Loading...
Foothill Court Drain Tile Project 2023Copyrighted December 19, 2022 City of Dubuque Consent Items # 017. City Council Meeting ITEM TITLE: Foothill Court Drain Tile Project 2023 SUMMARY: City Manager recommending that the award for the Foothill Court Drain Tile Project 2023 be officially recorded in the minutes of the City Council. SUGGESTED Suggested Disposition: Receive and File; Make Matter of Record DISPOSITION: FIN ik[O]:ILyil21zIII &] Description Type Award Recording Memo Foothill Court Drain Tile City Manager Memo Project 2023-MVM Memo Staff Memo Staff Memo THE C DUj!BQTE Masterpiece on the Mississippi TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Foothill Court Drain Tile Project 2023 DATE: December 13, 2022 Dubuque WAWca 914 ii 2007-2012.2013 2017*2019 Through the competitive quotation process for public improvements, this project was awarded on December 8t", 2022, Dirt Worx, LLC of Dubuque, Iowa, in the low bid amount of $62,618.04 which is 6.63% under the engineer's estimate of $67,067.26. City Engineer Gus Psihoyos recommends that the award for the Foothill Court Drain Tile Project 2023 be officially recorded in the minutes of the City Council. I concur with the recommendation and respectfully request Mayor and City Council approval. v Mic ael C. Van Milligen MCVM:sv Attachment CC' Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer THE CITY OF DUB E Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer DATE: December 12, 2022 RE: Foothill Court Drain Tile Project 2023 Dubuque All•Merin City 2007-2012.2013 2017*2019 The Foothill Court Drain Tile Project 2023 will provide for the reduction of icing and stormwater issues on Foothill Court. The project will provide for the installation of approximately 780 LF of 6-inch solid smooth wall inside drain tile and 4-inch perforated drain tile in the same trench at three locations on Foothill Ct. There are 13 outlet tie-in locations to connect the 6-inch solid tile with 4-inch solid tile. Additionally, approximately 360 LF of continuous curb and gutter on the south side between Pasadena Dr and Cherbourg Ct, 135 LF of curb and gutter spot repair on the upper section of Foothill Ct above Cherbourg Ct where required. Sidewalk replacement may need to occur in impacted areas. Also, two ADA single directional sidewalk ramps will require updating to current PROWAG standards at Foothill Ct and Cherbourg Ct. Asphalt street patching will be done by the City. The following is a summary of bids received for the Foothill Court Drain Tile Project 2023: Contractor Base Bid Dirt Worx, LLC $62,618.04 Temperley Excavating, Inc. $63,047.75 Tschiggfrie Excavating Co. Inc. $65,451.16 McDermott Excavating $67,721.28 Smith Dirt Works $68,320.83 Midwest Concrete, Inc. $74,704.60 Eastern Iowa Excavating & Concrete, LLC $87,883.85 Iowa Landscape, LLC $133,616.00 The engineer's estimate for the project is $67,067.26, this is 6.63% under the engineer's estimate. Through the competitive quotation process for public improvements, this project was awarded on December 8, 2022, to Dirt Worx, LLC of Dubuque, Iowa, in the low bid amount of $62,618.04. The funding is as follows: Project Fund Description Fund Amount 5586500003 Drain Tile Program $ 193,612.71 In accordance with the competitive quotation requirements of Iowa Code, Section 26.14, it is necessary that the award for the Foothill Court Drain Tile Project 2023 be officially recorded in the minutes of the City Council. Prepared By: Kerry Bradley, Eng. Dept. cc: Deron Muehring, Civil Engineer II Luke Steger, Engineering Tech 2