Loading...
Mystique Ice Center Ice Rink Concrete Subfloor Project -Acceptance of Public Improvement Construction ContractCity of Dubuque City Council Meeting Consent Items # 08. Copyrighted December 5, 2022 ITEM TITLE: Mystique Ice Center Ice Rink Concrete Subfloor Project -Acceptance of Public Improvement Construction Contract SUMMARY: City Manager recommending City Council accept the improvements and authorize the payment of the final contract amount of $408,805.00 to Portzen Construction, I nc. for the Mystique I ce Center - Rink Concrete Subfloor Project. RESOLUTION Accepting the Mystique Ice Center- Rink Concrete Subfloor Project and authorizing the payment to the contractor SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Acceptance Mystique Ice Center Ice Rink Concrete City Manager Memo Subfloor Project-MVM Memo Staff Memo Staff Memo Resolution Resolutions Engineer's Certificate of Completion Supporting Documentation THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Mystique Ice Center Ice Rink Concrete Subfloor Project Acceptance of Public Improvement Construction Contract DATE: November 30, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 Assistant City Engineer Robert Schiesl is recommending City Council accept the improvements and authorize the payment of the final contract amount of $408,805.00 to Portzen Construction, Inc. for the Mystique Ice Center - Rink Concrete Subfloor Project. This is a 7.9% increase from the original contract amount of $379,000.00. The increase was primarily due to the regrading that was required prior to the placement of the concrete subfloor, and the removal and replacement of the concrete floor in the resurfacing room. I concur with the recommendation and respectfully request Mayor and City Council approval. k�4 vij�� Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Robert Schiesl, Assistant City Engineer THE COF DtUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager Gus Psihoyos, City Engineer FROM: Robert Schiesl, Assistant City Engineer SUBJECT: Mystique Ice Center Ice Rink Concrete Subfloor Project Acceptance of Public Improvement Construction Contract DATE: November 30, 2022 INTRODUCTION Dubuque AIE•Amalcm C14 2007*2012.2013 2017*2019 The attached resolution provides for the acceptance of the public improvement construction contract for the Mystique Ice Center - Rink Concrete Subfloor Project. BACKGROUND City staff evaluated foundation soil remediation alternatives and consulted with several design -build geotechnical contractors that specialize in low mobility, low head room clearance, interior finished building, non-destructive deep foundation stabilization applications. The settlement remediation solution that was implemented utilized the installation of deep compaction grout columns to density the subgrade soils below the concrete floor slab. The grout columns were installed on an approximate 10-ft. by 10-ft. grid throughout the arena lower main level to a depth of treatment of approximately 30 to 35 feet. Once the deep compaction grout columns were installed to support the main level floor slab, rink, bleachers, and interior block walls, a 2-part expanding polyurethane foam was injected beneath the slab to fill voids, while providing the final lifting, re -leveling, and stabilizing the floor slab. The mitigation work for the ice arena settlement remediation has been successfully completed. The first phase of work began on June 1st with the removal of the rink dasher boards, the rink ice system, and bleachers to allow for the installation of a non-destructive deep foundation system under the rink area and throughout the lower -level main floor interior finished building space. Once the settlement and foundation system were completed, a concrete subfloor was installed and supported on the deep foundation system. Once the concrete subfloor was in -place, a new refrigerated ice rink concrete floor was installed which is now supported by the subfloor slab and foundation. Once the refrigerated ice rink floor was operational, the arena bleachers and seating were reinstalled along with installation of new dasher boards, and the installation of new rubber sport flooring on the lower -level main floor. All this work was successfully completed, and the Dubuque Ice Arena was reopened to the public on November 1, 2022. The Mystique Ice Center - Rink Concrete Subfloor Project provided for the construction of an approximate 200-ft by 85-ft by 10-inch thick fully reinforced concrete subfloor. Upon completion of the Settlement Remediation Project, performed by others, the concrete subfloor was constructed approximately 13-inches below the new Ice Rink Refrigerated Concrete Floor and is supported on the deep compaction grout columns. DISCUSSION The Mystique Ice Center - Rink Concrete Subfloor Project was completed by Portzen Construction, Inc of Dubuque, IA in the final contract amount of $408,805.00. This is a 