater Renovate basement area to provide new dressing rooms $150,000 $150,000 22 Increase rigging forsound system Theater Provide rigging points above the stage in the fly loft $35,000 $35,000 23 Need adequate space in orchestra pit Theater Rework orchestra pit floor and add lift $300,000 $300,000 24 Improve event capability Theater Provide concert grand piano for theatre and arena $180,000 $180,000 25 Improve event capability Theater Provide upright piano $17,500 $17,500 26 Improve event capability Theater Provide folding tables $15,000 $15,000 27 Improve event capability Theater Provide Street Level offices for the Symphony $0 $0 28 Improve small theatre facility Theater Provide upgrades for black box theatre (Allowance) $150,000 $225,000 29 Increase theatre seating capacity Theater Renovate third floor balcony (Allowance) in 10 years $350,000 $350,000 E - Subtotal $4,440,500 F Patron Amenities 1 Improve poor wi-fi access Arena Provide updated wi-fi system $250,000 $450,000 2 Provide weather cover at entrance Arena Add entrance canopy $75,000 $75,000 3 Improve ADA and box office access Arena Provide drop-off at new entrance (See Life Safety item above) $0 $0 4 Need improved ADA access Arena Renovate existing toilets $1,000,000 $1,000,000 5 Need improved concession service Arena Replace concession equipment $60,000 $250,000 6 Need improved concession service Arena Renovate concession stands and provide mobile carts $800,000 $1,300,000 7 Need improved concession service Arena Provide additional concession stands $0 $0 8 Improve concourse finishes/ acoustics Arena Replace concourse carpet and floor tile without grout joints $150,000 $210,000 9 Provide stroller and wheelchair storage Arena Provide new closet in concourse $15,000 $15,000 10 Limited hospitalty and concourse areas Arena Provide hospitality area and party suites - No solution $0 $0 11 Improve poor theatre acoustics Arena Provide added sound absorption and reflective clouds $65,000 $65,000 12 Improve patron comfort Arena Replace 1500 fixed seats $300,000 $300,000 13 Improve patron comfort Arena Replace 2400 riser seats $1,560,000 $1,560,000 14 Improve room acoustics Arena Replace arena sound system $550,000 $825,000 15 Need increased toilet capacity Theater Renovate back existing toilet not being used $75,000 $75,000 16 Improve finishes in theatre Theater Replace concourse carpet and floor tile without grout joints $45,000 $65,000 17 Need largertheatre lobby Theater Renovate arena concourse to serve as expanded theatre lobby $65,000 $65,000 18 Improve patron comfort Theater Renovate theatre historic seating $187,500 $375,000 19 Improve room acoustics Theater Replace sound system $100,000 $170,000 F - Subtotal $6,800,000 G Operations 1 Need 2" deck under telescopic seating Arena Provide 2" concrete fill under west telescopic risers $27,500 $27,500 2 Improve inefficient electrical systems Arena Increase electrical capacity (1200 amps) and provide shore power $175,000 $175,000 3 Improve inefficient electrical systems Arena Replace feeder cable with 4/0, 5 wire cable $5,000 $5,000 4 Improve inadequate loading areas Arena Provide loading dock with 3 service bays and compactor $75,000 $75,000 5 Improve number and image of offices Arena Renovate existing administrative office area $210,000 $210,000 6 Upgrade production capabilities Arena Remodel press box as a production area $75,000 $75,000 7 Upgrade production capabilities Arena Provide arena curtain trussing $50,000 $50,000 Appendix E: Capital Cost Estimates Page E-5 APPENDIX E: Capital Cost Estimates Comparison of Estimated Capital Construction, Repair & Replacement Costs over 15-Yr Projection Period (All figures are shown in current 2018 dollars) 8 Upgrade production capabilities Arena Provide 21 chain hoists $85,000 $170,000 9 Upgrade production capabilities Arena Provide 2 chain hoist motor controls and control cable $20,000 $40,000 10 Upgrade production capabilities Arena Provide double hung lighting truss $0 $100,000 11 Need more space for snow removal Arena Improve access to exterior plaza and sidewalk areas (Allowance) $0 $25,000 12 Improve limited grease trap capacity Arena Provide additional under countertraps in concession stands $0 $40,000 13 Need upgraded equipment Arena Replace follower spotlights (4) $0 $100,000 14 Need upgraded equipment Arena Provide basketball floorwith new finish and storage carts $0 $300,000 15 Need upgraded equipment Arena Remove existing goals from structure and replace basketball goals $0 $100,000 16 Improve inefficient electrical systems Theatre Provide shore power at theatre $0 $75,000 17 Improve inefficient mechanical systems Theatre Replace steam HVAC system with ducted air system in theatre $0 $500,000 18 Need upgraded equipment Theatre Replace theatre follower spotlights (2) $0 $50,000 18 Need increased theatre rigging capacity Theatre Provide structural modifications for front of stage rigging system $0 $300,000 19 Improve inadequate office areas Theatre Upgrade theatre office and production areas $0 $50,000 G -Subtotal $2,467,500 CONSTRUCTION COST $22,461,000 FEES, FF&E, SOFT COSTS, CONTINGENCY $3,369,150 TOTAL - SCENARIO 2 $25,830,150 Appendix E: Capital Cost Estimates Page E-6