Chavenelle Road - Northwest Arterial to Radford Road ReconstructionCity of Dubuque City Council Meeting Consent Items # 020. Copyrighted December 19, 2022 ITEM TITLE: Chavenelle Road - Northwest Arterial to Radford Road Reconstruction Project SUMMARY: City Manager recommending City Council adopt a resolution to approve the change order for the Chavenelle Road — NW Arterial to Radford Road Reconstruction Project in the amount of $533,782.50. RESOLUTION Approving Water Main Change Order for the Chavenelle Road — NW Arterial to Radford Road Reconstruction Project SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Chavenelle Road - NW Arterial to Radford Road City Manager Memo Reconstruction Project-MVM Memo Staff Memo Staff Memo Resolution Resolutions THE CITY OF Dubuque DUB TEE1. All -America City Masterpiece on the Mississippi � pp zoo�•*o 13 zoi720zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Chavenelle Road — NW Arterial to Radford Road Reconstruction Project CIP:3602551 DATE: December 14, 2022 City Engineer Gus Psihoyos and Water Department Manager Chris Lester are recommending City Council adopt a resolution to approve the change order for the Chavenelle Road — NW Arterial to Radford Road Reconstruction Project in the amount of $533,782.50. Based on this deterioration, it was determined that the watermain on Chavenelle Road between the Northwest Arterial and Radford Road and on Futuro Court needed to be replaced immediately. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen MCVM:sv Attachment cc: Crenna Brumwell, City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Chris Lester, Water Department Manager Jon Dienst, Civil Engineer 11 THE CITY OF DUB r Masterpiece on the Mississippi TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer Chris Lester, Water Department Manager DATE: December 8, 2022 Dubuque AII•Amedca City 2007-2012.2013 2017*2019 SUBJECT: Chavenelle Road — NW Arterial to Radford Road Reconstruction Project CIP:3602551 INTRODUCTION This attached resolution authorizes execution of the attached change order for the Chavenelle Road — NW Arterial to Radford Road Reconstruction Project. BACKGROUND The Chavenelle Road — NW Arterial to Radford Road Reconstruction Project included reconstruction of the roadway from the NW Arterial to Radford Road. The project was reconstructed using 9" PCC pavement in 2021 and 2022. DISCUSSION During the roadway reconstruction project, the water main ruptured in multiple locations. During planning for the project, the water main was not anticipated needing to be replaced due to the relatively young age of the water main. During emergency repairs at the rupture locations, it was discovered that the water main was badly deteriorated. See picture below. Based on this deterioration, it was determined that the watermain on Chavenelle Road between the Northwest Arterial and Radford Road and on Futuro Court needed to be replaced immediately. As a result of this determination, Origin Design was hired to develop separate water plans to make the emergency repair. City staff asked the contractor for the roadway project (Horsfield Construction) to provide pricing for installing the city supplied pipe. A copy of that itemized pricing is attached. Horsfield was asked to perform the repair since they already controlled the construction site with the roadway reconstruction contract. Additionally, Engineering and Water Department staff in conjunction with Origin Design deemed the situation an emergency. Horsfield would be able to coordinate the work within their traffic control and work around their own schedule with the water replacement and the roadway reconstruction. As a result of this work, a change order was required and issued. RECOMMENDATION This recommendation is to approve the attached change order in the amount of $533,782.50 for payment to Bard Materials Corporation as successor in interest to Horsfield Construction. BUDGETIMPACT The change order funding summary is as follows: CIP Fund Source Amount 3602551 Chavenelle Road Rehabilitation $ 111,778.79 7401405 Water Main Replacements $ 422,003.71 Total Project Funding $ 533,782.50 The Chavenelle Road Rehabilitation project has sufficient funds to cover the change order. ACTION TO BE TAKEN The City Council is requested to approve the change order for the Chavenelle Road — NW Arterial to Radford Road Reconstruction Project through the adoption of the enclosed resolution in the amount of $533,782.50. Prepared By: Jon Dienst, P.E. Cc: Jenny Larson, Finance and Budget Director Brant Schueller, Water Distribution Supervisor Prepared by Jon Dienst City of Dubuque Engineering 50 W 131" St Dubuque Iowa 52001 (563)589-4270 Return to Adrienne N. Bratfelder City of Dubuque City Clerk 50 W 131" St Dubuque, Iowa 52001 (563)589-4100 RESOLUTION NO. 386-22 APPROVING WATER MAIN CHANGE ORDER FOR THE CHAVENELLE ROAD — NW ARTERIAL TO RADFORD ROAD RECONSTRUCTION PROJECT WHEREAS, said sealed proposals were opened and read on the 8th day of July 2021 and it was determined Horsfield Construction, Inc. of Epworth, Iowa, submitted low bid in the amount of $1,864,873.50, and is the lowest responsive, responsible bidder for the Project; and WHEREAS, an emergency water main replacement on Chavenelle Road from the NW Arterial to Radford Road was deemed necessary by an Iowa Professional Engineer; and WHEREAS, Horsfield Construction, Inc., the contractor for the road reconstruction project was willing and able to complete the emergency water main reconstruction expeditiously; and WHEREAS, Horsfield Construction, Inc. subsequently assigned its interests in the contract to Bard Materials Corporation; and WHEREAS, the change order for the emergency water main replacement must be approved in order to facilitate project closeout. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That a change order in the amount of $533,782.50 for the project is hereby approved and the City Manager is hereby directed to sign the change order for the Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, adopted, and approved this 19th day of December 2022. Br. 'Cavanagh,• Attest: Adrienne N. Breitfelder, City Clerk