7.9% increase from the original contract amount of $379,000.00. The increase was primarily due to the regrading that was required prior to the placement of the concrete subfloor, and the removal and replacement of the concrete floor in the resurfacing room. Prior to the installation of the deep compaction grout columns within the rink area, the original ice rink system was removed, and the site was excavated to the lower elevation of the new concrete subfloor. As a result of the grout column installation operations, the subgrade was substantially disturbed, and the site needed to be excavated and regraded prior to the placement of the concrete subfloor. This extra cost was approximately $8,900. When the deep foundation settlement remediation work was successfully completed in the resurfacing room area, we were unable to restore the original floor slab grades to allow for proper floor drainage. Since it was critical to ensure proper drainage when operating the ice resurfacing equipment and to also ensure there is no standing or ponding water on the floor, the decision was made to remove and replace the concrete floor and install new floor trench drains in resurfacing room area. This extra cost was approximately $16,300. When the deep compaction grout columns were installed near the front entry doors, the interior floor slab heaved approximately '/z-inch, which caused operational issues with the doors. The contractor removed and replaced the concrete floor slab at the front entry doors at an additional cost of approximately $4,700. RECOMMENDATION I recommend that the City Council accept the improvements and authorize the payment of the final contract amount of $408,805.00 to Portzen Construction, Inc. for the Mystique Ice Center - Rink Concrete Subfloor Project. BUDGETIMPACT The summary of project costs for the Mystique Ice Center - Rink Concrete Subfloor Project is summarized in the following table: Description Estimate Award Final Construction - Ice Rink Concrete Subfloor $ 350,000.00 $ 379,000.00 $ 408,805.00 Consultant Services 51,510.00 51,510.00 51,510.00 Engineering Dept. Services and Admin. 20,000.00 20,000.00 20,000.00 Total Construction Cost $ 421,510.00 $ 450,510.00 $ 480,310.00 2 The project funding is summarized as follows: Project Code Fund Description Fund Amount 3449900001-67990 Ice Center Settling Remediation (FY23) $ 480,310.00 Total Project Funding $ 480,310.00 REQUESTED ACTION The City Council is requested to adopt the attached resolution accepting the public improvements and authorize the final payment of the contract amount of $408,805.00 to Portzen Construction, Inc. for the Mystique Ice Center - Rink Concrete Subfloor Project. cc: Jenny Larson, Director of Finance and Budget Marie Ware, Leisure Services Manager F:\PROJECTS\Mystique Community Ice Center\2022 Settlement Remediation Project\Ice Rink Concrete Subfloor Project\Council & Staff Documents\Acceptance 3 Prepared by' Bob Schiesl City of Dubuque Engineering 50 W 131" Street Dubuque IA 52001 (563)589 4270 Return to: Adreinne N. Breitbelder, City Clerk, 50W 13" Street, Dubuque, IA 52001 (563)589-4100 RESOLUTION NO. 369-22 ACCEPTING THE MYSTIQUE ICE CENTER - RINK CONCRETE SUBFLOOR PROJECT AND AUTHORIZING THE PAYMENT TO THE CONTRACTOR WHEREAS, the public improvement contract for the Mystique Ice Center - Rink Concrete Subfloor Project (the Project) has been completed by the Contractor, Portzen Construction, Inc., (Contractor), and the City Engineer has examined the work and recommends that the Project be accepted; and WHEREAS, the final contract amount for the Project is $408,805,00; and WHEREAS, the Contractor has previously been paid $388,364.75, leaving a balance of $20,440.25; and WHEREAS, the City Council finds that the recommendation of the City Engineer should be accepted. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: SECTION 1. The recommendation of the City Engineer is approved, and the Project is hereby accepted. SECTION 2. The Finance Director is hereby directed to pay to the Contractor the balance of the retainage of $20,440.25 as provided in Iowa Code chapter 573, and to pay such retainage in accordance with the provisions of Iowa Code chapter 573 or Iowa Code chapter 26.13. Passed, approved, and adopted this 5th day of December 2022. Attest: j� X A�� Adrienne N. Breitfelder, City Clerk CITY ENGINEER'S CERTIFICATE OF FINAL COMPLETION OF THE MYSTIQUE ICE CENTER - RINK CONCRETE SUBFLOOR PROJECT The undersigned City Engineer of the City of Dubuque, Iowa, hereby certifies that he has inspected the Mystique Ice Center - Rink Concrete Subfloor Project has been performed in compliance with the terms of the Public Improvement Contract, and that the total cost of the completed work is $480,315.00. Dated this 30t" day of November 2022. Gus Psihoyos, City Engineer Filed in the office of the City Clerk on the 30t" day of November 2022. akg f n 11 7&A, Adrienne N. Breitfelder, City Clerk