Loading...
Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project)City of Dubuque City Council Meeting Action Items # 08. Copyrighted December 19, 2022 ITEM TITLE: Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) SUMMARY: City Manager recommending City Council adopt a resolution awarding the contract for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) to Engineering & Construction Innovations, Inc in the low bid amount of $3,265,620.00. RESOLUTION Awarding the Public Improvement Contract for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project SUGGESTED Suggested Disposition: Receive and File; Adopt Resolution(s) DISPOSITION: ATTACHMENTS: Description Type Award Upper Bee Branch Creek Restoration Railroad City Manager Memo Sanitary Interceptor Crossing Project-MVM Memo Staff Memo Resolution Staff Memo Resolutions THE CITY OF Dubuque DUB TEE1. All -America City Masterpiece on the Mississippi � pp zoo�•*o 13 zoi720zoi9 TO: The Honorable Mayor and City Council Members FROM: Michael C. Van Milligen, City Manager SUBJECT: Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) Project #5581500003 DATE: December 14, 2022 City Engineer Gus Psihoyos is recommending City Council adopt a resolution awarding the contract for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) to Engineering & Construction Innovations, Inc in the low bid amount of $3,265,620.00. I concur with the recommendation and respectfully request Mayor and City Council approval. Mic ael C. Van Milligen IL[yTIL� IIIIIIIII Attachment cc: Crenna Brumwell City Attorney Cori Burbach, Assistant City Manager Gus Psihoyos, City Engineer Deron Muehring, Civil Engineer THE CITY OF Dubuque DB--'&-FEAEI-America U Ciiy . 1�I�I®r Masterpiece on the Mississippi � pp 2°°2.2° 13 zo17*�*za19 TO: Michael C. Van Milligen, City Manager FROM: Gus Psihoyos, City Engineer SUBJECT: Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project) Project #5581500003 DATE: December 13, 2022 INTRODUCTION The attached resolution authorizes the award of the construction contract for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (part of Phase IV of the Bee Branch Watershed Flood Mitigation Project). BACKGROUND In November of 2013, the City Council passed Resolution 335-13 adopting the 2013 Drainage Basin Master Plan Amendment. The amended Drainage Basin Master Plan outlined several improvements throughout the Bee Branch watershed to mitigate the effects of future flooding and disasters. Collectively, the improvements form the basis of the Bee Branch Watershed Flood Mitigation Project outlined in Table 1 below. Table 1. Twelve phases of the Bee Branch Watershed Flood Mitigation Project Phase Description Status 1 Carter Road Detention Basin Complete 2 West 32nd Street Detention Basin Complete 3 Historic Millwork District Complete 4 Lower Bee Branch Creek Restoration Complete 5 Flood Mitigation Gate Replacement Initiated' 6 Impervious Surface Reduction (Green Alleys) Initiated2 7 Upper Bee Branch Creek Restoration Initiated3 8 22"d Street Storm Sewer Improvements Complete to N. Main St.4 9 Flood Mitigation Maintenance Facility Site Cleanup 10 North End Storm Sewer Improvements 11 Water Plant Flood Protection 12 171" Street Storm Sewer Improvements Complete to Heeb St.5 ' Bids for the project were rejected in June of 2022 with the low bid at more than 50% (almost $9 million) over the engineer's estimate and City budget. Currently exploring re-design/funding options 2 80 of the 240 alleys have been reconstructed as "green", pervious alleys. Several are currently under design. 3 The Upper Bee Branch Creek Restoration Project includes the improvements associated with the Upper Bee Branch Railroad Culverts Project, including the proposed sanitary sewer crossing through the railroad property. 4 Design complete to Kane Street. 5 Design is complete to Angela St., 60% design to Kirkwood St., 30% design to Rosedale. Until the sewer system through the railroad property could be installed, a temporary siphon was installed as part of the Upper Bee Branch Creek Restoration Project improvements included a temporary siphon to force wastewater flow under the restored creek, allowing the wastewater to flow west along Garfield Avenue, then south down Elm Street, and to the Cedar Street Lift Station. Siphons require significant maintenance challenges and as the flow characteristics necessarily back up wastewater flows which can lead to the accumulation of solids within the line upstream of the siphon. Installation of the proposed sewer through the railroad property will allow for the elimination of the siphon, providing a more hydraulically efficient system that will not be prone to the accumulation of solids or require frequent, intensive maintenance. On November 21, 2022 the City Council adopted Resolution 363-22 approving the plans, specifications, form of contract and estimated cost for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project, in the estimated amount $ 3,203,300.00. DISCUSSION The City received bids on December 13, 2022 for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project. Engineering & Construction Innovations, Inc of Oakdale, Minnesota submitted the low bid in the amount of $3,265,620.00, which is 1.95% above the engineer's estimate. The low bid was 46% ($1,504,380.00) less than the next bidder. A summary of the bids received is as follows: Contractor Bid Amount Engineering & Construction Innovations, Inc $3,265,620.00 Tricon General Construction $4,770,000.00 Tschiggfrie Excavating $5,222,000.00 RECOMMENDATION I recommend awarding the contract for the for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project to Engineering & Construction Innovations, Inc in the low bid amount of $3,265,620.00. BUDGETIMPACT The estimated cost for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project is as follows: Description Estimate Award Construction Contract $3,203,300.00 $3,265,620.00 Contingency (5%) 320,000.00 320,000.00 Engineering 198,000.00 198,000.00 [Total Project Cost $3,721,300.00 $3,783,620.00 E The Project is to be funded through a FY22/23 appropriation in the amount of $448,620 (CIP#3402769) and an FY23 appropriation in the amount of $3,335,000 (CIP#7101298/ Project#5581500003). The funding summary is as follows: ARPA $3,335,000 State Sales Tax Increment Proceeds 448,620 TOTAL $3,783,620 ACTION TO BE TAKEN I recommend that the City Council adopt the attached resolution awarding the construction contract for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project to Engineering & Construction Innovations in the low bid amount of $3,265,620.00. Prepared by Deron Muehring cc: Crenna Brumwell, City Attorney Jenny Larson, Director of Finance and Budget Deron Muehring, Civil Engineer 3 Prepared by Deron Muehring City of Dubuque Engineering 50 W 13'h St Dubuque Iowa 52001 (563)589-4270 Return to Adrienne N. Breitfelder City of Dubuque City Clerk 50 W 13'h St Dubuque, Iowa 52001 (563)589-4100 RESOLUTION NO. 396-22 AWARDING THE PUBLIC IMPROVEMENT CONTRACT FOR THE UPPER BEE BRANCH CREEK RESTORATION RAILROAD SANITARY INTERCEPTOR CROSSING PROJECT Whereas, sealed proposals have been submitted by contractors for the Upper Bee Branch Creek Restoration Railroad Sanitary Interceptor Crossing Project (the Project) pursuant to Resolution No. 352-22 and Notice to Bidders published on the City of Dubuque, Iowa website and plan room service with statewide circulation on the 8th day of November 2022; and Whereas, said sealed proposals were opened and read on the 13th day of December 2022 and it has been determined that Engineering & Construction Innovations, Inc of Oakdale, Minnesota, with a low bid in the amount of $3,265,620.00 is the lowest responsive, responsible bidder for the Project. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF DUBUQUE, IOWA: Section 1. That a Public Improvement Contract for the Project is hereby awarded to Engineering & Construction Innovations and the City Manager is hereby directed tc execute a Public Improvement Contract on behalf of the City of Dubuque for the Project. Passed, approved, and adopted this 19th day of December, 2022. ,/Attest: A ,Q �& Adrienne N. Breitfelder, City Clerk Brad �� . ..